Abstract Firm growth relies on launching new products and services. An interesting question is,
what are those unique project management processes that firms need to know in order
to implement growth strategies in the form of new products and services. This paper will
aim to shed light on what are those specific project management processes that drive
the realization of firm growth. There research propositions highlighted on chapter three
have been investigated through a case analysis of two large banks. The case findings
indicate the organization’s ability to prioritize projects, implement those projects using a
simulation model and nurture a strong project culture are central towards achieving
growth. The findings of this paper build on earlier project, portfolio and programme
management disciplines and adds further understanding on competitive advantage.
Further research is proposed on innovation project management.
Keywords: Project Management Processes, Growth Strategies and Competitive Advantage
Copyright © 2013, University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria.
©© UUnniivveerrssiittyy ooff PPrreettoorriiaa
Declaration I declare that this research project is my own work. It is submitted in partial fulfillment of the
requirements for the degree of Master of Business Administration at the Gordon Institute of
Business Science, University of Pretoria. It has not been submitted before for any degree or
examination in any other University. I further declare that I have obtained the necessary
authorization and consent to carry out this research.
Student Signature:
Date of Declaration: 7th November 2012
Acknowledgements
The researcher would like to acknowledge the contribution of Mr. Phillip Viljoen, whose was
instrumental in the conception, refining and presenting of this research work. A note is also
extended to the heads of the project management units departments within the capital
markets and IT infrastructure, who granted the researcher access into the relevant data and
made time to meet for case interviews.
Declaration regarding plagiarism: MBA students
GIBS / University of Pretoria emphasises integrity and ethical behaviour with regard to the
preparation of all written assignments submitted for academic evaluation.
Students who are guilty of plagiarism will forfeit all credits for the work concerned.
In addition, this matter will be referred to the Committee for Discipline (Students) for
ruling. Plagiarism is considered a serious violation of the University’s regulations and may
lead to your suspension from the University.
Academic personnel provide information regarding reference techniques, as well as ways
to avoid plagiarism. Ultimately, it is your responsibility to comply with ethical academic
and research behaviour. The University’s policy regarding plagiarism is available on the
Internet at
http://www.ais.up.ac.za/plagiarism/index.htm.
You are guilty of plagiarism when you extract information from a book, article, web page
or any other information source without acknowledging the source and pretend that it is
your own work. This does not only apply to cases where you quote verbatim, but also
when you present someone else’s work in a somewhat amended (paraphrased) format,
or when you use someone else’s arguments or ideas without the necessary
acknowledgement. You are also guilty of plagiarism if you copy and paste information
directly from an electronic source (e.g. website, e-mail message, electronic journal article,
or CD ROM), without paraphrasing it or placing it in quotation marks, even if you
acknowledge the source. You are not allowed to submit another student’s previous work
as your own. You are furthermore not allowed to let anyone copy or use your work with
the intention of presenting it as his/her own.
The following declaration must accompany all written work that is submitted for evaluation
in this faculty. No work will be accepted unless the declaration has been completed and is
included in the particular assignment.
I (full names and surname): Student Number:
Fana Mazamisa 11369079
Declare the following:
a) I understand what plagiarism entails and I am aware of the University’ policy in this
regard.
b) I declare that this assignment is my own, original work. Where someone else’s work
was used (whether from a printed source, the Internet or any other source) due
acknowledgement was given and reference was made according to departmental or
faculty requirements.
c) I did not copy and paste any information directly from an electronic source (e.g. a
web page, electronic journal article or CD-ROM) into this document.
d) I did not make use of another student’s previous work and submitted it as my own.
e) I did not allow and will not allow anyone to copy my work with the intention of
presenting it as his / her own work.
f) I did not make use of a “ghost-writer” to compile the written assignment on my behalf.
g) I state that any company information contained herein that is not already in the public
domain has been obtained with the permission of the company, and that the company
has given permission for the disclosure of all this information
______________________________ ________________
Signature Date
Table of Contents
Page
1. Introduction ...................................................................................................................... 1
2. Theory and Literature Review .......................................................................................... 3
2.1 Introduction ...................................................................................................................... 3
2.2 Growth Strategy and Competitive Advantage ................................................................ 4
2.2.1 Growth Strategies Attributes and Determinants ........................................................... 4
2.2.2 Competitive Advantage Attributes and Determinants .................................................. 7
2.3 Project Implementation, Systems & Process View ........................................................ 8
2.3.1 Project Implementation Management ............................................................................ 9
2.3.2 Project Systems Management ...................................................................................... 12
2.3.3 Project Process Management ....................................................................................... 13
3. Research Propositions ................................................................................................... 16
4. Proposed Research Methodology and Design ............................................................. 17
4.1 Introduction .................................................................................................................. 17
4.2 Objectives ..................................................................................................................... 17
4.3 Case Study Design ....................................................................................................... 18
4.4 Case Study Plan ........................................................................................................... 18
4.5 Sample Design .............................................................................................................. 20
4.6 Sample Unit of Analysis ............................................................................................... 21
5. Results ............................................................................................................................ 25
5.1 Introduction .................................................................................................................. 25
5.2 Enquiry Process .......................................................................................................... 26
5.3 Characteristics of the studied cases .......................................................................... 30
5.4 Transcriptions and Quotations ................................................................................... 35
6. Discussion of Results .................................................................................................... 39
6.1 Project Management process selection is key in realizing growth strategies
growth projects and competitive advantage ............................................................. 40
6.2 An organizations Portfolio and Project Management contributes towards the
realization of growth strategies and competitive advantage .................................... 43
6.3 Are there other unique combinations of project management processes that are
key in achieving organizational growth strategies resulting into competitive
advantage ..................................................................................................................... 47
6. Conclusion and Research Limitations .......................................................................... 51
6.1 Conclusion ................................................................................................................... 51
6.2 Research Limitations................................................................................................... 53
7. References ...................................................................................................................... 56
1
1. Introduction
Organisations generally have two types of projects, namely operational and strategic
(Shenhar& Dvir, 2007).Operational projects tend to be delivered through a set of known,
repeatable project management processes and activities. The delivery and project
management of strategic growth projects, which are a source of competitive advantage,
require a set of unique, unknown project management processes. This is coupled by the
growing realization that project success, in any given context, is no longer achieved
through the conventional project management methods and concepts, such as the
management of the triple constraints of quality, cost and time as defined by the Project
Management Body of Knowledge (PMI, 2008).The root causes of why projects fail are
increasingly becoming less about technical and engineering aspects and more about
specific management approaches (Sauser, Reilly, & Shenhar, 2009).
In this paper, we examine the project management approaches, practises and methods of
organisations that depend on growth projects to achieve competitive advantage. This
paper is primarily located within the project management field and competitive advantage
and builds on the two main concepts – the achievement of growth strategies through
project management processes. Previous literature has shown that there has been a
growing realization that company growth and competitive advantage is increasingly
depended on the successful implementation of strategic projects (Doyle, 1998). The
strategic implementation of projects is underpinned by effective systems, processes and
innovation capabilities (Doyle, 1998).Companies have generally failed to execute
strategies due to overreliance on tried and tested management formulas found in existing
organisational structures, systems, and procedures (Lord, 1993).
The end result has meant that firms were caught in this downward spiral of pursuing and
implementing ill-conceived projects that don’t generate any future value and are not
aligned to the organisations strategy. Some descriptive evidence proved that top
management within these firms could not specify adequately the nature of their business
and how to translate the business strategies into actionable projects (Bong & Dastmalchin,
1998).On another end of same spectrum, organisations that demonstrated a systematic
planning approach in strategy execution have managed to post positive achievements in
their strategic mandates. These firms engaged in a systematic approach to business
planning (Paria, 1990).In implementing organisational strategy, executives also had to
2
grapple with aspects of organisational design in a form of a business model, organisational
structures and capabilities and most importantly on-going allocation of resources towards
the key processes in order to achieve strategy (Bradley, Hirt & Smit, 2011).
Part of the previous research findings suggested that this challenge could be addressed
through a number of competitive advantage attributes spanning a sound corporate culture,
management systems such as planning systems, and organisational structures (Flamholtz
& Wei, 2003). Designing well integrated organisational structures will partially address the
competitive advantage challenge and a stronger emphasis would then need to be placed
in the communication systems of the organisations in order to enable better
communications, knowledge transfer, cross functional teams engagement required to
deliver a mega project sustainable competitive advantage (Lei, Slocum& Pitts, 1999).
There other challenge was cited to be the project management ability of firms to carefully
prioritize key resource allocation towards decisions related to mega-projects.
This is coupled by the need for firms to innovate and change fast than its close
competitors in order to survive and prosper.Accordingly, firms need to change on a
number of areas which can be said to be recognising changing customer needs,
profitability by differentiation, balancing of organisation design thereby promoting the right
kind of innovation and thinking. One of the biggest conundrums facing matured firms is
that as they become larger and more successful over time, they tend to implement
practises and organisational structures that promote stability at the cost of bold innovation
(Lei, Pitts & Slocum, pp1-18,2002). We also know through some studies conducted on that
future organisations will be smaller and will operate in chaotic environments.The
successful organisations will be those that can embrace the project management way of
managing project and survival of organisations will be based on the the ability to master
the project management approach (Russell-Hodge,1995).
This leads us to the thrust of the objective of this paper, which argues that competitve
advantage is driven by growth strategies which are determined by project management
processes. Some earlier studies postulated that project management was a function of
tasks and business and project tasks processes were similar, and the ability to complete
these project tasks processes was becoming a major competitive advantage (Starr, 1990).
Some authors saw great merit in placing emphasis on the qualitative side of the project
3
management processes meant to control a number of potential fail points throughout the
project management lifecycle. This was achieved through a formalisation of a number of
key activities comforming to a specific documented procedure (Bryde, 1995).
The current research will seek to determine and answer the research question, are project
management processes key in the realization of growth strategies leading to competitive
advantage. This research will extend previous work on mainly two areas. Firstly, the
primary aim of this paper will extend previous work on strategic growth project
implementation through project selection, portfolio management and programme
management. This challenge was raised by recent authors, who argued that strategy
implementation is depended on projects and roughly 100 billion dollars were wasted in
projects that don’t add value due to the immature investment frameworks and poor project
management practises in selecting and prioritizing projects (Young,Young, Jordan &
oConnor, 2012). This research paper will seek to conduct research on programme
management, portfolio management and project governance. Secondly, it will build on
understanding what are the unique combinations of project management processes that
an organisations needs to follow in order to deliver unknown, uncertain strategies.
In the next chapters of this research paper the focus will be on discussing and contrasting
the main literature work within growth strategies, competitive advantage, project
management implementation, systems and processes in more detail. This will be followed
by key propositions in chapter three (3) followed by the research method description
before presenting the case studies which is the focus of this paper. The research findings
will then discuss the results in terms of the research propositions and link them with theory
base. The paper will finally present main conclusions, implications for future research and
research limitations.
2. Theory and Literature Review
2.1 Introduction
This chapter will seek to give an insightful assessment and contrasting views on the
main literature in growth strategy (Lindic, Bardaz & Kovacic, 2012., Majumdar, 2010.,
Chen, Zou & Wang. 2009., Yang 2011., Gumus & Apak, 2011., Kylaheiko, Jantunen,
Puumalainen, Saarenketo & Tuppura, 2011., Varkey , Corin, & Slevin ,2011., Young,
Young, Jordan & O’Connor , 2012., Thiry&Deguire, 2007, Goedhuys & Veugeler,
4
2011., Naaranoja, Haapalainen and Lonka, 2007), competitive advantage
(Weerawardena & Mavondo, 2011., D’Aveni, Dagnino & Smith, 2010., Bhuijan,
2011., Yuan Li & Liu, 2012., Webb, 2007), and project management (PMI,2008)
covering the main research work that was conducted during the past 5 years.
The project management (PMI,2008) literature review undertaken by the researcher
can be grouped into three main themes, namely the project management
implementation (Srivannaboon, 2009; Collyer&Warren; 2009; Killen&Kjaer, 2012;
Zeynek, Arditi, Dikmen, Birgonulet, 2009; Shehu and Akintage, 2010; Petit, 2012.;
Ozturkcan & Buyukozkan, 2010; Vidal, Marle, Bocquet, 2011; Young & Anban,
2009), project management systems (Kapsali, 2011; Hallgren, 2012; Liu&Wang,
2011; Shakshi-Niaei, Torabi & Iranmanesh,2011) and project management process
(Harold,Hempel & Srinivasan, 2003; Wadeson, 2005; Browning, 2010; Olsen &
Johannessen,2011; Lalonde, Bourgault& Findeli, 2012; Ebert & De Man, 2008;
Winter and Szczepanek, 2008; Turner and Simister, 2009; Unger, Kock, Gemunden
& Jonas,2012; Barbara Natalie Unger, 2012; Turner , Simister, Gower,2009) themes
comprised of main theoretical models.
A discussion of the project management (PMI, 2008) models would be premature
without a contextual review and discussion of the growth strategies (Lindic et al,
2012) and competitive advantage (D’Aveni et al, 2010) since the researchers
objective is to understand if project management (PMI, 2008) processes (Unger,
Kock, Gemunden & Jonas,2012) drive the realization of growth strategies (Lindic et
al, 2012) and competitive advantage (D’Aveni et al, 2010).
2.2 Growth Strategy and Competitive Advantage
2.2.1 Growth Strategies Attributes and Determinants
Strategic growth was defined as the company’s ability to create and sustain its key
markets, which are untapped or unserved by the potential competitors (Lindic, Bardaz &
Kovacic, 2012).Some authors attributed the concept of strategic growth to small
enterprises who were contextually driven to grow in chosen markets and were influenced
by a number of organisational variables such as industry structure, performance and
technology (Majumdar, 2010). Park, Cheong and Jang (2010) maintained that an
organisations size does not necessarily correlate with firm growth leading to a conclusion
5
that organisations of different size and makeup can pursue growth at any point. A
contrasting view by Gumus & Apak (2011) suggested that companies should consider
choosing an optimal size that can drive growth, influenced by external environmental
changes. The general view was that these companies took greater risk, experimented a lot
and displayed high rates of innovation (Majumdar, 2010).
The research work on what drives growth strategy offered by Goedhuys and Veugeler
(2011) established innovation, especially process and product innovation as key drivers of
organisational growth. This was in agreement with the concept of growth which found that
firm growth was determined by the company’s ability to attract new customers and the rate
at which it launches new products faster than its closest rivals (Kylaheiko, Jantunen,
Puumalainen, Saarenketo & Tuppura, 2011).Another observation by Chen, Zou & Wang
(2009) argued that small ventures followed distinct strategies with different resources
combinations.
An organisations growth strategy was identified as dependent on project management
strategies by the new product development strategy (NPD) research work (Yang, 2011).
The common determinants in project management strategy driving the realisation of NPD
(Yang, 2011) was identified as differentiation, operational and the quality strategy which
were associated with the project management body of knowledge projects success criteria
based on schedule, quality and innovation performance (PMI,2008).These project strategy
elements of the organisation were key in leading to an improved market performance of
the company resulting into market share and realised sales goals (Yang, 2011). This view
is linked to an observation by Cooper, Edgett, and Kleinschmidt (2004,p50), who
maintained that the best performing businesses undertake a higher proportion of more
innovative new product development projects, while the worst performers have a timid new
product development project portfolio. The concept of linking projects with strategy was
also proposed by the project based organisation (PBO) model who found that the
organisational wide use of project management standards, practises and methods
eventually influenced strategy (Thiry & Deguire, 2007).
Perhaps more enlightening was that earlier studies on the relevance of project
management in strategy execution and delivery proved that management executive did not
view project management as a strategic asset (Judgev & Thomas, 2002). This was in part
6
due to the inability of project managers to align project management performance
measures and objectives with business measures that contribute towards shareholder
value and sustainable competitive advantage (Judgev & Thomas, 2002).
A number of preceding models offered a non-traditional view which in some way shed new
light on whether project management drives the achievement of growth strategies. These
models aimed to redefine how traditional project management is viewed and offered a
departure towards linking business strategy and project management. Winter, Andersen,
Elvin & Levene (2006) offered a project management business view by suggesting a
radical overhaul of how business views project management by suggesting that projects
should be measured based on their contribution towards implementing business strategy,
improving the effectiveness of organisations and stakeholder benefits. This view was
closely followed and agreed by earlier work on the concept of business projects in which it
was suggested that the primary concern of executive management should be pursuing
project that lead to value creation and meeting the needs of different stakeholder groups
within the organisation (Winter et al, 2006).The strategic thinking in projects was cited as
important in driving execution and was paired with project management concepts such as
project portfolio strategy, project strategy, scope management and project selection
(Naaranoja, Haapalainen, Lonka, 2007). These were cited to be important project
management (PMI, 2008) elements for successful growth strategy implementation.
Varkey, Corin & Slevin (2011) maintained that the strategy formation process is normally
achieved and paired with forecasting, a project management concept, which results into
significant performance improvements for the firm. They contend that the chaotic, ever
complex of markets and industries in which companies operate in, can partly be managed
through forecasting and long range objective setting which are both project management
concepts (Varkey et al, 2011). Perhaps more revealing within the growth strategy school
of thought was research work done by Young, Young, Jordan & O’Connor (2012) that
showed that over 100 billion dollars invested in organisational projects did not yield the
desired results toward the achievement of strategic goals.
This paper concluded that the central reason behind this poor delivery rate of projects was
the organisational management capabilities, know-how and knowledge in project
management selection (PMI, 2008). The inherent deficiencies were found to be the
7
systems, and processes that companies use in selecting and managing projects for
realising strategic goals and these were found to be specifically be within the project/
programme/portfolio/ governance frameworks adopted by the individual companies (Young
et al, 2012). The greatest deficiency was found to be within the programme management,
specifically on classification criteria to select projects that will enable the realisation of
strategic growth projects (Young et al, 2012). The above authors agree that there’s a link
between strategy and projects (Thiry & Deguire, 2007; Varkey, Corin, & Slevin, 2011).
There’s also common agreement that growth strategy is driven by the ability of the
organisation to innovate by introducing new products that contribute towards the
realization of growth objectives (Yang,2011; Cooper, Edgett,& Kleinschmidt,2004; Winter,
Andersen, Elvin & Levene,2006).Lastly, growth projects were identified as driven by
innovation, and could be pursued by any organisation with different size and makeup
(Park, Cheong and Jang ,2010; Gumus & Apak, 2011; Goedhuys & Veugeler,2011).
2.2.2 Competitive Advantage Attributes and Determinants
The term competitive advantage was defined as a set of internal capabilities that are not
easy to emulate and that set the organisation apart from its competitors through a
company’s capability differential (Weerawardena & Mavondo, 2011).A company’s
competitive advantage was defined as an internal capability implicit within the organisation
(Bhuijan, 2011).A closer look at these capabilities confirmed that these capabilities are
technical know-how, managerial competence, organisational efficiency and acute
management of strategic assets (Bhuijan, 2011). Perhaps more closely related to this
definition, was research work conducted by Yuan Li & Liu (2012) that maintained that the
dynamic capabilities of the organisation drove the realisation of competitive advantage and
these capabilities were underpinned by the organisation ability to make timely decisions,
implement those decisions and changes in an efficient way against compared to its closest
competitors (Yuan Li & Liu, 2012).
This comes at a period in which companies find themselves in environments that are
increasing the likelihood of getting copied, and competitive advantage becoming less of a
sustainable advantage and only a temporal advantage that can be protected for a short
period of time (D’Aveni, Dagnino & Smith, 2010).The relationship between a company’s
growth agenda and competitive advantage was given another impetus through the
strategic entrepreneurship (Webb, 2007) school of thought that sought to argue that the
8
most successful companies are those that can optimally balance their efforts to grow and
seize future opportunities through the usage and reliance on current competitive
advantages. Organisations are constantly trying to balance the trade-off between growth
and maintaining current capabilities and it is those organisations that manage to renew
their growth agenda that will eventually remain competitive though the reliance and optimal
mix of internal operational, structural and cultural capabilities (Webb, 2007).
Their study is fundamental enough to be a precursor for highlighting the role that the
growth agenda plays in strategic management and entrepreneurship as key source of a
company’s competitive advantage (Webb, 2007). Project management know how and
capability resides within the company and drives competitive advantage as competitors
cannot comprehend its composition since it is an internal company capability (Browning,
2010). Competitive advantage is thus an internal capability, that needs to be harnessed
over time (Bhuijan, 2011; Yuan Li& Liu, 2012).It is based on the degree to which a
company differentiates its core activities, that cannot be copied and is the driven by the
execution of growth strategies (Weerawardena & Mavondo, 2011; Browning, 2010). We
now turn to an in-depth review and discussion of the role of project management in driving
growth strategies resulting into competitive advantage under the following discussion and
review of project management implementation, systems and process elements.
2.3 Project Implementation, Systems & Process View
The project management body of knowledge (PMI,2008) identified a number of key
essential project management elements for achieving project success, namely risk, quality,
time, procurement, financial, human resources and earned value as the cornerstone of
effective project execution (PMI,2008). The focus of this section will review and discuss
mainly three (3) essential themes within the project management body of knowledge,
namely project implementation (Srivannaboon, 2009; Collyer & Warren; 2009; Killen &
Kjaer, 2012; Zeynek, Arditi, Dikmen, Birgonulet, 2009; Killen & Kjaer, 2012; Shehu and
Akintage, 2010; Petit, 2012, Cooper, Edgett, and Kleinschmidt, 2004; Buyukozkan &
Ozturkcan, 2010; Vidal, Marle, Bocquet, 2011; Young& Anban 2009), project
management systems (Kapsali, 2011; Hallgren, 2012; Liu&Wang, 2011; Shakshi-Niaei,
Torabi & Iranmanesh, 2011) and project management processes (Harold , Hempel &
Srinivasan, 2003; Wadeson, 2005; Browning, 2005; Olsen & Johannessen,2011; Lalonde,
Bourgault& Findeli, 2012; Ebert & Man, 2008; Winter and Szczepanek, 2008; Turner and
9
Simister, 2009; Unger, Kock, Gemunden & Jonas,2012; Barbara Natalie Unger, 2012;
Turner , Simister, Gower,2009 ). This discussion is guided by the realisation that internal
capabilities eventually drive the realisation of growth strategies and it stands to be
reasoned that project management processes, systems and implementation are dynamic
factors that are largely internal within the organisation (PMI, 2008).
2.3.1 Project Implementation Management
Zeynep, Arditi, Dikmen & Birgonul (2009) research work on the impact the corporate
strengths and weaknesses has on project management competencies argued that the
implementation process of project management is normally uniform, in that it uses the 9
project management knowledge areas as defined by the Project Management Body of
Knowledge (PMI, 2008), across all projects even though each project is unique. Project
implementation was subject to the dynamic nature of project contexts and this dynamic
view of project management was conceived to be a key driver of project success. Collyer
& Warren (2009) research accepted that dynamism is one of an infinite number of project
dimensions that managers have to grapple with and that managers struggle to define.
Some of the project management approaches suggested to deal with dynamic
environments were cited to include environmental manipulation, scope, planning
approach, controlled experimentation, lifecycle, controls, culture, communication and
leadership style (Collyer & Warren, 2009).
The Plan-Do-Check-Act (PDCA) project management model by Srivannaboon (2009)
found that the relative competitive position of organisations determines the content and
focus of its project management elements that support the delivery of intended strategy.
The key for success was the organisation ability to conceive, develop, and implement
relevant project management approaches that support the desired business strategy. This
was coupled by the organisation ability to standardize internal project management
guidelines on how to adapt the internal project management practises based on the PDCA
(Srivannaboon, 2009). It was suggested that the organisation ability to map, standardize
and document the matching elements of different strategies and project types would result
into a project management scenario based view that could enable organisation to
understand the likelihood of project success based on the makeup and fusion of different
strategy and project types (Srivannaboon, 2009).
10
The organisations resources, capabilities, ability to make strategic decisions and its
relationships with its external parties, were identified as corporate strengths and
weaknesses (Zeynep et al, 2009). The link between project management processes and
strategy was determined by Zeynep et al. (2009) to be influenced by corporate strengths
and weaknesses, which carries some strong basis and merit as projects are conceived
and implemented within the constraints of companies’ resources.
In understanding project management dependencies, project culture and process were
identified as fundamental in achieving project success by Killen & Kjaer (2012). The
findings suggested the influence of culture and process as key drivers of project success.
Managers should pay more attention to project culture, tools and processes of project
management (Killen & Kjaer, 2012). The findings by Shehu and Akintage (2010) attribute
growth project success to programme management during implementation phase, a key
requirement for project implementation success. The paper highlight’s the common pitfalls
on programme management were largely human related aspects such as project
leadership, program control and political aspects. Some of the critical stages in
programme management were cited to be awareness, understanding, planning, piloting,
implementation, consolidation and customisation (Shehu & Akintage, 2010).
Perhaps contrary to the earlier view shared under the growth strategy section, was the
finding that the size of the organisation determined how projects were executed in order to
deliver products, and implement innovation resulting into organisation growth (Turner et al,
2010). This finding contrasted the common view held by some grwoth strategies authors
who held that company size did not determine the organisations ability to implement its
growth strategies (Park, Cheong and Jang , 2010; Gumus & Apak, 2011; Goedhuys &
Veugeler, 2011). Perhaps more revealing was a view that project management
implementation is less about risk management and more about managing and organising
for uncertainty (Petit, 2012).The research findings also indicated that project selection was
further complemented by portfolio management which was about creating and refining
business processes, creating new business models for managing uncertainty, and
implementing structures meant to deliver growth (Petit, 2012). The paper recommended
some practical implications for the PMI standard for Portfolio Management (PMI,2008)
including additions of new components such as uncertainty vs risk management, and
human resource management.
11
According to Besner & Hobbs (2008), managing unknown, highly innovative projects
required different project management approaches compared to managing projects that
produce a standard known product. A standard framework defined as a basic toolbox for
managing and implementing innovative projects was defined to include 10 essential
elements, namely progress reports, kickoff meetings, GANNT Chart, software tools,
change request, requirements analysis, milestone planning, scope management, assigned
sponsor, constraints and risks (Besner & Hobbs, 2008).
Table1 details the suggested project management elements that distingushes best
practise for managing innovative projects and standard project management.
Table 1: Project management elements for innovation and standard projects.
Elements of Innovative projects Elements of standard project management
Project Sponsor Earned Value
Database for cost estimations Change Requests
Stakeholder Analysis Plans/ Docs Milestone Planning
Database of historical project off Project Resource Matrix
Database of projects lessons learned Projects Acceptance Form
Database of project risks Project Scope Documents
Project Team development plan Projects Cost Estimations
Project Work Authorization Templates Project team Plan
Project Value Analysis Project Value Analysis
Project Mission Statements
Availability of skilled experienced manager
We conclude by looking at project selection as prerequisite for project implementation
based on the Decision Making Trial and Evaluation Laboratory (DEMATEL) model
(Ozturkcan, 2010). Both DEMATEL and ANP ( Analytical Network Process) techniques
were found to enable effective project selection thereby ensuring optimal resource
utilization and greater contribution of projects towards companies missions, goals and
strategies (Ozturkcan, 2010). This model was offered as an alternative to the widely
acclaimed Six Sigma, in that it overcame the current challenge of generating and
prioritizing critical projects (Ozturkcan, 2010).
The organisational strategic orientations towards defining project management elements
and its influence on how project management elements as outlined by the aforementioned
authors served to shed light on the fact that there’s awareness and empirical evidence that
12
projects do drive implementation strategy (Kwak & Anbari, 2009). The project
management implementation view tends to re-emphasize the underlying assumptions of
previous project management research by playing in the realm of the known (Hallgren,
2012).
2.3.2 Project Systems Management
The systems thinking in project management challenged conventional project
management theory that suggested a formalised careful project management control by
suggesting a flexible approach in planning, communicating and controlling activities
(Kapsali, 2011). In uncertain project environments that organisations find themselves
operating in, it was found that the degree to which organisations could maintain flexibility in
communication and project management processes become important in implementation
of projects, which was more significant that approaching projects in formalized way based
on specific control mechanisms (Kapsali, 2011). The high failure rates of most project
undertakings is evidence that conventional ways of managing are no longer viable hence
the systems thinking project management model.The paper raises key questions on the
traditional project management conventional emphasis on performance measures such as
the Iron Triangle (PMI, 2008) and failure to put emphasis on business measures that are
key in the achievement of strategic goals and implementation of innovation growth projects
(Kapsali, 2011).
Other recent research work, was conducted by Liu & Wang (2011) who determined a time-
dependent resource constraint modelling technique, called constraint programming
(CP),based on the project selection and scheduling dilemma that organisations have to
deal with in managing the unknown growth strategic projects.Although CP model research
is based on validated work across a range of projects within the construction industry, the
findings offer a project selection and scheduling model for project planners and how to
determine an optimal project management portfolio with specific resource contraints such
as time (Liu & Wang, 2011).
On there other hand of the same spectrum, the Monte Carlo model by Shakshi-Niaei,
Torabi & Iranmanesh (2011) proposed a simulation model and framework for project
selection challenge in uncertain and resource contraint operating business
envrionments.Although mathematical in its comprehension and design, the research
13
findings recommend a model for managing project selection within organisations using
Preference Ranking Organisation Method for Enrichment Evaluations (PROMEE), which
uses a logical model for making calculations on the likelihood of that specific project
selection would enable and contribute towards the organisation growth objectives(Shakshi-
Niaei et al, 2011). This PROMEE (Shakshi-Niaei et al, 2011) finding was also similar and
in agreement with a view that systems thinking methods provide the flexibility to manage
innovation projects that organisations have to implement in order to remain competitive
and achieve growth targets (Kapsali, 2011).
2.3.3 Project Process Management
The conventional definition on project management processes wa defined as composed of
project start, project controlling, project coordination, management of project
discontinuities’ and project close down (PMI, 2008; Turner & Simister, 2009). Emphasis on
the most important project management processes has gradually identified project
objective setting, scope of work, the project schedule or was is commonly held as project
plan, project team organisation, project costs, project culturre and finally project context
(PMI, 2008; Turner & Simister, 2009). This view was generally held is true of project
management due to historic project management approaches widely used within proejct
based organisations(Thiry & Deguire, 2007; PMI, 2008; Turner & Simister, 2009).
Earlier work on project selection and process analysis, proved that process management
were determined by value judgements as new information arised during project execution
(Daniel, Hempel & Srinivasan, 2003). These value judgements were defined to be
customer insights, perfomance measures and management routines (Daniel et al, 2003).
This was in agreement to a view that proposed that projects were a set of information
collection process which then implied that the conventional schema and knowledge of
using tried and tested models might entail that managers in some projects might invest
minimal energy on what needs to be done (Wadeson, 2005). Project in natural definition
are unique undertakings (PMI, 2008) that require an exploration of different sets of
management know how, this challenge increases when organisation have to deliver highly
innovative products (Wadeson, 2005).
Part of the project management dilemma is that these project management information
processes don’t get improved or documented properly within organisations when new
14
project information presents itself leading to wrong decisions. This challenge can be
addressed through a disciplined project management information collection process
(Wadeson, 2005). This challenge was given fresh impetus by earlier work on the Purpose
View Alignment model, which argued that organisations fail to align the objectives of their
business strategies with their purpose of the project (Browning, 2010). This was as a direct
result of managers using the incorrect tools for project context analysis and failure to map
back the information gathered back to the purpose of the organization project purposes
(Browning, 2010).The PVA model argues that project management effectiveness and
efficiency is driven by the management ability to utilize the relevant tools and models in the
management of large, complex unknown projects (Browning, 2010).
The ability of organization’s to turn project management communication processes into a
capability was defined as important factor in driving execution of innovation projects (Olsen
& Johannessen, 2011).The paper findings suggest that this ability of combining
communication processes with traditional project management elements of time, quality
and cost should receive the attention of executive management (Olsen & Johannessen,
2011).
The project management practise as an enquiry process shed new insights by suggesting
that the project management process was determined by the maturity of interactions within
and in between the project personel (Lalonde, Bourgault & Findeli, 2012). These feedback
loops in projects were critical in project implementation of unknown growth projects
through an enquiry process based on understanding the external trends impacting project
implementation (Lalonde et al, 2012).Accordingly, project management enquiry process
was more than tools and methods but the a combination of technical know how, social,
cognitive and reflective project management processes that enabled managers to
comprehend the project situation and reflect on an ongoing basis in order to cope
effectively with project challenges posed by unknown growth strategies(Lalonde et al,
2012). This integration effort on the part of project management proved key in Alcatel-
Lucent intergration of engineering processes, tools and people towards an achievement of
single goal leading to unparallel growth of one product line (Ebert & Man, 2008)
We conclude this section by looking at work that was conducted by Winter and
Szczepanek (2008) who concluded that the classical engineering view of project
15
management was no longer relevant in managing todays complexity as it ignores the value
part of project management. This view has to shift from the classical triple constraints
project management approach to a more business strategic value view, in which the
primary concern of the project management execution is about creating long term benefits
for multiple stakeholder groups (Winter & Szczepanek, 2008).This implied that
organisations have to strive towards identifying new frameworks that can help managers
think about the value creation drivers of projects and programmes towards implementing
growth strategies (Winter & Szczepanek, 2008).
Finally, Unger, Kock, Gemunden & Jonas (2012) hypothesized that a companies strategy
is implemented through project portfolios and as such it was found eqaully important to
apply the correct metrics in selecting projects. This could be achieved through a standard
selection procedure based on standard metrics within the organisations and the consistent
approach towards eliminating projects that don’t any value (Unger et al, 2012). A huge
challenge with projects was that managers lacked the ability to proactively terminate
projects at a crucial point and this could at least be managed through a structured process
with early warning for problematic projects that could fail (Unger et al, 2012).
The main findings of the literature review make reference to a number of important project
management approaches which are important in the achievement of growth
strategies.Firstly, the project implementation view emphasised a number of important
consideration for successful implementation and these were cited to include dynamism as
an important consideration for managing projects (Collyer & Warren,2009), standardization
of the measurements on the alignment of various business strategy types and project
types (Srivannaboon, 2009), human considerations for effective programme management
(Shehu & Akintage, 2010), project culture and process as important attributes of project
success (Killen & Kjaer, 2012).Project implementation was also cited as a function of
models that enabled management to partially predict the likely outcomes of choosing a
combination of project management elements
(Buyukozkan & Ozturkcan , 2010).
Secondly, the researcher established from the above literature review that project
management systems, were largely a function of thinking systematically in delivering
projects (Kapsali, 2011).Perhaps more enlightining was a finding that the logical models
16
can contribute towards decision making by calculating the likelihood of selecting a specific
project and how this selected project would enable and contribute towards the organisation
growth objectives (Shakshi-Niaei et al, 2011). Finally, the project management process
view key findings touched on the important aspect of communication in project
management as essential in strategy implementation (Olsen & Johannessen, 2011), and
that a company’s strategy is implemented through project portfolios based on the
appplication of appropriate project selection metrics and standardized termination process
(Unger et al, 2012).
3. Research Propositions
It follows from the above literature review that the emergent themes identified project
management as a key driver of strategies and competitive advantage. The organization’s
ability to implement projects was also identified as dependent on prioritization, selection
and effective programme management. Project management was also seen as an
impediment in some instances, leading to lost opportunities in implementing projects at
faster and effective rate. Growth strategies were equally pursued by organizations of
varying size and were the key driver of organization’s sales and market growth.
Competitive advantage was defined as largely an internal capability and the extent to
which an organization’s combined its internal capability to match its strategies was seen as
a key enabler for achieving an advantage.
Anban and Young (2009) pinpoint that the project management research conducted during
the past 50 years contained subjects on Strategy, Portfolio and Operations Management.
Specifically, project selection was identified as critical driver of the organizations strategy
implementation and further research was suggested on portfolio management, programme
management, project governance in respect to strategy (Young et al, 2012).Earlier
research by the project based organization suggested that additional research be
conducted in the areas of the influence of project approach on organizational structures
and optimal strategies (Thiry & Deguire, 2007). The researcher will aim to establish and
investigate the below mentioned propositions which were established during the literature
review;
1. Project management process selection is key in realizing growth strategies, growth
projects and competitive advantage;
17
2. An organizations portfolio and project management contributes towards the
realization of growth strategies and competitive advantage;
3. What are other unique combinations of project management processes that are
key in the achievement of organizational growth strategies resulting into
competitive advantage?
The above propositions will aim to accept or refute whether project management
processes are key in the realization of the organizations growth strategies leading to
competitive advantage.
4. Proposed Research Methodology and Design
4.1 Introduction
This chapter will discuss the chosen research method and design that will enable the
researcher to understand and answer the problem statement, “Are project management
processes key in driving growth strategies and competitive advantage”. The primary focus
of this chapter will aim to share the key research objectives and constituents of the case
study method and design for answering the problem statement highlighted in chapter one.
4.2 Objectives
As highlighted above, the primary objective of this case study research will be exploratory
in nature and will aim to gain new insights (Saunders & Lewis, 2012) and assess the
topic,” which unique project management processes are key in the realisation of growth
strategies and competitive advantage”. The research approach will follow a case study
methodology based on a combination of academic literature review and case studies. The
analysis of literature will essentially focus on the main authors within the project
management, growth strategy and competitive advantage field. This will be followed by a
case research method which is important and essential where theory exists but the
research environment context is different in terms of how and why certain research
variables behaviour in a specific manner (Yin, 2009).
Three interrelated avenues or phases of investigation will be followed. The first one will be
based on the analysis of the secondary data through an indepth review of empirical project
management process, growth strategy and competitive advantage academic literature
and academic journals.This will be complemented and followed by initial pilot interviews
mainly telephonic and desktop website search query in order to confirm existance of
18
specific project management practises and behaviours. The final process will then
graduate into an indepth case study analysis.
4.3 Case Study Design
The main rationale behind using the case study method is based on the researcher’s
realisation that the case study method offers the researcher an ability to study the
research constructs or contemporary phenomena in its natural context (Yin, 2009). The
analytical research paradigm is not sufficient for investigating complex real life issues,
involving humans and their interactions with the identified constructs such as the project
management processes (Soy, 2006). Case study research design offers the researcher
the flexibility in coping with the complex and dynamic characteristics of real world
phenomena and can potentially build on theory (Yin, 2009).The chosen case study
research method and design is comprised of four (4) process steps ( Runeson & Host,
2009) namely;
1. Case Study Plan;
2. Procedures for case data collection;
3. Elicit and gather relevant evidence;
4. Data processing and analysis.
4.4 Case Study Plan
The focus of the case study plan will aim to analyse relevant research constructs which will
help answer the research problem (Runeson & Host, 2009). The case study plan, which
forms part of the thrust of this research methodology, will be based on not more than one
to five unique case study analysis over a period of not more than 8 weeks by studying the
nature of individual organisational project management processes.
Case Study Procedures and Standards
One of the foremost challenges in case study research methodology pertains to
maintaining validity during the data collection process, especially construct validity (
Saunders & Lewis, 2012). This challenge can be addressed by imposing a procedure for
keeping track of changes during the research project through a log or diary where all
conducted data collection and analysis is recorded with change decisions that are taken
during the case study research process. Table 2 aims to share an example of the relevant
logbook fields and how the template might pan out as the research unfolds.
19
Table 2: Case Study Logbook elements
Case Study
version #
Goals and scope
Data Collected
Analysis focus
Interpretation Key Gaps
1 Initial screening of Organisational Project Management Maturity levels
2 Case Study Pilot
3 Archival document
4 Qualitative data on feature groups
5 Respondent feedback
The main idea behind case procedures and standards is to ensure consistency and
accurate account of the case study data collection as it changes throughout the research
process.
Elicit and gather relevant evidence
An important consideration on the part of the researcher is how the researcher will select
the companies and organisations for case study data collection. This poses some unique
challenges which can be resolved through a focussed identification, and selection of
relevant cases. The standard criteria for selecting the relevant cases for inclusion into the
research project will essentially be based on specific elements such as;
1. A corporate company that has a set of defined strategic growth objectives in South
Africa, Africa and globally. These could be new market share growth objectives, or
any strategic growth agenda that the company needs to attain in order to grow its
relative size, customers, markets and sales. It is highly probable that this
organisation will be listed and will be seeking new markets in emerging economies;
2. The second criteria for selecting these cases will be an existence of an established
strategic project management unit or department that enables these organisations
to achieve the growth agenda;
3. The other criteria will be determined as the case study unfolds due to the fact that
case study research is flexible and since it's based on observed reality, it can offer
more insights on the characteristics of these organizations that can help the
researcher answer the problem statement.
20
The above criteria will be updated as new evidence is gathered, and will be used by the
researcher as a basis for choosing cases. The following subsections will give more
information on the specifics around sample frame, population, and cases methods.
4.5 Sample Design
The basis data will be derived from the case study (Saunders&Lewis, 2012) analysis.This
is to ensure that detailed insights can be arrived at through analysis of project
management organisational departments and units. Specific contextual project
management process activity will be analysed in order to understand and determine which
unique project management process are key for realizing growth strategies. The context is
very key and as such extreme diligence will be used in order to ensure consistency across
all identified organisations without losing variance.
As outlined earlier on, the case study research approach will focus on organisations that
demonstrate experience or have documented practices in using project management
approach, methods, and models for implementing strategic growth projects leading to
competitive advantage. The main focus areas for data collection phase will utilise a mix
method approach composed of academic journal reviews, case interviews (mainly
unstructured interviews), analysis of archival information, and direct case observations.
Sample frame and population
As outlined above on the research design and method section, a non-probability sampling
method will be considered for this research study. A sample is a subgroup of the whole
population that has got relevant attributes for the research topic or problem to be
answered (Saunders & Lewis, 2012). The potential sample in this case study method
would be users of the project management process, methods and practices for the
achievement of some strategic growth agenda within the organisation. The foregoing
sections will paint a picture on the relevant characteristics of the identified population and
the units of analysis.
Population
The research population will be determined using a non-probability sampling technique
based on expert self-selection sampling method. The population will include group
members (Saunders & Lewis, 2012) within any small, medium or large organisation that
21
utilises project management approach, practises, and methods, models to manage and
deliver on primarily growth strategies. An initial list will be obtained through desktop
research and other website search query. The selected organisations for this research
study will be headquartered and be operational in Johannesburg within the Gauteng
province in South Africa. The unit of analysis will be the project management units
(departments) within these organisations and will be the source of case study analysis and
data collection. Table three (3) aims to share a granular view of the population parameters
that this research will focus on. The below mentioned parameters will initially serve to
guide the first case analysis and will be refined further as new research information
presents itself.
Table 3: Companies identified for interviews
Location Size Industry PM Maturity Nature Sales Growth
Johannesburg EFT T C
ICT HIGH Banking
Pretoria EFT T C
Public S LOW Government
Sandton EFT T C
Services MEDIUM Marketing
Parktown EFT T C
Retail MEDIUM Retail
Woodmead EFT T C
ICT HIGH IT Consulting
Key: EFT= Employee full time equivalent; T= Turnover; C- Capital employed
The size of these organisations will range from medium to large companies that have
established project management practises, depend on projects to deliver on their growth
strategies and have used these project management practises to achieve the
organisational growth objectives during the past five to ten years.
4.6 Sample Unit of Analysis
Case study analysis will target interviews, case analysis and observations of the relevant
actors within the project management units which have been defined to include heads of
the strategic project management office, project managers, project sponsors, business
owners, and project planners. This is largely due to the researchers’ realization that the
Project Management Office is part of a complex network and relations that links strategy,
projects and structures (Aubry, Hobbs & Thuillier, 2007). Table 4 shares a granular view of
the characteristics of these respondents.
22
Table 4: Case Study Sample Characteristics
Case Respondent Years of project management leadership, management and experience
A Executive Sponsor 3-10
B Project Management Unit /Office Director
3-10
A snowball sampling method (Saunders & Lewis, 2012) will be used in case non response
bias presents itself during the research process.
Academic Journals
Academic journals, not more than 5 years, are a strong basis for the research to identify
future research questions but also to offer a basis for understanding what other experts in
the field of project management, growth strategy and competitive advantage have to say
about the research problem statement. To this end, the research could establish the main
school of thoughts during the past 5 years including the future research gaps and
opportunities for formulating research questions.
Archival Data
The analysis of work products and artifacts will enable the research to gain additional
insights and data in relation to the research problem outlined in chapter one. Although this
method will expose the researcher on a number of historic records, as outlined earlier on,
such project finacnails, minutes, organisational charts etc, it should be stated that upfront
that these documents were not orginally developed with the intention to provide data to the
research problem of this case study. This means that the document might contain
irrelevant parts, with missing information which implies that archival data should be
combined with other data collection techniques, such as further interviews with human
cases, in order to obtain missing historical factual data.
Measurement
The case study data gathering will be complemented by semi structured telephonic
interviews using a standard questionaire couple with observations and document analysis
of project management reports as outlined on the research method and design section.
Instrument structure
23
a. Questionnaire
The telephonic interviews and face to face interviews will remain largely semistructured,
beginning with a set of general questions but also allowing for open –ended responses.
The survey instrument is divided into four major sections;
(1) The section Company Characteristics includes items referring to general
characteristics of the firm, such as the business sector, number of employees and sales
volume. The items in this section are ‘‘fact-based”, meaning that most of them can be
answered by falling back on annual reports or publicly available company data.
(2) The section regarding the Work Environment is mainly about the department in
which the participant works. The instrument strictly distinguishes between the enterprise
as a whole and the department of the respondent because project management standards
are frequently implemented in different ways in different parts of companies. A research
and development department, for example, may apply other standards
than an IT department.
(3) The Portfolio/ Programme/ Project Management Knowledge/Application of
Standards section presents participants with a list of project management standards and
project management-related standards and asks them to apply these standards.
Moreover, a record is made of how the standards are adapted in the enterprise in order to
achieve growth strategies.
(4) The section Benefits and Deficiencies of Standards was added to examine whether
or not standards are recognized as being beneficial to the success of project management.
Additionally, the major problems and deficiencies experienced when implementing project
management process standards are examined.
The questionnaire will be used for the initial pilot in order to enable the reseacher to
understand and select the relevant cases based on criteria listed on the research
questionnaire. This will then be followed by an indepth case study analysis and will signal
the start of data collection.
Case Interviews
The case study interviews (Yin, 2009) will be conducted within the strategic project
management unit and will initially target human cases composed of project sponsors,
24
project managers, team members and other relevant project management respondents in
order to obtain different viewpoints.Each case study interviews will be transcribed into
specific text and audio memos, and will be a source of primariy data. Consent will also be
sought for analysis of work artefacts and products such as project documents, files, and
relevant records of growth projects. The researcher will initially aim for five (5) relevant
cases.
Observations
Case study observations (Yin, 2009) are an ideal secondary way to gather information
should the researcher fail to secure direct contact with the human cases. This method will
assume the form of observations in meetings, where attendats interact with each and thus
generate information about the studied object. Observations may provide a deep
understanding of the phenomenon that is studied and prove relevant where it is suspected
that there is a deviation between an official view of matters and the real case (Runeson &
Host , 2008). Observations will take the form of the researcher observing how and why
actors implement project management processes in order to achieve growth strategies.
Data Analysis Method
This phase will primarily focus on qualitative data analysis and will be iterative in nature in
that it will be carried out in parallel with the data collection since the case study research
approach is flexible and will also allow the researcher to fine tune the analysis as new
insights are uncovered during the research process. The researcher will consider to utilise
data coding, and analysis of similar patterns in order to decipher the anticipated case
study transcripts which can pose difficulty on the part of the researcher when analysing
case data.
Data Coding
The data coding approach (Runeson & Host, 2008) will seek to minimise complexity posed
by the case study approach in that it will seek to assign certain parts of the text a code
representing a certain theme, area or research construct. The coded material can be
combined with specific additional researchers comments and reflections recorded in
research memos. The other data analysis consideration could be in a form of table 5
showing data arranged in rows and columns in Excell 2010 software tool.
25
Table 5: Data Coding Case Interview Subject
Codes of Interest Project model Communication
Codes of Interest Planning Follow up
Codes of Interest Quality Technical issues
Analysis of Similar Patterns
Another considered approach in order to enhance the data coding analysis, will be
identification and analysis of data patterns that are reoccuring , phrases that are similar in
different parts of the material, patterns in data, differences between subgroups of subjects.
The identified patterns can then be used when further data is collected and analysed
leading to an iterative process. Each statement in the transcribed interviews will get a
unique code of identification, and transcribed data will then be filled into a table as outlined
on table 4, allowing for analysis of patterns in the data by sorting issues found by
interviewee role.
During analysis, it is also important to maintain a chain of evidence from the findings to the
orginal data.Each interview will be transcribed once the interview is completed.This would
be complemented by a detailed summary of each case study and specific notes will be
compiled and main points will be made in relation to each of the research questions. Cross
case analysis will also be conducted in order to spot any differences and similarities. The
researcher would also need to consider applying a formal approach to record all decisions
taken, links between data, codes, and memos. An example could be editing and template
approaches.There is no burning requirement to conduct statistical analysis due to the case
study method chosen which will observe and study organisational practises.
5. Results
5.1 Introduction
The aim of this chapter will be on presenting the case study enquiry process including how
interviews were conducted and gap analysis, the attributes of the archival data and lastly
an overview of specific feedback supported by case study responses, transcriptions, and
relevant quotes. This will include an overview of the internal characteristics of the case
study analysis, such as the size of the studied units, the average experience of the
personnel. Care was considered and exercised in order to strike a balance between the
researcher’s duty and goal to publish their results and the respondent companies and
individual integrity (Runeson & Host., 2009).This chapter will provide a clear sense of the
26
studied cases, provide an account of the inquiry process in terms of what was done, by
whom and how and lastly provide coded data in terms of transcription of interviews.
5.2 Enquiry Process
The linear-analytical reporting style was used to detail the case study analysis and
reporting (Yin,2009).Case interviews, and archival data analysis were used mainly to elicit,
and collect research data.
5.3.1 Case Interviews
The first degree (Lethbridge, Sing & Sim, 2005) data collection method was used by the
researcher which entailed direct contact with the subjects and collection of data in real
time in the form of mainly unstructured, semi structured interviews and analysis of archival
data. A semi-structured interview approach was utilised for the bulk of the interviews. This
was intentional on the part of the researcher in order to reemphasise the most important
aspects of the case study research. The researcher exercised extreme diligence in
ensuring consistency at least for the initial two cases. This was intended to allow for
exploration and improvisation of the studied cases. The interview process was divided into
a number of phases. The initial session sought to present the objectives of the interview
and the case study, and explained how the data from the interview will be used. A set of
introductory questions around the case background, history and experience of the
individual subjects was used to set the case study context.
The main interview questions followed the introduction phase after the rapport had been
established with the individual case and were more specific. A digital recording device was
used for recording the discussions during the interview. The interview recording was later
transcribed into specific insights, themes and codes. In some cases, the notes and
transcripts were reviewed by the interview subjects. This was meant to ensure that
consistency in terms of what was said and offered the interview subject to point out any
interview discrepancies, paraphrasing any comments made, or simply altering statements
made during the case study interview. The interviewees were mainly aimed at the project
management office leadership and executive level, and excluded interview subjects that
worked within the projects, such project managers, and administrators. Tables six (6) and
seven (7) will highlight key case findings and gap analysis that served to guide the case
study research approach during the process of data collection.
27
Table 6: Capital Markets Case Study Gap Analysis
Date
Case Study Cycles
#
Goals and scope
Data Collected
Analysis focus
Interpretation Key Gaps
23.07.12
1
Initial screening of
Project Management
Maturity levels
Project Maturity Levels
Build Pilot model
Relevant scope Analysis of Capital Markets PMO Top Ten List Process.
20.08.12
2 Pilot
Industry category,
size, makeup, sample,
prevalence of process elements
Refine case study
constructs and questions
Relevant scope What is the process for
selecting, and abandoning of projects that don’t value?
20.08.12
3 Archival
document
Relevant project
management document
Supporting information
Relevant scope and work products
Top Ten list document, Business Case, Resource profiling, Planning Toolkit, Execution and follow up
docs.
TBA
4
Qualitative data on feature groups
Interview with relevant cases
Observation, interviews
Table 7: Infrastructure Case Study Gap Analysis
Date
Case Study Cycles
#
Goals and scope
Data Collected
Analysis focus
Interpretation Key Gaps
13.08.12
1
Initial screening of
Project Management
Maturity levels
Project Maturity Levels
Build Pilot model
Relevant scope Group-Wide Selection
Process
03.09.12
2 Pilot
Industry category,
size, makeup, sample,
prevalence of process elements
Refine case study
constructs and questions
Relevant scope
What is the process for selecting, and
abandoning of projects that don’t value?
03.08.12
3 Archival
document
Relevant project
management document
Supporting information
Relevant scope and work products
PlayPen Outputs / Documents, Business
Case, Resource profiling, Planning Toolkit,
Execution and follow up docs.
TBA
4
Qualitative data on feature groups
Interview with relevant cases
Observation, interviews
28
5.3.2 Archival Case Data Analysis
The main archival data that was collected was composed of strategic material and was
project, programme and portfolio management related. The case analysis information
included programme wide selection lists, top ten list, strategic portfolio and programme
reports. A realization was made by the researcher on the validity of these documents as
the original intent in devising these documents was based on a different organisational
need and not for the case study analysis.
This challenge was addressed through follow up interviews with respective interview
subject in order to understand its general application within the case study. The researcher
recognizes the difficulty in assessing the quality of these documents which was partly
offset by the document versions or release dates falling within the past 3 months. Table
eight (8) shares the details of the archival data that the researcher identified.
Table 8: Archival Data Table
Cases Capital Markets Infrastructure
Archival Data
Group Top Ten List Group Wide Selection
Business Case Business Case
Action Minutes Schedule
Project Reports Risks and issues
Project method Scope document
Project Dashboard Financials
Benefits realization Earned Value
Team Status
Resource pool level management
The below diagram shares a summarised version of the key phases of the inquiry process
that the researcher undertook during the case study. These phases were essentially used
to structure the case study approach. In each case study instance, the researcher
evaluated ensured consistency by conducting initial telephonic semi structured interviews,
followed by an initial recorded pilot culminating into an in-depth review of archival data.
These findings would eventually help the researcher refute or accept the researcher
propositions outlined on chapter three. The below diagram aims to depict the pocess flow
in simple steps.
29
Refute or Accept Research Propositions based on key Case Analysis findings
Sound
recording of
interview
Case Analysis
Subjects perceptions based on their
observations and experiences
“Linear S t ruc tu re”
Actual events within the case context
(PMO UNIT)
Transcriptions
of recording
Grouped
terms, quotes
30
5.3.3 Observations
The researchers ability to conduct case study observations for both the capital markets
and infrastructure case studies did not occur as originally planned due to the timing and
occurrence of strategic project portfolio and programme forums that typically took place
during the start of the new financial year in early April and happened once every quarter.
The data collection for this case research took place during the last quarter of 2012,
beginning from mid-July until end of August 2012 which did not correspond with the
quarterly reviews within the target cases.
5.3 Characteristics of the studied cases
The cases studied during the research process were selected based on important
considerations outlined on chapter 4. These cases contained a well balanced mix of
financial companies, consulting, and government. The holistic case study (Yin, 2009) was
the basis of identifying the correct context, case and unit of analysis.
Case Analysis 1
Case Context: The initial case study chosen was a multinational niche capital markets
bank that specialised in investment products in Treasury, Trade and Lending. The
cumulative market capitalization of this bank was in the region of R167 Billion and
specialised in high end niche banking clients. It is an international specialist banking and
asset management group. It provides a range of financial products and services to a client
base in four principal markets: the United Kingdom, South Africa, Australia and Ireland. It
is listed on the London Stock Exchange and the Johannesburg Stock Exchange and is a
FTSE 250 company. The company is headquarters in Johannesburg, South Africa and has
other offices in the UK.
Its product range is in Private Banking, Capital Markets, Investment Banking, Asset
Management, Property Activities, Wealth Management and Investment Management. It
had gross revenue of £1,955.0 million in 2011, Operating income £410.2 million in 2011
leading to Net income of £407.9 million in 2011. Its full time employee head count equalled
roughly 5,951 worldwide in 2009. The organisation is organised as a network comprising
six business divisions: Asset Management, Wealth & Investment, Property, Private
Banking, Investment Banking and Capital Markets. The head office provides certain group-
wide integrating functions and is also responsible for central funding and the Trade
31
Finance business is organised as a network comprising six business divisions: Asset
Management, Wealth & Investment, Property, Private Banking, Investment Banking and
Capital Markets. A key challenge within this company was achieving consistent growth in
the local and international markets, especially the capital markets side of the business.
Case Attributes: The case analysis studied the Capital Markets project management office
and the researchers interviewed the director and head of the Capital Markets project
management office. The researcher spent time making the initial screening over desktop
analysis that sought to identify the nature of the organisations growth strategy, followed by
initial phone calls to ascertain prevalence of specific case elements such as prevalence of
the project management unit, years in implementing and using the project management
method, staffing of not less than 10 full time employees. The department was structured
around specialist functions by business unit in a form of dedicated project teams for each
business function in Treasury, Trade, and Lending. The project management department
teams comprised of experienced senior project managers, project administrators and
business analyst at each functional level supporting the business teams in Trade, Lending
and Treasury. This analysis was further complemented by initial interviews mainly
focussed on setting a base to build further iterations of the case study analysis. A
snapshot of the initial findings based on desktop research and initial semi structured
interview with the head of the project management office is depicted on Table nine (9).
Table 9: Initial Desktop search and semi structured interview results
Version Interview Date Author Change Description
0.1 23rd July 2012 Fana Mazamisa Initial Draft,
Case study purpose and objectives: The objective of this initial meeting was established along the below mentioned points which are aimed at supporting or refuting the below mentioned propositions.
1 Project Management process selection is key in realizing growth strategies, growth projects and competitive advantage
2 An organizations Portfolio and Project Management contributes towards the realization of growth strategies and competitive advantage
3 Are there other unique combinations of project management processes that are key in the achieving organizational growth strategies resulting into competitive advantage
Company Characteristics Relevant Metrics
Size by Market Cap 14.89bn
Sector Financial Services
Capital Markets PMO FTE 40 Full Time Equivalents
Work Environment Relevant Metrics
PMO Unit Exits Yes, 1 dedicated
Make Up and Size Matrix structure by functional engagement (Treasury, Trade and Lending)
# of projects per portfolio Over 60
Project team size 40 full time project consultants per 60 business applications
32
The researcher essentially focussed on understanding the basic attributes of the project
management unit, its model and methods of achieving growth strategies. This initial
interview held with the case subjects was also used to establish rapport with the case
subjects. The outcome of this initial step enabled the researcher to understand the aspects
of case validity and relevance. This initial step also resulted in the refining of a more
detailed interview and follow up session that sought to analyse and interview individual
cases including work archives.
The cases were strictly limited within the project management unit of this organisation and
all interviews were recorded and later transcribed into thematic codes of analysis which
will be discussed under inquiry process section. The objectives were explained as part of
the initial and subsequent interviews to maintain clarity and focus on the part of the
researcher.
Unit of Analysis: The unit of analysis was the project management office and case
interviews were held with the director and head of the capital market project management
office who carried the overall responsibility for the strategic management, selection,
prioritization, implementation and monitoring of all growth projects within the project
management department. The individual carried ultimate responsibility for the success of
the project management department. They also had over ten (10) years’ experience
managing projects of different risk profile, complexity and carried budgets of not less that
R10 Million in investment terms. The researcher disclosed the names and contact
information, explained the purpose of the case study objectives, provided a high level
description of what the individual participant would be required to do during the case
analysis, such as access to information such as documents that demonstrate how growth
projects are delivered and a generic overview of the steps that the researcher will carry out
during the these activities. This was also completed by informed consent, confidentially as
devised by the company.
Case Analysis 2
Case Context: The second case context was within a large banking company in South
Africa headquartered in Johannesburg. Its Market capitalization was R509.7 billion as of
31 December 2009. It primarily focused on a diversified offering of financial services
33
products and had revenues of about R8.1 billion in 2009 with total assets under
management equalling R510 Billion with a full time employee count of about 22,000+. The
company increasingly relied on growth projects to defend its market share and grow its
customer base. This was further compounded by the fact that the banking industry is
increasingly seen as undifferentiated and in this instance the target bank increasingly
relied on innovation as an anchor for strategic growth, new business in terms of customers
and its global growth strategy in Africa and select markets around the world where it
enjoyed operating license. The main driver in this instance as was deep reliance in
technological innovation, in terms of new product launches, optimal processes, security,
and other Basel III requirements as required by the banking legislation.
Case Attributes: The individual cases were within the information technology infrastructure
project management department. The composition of innovation projects initiated by
business technology constituted about 80% of all infrastructure projects and programmes
with operations accounting for less than 20% of the total annual programmes, portfolios
and projects. The project management unit was established over 10 years ago and had
established project management standards, models and best practise for achieving growth
strategies. The project management unit was organised around a formal structured format
with about 100 projects managed annually. The total full time staffing of this department
equalled 15 full time employees who were composed of senior project managers, project
administrators, business analysts, and other technical related roles. Table ten (10) shares
initial findings based on desktop and pilot interviews.
Table 10: Initial Desktop search and semi structured interview results
Version Date Author Change Description
1.0 14.08.12 Fana Mazamisa Initial drafting
The objective of this report is gathering all relevant information that refutes or supports the below propositions
1 Project Management process selection is key in realizing growth strategies, growth projects and competitive advantage
2 An organizations Portfolio and Project Management contributes towards the realization of growth strategies and competitive advantage
3 Are the other unique combinations of project management processes that are key in the achieving organizational growth strategies resulting into competitive advantage
Company Characteristics Relevant Metrics
Size by Market Cap R509.7 billion
Sector Financial Services
Industry Growth Africa and other global markets
Infrastructure PMO FTE 15
34
Work Environment Factors That Supported Success
PMO Unit Exists & Years One, 10 years
Make Up and Size Structured
# of projects per portfolio Over 100
Project team size 15
The researcher focussed on firstly understanding the prevalence of the project
management unit, including an initial email enquiry on the project management model in
use, composition of projects and the total share of growth projects, the basic model for
delivering growth projects, maturity levels in using the project management model over the
years, budgets managed annually which total roughly R600 Million annually, and if an
accurate account of project management records was kept within the organisational
premises. The case selection evolved as well due to the learning learned during the first
iteration of the case study project. The outcome of this initial step enabled the researcher
to understand the aspects of case validity and relevance. This initial step also resulted in
the refining of a more detailed interview and follow up session that sought to analyse and
interview individual cases including work archives. The cases were strictly limited within
the project management unit of this organisation and all interviews were recorded and later
transcribed into thematic codes of analysis which will be discussed under inquiry process
section. The objectives were explained as part of the initial and subsequent interviews to
maintain clarity and focus on the part of the researcher.
Unit of Analysis: The unit of analysis was the project management unit (PMO) within the
organisation and interviews were held with the PMO head of strategic infrastructure group
operations and head of the infrastructure project management office who’s ultimate
mandate was the effective conceptualization, selection, leadership, planning,
implementation, and monitoring of the banks group wide growth projects. The individual
carried over 15 years of working within the banking environment and less than 13 years
managing and leading a project management office. The individual carried ultimate
authority, accountability and responsibility for the success of the project management
department. The total projects under management equalled R600 Million annually to which
growth, innovation projects accounted for 80% of the total R600 Million invested annually.
The researcher disclosed the names and contact information, explained the purpose of the
case study objectives, provided a high level description of what the individual participant
would be required to do during the case analysis, such as access to archival information
35
such as documents that demonstrate how growth projects are delivered and a generic
overview of the steps that the researcher will carry out during the these activities. This was
also completed by informed consent, confidentially as devised by the company.
5.4 Transcriptions and Quotations
Table 11 and 12 shares case findings coupled with research propositions and
transcriptions.
Table 11: Capital Markets Case Study
Research Proposition : Project Management process selection is key in realizing growth strategies, growth projects and competitive advantage
Response
Capital Markets project executive management ensures that projects align with the strategic direction of the company and Capital Markets project management office is responsible for compiling a company-wide Top Ten List that is prioritized. All projects in this top ten lists are selected and prioritized based on the following key metrics; 1 Revenue – the future cash flows that can be derived from implementing a project against the short and long term strategic growth objectives.. 2. Operational Efficiency - minimize all operational waste 3. Risk – the extent to which risk can be managed against the perceived benefits of the pursuing a given project 4. Legal / Compliance – the legal implications of implementing a given project and associated legal costs of implementing that projects
Transcriptions & Quotes
“This process is tightly managed by the divisional management committee (MANCO)” “All project selection conflicts are escalated to the company Chief Operations Officer and Chief Executive Officer, who will make the final decision based on the strategic priorities of the company” “Executive management buy in will then follow” “ Strict governance of this selection process is made through the waterfall approach with milestone review gates”
Research Proposition : An organizations Portfolio and Project Management contributes towards the realization of growth strategies and competitive advantage
Response
The Capital Markets PMO process is underpinned by a strong culture which is non-hierarchical, collaborative and faster decision making that is the pinnacle and anchor of this process. The below mentioned project management process steps were identified as central in the delivery of Capital Markets Revenue Projects (Growth Projects); 1. Portfolio Top ten list – a project has to form part of the this list which is based on the criteria outlined on 2.Business case conceptualization and approval – shorter time frames entail that projects are approved and selected based a strict business criteria as outlined on point 4 3. Scope generation – a highly collaborative phase that involved internal sourcing of solutions and ideas within other divisions. Includes review by the selected executive management team for decision review. The team utilizes active internal consulting as well and prototyping in order to minimize project costs. 4. Resource onboarding – team composition is by business need and support. Each team is split according to a specific skill set to focus on growth projects within those business units, namely Treasury, Trade, and Lending. The team is composed of 40 project management teams supporting 60 business projects. Project challenges and objectives are the core determinants of which skills to onboard. 5. Planning – Capital markets follows a mixed method approach composed of best practice in project schedule planning, and resourcing. 6. Execution – this phase is managed actively through weekly engagements with business, IT, Steercom teams by using an EPM software tool to track and measure progress. The approach is practical in that it seeks to identify potential risks and issues that might present themselves during execution. Examples of documents would be risk, issues and logs, action minutes and strict governance in order to minimize risks.
36
Transcriptions & Quotes
“We manage all our portfolios and projects through the top ten list, which is reviewed every month” “Portfolio management is achieved through governance that is based on the waterfall principle “ “ All projects are tracked through the business benefits tracking mechanism which monitors budget spend based on agreed objectives” “All critical project scope elements are reviewed for consistency” “Over 200 initiatives form part of the organization projects portfolio and programme at a given quarter” “ The project management office will routinely check for projects that don’t add any value, and roughly 20-50 initiatives are stalled”
Research Proposition : Are there other unique combinations of project management processes that are key in the achieving organizational growth strategies resulting into competitive advantage
Response
Unique attributes of the PMO process 1.Culture – greater accountability and decision making by executive management, coupled with sponsor buy in 2. Peer Review – strong, agile approach that relies on collaboration within the company. Peer network linked globally for similar projects
Transcriptions Quotes
“ We believe in strong collaboration and consultation within the company” “ Our leaders are fully engaged” “ We ensure cross functional alignment before we proceed with any project”
Table 12: IT Infrastructure Case Study Findings
Research Proposition : Project Management process selection is key in realizing growth strategies, growth projects and competitive advantage
Response
Project selection is based on a flexible group wide process that is based on the following key steps. 1. Strategic alignment – projects are essentially initiated by business based on a need to achieve a specific strategic agenda, such as financial, compliance or other banking licensing objective 2. Clustering – each division or cluster within the bank then devises a specific plan based on the overarching objective of the bank, that translates into specific cluster objectives 3.Business Initiative – this is then translated into specific business case within a cluster 4. PlayPen Simulation – information is then fed into an online project simulation tool that gives a high-level view of project resource constraints such as cost, time and resource. This tool runs on MSP 5. Group Prioritization Forum – the cluster project lists are then submitted to a Group wide list, which is worth an estimated 600 Million in terms of project value, for prioritization at a group level. This list is published for organization wide visibility and is driven by business. This forum meets once every quarter and is driven by the PMO. 6. Pre-Execution – this phase then details the granular aspects of the chosen projects and project teams provide details on cost, time, resources, business requirements specifications, high-level designs, benefits 7. Business Case approval – 8. Execution – projects are essentially monitored in terms of financial risk, data complexity, process impacts, people and resourcing impact, compliance. A Call Centre facility plays a crucial role in guiding execution efforts such as required work products per phase in terms of plans. This includes detailed designs on the solution as well. Project Execution is made up of the Detailed Design, Build test and Fix, Implementation and Benefits tracking phases
37
Transcriptions
& Quotes
1. It starts with Group Strategy, so Group Strategy is defined and agreed by
business.
2. Then each of the business clusters define and identify initiatives that are
going to enable these strategies and they then come up with strategic
projects.
3. We go through a process, called PlayPen, which is an offline application, that
results into a high level cost and benefit analysis. All strategic projects are
loaded onto a PlayPen application.
4. When projects are loaded into PlayPen, the projects are modeled in that
simulation environment using a tool called project office toolkit which has
been perfected over ten (10) years within the company.
5. This solution was developed internal staff.
6. The outcomes are high level cost, resource requirements for executing
projects.
7. They then play back the high level outcomes back to business and ask of
this fits back to your business resources.
8. They then go through a business case process defining process defining
each project that will deliver on their strategy.
9. Once those business case projects are defined, they there project goes into
what we call, pre-execution, so it moves from this Play-Pen environment into
a proper programme, project schedule. It is during pre-execution that we
have more certainty around the cost, time, resourcing and planning goes into
granular level (detailed business case). The preexecution defines all the
requirements before execution.
10. While that is happening, they start with their business requirements which
are detailed.
11. They (clusters) then go and refine the cost and time variables against the
business case
12. Execution will follow after approval
13. Once all planning is done, they (projects) are fed back into a Group-Wide list.
They are put into a group list and then that list in every quarter sits in excess
of a billion rand.
14. They then go through a Group-prioritization list, and get all the clusters
bosses/ heads into a room and they go through the list end to end and
question what is number one priority on the list based on strategic project
observations.
15. They come up with a published Group Wide prioritized list that contains
approved projects for execution and implementation.
16. They then execute against that group prioritization list and they track project
progress against the commitments.
17. They are held accountable for the bad planning around the business cases,
because all planning sets budget commitments against business cases.
Research Proposition : An organizations Portfolio and Project Management contributes towards the
realization of growth strategies and competitive advantage
Response Through a Group Wide Selection Process that prioritizes projects at an enterprise level.
38
Transcriptions
& Quotes
1. Between 600-700 Million rand worth projects are delivered annually and 80% of that budget goes towards the implementation of growth, revenue projects
2. When we do the planning, we tend to give lower priority to the remaining 20% of the projects
3. The way we prioritize projects is based on the strategic importance of the project and its legal and compliance importance
4. We have a standard artifacts for everything, there’s a standard schedule that when new projects start, there project managers take schedule template and tailor out from the schedule the relevant parts for execution.
5. When we load projects on the project office toolkit, there a number of strategic dimensions that we look for and approve project on. These are
Complexity – how many systems, divisions is the project impacting
Resourcing – how many resources will the project require
Financial – how much will it cost and the expected investment benefits
Strategic alignment – does this project fulfill the strategic mission and dimension
6. All projects are loaded into a project office toolkit and then based on these dimensions, they get filtered and a decision is made on which projects are strategic, of compliance nature, internal or operational.
7. Senior executives will then agree on which projects important are based on the above criteria.
8. The project office toolkit uses a dynamic model that makes initial calculations and prioritizations of the projects and it then applies this logic which is mainly based on the organization strategic risk appetite.
9. So if a project adheres to one strategic dimension then it is held or if it fulfills one out of 10 of the required strategic dimension, then it will be prioritized lower.
10. The group wide prioritization committees take place once every quarter through the following key steps or processes
Initiate – once every quarter
Validate – every quarter, check priority and swap projects on the group wide list based on strategic importance
Contextual – review the market execution conditions and swap priority based on that.
11. All the above project executive control processes are driven and managed by the Project Management Office.
Research Proposition : Are there other unique combinations of project management processes that are key in the achieving organizational growth strategies resulting into competitive advantage
Response Call Centre process support for project management and playpen simulation
Transcriptions
& Quotes
a. We go through a process, called PlayPen, which is an offline application, that results into a high level cost and benefit analysis. All strategic projects are loaded onto a PlayPen application.
b. When projects are loaded into PlayPen, the projects are modeled in that simulation environment using a tool called project office toolkit which has been perfected over ten (10) years within the company.
c. This solution was developed internal staff d. A Call Centre facility plays a crucial role in guiding execution efforts such as
required work products per phase in terms of plans. e. We have a standard artifacts for everything, there’s a standard schedule that
when new projects start, there project managers take schedule template and tailor out from the schedule the relevant parts for execution.
We conclude with a set of common themes that emerged during the case study interviews,
and analysis. These themes are reflected on the below Table 13.
39
Table 13: Common Case Themes
Common Themes in all Case Interviews
Codes of Interest Project model Communication
Codes of Interest Planning Follow up
Codes of Interest Agile Financial
Codes of Interest PMBOK Steering Committees
Codes of Interest Risk Change
Codes of Interest Strategic alignment Business Case
Prioritization Group List
Codes of Interest Commitments Ownership
Learning’s Training
Codes of Interest
Simulation Execution
6. Discussion of Results
This research has examined the project management processes within two financial
organizations with established project management units. Although this research was set
in two distinct project management organizations, one capital markets and one a large
South African Bank, the findings from this research indicated that in all participating cases,
the project management processes were essential in delivering the strategic growth
projects. Furthermore, it was found that these organizations intentionally devised project
management process approaches that were relevant to their individual competitive
environments and the demands of growth strategies. The researcher noted that these
companies had established project management practices that were in practical use for
more than ten years. The aim of this chapter will discuss and link the research study
question, which are the specific project management processes that drive the realization of
growth strategies and competitive advantage through the below research proposition
outlined in chapter three .
1. Project Management process selection is key in realizing growth strategies,
growth projects and competitive advantage;
2. An organizations Portfolio and Project Management contributes towards the
realization of growth strategies and competitive advantage;
3. What are other unique combinations of project management processes that
are key in the achievement of organizational growth strategies resulting into
competitive advantage?
40
The researcher will link the above propositions with main authors discussed in chapter two
and the research problem raised in chapter one.
6.1 Project Management process selection is key in realizing growth strategies,
growth projects and competitive advantage
Organisation project management selection ability was cited to be a key driver of strategy
implementation (Young et al, 2012). Project selection was also seen to be behind why
companies fail in execution strategy. We found that in both cases this ability to select and
prioritize projects was conceptualized and implemented in a disciplined approach within
the studied cases. The research findings on both the capital markets and bank case
studies confirm this important aspect of project management selection. A review of both
case findings will follow.
a. Capital Markets Case
“We use a non-hierarchical structure underpinned by a strong focus towards projects that
will enable us to deliver on revenue building projects”. “The capital markets project
management office process of project selection uses the portfolio top ten list which is the
basis of projects selection”.
The findings within the capital markets project management unit confirmed that there
organisation followed a disciplined approach in selecting and implementing projects. The
selection of these projects was based on strict a criterion that was a standard project
management process for achieving growth strategies and competitive advantage. This
criterion was firstly based on the strategic alignment of selected projects with Capital
Markets project executive management. The key mandate of this leadership group
ensured that projects align with the strategic direction of the company. This finding is in
line with the concept of linking projects with strategy which was initially proposed by the
project based organization (PBO) model which found that the widespread adoption of a
project management approach within organization’s that depend on project management
practices and methods had come to gradually influence strategy (Thiry & Deguire, 2007).
The Capital Markets project management office compiled a companywide Top Ten List
that was prioritized. All projects in this company wide top ten lists were selected and
prioritized based on the following key metrics;
1. Revenue – the future cash flows that can be derived from implementing a project
against the short and long term strategic growth objectives;
41
2. Operational Efficiency – the extent to which a project minimize all operational
waste;
3. Risk – the degree to which risk can be managed against the perceived benefits
of the pursuing a given project;
4. Legal / Compliance – the legal implications of implementing a given project and
associated legal costs of implementing that projects.
The above criteria served to support the view that there success of the company wide top
ten list model was depended on the project management maturity levels within the
organisaiton, the level of authority given to project managers, the level of precision of the
project definition and availability of competent personnel (Besner & Hobbs, 2008). This
ability to select project in time was also underpinned by the Capital Markets project
management office strong culture which is non-hierarchical, collaborative and had faster
executive management decision making that is the pinnacle and anchor of this process.
b. Infrastructure Case Study
“It starts with Group Strategy, so Group Strategy is defined and agreed by business”
“Then each of the business clusters defines and identifies initiatives that are going to
enable these strategies and they then come up with strategic projects.”
“We go through a process, called PlayPen, which is an offline application, that results into
a high level cost and benefit analysis. All strategic projects are loaded onto a PlayPen
application”.
“When projects are loaded into PlayPen, the projects are modelled in that simulation
environment using a tool called project office toolkit which has been perfected over ten
(10) years within the company”.
Perhaps similar in some ways to the Capital markets case findings was the realization
made on the infrastructure case study that proved that managing projects selection using a
number of approaches was treated with equal formality and discipline. The researcher
established that project selection is based on a flexible group wide process that is based
on the following key steps.
42
1. Strategic alignment – projects are essentially initiated by business based on a need to
achieve a specific strategic agenda, such as financial, compliance or other banking
licensing objective;
2. Clustering – each division or cluster within the infrastructure then devises a specific
business plan based on the overarching objective of the bank, that translates into specific
cluster objectives;
3. Business Initiative – this is then translated into specific business case within a cluster;
4. PlayPen Simulation – information is then fed into an online project simulation tool that
gives a high-level view of project resource constraints such as cost, time and resource.
This project cost and benefits modelling and simulation runs on Microsoft Project Toolkit;
5. Group Prioritization Forum – the business cluster project lists are then submitted to a
Group wide list, which is worth an estimated 600 Million in terms of project value, for
prioritization at a group level. This list is published for organization wide visibility and is
driven by executive business. This forum meets once every quarter and is driven by the
project management office.
There above findings confirm that there group-wide prioritization forum played a critical
role of ensuring that projects could support the overall revenue objectives of the
organisation. A huge challenge with projects was that managers lacked the ability to
proactively terminate projects at a crucial point and this could at least be managed through
a structured process with early warning for problematic projects that could fail
(Unger et al, 2012). The researcher established that the group-wide prioritization forum
quarterly meetings focussed on selecting projects that enabled the organisation to
implement the strategy through project portfolios and focussed on using the correct
metrics, such as complexity of the project, resourcing, financial and strategic alignment in
selecting projects by rigorously resorting to a strict selection routine and standardized
termination process which lead to transparency and thus better decisions and ultimately to
adequate allocation of resources. This view was supported by earlier work conducted by
Unger et al. (2012).
The researcher found that the group-wide prioritization forum played specific roles during
the critical stages in programme management which were strategic awareness,
understanding, planning, piloting, implementation, consolidation and customisation of all
group-wide project initiatives within the organisation (Shehu & Akintage, 2010). The
43
resulting outcome of these group wide prioritization forums was a group wide list, which is
worth an estimated 600 Million in terms of project value, for prioritization at a group level.
This list contained all project per business cluster that will be implemented for growth. This
active project management selection process led to the implementation of between 600-
700 million rand worth projects delivered annually. This is because there way we prioritize
projects is based on the strategic importance of the project and its legal and compliance
importance. Their research findings confirm that project selection is an important project
management process element that organisations have to master in order to deliver short,
medium and long term strategic growth.
This was confirmed by Ozturkcan & Buyukozkan (2010) who endorsed the importance of
project selection thereby ensuring optimal resource utilization and greater contribution of
projects towards companies missions, goals and strategies. The playpen simulation model
that the banking company used in project selection supported the Preference Ranking
Organisation Method for Enrichment Evaluations (PROMEE), which uses a logical model
for making calculations on the likelihood of that specific project selection would enable and
contribute towards the organisation growth objectives (Shakshi-Niaei et al,2011).
The reseacher established that the PlayPen simulation helps in executive management
decision making by revealing simulated information with regards to a projects highlevel
cost and benefit analysis. The starddization of this project management process within the
organsiation meant that all strategic projects were loaded onto a PlayPen application for
simulation on a consistent basis.
6.2 An organizations Portfolio and Project Management contributes towards the
realization of growth strategies and competitive advantage
The research findings on both the capital and infrastructure cases confirmed that both
organisations had a well-documented practice of managing growth projects using specific
project management processes. The researcher could clearly establish there existence of
these processes which were linked with the organisational strategic growth objectives.
Further in both cases, the researcher could determine how these processes were used in
order to deliver strategic growth projects. In most instances, the mix of these processes
was used for both strategic growth and operational projects. This was due to the
increasing realisation by the executive project management personnel that projects would
eventually become operational once implemented.
44
This finding agrees to two authors that were covered during chapter two who confirmed
that the scales for managing project complexity were identified to address many issues
regarding decision-making and project complexity starting with project prioritization within
a portfolio in order to focus on the most complex projects, comparison of present projects
with past projects, and one on one mapping and detailed comparison of two projects which
exists in the same portfolio in terms of project complexity ( Vidal et al, 2011). This is
because, the learning’s of implementing project management processes for strategic
growth projects was turned into a know-how that was documented and archived as part of
the organisation best practise. Further, there execution discipline behind the organisation
portfolio and project management indicated that executive management treated individual
projects as key enablers for strategic growth project. This agrees to the research view that
there’s awareness and empirical evidence that projects do drive implementation strategy
(Kwak & Anbari, 2009). The researcher will now share key findings in terms of the
problem statement and key propositions outlined in chapter three.
Capital Markets
“We manage all our portfolios and projects through the top ten list, which is reviewed every
month”
The below mentioned project management process steps were identified as central in the
delivery of Capital Markets Revenue Projects (Growth Projects) and also in portfolio and
programme management of companywide projects;
1. Portfolio Top Ten list – a project has to form part of the this list before it can be form part
of the portfolio and programme list;
2. Business case conceptualization and approval – shorter time frames executive approval
entail that projects are approved and selected based on risk complexity, potential
revenue, operational efficiency and legal and compliance;
3. Scope generation – a highly collaborative phase that involved internal sourcing of
solutions and ideas within other divisions. Includes review by the selected executive
management team for decision review. The team utilizes active internal consulting as well
and prototyping in order to minimize project costs;
45
4. Resource onboarding – team composition is by business need and support. Each team
is split according to a specific skill set to focus on growth projects within those business
units, namely Treasury, Trade, and Lending. The team is composed of 40 project
management teams supporting 60 business projects. Project challenges and objectives
are the core determinants of which skills to onboard;
5. Planning – Capital markets follows a mixed method approach composed of best
practice in project schedule planning, and resourcing;
6. Execution – this phase is managed actively through weekly engagements with business,
IT, Steercom teams by using an EPM software tool to track and measure progress. The
approach is practical in that it seeks to identify potential risks and issues that might present
themselves during execution. Examples of documents would be risk, issues and logs,
action minutes and strict governance in order to minimize risks. This findings further attest
to the purpose view alignment, which suggested that project management effectiveness
and efficiency is driven by the management ability to utilize the relevant tools and models
especially in the high-stakes management of large, complex projects (Browning, 2010).
The findings for the bank case study contained some key findings as well which will follow.
Infrastructure Case
“There way we prioritize projects is based on the strategic importance of the project and its
legal and compliance importance”.
“We have a standard artifacts for everything, there’s a standard schedule that when new
projects start, there project managers take schedule template and tailor out from the
schedule the relevant parts for execution”.
“All projects are loaded into a project office toolkit and then based on these dimensions,
they get filtered and a decision is made on which projects are strategic, of compliance
nature, internal or operational”.
“Senior executives will then agree on which projects important are based on the above
criteria”.
“So if a project adheres to one strategic dimension then it is held or if it fulfills one out of 10
of the required strategic dimension, then it will be prioritized lower.”
“The group wide prioritization committees take place once every quarter through the
following key steps or processes Initiate – once every quarter, Validate – every quarter,
check priority and swap projects on the group wide list based on strategic importance,
Contextual – review the market execution conditions and swap priority based on that.”
46
“All the above project executive control processes are driven and managed by the Project
Management Office”.
The case findings for the infrastructure portfolio and programme management confirmed
that the project management processes that were followed for growth projects covered the
below steps;
1. Strategic alignment – projects are essentially initiated by business based on a need to
achieve a specific strategic agenda, such as financial, compliance or other banking
licensing objective
2. Clustering – each division or cluster within the bank then devises a specific plan based
on the overarching objective of the bank, that translates into specific cluster objectives
3. Business Initiative – this is then translated into specific business case within a cluster
4. PlayPen Simulation – information is then fed into an online project simulation tool that
gives a high-level view of project resource constraints such as cost, time and resource.
This tool runs on MSP
5. Group Prioritization Forum – the cluster project lists are then submitted to a Group wide
list, which is worth an estimated 600 Million in terms of project value, for prioritization at a
group level. This list is published for organization wide visibility and is driven by business.
This forum meets once every quarter and is driven by the PMO.
6. Pre-Execution – this phase then details the granular aspects of the chosen projects and
project teams provide details on cost, time, resources, business requirements
specifications, high-level designs, and benefits
7. Business Case approval –
8. Execution – projects are essentially monitored in terms of financial risk, data complexity,
process impacts, people and resourcing impact, compliance. A Call Centre facility plays a
crucial role in guiding execution efforts such as required work products per phase in terms
of plans. This includes detailed designs on the solution as well. Project Execution is made
up of the Detailed Design, Build test and Fix, Implementation and Benefits tracking
phases.
A number of observations can be offered based on the literature review. The first one is
about a consistent approach towards managing the complexity and conflict posed by
managing portfolio programmes. It is evident from the capital markets and infrastructure
case study findings that both organisations made huge investments in building optimal
47
project management process models for managing complexity. This is in full alignment
with the findings that constraint programming, such as project selection and scheduling,
offered project planners an optimal project management portfolio to manage complexity
with specific resource constraints such as time (Liu & Wang, 2011).
The research findings further confirm that growth project success is a result of sound
programme management practises that organisation follow in managing portfolio and
programme management during growth strategy implementation. The case findings
underline the importance of human collaboration in terms of project leadership, and
program control, which were identified by Shehu and Akintage (2010) as common pitfalls
in programme management. The researcher will now turn to discussing the final
proposition, which shed new insights on the project management processes. The
importance of utilising a standard programme and portfolio management was further
emphasised by Turner (2010) who identified pproject management processes as
consisting of sub processes project start, project controlling, project coordination,
management of project discontinuities’ and project close down (Turner & Simister, 2009).
These considerations were evidenced in both cases, as executive management in both
cases focussed on project objectives, the scope of work, the project schedule and the
project costs, as well as the project organisation, the project culture, and the project
context (Turner & Simister, 2009) as important drivers of portfolio and programme
management.
6.3 Are there other unique combinations of project management processes that
are key in achieving organizational growth strategies resulting into
competitive advantage
The final discussion will share case study findings on other unique project management
processes that were key in achieving growth strategies. Both studied cases revealed that
these unique project management processes were used in conjunction with the above
project selection, portfolio and programme management approaches for managing growth
projects. Case study research findings indicate that these unique project management
processes did not fit the conventional definition of project management and were meant to
complement the standard project management. These processes did not fit the standard
definition of project management (PMI, 2008) in some instances. This concept of
managing for uncertainty was suggested by Petit (2012), who found that successful
48
organisation in growth strategies, did not manage risk on its own.Managing project
portfolios involved creating structures, introducing new processes, introducing new
business models within organisations which goes beyond project selection. (Petit, 2012).
Capital Markets Case Study
“We believe in strong collaboration and consultation within the company”
“Our leaders are fully engaged”
“We ensure cross functional alignment before we proceed with any project”
Some of the cited unique attributes of the capital markets project management processes
were reported to be human and leadership. These included a greater awareness on the
culture built and founded on the principles of greater accountability, rapid decision making
and follow up coupled with executive sponsor buy in and support. Collyer & Warren (2009)
cited culture, leadership style and communication as essential factors for managing the
unknown, dynamic project management environments. This is further confirmed by the
finding that the link between project management processes and strategy is determined to
be influenced by corporate strengths and weaknesses, which carries some strong basis
and merit as projects are conceived and implemented within the constraints of companies’
internal resources (Zeynep et al, 2009).
Another interesting aspect was the level of engagement and awareness on driving
collaboration within the organisation. This was achieved through peer review structures
that were built on an agile approach that relied on collaboration within the organisations.
These networks extended to other global parts of the organisation and served as key
networking links for implementing projects of similar risk and context profile.
This was raised by Killen & Kjaer (2012) who found that, project culture and process were
fundamental in achieving project success. Their research findings highlighted the
importance of both culture and process, and suggested that the culture factors may have
more influence than the process factors on an organisations understanding of project
interdependencies in achieving project success.
49
Infrastructure / Bank Case Study
“We go through a process, called PlayPen, which is an offline application, that results into
a high level cost and benefit analysis. All strategic projects are loaded onto a PlayPen
application”.
“When projects are loaded into PlayPen, the projects are modelled in that simulation
environment using a tool called project office toolkit which has been perfected over ten
(10) years within the company”
“This solution was developed internal staff”
“A Call Centre facility plays a crucial role in guiding execution efforts such as required
work products per phase in terms of plan”
“We have a standard artefacts for everything, there’s a standard schedule that when new
projects start, there project managers take schedule template and tailor out from the
schedule the relevant parts for execution”
The case findings within the infrastructure confirmed the existence of some unique project
management processes. The call centre facility helped with project management
execution, especially for growth projects. This ensured standardisation across the
organisation for faster execution of growth projects. Communication as a key project
management process was redefined to suit the contextual challenges of implementing
growth strategies. This capability meant that the project as a communication processes
and systems was transformed into a project management capability by combing a number
of project aspects with traditional project value drivers such as time, quality and cost were
integrated. This again supports work by Olsen & Johannessen (2011) concluded that an
important success factor for projects is to transform communication processes into
communication capabilities (defined as communication systems which combine economic/
technical communication, management communication, social communication and cultural
communication).
This strategic project management awareness is further testimony towards the project
management practice as an enquiry process (Lalonde, Bourgault & Findeli, 2012). This
practice within the infrastructure case study confirmed that an essential project
management process was to devise means in which project actors, in this instance
managers, could interact in faster way and drive decision making. The call centre feature
50
facilitates active engagement between project actors and provides a live platform for
sharing know how, information, decision making, and other project related information.
This was also found to be an instrumental project management support within the
organization, which enabled cross departmental standardization of project management
processes. This approach supports Lalonde et al. (2012) work which suggested that the
project management inquiry process is key in the project context and is composed of two
categories based on trends shaping the physical world and the what of the project
situation.
The PlayPen simulation model, served to differentiate the infrastructure case study. It is a
model that is based on the strategic risk makeup of the organisation, its individual growth
objectives, the total composition of the projects that are planned or completed, the
financial standing and budgetary requirements and finally the legal implications of
implementing a given project. The simulation model runs on a standard software platform
that has been perfected over a ten year period. This model is one of the internal staff
innovations. This unique project management process agrees with the view by Kapsali
(2010) that says that the systems thinking methods provide the flexibility to manage
innovation projects that organisations have to implement in order to remain competitive
and achieve growth targets(Kapsali, 2011). Another view is that the logical models for
making calculations on the likelihood of that specific project selection would enable and
contribute towards the organisation growth objectives helps with better project
management (Shakshi-Niaei et al, 2011). This is the case with the PlayPen simulation tool,
which meant that the infrastructure unit could plan and implement growth projects easier
through project management information that enables decision making and profiling of
projects based on the probability and likelihood to succeed.
We conclude this chapter with a table 14 that lists and maps the results of this study
against the findings of the Young et al, 2012; Thiry, 2007, Shehu & Akintage, 2007; Besner
& Hobbs, 2008; Shaksi et al, 2011; Turner & Simister, 2009; Vidal et al, 2011; Liu & Wang,
2011; Unger et al, 2012; Kapsali, 2011; Olsen & Johannessen, 2011; Lalonde et al, 2012;
Collyer & Warren, 2009 coupled with research propositions , and the final case study
research findings.
51
Table 14: Main Findings
Research Propositions Main Authors Key Case Study Project Management Process Findings
Project Management process selection is key in realizing growth strategies, growth projects and competitive advantage
Young et al, 2012; Thiry&Deguire, 2007; Besner & Hobbs, 2008,; Barbara Natalie Unger, 2012; Unger, Kock, Gemunden & Jonas ,2012; Shakshi-Niaei et al,2011; Shehu & Akintage, 2010; Shehu & Akintage, 2010; Ozturkcan, 2010; Srivannaboon, 2009.
Organisation Wide Project List Strategic Alignment Selection Criteria Prioritization forum
An organizations Portfolio and Project Management contributes towards the realization of growth strategies and competitive advantage
Vidal, Marle, Bocquet, 2011; Kwak & Anbari, 2009; Browning, 2010; Liu & Wang, 2011; Shehu and Akintage,2010; Turner,2010; Turner & Simister, 2009;
Company-wide standards Models for complexity Project leadership Project culture Communication
Are there other unique combinations of project management processes that are key in the achievement of organizational growth strategies resulting into competitive advantage
Petit,2012; Collyer & Warren,2009; Zeynek et al,2009; Killen & Kjaer,2012; Olsen & Johannessen,2011; Lalonde, Bourgault & Findeli, 2012; Kapsali, 2011; Shakshi-Niaei et al,2011; Besner & Hobbs, 2008.
Managing for uncertainty Peer review structures Communication processes Enquiry process Project Simulation Support structures
7. Conclusion and Research Limitations
7.1 Conclusion
There aim of this research case study was to establish if project management processes
lead to the achievement of growth strategies and competitive advantage. This was
investigated in a cross case study of two large organisations, both having established
project, portfolio and programme management practises. These practises were perfected
over a long period, in some instances over ten years. This research paper found that the
project management processes do drive the realization of growth strategies and these
were devised differently but contained similar elements of importance. The suggested
project management processes were found to be: (a) organisation wide projects lists that
are aligned with the strategic direction of the organisation. A selection criteria that is the
basis of adding projects onto a group-wide list and the ability to prioritize effectively when
external and internal factors change, (b) standard companywide project management
practices that deliver repeatable results underpinned by strong project management
culture, leadership and communication, and (c) managing for uncertainty which is built on
strong internal peer review networks that are facilitated by communication process and
support structures. The findings from this research demonstrate that the project
management processes are not fully agile to capture the dynamic environment that
businesses operate in.
52
(a) Organisation wide projects lists that are aligned with the strategic direction of
the organisation and selection criteria.
It follows that organisations eager to influence achievement of their individual growth
strategies need for formalise a process for collating projects into a visible company-wide
project list. This list must be the basis for selecting and prioritizing projects based on
strategic criteria. The criteria should include strategic growth criteria based on the
company’s business objectives, financial risk, skills sets, legal considerations and other
inherent capabilities that the company needs in order to deliver its growth mandate using
projects. The findings were both consistent in both cases.
(b) Standard companywide project management practices that deliver repeatable
results underpinned by strong project management culture, leadership and
communication.
The research findings emphasised the need for standardisation of project management
processes that were repeatable and produced repeatable results for strategic growth
success. This was dependent on the company’s ability to institutionalize these project
management processes and offer corresponding support for inexperienced project
managers. The extent to which a company could turn these processes into a management
culture supported by strong leadership that could take decisions in a group-wide
prioritization forum determined its growth project success. Effective project communication
across a different stakeholder base formed part of the research findings. Project
communication was found to be an important driver of executive decision making and was
essential within the company wide group prioritization forums. The communication served
to provide early warnings for executive management decisions, especially with failing
projects and those that needed funding. We conclude findings on
(c) Managing for uncertainty which is built on strong internal peer review networks
that are facilitated by communication process and support structures.
The process of internal peer review networks were identified as other unknown unique
project management processes that enabled project information sharing for decision
making. These networks served to aggregate decision making and were used as sounding
board for effective project management decision making. Some of these decisions
pertained to unknown project management challenges posed by implementing growth
strategies. These networks were global in nature as evidenced within the capital markets
case study.
53
Other unique project management processes uncovered by the research, pertained to the
call centre support structure. The call centre structure was intentionally setup to provide
project management execution guidance within the infrastructure organisation. The
benefits abound, as rework was minimised in some instances, and project managers could
reuse insights gained within other departments leading to crosspollination of ideas
instantly. The researcher identified this practise as unique as the literature review did not
identify the call centre support structure as an essential project management process for
supporting implementation.
Finally, the unique practise of having prepopulated project management templates stored
online for faster execution caught the attention of the case study research. Each growth
project work artefact was stored in a specific folder for access during and after working
hours. This came with necessary identification security for highly restricted strategic
growth project information.
The above findings were not exhaustive in nature but helped the researcher to understand
the project management processes that drive implementation of growth projects leading to
competitive advantage. The contribution of the research was an improved understanding
of the essential processes for managing growth strategies and the overall conclusion is
that organisations need group-wide projects lists that is prioritized and aligned with the
strategic direction of the organisation. It was further established by the researcher that
implementation of growth strategies was due to standard companywide project
management practices that deliver repeatable results underpinned by strong project
management culture, leadership and communication and finally managing for uncertainty
is built on strong internal peer review networks that are facilitated by communication
process and support structures selection criteria.
7.2 Research Limitations
The research findings in this paper were found to be mainly three (3) areas. Firstly, on the
role and importance of organisation wide projects lists that are aligned with the strategic
direction of the organisation and are based on selection criteria. Secondly, the significance
of the organisation ability to standardize companywide project management practices that
deliver repeatable results underpinned by strong project management culture, leadership
54
and communication and thirdly the need to manage for uncertainty through strong internal
peer review networks that are facilitated by communication processes and support
structures. However, the research reported is limited by mainly three (3) factors, namely;
Time frame;
Sample size and external validity;
Case Study Observations.
The researcher will briefly expand on the above limitations. The timeframe in which this
case study research was conducted spanned roughly eight (8) weeks, which meant that
the researcher did not have ample time to explore in deeper detail the relevant research
constructs beyond the project management unit which could have potentially include the
strategic units of the organisation as well. This limitation links well with the second one.
There was not the time to more thoroughly investigate and explore beyond the two large
organisations to establish if project management processes drive the realisation of growth
strategies. There researcher initially aimed to cover five(5) case studies spread across
government, retail, consulting, banking and information technology. There initial selection
of these cases could not establish the prevalence of project management established
practises and methods. This meant that researcher isolated about three (3) of potential
cases based on this realisation. This challenge could have been resolved successfully had
the researcher had enough time.
The other limitation that closely follows the time limitations pertains to the external validity
based on the selected cases. The researcher mainly had an opportunity to study the
information technology project management units primarily within the banking industries.
Further research could potentially aid in answering if there research findings of this paper
were applicable in other project management context in government, retail and consulting.
The case study research method plan mentioned on chapter four (4) stated that case
study observations (Yin, 2009) were an ideal secondary way to gather information should
the researcher fail to secure direct contact with the human cases. This method was aimed
at complementing interviews and archival data analysis in the form of observations in
meetings, where attendants interact with each and thus generate information about the
studied object. Furthermore, the case study research observations were conceived to take
55
the form of the researcher observing how and why actors implement project management
processes in order to achieve growth strategies. This was the fundamental challenge of
time frame as the two case studies that the researcher covered did not provide the
researcher with an opportunity to observe the cases. This limitation was primarily due to
the business planning cycles of the relevant case studies, which fell during the January to
April period. Some of the group-wide prioritization forums had already completed the
planning and review cycles. This inability to observe case studies meant that research
findings were not based on a full case study method as planned and highlighted on
chapter four (4). The considerations for future project management research work could
touch on risk and uncertainty, specifically what are the project management processes for
implementing innovation projects. This future research could specifically cover constructs
such as the management of strategy and stakeholders, mastering of technology, effective
teams and project management practises in innovation projects.
56
8. References
Asrilhant, B., Dyson, R. G. & Meadows, M. (2007, April 28). On the strategic project
management process in the UK upstream oil and gas sector. Omega International
Journal of Management Science, 35, 89-103.
Aubry, M., Hobbs, B. & Thuillier, D. (2007). A new framework for understanding
organisational project management through the Project Management Office.
International Journal of Project Management, 25, 328-336.
Bobillo, A.M., Lopez-Iturriaga, Tejerina-Gaite, F. (2010). Firm performance and
international diversification: The internal and external competitive advantages.
International Business Review, 19, 607-618.
Bhuijan, M.S.H. (2011). Tacit sources of competitive advantages of the
leading Chinese companies extracted from the longitudinal analysis of Chinese
Internationalisation. Procedia Social and Behavioural Sciences, 24, 727-736.
Bradley, C., Hirt, M. & Smit, S. (2011). Have you tested your strategy lately.
Mckinsey Quarterly Update, p. 13.
Browning, T. R. (2010). On the alignment of the purposes and views of
process models in project management. Journal of Operations Management, 28, 316-
332.
Bryde, D. J. (1995). Establishing a project organisation and a project management
process for telecommunications project management. International Journal of Project
Management, 13, 25-31.
Buyukozkan, G. & Ozturkcan, D. (2010). An integrated analytic approach for Six Sigma
project selection. Experts Systems with Application, 37, 5835-5847.
Chen, J., Reilly, R. & Lynn, G. (2005). The impacts of speed-to-market on new product
success: the Moderating effects of uncertainty. IEEE Transactions on Engineering
Management, 52, 199-211.
57
Chen, X., Zou, H.& Wang, T.D.(2009). How do new ventures grow? Firm capabilities,
growth strategies and performance. International Journal of Research in
Marketing, 26, 294-303.
Collyer, S. & Warren, C.M.J.(2009). Project management approaches for
dynamic environments. International Journal of Project Management, 27, 355–364.
Czuchry, A. J. (2003). Managing the project management process. Industrial
Management & Data Systems, 103 , 39-46.
Daniel, H.Z., Hempel, D.J. & Srinivasan, N.(2003). Project selection:
A process analysis. Industrial Marketing Management, 32 , 39-54.
Dastmalchian, A. & Boag, D. (1988). Growth strategies and performance in
electronics companies. Industrial Marketing Management, 17, 329-336.
D'Aveni, R.A., Dagnino, G.B. & Smith,K.G.(2010), The age of temporary advantage.
Strategic Management Journal,13,1371-1355.
Doyle, P. (1998). Radical strategies for profitable growth. European Management
Journal, 16, 253-261.
Dvir, A. & Shenhar, A.J. (2007). Reinventing Project Management. Harvard Business
School Publishing Corporation.
Ebert, C. & DeMan, J. (2008). Effectively utilizing project, product and process
knowledge. Information Software Technology, 50, 579-594.
Fahy, J. (2002). A resource based analysis of sustainable competitive advantage in a
global environment. International Business Review,11, 57-78.
Flamholtz, E. & Hua, W. (2003). Searching for competitive advantage in the Black Box.
European Management Journal, 21, 222-236.
58
Goedhuys, M. & Veugelers, R.(2011). Innovation strategies, process and product
innovations and growth: Firm level evidence from Brazil.Structural Change and
Economic Dynamics. [ Manuscript submitted for publication].
Retrieved from http://o-www.sciencedirect.com.innopac.up.ac.za/.
Hallgren, M. (2012). The construction of research questions in project
management. International Journal of Project Management, [ Manuscript submitted
for publication]. Retrieved from http://o-www.sciencedirect.com.innopac.up.ac.za/.
Hobbs, B. & Besner, C. (2008). Discriminating contexts and project management best
practises on innovative and non innovative projects. Project Management Journal, 39,
123-134.
Host, M. & Runeson, P. (2009). Gudelines for conducting and reporting case study
research in software engineering. Empirical Software Engineering, 14, 131-164.
Isik, Z., Arditi, D., Dikmen, I. & Birgonal, M.T. (2009). Impact of corporate
strengths/weaknesses on project management competencies. International Journal of
Project Management, 27, 629-637.
Johannessen, J-A. & Olsen, B.(2011).Projects as communication systems. creating a
culture of innovation and performance. International Journal of Information
Management, 31, 30-37.
Jugdev,K., Mathur, G. & Fung, T.S.(2007). Project management assets and their
relationship with the project management capability of the firm. International Journal of
Project Management, 25, 560-568.
Judgev, K. & Thomas, J. (2002). Project Management Maturity Models: The Silver
Bullets of Competitive Advantage. Project Management Journal, 33, 4-14.
Kapsali, M. (2011). Systems thinking in innovation project management: A match that
works. International Journal of Project Management, 29, 396-407.
59
Killen, C.P. & Kjaer, C. (2012). Understanding project interdependecies: The role of
visual representation, culture and process. International Journal of Project
Management, 20,554-566.
Kylaheiko, K., Jantunen, A., Puumalainen,K., Saarenketo, S. & Tuppura, A.(2011).
Innovation and internatiolization as growth strategies: The role of technological
capabilities and appropriability.International Business Review, 20, 508-520.
Lalonde, P.L., Bourgault, M., & Findeli, A. (2012). An empirical investigation of the
project situation: PM practise as an inquiry process. International Journal of Project
Management, 30, 418-431.
Lei, D., Slocum, J.W. & Pitts, R.A.(1999). Designing organisation for competitive
advantage: the power of unlearning & learning. Organisational Dynamics, 27 , 24-38.
Lei, D. & Slocum, J.W. (2002). Organisational design to renew competitive advantage.
Organisational Dynamics, 31, 1-18.
Lethbridge, T.C.,Sim, SE., & Singer, J.(2005).Studying software engineers:data
collection techniques for software field studies. Empirical Software Engineering, 10,
311-341.
Lindic, J., Bardaz, M. & Kovacic, H. (2012). Higher growth through the Blue Ocean
Strategy: Implications for economic policy. Research policy, 41, 928-938.
Liu, D.-Y. & Liu, J.(2012). Dynamic capabilities, environmental dynamism, and
competitive advantage: Evidence from China. Journal of Business Research.
[Manuscript submitted for publication].
Retrieved from http://o-www.sciencedirect.com.innopac.up.ac.za/.
Majumdar, S. (2010). How do they plan for growth in auto component business, A study
on small foundries of western India. Journal of Business Venturing, 25, 274-289.
Mavondo, F.T. & Weerawardena, J. (2011). Capabilities, innovation & competitive
60
advantage. Industrial Marketing Management, 40, 1220-1223.
Naaranoja, M., Haapalainen, P., & Lonka, H.(2007). Strategic management tools in
projects case construction project.International Journal of Project Management,
25,659-665.
Paria, T. M. (1990). Product growth strategies in young high-technology firms. Journal
of product innovation management, 7, 297-309.
Park, K., Cheong, S. & Jang, S. (2010). Firm growth patterns : examining the
associations with firm size and internationalization. International Journal of Hospitality
Management, 29, 368-377.
Peng, M.W.,Lee, S.-H. & Tan, J.J. (2001). The Keiretsu in Asia: Implications for
multilevel theories of competitive advantage. Journal of International Management,
7, 253-276.
Pennypacker, K. P. (2006, February). Project Management Maturity:An Assessment of
Project Management Capabilities Among and Between Selected Industries. IEEE
Transactions on Engineering Management, 531, 59-68.
Petit, Y. (2012). Project portfolios in dynamic environments: Organising for uncertainty.
International Journal of Project Management, 30, 539-553.
PMI. (2008). A Guide to the Project Management Body of Knowledge (4th ed.).
Newtown Square: Project Management Institute.
Russell-Hodge, J. (1995). Total project management: the customer-led organisation.
International Journal of Project Management, 13, 11-17.
Sauser, B. J., Reilly, R. R., & Shenhar, A. J. (2009). Why projects fail? How contingency
theory can provide new insights--a comparative analysis of NASA's Mars Climate
Orbiter loss. International Journal of Project Management, 27,665-679.
61
Shehu, Z. & Akintoye, A. (2010). Major challenges to the successful
implementation and practise of programme management in the consturction industry:
A critical analysis. International Journal of Project Management, 28, 26-39.
Suikki, R., Tromstedt, R.,& Haapasalo, H. (2006). Project management competence
development framework in turbulent business environment. Technovation, 26, 723-738.
Sampson, C. A. (2002). Critical Appraisal Guidelines for single case research. 8th
European Conference on Information Systems, pp. 100-109.
Sandeep Salunke, J. W.-K. (2011). Towards a model of dynamic capabilities
in innovation-based competitive strategy: Insights from project-oriented service firms.
Industrial Marketing Management, 40, 1251-1263.
Saunders, M. &. Lewis, P. (2012). Doing Business Research in Business &
Management. Edinburgh: Pearson.
Shehu, Z., & Akintoye, A. (2010). Major challenges to the successful
implementation and practise of programme management in the consturction industry:
A critical analysis. International Journal of Project Management, 28, 26-39.
Shih, H.M., &Tseng, M. M. (1996). Workflow technology-based monitoring and control
for business process and project management. International Journal of Project
Management, 14, 373-378.
Simister, J. T. (2009). Project management competencies in the project-oriented
organisation. The Gower Handbook of Project Management, 2, 159-160.
Smit, M. H. (2011, January). Have you tested your strategy lately. Mckinsey Quarterly
Update, p. 13.
Srivannaboon, S.(2009). Achieving competitive advantage through the use of project
management under the plan-do-check-act concept.Journal of General Management,
34,1-20.
62
Srivannaboon, S., Milosevic, D. Z. (2006). A two-way influence between business strategy
and project management. International Journal of Project Management, 24, 493-505.
Soy, S. K. (2006, December 02). Case Study as a Research Method. Retrieved July
3rd, 2012, from http://www.gslis.utexas.edu/:
http://www.gslis.utexas.edu/~ssoy/usesusers/1391d1b.htm
Starr, M. K. (1990). In the role of project management in the fast response
organisation. Journal of Engineering and Technology Management, 7, 89-110.
Thiry, M. & Deguire, M.(2007). Recent developments in project based
organisations.International Journal of Project Management. 25,649-658.
Titus, V.K., Corin, J. G. & Slevin, D.P.(2011). Aligning strategic processes in pursuit of
firm growth. Journal of Business Research, 64, 446-453.
Turner, R., Ledwith, A. & Kelly, J. (2010). Project management in small to medium-sized
enterprises: Matching processes to the nature of the firm. International Journal of
Project Management, 28, 744-755.
Unger, Kock, Gemunden & Jonas. (2012). Enforcing strategic fit of project portfolios by
project termination: An empirical study on senior management involvement.
International Journal of Project Management.
Wadeson, N. (2005). Projects as search processes. International Journal of Project
Management, 23, 421-427.
Webb, R., Ireland, D. & Justin, W. (2007). Strategic entrepreneurship: creating
competitive advantage through streams of innovation. Business Horizons, 50, 49-59.
Winter, M., Andersen, E.S., Elvin, R. & Levene, R. (2006). Focusing on business
projects as an area for future research: An exploratory discussion of four different
perspectives. International Journal of Project Management, 24, 699-709.
63
Winter, M. & Szczepanek, T.(2008). Project and programmes as value creation
processes. A new perspective and some practical implications.International Journal of
Project Management, 26,95-103.
Yang, L.-R. (2012). Implementation of project strategy to improve new
product development performance. International Journal of Project Management, 30,
760-770.
Young, H-K., Anbari, F. T. (2009). Analysing project management research:
Perspectives from top management journals. International Journal of Project
Management, 27, 435-440.
Young, R., Young, M., Jordan, E. & oConnor, P.(2012). Is Strategy being implemented
through projects? Contrary evidence from a leader in New Public Management.
International Journal of Project Management. [Manuscript submitted for publication].
Retrieved from http://o-www.sciencedirect.com.innopac.up.ac.za/.
Yin, R. K. (2009). Case Study Research, Design and Methods. California: SAGE Inc.