Presented by| Keith McCullough, Sydney Hawran & Amy Lamott Vargas
Complex Issues With New Project Delivery Techniques
I - 15 Norco – Riverside County
Historic approach to project implementation· Design – Bid – Build
- fixed ROW lines
- consistent with RON descriptions
- inflexible, long lead time, costly
That was then . . .
I-5 at SR55 Orange County – Design Bid Build
Duration and complexity of projects increase- Often dense, urban settings- Duration of Temporary Construction
Easements increase- Investigative entries and the timing of permanent
takings
That was then . . .
City of Livermore v. Baca – Temporary Severance Damages
City of Livermore v. Baca – Temporary Severance Damages
Contemporary techniques for dealing with ever-increasing project complexities- Pros and cons with each technique- Challenges become opportunities- Flexibility in current ROW practices: “Every day counts”
. . . this is now
Design – Build- Shorter lead times- Adjust more easily to field conditions- One stop shop project- Changes to ROW lines create challenges- Potential for increased acquisition costs
. . . this is now
Baseline condition – Lakeview Grade Separation – Design Build
Design Sequencing– advantages / disadvantages– potential legal implications
. . . this is now
OTAY MESA CROSSING – Design Sequencing
OTAY MESA CROSSING – Design Sequencing
Construction Management General Contractor– Pros / Cons– Coordinated team approach – ROW Strategic Team– Business decision: do the project management
flexibility merits outweigh potential delay and cost increases of legal challenges?
. . . this is now
I-5 North Coast– Construction Management General Contractor
Questions?
Keith E. McCullough, Esq.AlvaradoSmith, APC(714) [email protected]
Amy Lamott Vargas Deputy District Director
Right of Way DivisionCaltrans District 11
(619) [email protected]
Sydney H. Hawran, MAIHawran & Malm, LLC
(949) [email protected]