Summary
Mandating Authority :
Expected project CAPEX :
Main stakeholders
Social and environmental impact
Location and population
Project Type :
Photovoltaic solar power plant in Tibati
Raising the socio-economic conditions of the inhabitants of the city of Tibati and sur-rounding towns
The project involves the implementation of a photovoltaic solar plant with a production capacity of 30 MW and a storage capacity of 5 MW
Tibati Council
80’753’000 €
CRES S.A (Cameroon Renewable Energy Systems), Tibati Council; S2 Services Sarl; Exicel; Rural Electrification Agency (Fonds d’Electrification Rurale)
Tibati city, Djerem Depart-ment, Adamawa Region, Cameroon.26 683 inh.
Solar
100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016
Project maturity ( IFC / World Bank Categories )
STAGE 1 : Concept Development, Site identification
Site identified :
Site access :
Technology :
Expected installed capacity :
Energy resource data
Expected type of contract :
Adequate road Rail access Port facilities
Comments
Building permits signed :
Grid Connection :
Land concession signed :
STAGE 4 : Permitting / Financing / Contracts
Operation and Maintenance Contractor :
STAGE 5 : Engineering / Construction / Commercial Operation
Engineering, Procurement and Construction Contractor :
Power Purchase Agreement
Off-Taker :
Tenor : Price of electricity :
Identified sources of fundings
Environmental impact study
STAGE 2 : Pre-Feasibility Studies
Pre-feasibility study :
STAGE 3 : Feasibility Studies
Feasibility study :
✓ ✓
STAGE 1 : Concept Development, Site identification
STAGE 2 : Pre-Feasibility Studies
STAGE 3 : Feasibility Studies
STAGE 4 : Permit t ing / Financing / Contracts
STAGE 5 : Engineering/Construction/Commercial Operation
Yes but not complete
A final design (sort of business plan) was submitted and presented to the Ministry of Energy. The document is being improved to reflect the instructions, comments, and suggestions of the Ministry.
Photovoltaic Panels
Yes
No, but the site offered by the Lamido and the town hall is defined and localized
No
CRES SA; BG Ingénieurs Conseils SA; S2 Services Sarl; Exicel
CRES SA; S2 Services Sarl; Exicel
No
No
The connection will be done once the project has started; a study was made for this and must be completed and followed by SONATREL
Ongoing discussions with the Department of Energy, but the buyer will SONATREL newly created.
To be defined To be defined
Fonds d’Electrification Rurale; other to be defined
30 MW
PVgyst
Engineering Procurement Construction / BOT, BOOT, etc.