Osaka – Office Modification at Miyazaki Ginko Building
In line with Elsevier’s operation objectives and its required head counts for the forthcoming years, slight design
modification to existing office was carried out, and concurrently with the drive for implementation of
workplace of the future upon project completion.
The office modification project involved the re-configuration of existing 1.2K sqft office space with additional new
static work desks and meeting boxes. It was successfully completed within short timeline of 1 weekend on 12
January 2015.
The new office space can accommodate up to 24 staff, and it is a hybrid solution between flexi and static desks
with added breakout spaces that facilitate better collaboration and operational efficiency within the same office.
The entire transition process was managed by the GRECS team, remotely via Tokyo and Singapore, with assistance
from the RETS team, and with full support and co-ordination of the project leads from Elsevier.