I H G F E D C B A
-3,080Upper Basement
±0Ground Floor
+3,155Level 1
+6,115Level 2
+9,075Level 3
+12,035Level 4
+14,995Level 5
+17,955Level 6
+20,915Level 7
+23,875Level 8
+26,835Level 9
+29,795Level 10
+32,755Level 11
+35,715Level 12
+38,895Roof
2.02.11 Existing BalustradeDemolition
2.02.22 Existing ACM ParapetCapping Demolition
2.02.06 Existing Upper StoreyJoinery Demolition
2.02.22 Existing ACM ParapetCapping Demolition
2.02.11 Existing BalustradeDemolition
2.02.07 Existing PodiumLevel JoineryDemolition
2.02.07 Existing PodiumLevel JoineryDemolition
2.02.21 Existing ACMCladdingDemolition
2.02.22 Existing ACM ParapetCapping Demolition
2.02.22 Existing ACMParapet CappingDemolition
Approximate outline of existingneighbouring builiding dashed
Approximate outline of existingneighbouring builiding dashed
Approximate outline ofexisting neighbouringbuiliding dashed
Approximate existing Volcanic Viewshaftinfringement hatched. Refer proposed
Elevations for extent of proposed minor change.
HOBSON STREET
E10 Volcanic Viewshaft 06
E10 Volcanic Viewshaft 05E10 Volcanic Viewshaft 05
E10 Volcanic Viewshaft 04
E10 Volcanic Viewshaft 03
E10 Volcanic Viewshaft 06 Notes
2 SITE
2.02.06 Existing Upper Storey Joinery DemolitionRemove existing aluminium joinery from level 1 tolevel 12 to Eastern Elevation (Hobson Streetfaçade), Western Elevation (Podium façade),Northern Elevation (Podium façade) and disposeoff site. Including steel wall framing and liningsover to the underside of the floor above.
2.02.07 Existing Podium Level Joinery DemolitionRemove all existing podium level aluminiumjoinery, where affected by the new podiummembrane works and dispose off site.
2.02.11 Existing Balustrade DemolitionRemove existing aluminium and glass infillhandrails to decks on level 1 to level 12 to EasternElevation (Hobson Street façade), WesternElevation (Podium façade), Northern Elevation(Podium façade) and dispose off site.
2.02.21 Existing ACM Cladding DemolitionRemove existing ACM alucobond cladding fromlevel 1 to level 12 to Eastern Elevation (HobsonStreet façade), Western Elevation (Podiumfaçade), Northern Elevation (Podium façade) anddispose off site.
2.02.22 Existing ACM Parapet Capping DemolitionRemove existing ACM cladding at roof level,forming the parapet roof capping, to EasternElevation (Hobson Street façade), WesternElevation (Podium façade), Northern Elevation(Podium façade) and dispose off site.
02-1
Ex1 North Elevation - Existing 1:100
Note:Refer RC-30 for Plan View of VolcanicView Shafts crossing over building
RevID Issue ChID Comments Date
01
02
Resource ConsentIssue
Resource ConsentIssue 02-1 Existing Roof Height Adjusted to
Survey
08-Nov-18
22-May-19
rev n#:
dwg n#:drawn: checked:job n#:date created:date plotted:issue:scale: @A1NOTE: Drawings are ½ scale @ A3
RC22-May-1922-May-19
RA187MB
RC-22
CAD ref: MarkBZ:\Projects\100-1000\187 - BBCL 3488047 Imperial Gardens\3.RC\RA187 Imperial Gardens_ RC.pln
sheet title:North Elevation - Existing
project title:Proposed Remedial Works for:Imperial Gardens Apartmentsfor:Body Corporate 348047135 Hobson StreetAuckland CBD, Auckland
DESIGN AND DRAWINGS ARE COPYRIGHT OF CREATIVE ARCH LTD
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCINGWORK
ALL RESTRICTED BUILDING WORK TO BE CARRIED OUT BY LICENSEDBUILDING PRACTITIONERS
LBP#
BP1
0147
0
Level 2, 33 Sale StreetFreemans BayPO Box 78 282 Grey LynnAucklandp:+64 9 368 2130f: +64 9 309 [email protected]
02
MC
RES
OU
RC
E C
ON
SEN
T IS
SUE
ON
LY