WELCOME MUMINEEN ENTREPRENEURS
DEAR MUMINEEN, BAAD SALAM IL JAMIL,Recently, in Ashara Mubarak, 1436, Aqa Mufaddal
Moula TUS exhorted mumineen to go into industries’
line of business, in resonance with the Govt. of India’s
Make In India initiative. We , at SMB Environmental
Projects Pvt Ltd are pleased to present 53 such SSI
units, which can be taken up at low investment and
are very profitable as well.
1
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
1. AIR AND OIL FILTERS
2
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
1. AIR AND OIL FILTERS
LAND REQUIRED : 5,000 sq ft
PLANT CAPACITY : 120,000 / YEAR
COST OF PLANT, MACHINE
& WORKING CAPITAL : Depends
MANPOWER REQ’D : 15
PAYOUT PERIOD : 2 - 3 YEARS
3
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
2. ALUMINIUM VENETIAN BLINDS
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
2. ALUMINIUM VENETIAN BLINDS
LAND REQUIRED : 4000 sq ft
PLANT CAPACITY : 180,000 sq met / year
COST OF PLANT, MACHINE
& WORKING CAPITAL : 30 Lakhs
MANPOWER REQ’D : 8
PAYOUT PERIOD : 2 - 3 YEARS
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
3. ALUMINIUM FOIL
LAND REQUIRED : 1000 sq ft
PLANT CAPACITY : / year
COST OF PLANT, MACHINE
& WORKING CAPITAL : 10 Lakhs
MANPOWER REQ’D : 5
PAYOUT PERIOD : 2 - 3 YEARS
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
4. AUTO CONTROL CABLES
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
4. AUTO CONTROL CABLES
LAND REQUIRED : 3000 sq ft
PLANT CAPACITY : 250,000 / year
COST OF PLANT, MACHINE
& WORKING CAPITAL : 50 Lakhs
MANPOWER REQ’D : 8
PAYOUT PERIOD : 2 - 3 YEARS
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected] 9
5. BAKERY PRODUCTS
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 10 Lakhs / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 30 Lakhs
- MANPOWER REQ’D : 15
- PAYOUT PERIOD : 3 YEARS
11
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
6. BARBED WIRE
- LAND REQUIRED : 2,000 sq ft
- PLANT CAPACITY : 600 T / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 50 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS
13
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
7. BITUMEN MODIFIED ASPHALT
14
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
7. BITUMEN MODIFIED ASPHALT
- LAND REQUIRED : 10,000 sq ft
- PLANT CAPACITY : 72000 / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 75 Lakhs
- MANPOWER REQ’D : 12
- PAYOUT PERIOD : 3 YEARS
15
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
8. BELT FASTENERS
16
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
8. BELT FASTENERS
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 36,000 BOXES / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 55 Lakhs
- MANPOWER REQ’D : 17
- PAYOUT PERIOD : 3 YEARS
17
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
9. BOLTS AND NUTS
18
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
9. BOLTS AND NUTS
- LAND REQUIRED : 4,000 sq ft
- PLANT CAPACITY : 3,000 T / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 175 Lakhs
- MANPOWER REQ’D : 20
- PAYOUT PERIOD : 3 YEARS max
19
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
10. CARD BOARD BOXES
20
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
10. CARD BOARD BOXES
- LAND REQUIRED : 2500 sq ft
- PLANT CAPACITY : 150,000 / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 55 Lakhs
- MANPOWER REQ’D : 15
- PAYOUT PERIOD : 3 YEARS max
21
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
11. CATTLE & POULTRY FEED
22
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
11. CATTLE & POULTRY FEED
- LAND REQUIRED : 12,000 sq ft
- PLANT CAPACITY : 2500 T / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 75 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
23
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
12. CHAINLINK FENCING
24
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
12. CHAINLINK FENCING
- LAND REQUIRED : 2,000 sq ft
- PLANT CAPACITY : 12 T / DAY
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 10 Lakhs
- MANPOWER REQ’D : 6
- PAYOUT PERIOD : 3 YEARS max
25
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
13. CORN FLAKES
- LAND REQUIRED : 20,000 sq ft
- PLANT CAPACITY : 300 T / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 55 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
27
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
14. CORRUGATED CEMENT SHEETS
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +9198602852 Email: [email protected]
14. CORRUGATED CEMENT SHEETS
LAND REQUIRED : 10,000 sq ft
PLANT CAPACITY : 200 SHEETS / DAY
PLANT & MACH: 20 LAKHS
WORKING CAPITAL: 5 LAKHS
MANPOWER REQ’D: 15
PAYOUT PERIOD: 2.5 YEARS
29
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
15. CORRUGATED FIBRE BOARD
30
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
15. CORRUGATED FIBRE BOARD
- LAND REQUIRED : 40,000 sq ft
- PLANT CAPACITY : 16 Lakhs / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 105 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
31
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
16. CORRUGATED MS SHEETS
32
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
16. CORRUGATED MS SHEETS
- LAND REQUIRED : 5,000 sq ft
- PLANT CAPACITY : 30,000 / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 80 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
33
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
17. DEHYDRATED ONION & GARLIC
34
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
17. DEHYDRATED ONION & GARLIC
- LAND REQUIRED : 12,000 sq ft
- PLANT CAPACITY : 300 MT / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 35 Lakhs
- MANPOWER REQ’D : 15
- PAYOUT PERIOD : 3 YEARS max
35
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
18. DETERGENT POWDER
36
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
18. DETERGENT POWDER
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 15000 / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 40 Lakhs
- MANPOWER REQ’D : 8
- PAYOUT PERIOD : 3 YEARS max
37
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
19. DIE CASTING UNIT
38
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
19. DIE CASTING UNIT
- LAND REQUIRED : 4,000 sq ft
- PLANT CAPACITY : 100 MT / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 60 Lakhs
- MANPOWER REQ’D : 7
- PAYOUT PERIOD : 3 YEARS max
39
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
20. EGG TRAYS
- LAND REQUIRED : 4,000 sq ft
- PLANT CAPACITY : 10 Lakhs / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 45 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
41
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
21. ELASTIC TAPES
42
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
21. ELASTIC TAPES
- LAND REQUIRED : 2,500 sq ft
- PLANT CAPACITY : 20 Lakh M / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 25 Lakhs
- MANPOWER REQ’D : 8
- PAYOUT PERIOD : 3 YEARS max
43
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
22. ESSENCE EXTRACTION
44
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
22. ESSENCE EXTRACTION
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 450 T / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 45 Lakhs
- MANPOWER REQ’D : 7
- PAYOUT PERIOD : 3 YEARS max
45
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
23. EGG ALBUMIN
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 300 T / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 195 Lakhs
- MANPOWER REQ’D : 15
- PAYOUT PERIOD : 3 YEARS max
47
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
24. FILE FASTENERS
48
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
24. FILE FASTENERS
- LAND REQUIRED : 1,500 sq ft
- PLANT CAPACITY : 300,000 / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 15 Lakhs
- MANPOWER REQ’D : 8
- PAYOUT PERIOD : 3 YEARS max
49
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
25. FLAVORED MINERAL WATER
50
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
25. FLAVORED MINERAL WATER
- LAND REQUIRED : 7000 sq ft
- PLANT CAPACITY : 5000 lit / day
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 95 Lakhs
- MANPOWER REQ’D : 15
- PAYOUT PERIOD : 3 YEARS max
51
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
26. FRUIT, JAM, JELLY
52
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
26. FRUIT, JAM, JELLY
- LAND REQUIRED : 1,500 sq ft
- PLANT CAPACITY : 100,000 Kg / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 25 Lakhs
- MANPOWER REQ’D : 5
- PAYOUT PERIOD : 3 YEARS max
53
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
27. GINGER GARLIC PASTE
54
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
27. GINGER GARLIC PASTE
- LAND REQUIRED : 1,500 sq ft
- PLANT CAPACITY : 10,000 Kg / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 8 Lakhs
- MANPOWER REQ’D : 3
- PAYOUT PERIOD : 2 YEARS max
55
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
28. HDPE WOVEN SACKS
56
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
28. HDPE WOVEN SACKS
- LAND REQUIRED : 7,000 sq ft
- PLANT CAPACITY : 250 MT / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 95 Lakhs
- MANPOWER REQ’D : 20
- PAYOUT PERIOD : 3 YEARS max
57
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
29. LAUNDRY SOAP
58
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
29. LAUNDRY SOAP
- LAND REQUIRED : 6,000 sq ft
- PLANT CAPACITY : 150 MT / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 22 Lakhs
- MANPOWER REQ’D : 7
- PAYOUT PERIOD : 3 YEARS max
59
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
30. LEATHER BELTS
60
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
30. LEATHER BELTS
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 150,000 Pc / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 15 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
61
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
31. LEATHER GARMENTS
62
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
31. LEATHER GARMENTS
- LAND REQUIRED : 4,000 sq ft
- PLANT CAPACITY : 15,000 Pc / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 40 Lakhs
- MANPOWER REQ’D : 12
- PAYOUT PERIOD : 3 YEARS max
63
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
32. LEATHER PURSES & HANDBAGS
64
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
32. LEATHER PURSES & HANDBAGS
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 60,000 Pc / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 15 Lakhs
- MANPOWER REQ’D : 15
- PAYOUT PERIOD : 3 YEARS max
65
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
33. LEATHER SHOPPING BAGS
66
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
33. LEATHER SHOPPING BAGS
- LAND REQUIRED : 2,000 sq ft
- PLANT CAPACITY : 20,000 Pc / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 12 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
67
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
34. MICROCELLULAR SHEETS
68
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
34. MICROCELLULAR SHEETS
- LAND REQUIRED : 7,000 sq ft
- PLANT CAPACITY : 75,000 sheets / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 55 Lakhs
- MANPOWER REQ’D : 25
- PAYOUT PERIOD : 3 YEARS max
69
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
35. MS BINDING WIRE
70
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
35. MS BINDING WIRE
- LAND REQUIRED : 4,000 sq ft
- PLANT CAPACITY : 720 MT / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 30 Lakhs
- MANPOWER REQ’D : 8
- PAYOUT PERIOD : 3 YEARS max
71
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
36. OIL MILL
- LAND REQUIRED : 15,000 sq ft
- PLANT CAPACITY : 3000 T / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 225 Lakhs
- MANPOWER REQ’D : 12
- PAYOUT PERIOD : 4 YEARS max
73
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
37. ORANGE SQUASH
74
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
37. ORANGE SQUASH
- LAND REQUIRED : 5,000 sq ft
- PLANT CAPACITY : 36,000 Lit / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 30 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
75
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
38. PAPER CUPS & GLASSES
76
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
38. PAPER CUPS & GLASSES
- LAND REQUIRED : 2,500 sq ft
- PLANT CAPACITY : 50 Lakhs / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 7 Lakhs
- MANPOWER REQ’D : 8
- PAYOUT PERIOD : 3 YEARS max
77
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
39. PAPER NAPKINS
78
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
39. PAPER NAPKINS
- LAND REQUIRED : 2,500 sq ft
- PLANT CAPACITY : 300 MT / YEAR
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 100 Lakhs
- MANPOWER REQ’D : 12
- PAYOUT PERIOD : 3 YEARS max
79
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
40. PAPER PIN & GEM CLIPS
80
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
40. PAPER PIN & GEM CLIPS
- LAND REQUIRED : 2,000 sq ft
- PLANT CAPACITY : 500 Pc / minute
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 25 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 3 YEARS max
81
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
41. PLASTIC BLOW MOULDING
82
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
41. PLASTIC BLOW MOULDING
- LAND REQUIRED : 4,000 sq ft
- PLANT CAPACITY : 150 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 75 Lakhs
- MANPOWER REQ’D : 8
- PAYOUT PERIOD : 3 YEARS max
83
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
42. POLYETHEN COLLAPSIBLE TUBES
84
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
42. POLYETHEN COLLAPSIBLE TUBES
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 72 Lakh Tubes / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 80 Lakhs
- MANPOWER REQ’D : 11
- PAYOUT PERIOD : 3 YEARS max
85
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
43. POTATO / BANANA WAFERS
86
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
43. POTATO / BANANA WAFERS
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 150 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 50 Lakhs
- MANPOWER REQ’D : 7
- PAYOUT PERIOD : 3 YEARS max
87
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
44. PVC PIPES & FITTINGS
88
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
44. PVC PIPES & FITTINGS
- LAND REQUIRED : 4,000 sq ft
- PLANT CAPACITY : 150 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 45 Lakhs
- MANPOWER REQ’D : 12
- PAYOUT PERIOD : 3 YEARS max
89
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
45. PVC WIRE & CABLE COATINGS
90
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
45. PVC WIRE & CABLE COATINGS
- LAND REQUIRED : 3,000 sq ft
- PLANT CAPACITY : 100 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 60 Lakhs
- MANPOWER REQ’D : 8
- PAYOUT PERIOD : 3 YEARS max
91
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
46. SCHOOL BAGS ( CANVAS)
92
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
46. SCHOOL BAGS ( CANVAS)
- LAND REQUIRED : 1,500 sq ft
- PLANT CAPACITY : 15000 Pc / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 12 Lakhs
- MANPOWER REQ’D : 12
- PAYOUT PERIOD : 3 YEARS max
93
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
47. SPECTACLE FRAMES
94
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
47. SPECTACLE FRAMES
- LAND REQUIRED : 1,500 sq ft
- PLANT CAPACITY : 10 lakh Pcs / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 10 Lakhs
- MANPOWER REQ’D : 12
- PAYOUT PERIOD : 3 YEARS max
95
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
48. THERMO FORM PLASTICS
96
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
48. THERMO FORM PLASTICS
- LAND REQUIRED : 1,500 sq ft
- PLANT CAPACITY : 400 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 50 Lakhs
- MANPOWER REQ’D : 5
- PAYOUT PERIOD : 3 YEARS max
97
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
49. WAX CANDLES
- LAND REQUIRED : 2,500 sq ft
- PLANT CAPACITY : 150 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 30 Lakhs
- MANPOWER REQ’D : 9
- PAYOUT PERIOD : 3 YEARS max
99
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
50. WELDED WIRE MESH
100
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
50. WELDED WIRE MESH
- LAND REQUIRED : 10,000 sq ft
- PLANT CAPACITY : 3600 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 175 Lakhs
- MANPOWER REQ’D : 15
- PAYOUT PERIOD : 4 YEARS max
101
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
51. WHEAT FLOUR MILL
102
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
51. WHEAT FLOUR MILL
- LAND REQUIRED : 2,500 sq ft
- PLANT CAPACITY : 150 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 25 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 4 YEARS max
103
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
52. WIRE NAILS
- LAND REQUIRED : 5,000 sq ft
- PLANT CAPACITY : 600 T / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 40 Lakhs
- MANPOWER REQ’D : 7
- PAYOUT PERIOD : 4 YEARS max
105
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
53. WOOD SCREWS
106
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
53. WOOD SCREWS
- LAND REQUIRED : 7,000 sq ft
- PLANT CAPACITY : 9 Mil Pcs / year
- COST OF PLANT, MACHINE
& WORKING CAPITAL : 25 Lakhs
- MANPOWER REQ’D : 10
- PAYOUT PERIOD : 4 YEARS max
107
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]
THANK YOUALLAH AQA AALI QADR MUFADDAL MOULA NI UMAR
MUMINEEN NI RAAHNUMAI WAASTE SEHA AAFIYAT MA TA ROZ E QAYAMAT DARAAZ KARE…AAMEEN.
SMB ENVIRONMENTAL PROJECTS P LTD. Mobile: +919860240852
Email: [email protected]