Previous Week’s Goals StatusGoal Status Narrow down materials through 98% Completetesting (all)Continue to learn Inventor In ProcessTesting In Process
Design Analysis/Testing
Results From Testing
Back wall set to 4.5”
Gap between rollers at 5.25”
Plastic wheel rollers show the most promise
PrototypesProto-type # 3
Adjustments leading up to prototype 4
Angles within grabber
Materials on rollers
Power supplied
Prototypes
Grip Tape Roller
Rubber Bike Tube Roller
Plastic Wheel Roller
Manufacturing & Assembly
Bevel gear proof of concept
Polycarbonate guardsTroy tapping holes
CAD/Drawings
Angled Main Rollers Assembly
Alternative View
CAD/Drawings
Next Week: Goals
• Ongoing- Continue to machine parts for the final
grabber design(All)
• Thursday- finished practice roller assembly (All)
• Continue to learn inventor (Mr. Fox)
Questions?