1. URBAN PLANNING INCLUDING TOWN PLANNING
Table 1.1: Report and Maps of Master Plans including Zoning Regulations
(Please fill in following information)
Sl.
No
Name of the reports related to Master
Plan, Zoning Regulation and CDP
Enclosure in
Maps related to Master Plan, Zoning
Regulations, Planning District and
CDP
Enclosure in PDF
1 N/A Enclosure N/A Enclosure
Table 1.2: Number of provisional and final approved layouts
(Please fill in following information)
Years Number of provisional layouts Number of approved layouts Details of layout as enclosure
2014-15 NIL NIL
2013-14 NIL NIL Enclosure as per the format
20012-13 05 05 Enclosure as per the format
2011-12 Nil Nil
2010-11 NIL NIL Enclosure as per the format
2009-10 05 05 Enclosure as per the format
2008-09 01 01 Enclosure as per the format
2. REGULATION OF LAND-USE AND CONSTRUCTION OF BUILDINGS
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency of
Disclosure
Reference Remarks
2 Regulation of
Land- use and
Construction of
Buildings
UDA/ULB (i) Details of Building
Commencement &
Completion Certificate
(Total application
received, total
permission granted,
location details)
Previous three
years including
current year
ULB Annually Table 2.1 (a)
& Table.2.1
(b)
(ii) Details of Industries
and commercial
complexes approved
(Survey No., Type,
Name of the owner)
Previous three
Financial years
including current
year
ULB Annually Table 2.2
Table 2.1 (a): Details of Building Commencement & Completion Certificate
Total number of application received for building plan approval
from past three years
Total number of License granted from past three years
2014-15 2013-12 2012-11 2011-10 2009-10 2013-12 2012-11 2011-10 2009-10
980 950 842 820 725 386 364 176 490
3. PLANNING FOR ECONOMIC AND SOCIAL DEVELOPMENT
Table 3.1
List and brief of the social and economic Development Schemes for three years
Current FY 1 2008-09
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 18% 54.16 26.37 Enclosure
Current FY-1 2009-10
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
22.75% 41.75 21.16 Enclosure
Current FY-2 2010-11
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
3. PLANNING FOR ECONOMIC AND SOCIAL DEVELOPMENT
Table 3.1
List and brief of the social and economic Development Schemes for three years
Current FY 1 2008-09
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 18% 54.16 26.37 Enclosure
Current FY-1 2009-10
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
22.75% 41.75 21.16 Enclosure
Current FY-2 2010-11
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 ªÁd¥ÉÃ¬Ä ªÀ À̧w AiÉÆÃd£É
61.80 10.50 Enclosure
2 22.75 & 7.25% 71.43 51.03 Enclosure
5. WATER SUPPLY DOMESTIC, COMMERCIAL & INDUSTRIAL
Format 5.1 -Per capita production of water
Water supplied through Surface Source 35 in MLD
Water Supplied through Underground Source--NIL--in MLD
Water supplied through external source--NIL---in MLD
Format 5.2- Water Supply Coverage
Total Number of Households NIL in numbers
Number of house holds with direct water supply connections…NIL…in numbers
Total number of Public Stand Posts NIL in numbers
Total number of industrial connections……NIL…in numbers
Format 5.3- frequency & Timings of water supply
Frequency and Timing for Water Supply
Number of days of water supply per week in
Normal season
Number of hours of water supply on any supplied day (Normal
season)
3 days in a week One & Half Hour
Format 5.4- Quality of water supply
Total number of water samples collected at the consumer end- 03 -in Numbers/6 months
Number of water samples that meet potable water standards-03--in Numbers/6 months
Format 5.5- Cost recovery in water supply (same as in SLB)
Expenditure
1 Total contractual (if outsourced) cost for Bore wells, O & M of
piped network, O & M of vented dam/ Impounding structure/
Jack well/ Intake well, valves, replacement of distribution
network, supplying of spare materials, salaries of Contract
labours, vehicles etc)
Curren
t Year
2010-
11
Curren
t FY-1
2009-
10
Current
FY -2
2008-09
2 Total expenditure borne by ULB on Bore wells, O & M of
piped network, O & M of vented dam/ Impounding structure/
Jack well/ Intake well, valves, replacement of distribution
network, supplying of spare materials, vehicles etc
8.00 4.32 3.02
3 Salaries of employees under water supply (Permanent and Daily
wages 7.24 7.06 6.48
4 Purchase of items (for water treatment, for pumping machinery
and spare parts if any 11.25 12.34 12.15
5 Electricity Bill for water supply (Surface source and Ground
water)
100.20 83.28 76.54
Revenue
1 Amount collected out of current year demand 5.23 7.00 5.86
2
Amount collected for providing new connection 1.25 1.5 0.75
Format 5.6- Water Tariff
Water Tariff
Present water charges (which ever is applicable)
Flat rate ( mention the rate)
slab Rate (Mention the slab)
45/-
6. PUBLIC HEALTH, SANITATION, CONSERVANCY and SOLID WASTE MANAGEMENT
Table 6(a).1 Private sector participation details for SWM
Package Number Scope of work Name of the
contractor
Contract period (dd/mm/yyyy to
dd/mm/yyyy)
Contract value in
Rs. In lakhs
01 Street sweeping A.A.Pitali 14-07-2011 to 31-12-2011 6.15/ months’
02 Street sweeping Kumargowdar
Associates
14-07-2011 to 31-12-2011 4.985/ months’
03 Street sweeping B.A.Pujari 14-07-2011 to 31-12-2011 7.745/ months’
Table 6(a).2
Street Sweeping Schedule
Package
number
ward
number
Road ID
if
avaliable
Road name Road length in
Kms
Sun Mon Tue Wed Thu Fri Sat
A* type NIL NIL NIL NIL NIL NIL NIL NIL
.. NIL NIL NIL NIL NIL NIL NIL NIL
…
A type 82.27 Km
..
…
B type 63.78Km Twice in a week
..
…
C type 89.97 Km Once in Week
..
…
D type 189.00 NIL NIL NIL NIL NIL NIL NIL
..
…
ل
Source: SWM Action Plan
Table 6(a).3.1
Details Handled by SHG
(No.s)
Handled by Service Provider, if
applicable (No.s)
Handled by ULB
(No.s)
Handled by
RWA/NGO (No.s)
Non slum Household’s 17000 NIL NIL NIL
Slum Household’s NIL NIL 1000 NIL
commercial establishments 500 NIL NIL NGO
Bulk generators 25 NIL NIL NIL
Expected User fee generation (demand) NIL NIL NIL NIL
Table.6 (a) 3.2
General statistics on Solid Waste Management
Total Quantity of waste
generated in the city per
day(TPD)
Total Quantity of waste
Collected (TPD)
User fee Slab details
enclosed
Resolution date
passed from
Council
Land fill location Number of
secondary
transportation
vehicles under
SWM
109 78.00 NIL NIL Mahalbagayath
Sy.no.138&139
Dumper plour-05
Tractor -12
Secondary storage
containers Location Map
Enclosure
Source: SWM Action Pla
Table 6(a).4
Number of Households participating in segregation Nil
Table 6(a).5 Scientific Disposal of MSW
Total waste collected & transported to disposal sites 09 in tones/day
Total waste processed in scientific manner NIL in tones/day
Table 6(a).6 Cost recovery under SWM in Rs Lakhs
Expenditure
1. Salary of the employees under SWM
In Rs Lakhs 25.00
2 Total Contractual cost if outsourced under
MSWM for hiring services, vehicles or
In Rs Lakhs 25.00
equipments, O& M of vehicles, fuel cost, labour
cost etc.
3 Total expenditure borne by ULB on SWM for O
&M of vehicles, purchase of tools and
equipments, insurance cost for vehicles, landfill
management cost like tipping fee etc.
In Rs Lakhs 22.40.00
Revenue
1 Total Revenue generated under SWM
NIL
Table.6 (b) 1. UGD Coverage
Total Number of households with direct UGD Connections Nil .in Numbers
Table.6 (b) 2 Percentage Waste Water treated
Total waste water collected at sewage treatment plant…Nil in MLD
Quantity of waste water treated Nil in MLD
Table.6 (b) 3 extent of reuse and recycle of waste water
Quantity of waste water recycled & reused out of treated waste water…Nil …..in MLD (when mouse is moved on MLD
then it should show “million Liters per day”)
Table.6 (b) 4 Cost recovery under UGD (Input screen)
Expenditure
1. Electricity bill for sewage treatment plant In Rs Lakhs Nil
2 Total salaries of ULB employees working in STP & UGD system In Rs Lakhs Nil
3 Total O& M Contractual cost (if Outsourced) under UGD and STP (purchase of items,
repair and replacement of spares, labour cost etc.)
In Rs Lakhs Nil
Total O& M cost born by ULB under UGD and STP (purchase of items, repair and
replacement of spares etc.)
Nil
Revenue
1 Total revenue collected from UGD In Rs Lakhs Nil
Storm Water Drains
Table.6(c).1
Statistics of storm water drains
Name of major storm water drains Length in kms Cleaning frequency per annum
Vemochan Hotel to Bus Stand 2 Twice
Ambedkar Circle toBasavashwar Circle 2 Twice
Ambedakar Circle to Vittal Temple 1 Twice
Keri Cross to Agasi 2 Twice
Old Marcket to Agasi 2 Twice
Table.6 (c) 2
Length of road side drains 25 Km
Table.6 (c) 3
Number of water logging and flooding cases per year……in numbers 15
Total number of identified points….in Numbers 05
Public Health to be filled by the ULBs if they are managing this function
Table 6 (d).1.1
Public Health
Name of the Municipal
hospitals
Location details Detail of facilities
Number of
beds
Number of
staff
OPD1
Timings of
the OPD
Lab Facility
(yes/No)
Others if any
N/A N/A N/A N/A N/A N/A N/A
Table 6(d). 1.2
Number of vector borne disease cases per 1000 population Number of water borne disease cases per 1000
population
NIL NIL
8. URBAN FORESTRY, PROTECTION OF ENVIRONMENT AND ECOLOGY
Table.8.1 (To be filled by the ULBs if they are managing this function)
Urban forestry
Total Number of existing trees Total Number of trees cut/uprooted Total Number of new saplings planted
Managed by Forest Dept NA NA
Table.8.2
Protection of Environment and Ecology
Sl. No Name existing water bodies
like lake, tanks, pond etc.
Proposed for revival in Yes/No Amount budgeted for revival in Rs.
in lakhs
Expenditure
met in Rs. in
Lakhs
NIL NIL NIL Nil NIL
10. SLUM IMPROVEMENT & UP-GRADATION
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
10 Slum
Improvement &
Up-gradation
ULB/UDA (i) Details on declared
and undeclared slums
(numbers, location,
number of households,
population, area)
current status ULB/Ward Half yearly Table 10.1
(ii) Details of slum
improvement schemes
(schemes, slums
benefited, budget and
expenditure)
Previous three
financial years
including current
year
ULB/Ward Half yearly Table 10.2.
(iii) Beneficiary list under
each scheme
current status ULB/Ward Half yearly Table 10.2
(iv) Status of Basic
Services in Slums
(a) No of connections -
Water Supply &
sanitation (% coverage)
(b) Length of Roads and
drains (paved and
unpaved)
(c) No and % of houses
(pacca and katcha houses)
current status ULB/Ward Half yearly Table 10.3
Table 10.1 Details on declared and undeclared slums (Input Screen & Output screen are same)
Details of declared and undeclared slums
Name of the slum Declared/ Undeclared Extent in Sq. mt Population Number of Households
NIL NIL NIL NIL NIL
NIL NIL NIL NIL NIL
NIL NIL NIL NIL NIL
Table.10.2 Details of slum improvement Schemes (Input & Output Screen are same)
Current Year 2008-09 Name of the slum
Improvement Schemes Total Number of Budget and under
each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure Slums Beneficiaries
S.F.C United NIL NIL NIL NIL NIL S.F.C united NIL NIL NIL NIL NIL S.F.C united
12th
Fianace NIL NIL NIL NIL NIL 12
th Fianace NIL NIL NIL NIL NIL
12th
Fianace NIL NIL NIL NIL NIL
2009-10
Name of the slum Improvement Schemes
Total Number of Budget and under each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure
Slums Beneficiaries S.F.C united NIL NIL NIL NIL NIL
S.F.C united NIL NIL NIL NIL NIL S.F.C united NIL NIL NIL NIL NIL
22.75% NIL NIL NIL NIL NIL 22.75%
22.75% NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL
2012-13
Name of the slum Improvement Schemes
Total Number of Budget and under each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure
Slums Beneficiaries S.F.C United NIL NIL NIL NIL NIL S.F.C United NIL NIL NIL NIL NIL S.F.C United
22.75% NIL NIL NIL NIL NIL 22.75% NIL NIL NIL NIL NIL 22.75% NIL NIL NIL NIL NIL
NIL NIL NIL NIL NIL
Table 10.3 Basic Service status in Slums
Status of Basic services in Slums
Total number of
households with
direct water
supply
connections
(numeric)
Total number
of public
taps/mini
water cisterns
(numeric)
Total length
of roads
paved and
unpaved in
Kms
Total
households
connected to
UGD
(numeric)
Total
length of
road
side
drains in
Kms
Total
number of
HH with
individual
toilets
(numeric)
Number of
Functional
Community
Toilets
(numeric)
Total number of
pacca/kaccha
houses
(numeric)
NIL NIL NIL NIL NIL NIL NIL NIL
11. URBAN POVERTY ALLEVIATION
Sl.
No
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
11 Urban Poverty
Alleviation ULBs
/DMA/UDA (i) Details of the Urban
Poverty Alleviation
Schemes (eg. Components
of SJSRY )
Current status ULB Annually Table 11.1
NIL NIL NIL NIL NIL NIL NIL
Table 11.1 Details of Urban Poverty Alleviation
Name of Schemes
under urban poverty
alleviation (multiple
entries)
2008-09
Budget for the
schemes
Expenditure
met for the
scheme
Number of beneficiaries under
the scheme
list of the beneficiaries to be
enclosed
SJSRY 8.96 8.96 32 Enclosure
12. PROVISION OF URBAN AMENITIES AND FACILITIES-PARKS, GARDENS & PLAY GROUNDS
Table.12.1. Area reserved under Parks & Gardens
1. Total ULB area 10.3 in Sq.kms
2. Area reserved under Parks & Gardens O in Sq.meters
3. Area of developed parks and gardens O in sq. mts
Table.12.2 (a) Amenities under parks & Gardens
Locations of
the park
Park Area in
sq. mt
Amenities available under each park (yes/no)
-
Contact details of the
Maintaining Agency
Children
play area
Seating
facility
Track for
walking/joggin
g
Facility for
exercise
Name Contact
number(n
umeric)
(multiple
entries)
NA NA NA NA NA NA
Table 12.3.(b) Play ground details Locations of the
playgrounds
playground Area in sq. mt Contact details of the Maintaining
Agency
NA NA NA NA
Table 13.1.a Details of cultural Centers
Table 13.1 (b) Details of educational institutes (only if applicable)
Table13.2.1 Details of Advertisement Hoardings (Input & Output screens are same)
Details of Advertisement hoardings
Number of Hoardings Slab rates for advertisement
(As Enclosure)
Advertisement tax demand
for the current year in Rs. in
lakhs
Advertisement tax collected
in the current year in Rs. in
lakhs
30 12 Rs/sq.m 0.15 0.11
Community halls/Auditorium Details
Name Address Booking office
address and
contact details
NIL
Nil Nil
Name of the Municipal Educational Institutes Number of teachers in each
municipal Educational Institutes
(in numbers)
Name Address Numbers
Nil Nil Nil
Table 13.1.a Details of cultural Centers
Table 13.1 (b) Details of educational institutes (only if applicable)
Community halls/Auditorium Details
Name Address Booking office
address and
contact details
NIL
Nil Nil
Name of the Municipal Educational Institutes Number of teachers in each
municipal Educational Institutes
(in numbers)
Name Address Numbers
Nil Nil Nil
Table13.2.1 Details of Advertisement Hoardings (Input & Output screens are same)
Details of Advertisement hoardings
Number of Hoardings Slab rates for advertisement
(As Enclosure)
Advertisement tax demand
for the current year in Rs. in
lakhs
Advertisement tax collected
in the current year in Rs. in
lakhs
30 12 Rs/sq.m 0.15 0.11
14. BURIALS AND BURIAL GROUNDS, CREMATIONS, CREMATION GROUNDS AND ELECTRIC CREMATORIUMS
Sl.N
o
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
14 Burials and
burial grounds,
cremations,
cremation
grounds and
electric
crematoriums
ULBs (i) Numbers, type,
Location of burial
grounds and cremation
facilities available, fee
charged if any
Current Status ULB Annually Table 14.1
(a). and
14.1(b)
(ii) Details of facility of
“Herse/ Corpse
Vehicles”(number and
contact details)
Current Status ULB Annually Table 14.2
Table.14.1 (a) Details of Burial grounds, cremation grounds & electric crematoriums
Details of Burial grounds, cremation grounds & electric crematoriums
Name of the
Community burial
ground with
locations
Name and
location of
the
Crematorium
s/Burial
ground
Facilities available in the Crematoriums ( Yes / No)
Electric Burning Burial Availabili
ty of
wood
Water
facility
Cleaning
facility
Others
if any
Maintaining agency
Name Contact
details
ªÁ.£ÀA:2 gÀ°è lPÉÌ Kj0iÀiÁzÀ°è »AzÀÄ ¸ÀªÀÄÄzÁ0iÀÄ
NIL NIL NIL NIL NIL NIL NIL Maintained by concert
community
¸Àä±Á£À 1
ªÁ.£ÀA:2 gÀ°è lPÉÌ Kj0iÀiÁzÀ°è ªÀÄĹèA ¸ÀªÀÄÄzÁ0iÀÄ ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:2 gÀ°è zÀUÁð Kj0iÀiÁ, SÁeÁC«ÄãÀ zÀUÁð ¨ÁåPÀ ¸ÉÊqï ªÀÄĹèA ¸ÀªÀÄÄzÁ0iÀÄ ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:3 gÀ°è ¸ÉÆÃ,Á¥ÀÇgÀ gÀ¸ÉÛ0iÀÄ ¥ÀPÀÌzÀ°è0iÉÄ ªÀÄĹèA ¸ÀªÀÄÄzÁ0iÀÄ ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:3 gÀ°è ¨ÁªÀ¸ÁgÀ £ÀUÀgÀ ¥ÀPÀÌzÀ°è0iÀÄ ªÀÄĹèA ¸ÀªÀÄÄzÁ0iÀÄ ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:12 gÀ°è - NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:13 gÀ°è EAr gÀ¸ÉÛ0iÀÄ°è §A§¼À CUÀ¹ ºÉÆgÀUÀqÉ eÉÊ£À ¸ÀªÀÄÄzÁ0iÀÄ ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:14 gÀ°è - NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:15 gÀ°è ¹AzÀV gÀ¸ÉÛ J£ï.JZï-13 gÀ¸ÉÛUÉ ºÉÆA¢gÀĪÀ »AzÀÄ ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:16 gÀ°è ¨Á«PÀnÖ vÁAqÁ ºÀwÛgÀ »AzÀÄ ¸ÀªÀÄÄzÁ0iÀÄ ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:17 gÀ°è GPÀÌ° gÀ¸ÉÛUÉ ºÉÆA¢gÀĪÀ ªÀÄĹèA ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:17 gÀ°è gÀA¨sÁ¥ÀÇgÀzÀ »AzÀÄ ¸Àä±Á£À gÉÃ,ÉéUÉÃl ºÀwÛgÀ 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:17 gÀ°è C,Áè¥ÀÇgÀ Nt ºÀwÛgÀzÀ »AzÀÄ ¸Àä±Á£À 2
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:19 gÀ°è gÀA¨sÁ¥ÀÇgÀ JPÀìZÉÃAeï PÉÆÃmÉUÉÆÃqÉ ºÀwÛgÀ ZÀ¥ÀàgÀ§AzÀ ªÀÄĹèA ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:20 gÀ°è UÀaÑ£À ªÀĺÀ® gÀ¸ÉÛ ¸ÁªÀðd¤PÀ ±ËZÁ®0iÀÄ ºÀwÛgÀ«gÀĪÀ ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:20 gÀ°è dĪÀiÁä ªÀĹâ dªÀiÁvÀzÀ
NIL NIL NIL NIL NIL NIL NIL
PÉÆÃmÉUÉÆÃqÉ ºÀwÛgÀ«gÀĪÀ aPÀÌ ªÀÄPÀ̼À ªÀÄĹèA ¸Àä±Á£À 1
ªÁ.£ÀA:21 gÀ°è ªÀÄ£ÀUÀƽ gÀ¸ÉÛ0iÀÄ°è ªÀÄ£ÀUÀƽ CUÀ¹ ºÉÆgÀUÀqÉ ªÀÄĹèA ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:22 gÀ°è ªÀÄ£ÀUÀƽ gÀ¸ÉÛ PÉ.PÉ.PÁ®¤ ºÀwÛgÀ »AzÀÄ ¸Àä±Á£À 2
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:22 gÀ°è QÃwð£ÀUÀgÀ ªÀÄÄvÀÄðf SÁzÀj zÀUÁð ºÀwÛgÀ ªÀÄĹèA ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:28 gÀ°è C°èPÀgÉÆÃeÁ ¸ÁzÀvÀ ªÀĺÀ®zÀ ºÀwÛgÀ ªÀÄĹèA ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:3 gÀ°è C§ÄÝ® ºÀ«ÄÃzÀ zÀUÁð ºÀwÛgÀ ªÀÄĹèA ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:3 gÀ°è ¸ÀgÀPÁj vÉÆÃl PÉÆÃqÉUÉÆÃqÉ ºÀwÛgÀ Qæ±ÀÑ£ï ¸ÀªÀÄÄzÁ0iÀÄ ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:34 gÀ°è dªÀÄRAr gÀ¸ÉÛ0iÀÄ ¨ÁæºÀä£À ¸ÀªÀÄÄzÁ0iÀÄ ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:34 gÀ°è dªÀÄRAr gÀ¸ÉÛ M¼ÀgÀ¸ÉÛ0iÀÄ°ègÀĪÀ §Æ¼À±ÉnÖ »AzÀÄ ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
ªÁ.£ÀA:34 gÀ°è E¨Áæ»AgÉÆeÁ gÀ¸ÉÛ0iÀÄ ¥ÀPÀÌzÀ gÀ¸ÉÛ0iÀÄ°ègÀĪÀ ªÀÄĹèA ¸Àä±Á£À 1
NIL NIL NIL NIL NIL NIL NIL
MlÄÖ £ÀUÀgÀzÀ°è0iÀÄ ¸Àä±Á£ÀUÀ¼À ¸ÀASÉå = 32
Table 14.1 (b) Fee slab for each crematorium (Input and Out put screens are same)
Fee slab for each crematoriums and burial grounds Enclosure
Nil NIl
Table 14.2: Details of Hearse Vehicles
Hearse/Corpse vehicle details
Number of hearse vehicles
available
Fee details for the vehicle(
in Rs)
Contact details
to hire the
vehicle
Maintaining agency
Contact Number Name Contact
Number
NIL NIL NIL NIL NIl
15. CATTLE PONDS, PREVENTION OF CRUELTY TO ANIMALS
Table.15.1.1 Details of stray animals (input & output screen are same)
Number of stray animals Number of stray dogs
vaccinated
Location of Kanji House
(care centers for Stray
animals) if applicable Dogs Cows Pig Others if applicable
5000 400 25000 NIL NIL Nil
Table 15.1.2 Details of Veterinary & Animal Welfare Centers (input & output screen are same)
List of location of Veterinary hospitals -----
List of Animal Welfare Association (if available) Animal Rights fund
Name and location of NGOs working for animal
welfare( if available)
Comfort manner 1st floor -10/4-
2,kumar krupa road Banglore-
560001