Progress of Electronics Stewardship at Sandia National Laboratories
June 5, 2007
Ralph WronsPollution Prevention Program Coordinator
Sandia National Laboratories, NM
Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company,for the United States Department of Energy’s National Nuclear Security Administration
under contract DE-AC04-94AL85000.
SN
L/N
M P
ollution
Preven
tion
•Multi-program Security Laboratory– NM & CA Sites, about 7M GSF– Non-proliferation of nuclear, chemical and
biological weapons – Critical energy infrastructures– Homeland security
•Collaborates with industry, universities & other government agencies to commercialize new technologies
• http://www.sandia.gov/
Sandia National Laboratories
SN
L/N
M P
ollution
Preven
tionPurpose
•FEC Partner goals
•Purchasing
•Operations
•Disposal
•Current Efforts
SN
L/N
M P
ollution
Preven
tion FEC Partner Goals: 2006
•Joined February 2006
•First year goals:– Vendors supply equipment with “Sleep”
feature enabled– “Sleep” features enabled on 100% of
existing monitors– Default to 2-side printing at copiers and
network printers (ongoing)(ongoing)
– Recycle 100% of non-reusable computers
SN
L/N
M P
ollution
Preven
tionEstimated impact –
purchase, operations and disposal
• FY06 purchases: $34.4M ($67M in FY05)• Estimated in service:
– 20,000 desktop systems (6300 desktops purchased in FY06)
– 5000 laptops– 4000 additional monitors– 30 months lifetime
• Estimated consumption:– ~13M kWh/yr, ~$518,000
SN
L/N
M P
ollution
Preven
tionPurchasing
• CRTs out, LCDs in – Energy Star compliant• FY06: Spent over $7.5 million to purchase:
– 2,822 desktop systems, 989 laptops, and additional 602 monitors, all of which are registered as EPEAT-Silver
• Preference for EPEAT Bronze or higher in JIT computer contract language
SN
L/N
M P
ollution
Preven
tion
“Green” Printer matrix
• Complementary to EPEAT, customized to SNL/NM• Trial basis at this point• Entry per product, scored by supplier• “Binary” scoring system for green features:
– Energy Star– Blue Angel– Duplexing– Network capable
• Higher score means green choice• Qualifying scores and an icon to be added to
vendor catalog entries
SN
L/N
M P
ollution
Preven
tionEnergy Star enabled
• Network-based enterprise delivery of Common Operating Environment (COE) software programs– Immense savings on (no delivery of) boxed manuals
and software– At end of FY06, deployed new program to activate
“sleep” features on network-connected monitors• Within first week, 9300 computer stations impacted• Estimated 12,000 monitors were finally changed
• To raise awareness, several internal e-newsletters sent to give details on enabling and estimated savings.
SN
L/N
M P
ollution
Preven
tionInstructions to save
energy and paper
•Fact sheet distributed to department secretaries
– Energy Star– Duplexing– Recycling of
consumables
SN
L/N
M P
ollution
Preven
tionReuse & Recycling
• 104,700 pounds reused or recycled during the FEC Electronics Reuse and Recycling Campaign (ERRC).
• Two separate shipmentsto an approved e-wasterecycling vendor– 76 pallets of CPU’s
• Receive certificate of destruction
SN
L/N
M P
ollution
Preven
tionPartnering
• (This week) New tent will be installed at our Reapplication Services yard.
• Developed an MOA and an associated procedures document
SN
L/N
M P
ollution
Preven
tion
New Tent
• Staging area for electronics prior to recycle
• House other P2 initiatives:– Toner Exchange– Office Supply reuse area – LCDs for CRTs, for energy
savings– Building materials recycling
SN
L/N
M P
ollution
Preven
tion FEC Partner Goals: 2007
1. Evaluate total cost of ownership for new purchases
2. Establish & promote policy to power off PCs when employees go home
3. Reuse or refurbish 25% of equipment
• Drawn from FEC annual award criteria• Seeking a 2007 Bronze or Silver award
SN
L/N
M P
ollution
Preven
tionPath Forward
•Develop an FEC fact sheet for internal awareness & training
•Pursue 16 objectives listed in FEC annual award criteria that were evaluated to be “achievable”–An additional 10 objectives “require
further investigation” for feasibility•Contract for e-waste recycling•New Energy Star designated equipment
SN
L/N
M P
ollution
Preven
tionCopiers are Printers too
• 10 Copiers enabled as network printers– Pre-existing capabilities not being used
– Pursuing fax and scan-to-email options– Objective: reduction of equipment fleet
• 450 copiers site-wide is long-term objective
SN
L/N
M P
ollution
Preven
tionPartnering for improved Electronics Stewardship
2007 DOE NNSA P2 Environmental Stewardship Awardfor Electronic Stewardship
SN
L/N
M P
ollution
Preven
tion
Acknowledgements: Sam McCord
THANK YOU
For further details, contact: