Page 1: Production diary schedule

Production schedule

Name: Rehana Whiteley

Date Action Taken04/5/15 I first started to create the presentation and assets- e.g logo, menu

07/05/15 I am half way through completing the whole presentation, I have finished creating the logo etc. and am now happy with the appearance of the app up to now

11/05/15 I changed the app menu but I have finished everything else for example what I want to be interacted etc.

13/05/15 I started the story board for my presentation, I think ill end up altering it along the way.

28/05/15 I am now starting the presentation and have decided to learn different effects in flash before I start the presentation probably.

02/06/15 Up to now I have finished the first few scenes on flash and am happy with the presentation. I have used how to do fade in and out and motion tween

09/06/15 I’ve nearly finished most of the presentation. I am now starting the ‘interactive’ bit off the presentation.

12/06/15 I’ve finished doing the ‘interactive’ bit on the presentation which was a little difficult but I figured it out and is much easier to do now.

15/06/15 I have finished doing the whole presentation and am uploading.