Transcript
Page 1: Real a  · 2/18/2013  · operational by 2014. has completed test drilling of 52 sites on 81,000 acres near Holbrook. Resource reports indicate widespread resource availability and

R E A Lesources | nergy | ccess | ifestyle

CORRIDOR

RealReala

Resources Energy Access Lifestyle

www.RealAZCorridor.com

Discover Ground-Floor Opportunity and Sky High Potential at www.RealAZCorridor.com

Wind

Dry Lake Wind Farms (IberdrolaRenewables)

Disgen Marcou Mesa Wind Farm

RES Americas

Pacific Wind Development, LLC

Apache Wind District

SnowflakePower LLC

operates two wind farmswith a total of 61 towers and an outputof approximately 130 MW on more than16,000 acres of private, State and Federalland north of Snowflake.

hasapproval to develop a 390 MW windfarm with up to 194 turbines onapproximately 34,000 acres of privateand State land north of Holbrook. Theproject is expected to be operational inlate 2012.

has installed ameteorological testing tower (MTT) nearHeber and has approval to site threeadditional towers in the same area. MTTsare used to measure wind for thepotential to generate renewable energy.

, asubsidiary of Iberdrola Renewals, Inc.,has received a permit to site ameteorological testing tower (MTT)northwest of Snowflake (north of the DryLake Wind Farms).

, a subsidiary ofJuwi Wind, LLC, is working to site ameteorological testing tower (MTT)southwest of Holbrook.

An $85 million 25MW biomass electricalgeneration plant was built nearSnowflake in 2006 and sold to

in 2010. The plant is fueled bywoody waste from the White MountainStewardship and, potentially, the FourForests Initiative, and by waste recycledmaterial from the Catalyst paper mill.

Biomass

The Real AZ CorridorIs Also Home To...

New opportunities forinvestment, capitaldevelopment andfuture-focused industryappearing daily!

Arizona Public Service

APS Eastern ArizonaWind Energy Center

Eurofresh, Inc.

Forest Energy Corp.

Salt River Project

Tucson Electric

Coal-fired power plant

Wind generation forelectrical energyproduction

Hydroponic agriculture

White MountainStewardship contracting,biomass production andwood productsmanufacturing

Coal-fired power plant,wind generation facilities

Coal-fired power plantPower Company

The Real AZ Corridor – Arizona’s Energy Future ... At Work!The Real AZ Corridor is home to a growing list of companies and initiatives that are puttingthe region’s abundant, diversified resources, energy potential and access to work to build astrong economy and to assure America’s energy future. They include:

Solar

Algae

Aurora Solar

Algae Biosciences Inc.

, a subsidiary of IberdrolaRenewables, has received approval todevelop a 50 MW solar photovoltaicfacility within the Dry Lake II wind farmnorth of Snowflake.

in Holbrookresearches, develops and manufacturersmicro and macro algae for use innutraceuticals (including Omega-3 fattyacid oils), food additives andpharmaceuticals. Near-perfect algaegrowing conditions, a pristine brine watersupply and demand which far exceedsindustry capacity have the company on afast growth track. A $5 million expansionin 2012 gave the company large-scalecommercial production capabilities.

The Four Forest Restoration Initiative(4FRI)

Navajo CountyReal AZ Corridor

signed in February 2011 is workingto restore 2.4 million acres of theSouthwest’s National Forests throughaccelerated, large-scale small timbermanagement and the re-introduction ofindustry into the forests.and the have beenleaders in the movement, which includesenvironmentalists, industry groups andscientists. 4FRI will also createopportunity in the Apache-SitgreavesForest for sustainable forest industriesand environmentally-minded harvestingoperations. The U.S. Forest Serviceawarded the contract for the first 300,000acres in April 2012. It is the largestrestoration contract ever awarded by theForest Service.

Future Forest/ForestManagement

2/2013

Geothermal Resources

Other

GreenFire Energy

Kinder Morgan Co

American West Potash

Passport Potash

NZ Legacy

is refining CO2-basedgeothermal energy technology nearSpringerville. The company is working tobecome the first company in the world toproduce electric power at commercial scale,using geothermally heated CO2.

. acquired the St. JohnsDome and is evaluating wells on that and otherassets in the Corridor to determine potentialCO2 production. A strategy to lay 400 miles ofpipeline is being developed, along with plansfor a plant in Springerville.

The Real AZ Corridor is well positioned tobecome a significant potash producing region,with multiple exploration projects underway.

(AWP) has completedthe second phase of drilling on 95,000 acres inthe Holbrook Basin. AWP expects to beginengineering in 2013 and have its mineoperational by 2014.

has completed test drilling of52 sites on 81,000 acres near Holbrook.Resource reports indicate widespread resourceavailability and mining potential at shallowdepths.

— The company’s land holdings innortheastern Arizona hold potential for potash,solar, wind, biomass and energy storage.

Several sites are being evaluated by USGeological Survey and (West CoastRegional Carbon Sequestration Partnership) fortheir potential to store CO2 in wells drilled insecure geological formations. The ColoradoPlateau is considered ideal for long-term CO2storage.

WESTCARB

CO2 Storage

Potash

Contact us at or(928) 243-8840 [email protected]

Recommended