RETROFIT AND ECOLOGY PROGRAMRETROFIT AND ECOLOGY PROGRAM
A rehabilitation project funded by SOP Environment A rehabilitation project funded by SOP Environment
Member COGEN Romania Oct 2011Member COGEN Romania Oct 2011
CET Govora
ACTIVITIES OF CET GOVORA
► Electricity production – Conection to NES and OLTCHIM by 110 KV lines;► Industrial steam production – Industrial Platform South Rm. Vâlcea;► District Heating for Rm. Vâlcea;► District Heating for Călimăneşti (geotermal);► District Heating for Băile Olăneşti;
Turnover: 74 mil euro/2008 - 70 mil Euro/2009, 2010.
Oct 2011
TitleAdd your text
ACTUAL TECHNOLOGIC DIAGRAM OF CET GOVORA
4 turbines * 50 MW2 new turbines = 11MW
C7 C6 C5 C4 C3
140 bar
35 bar
13 bar
6 bar
DH
130 grd C
TA6 TA5 TA4 TA3
Stack nr. 3 LCP 3
Stack nr. 2 LCP 2
Stack nr.1 LCP1
2 natural gas
boilers reserve
Oltchim 70 t/hUSG 45 t/h
Oltchim 120 t/hUSG 72 t/h
Oltchim 65 t/hUSG 1 t/h
Internal Serv. 60 t/h
Rm Valcea SACET Summer 20 MW
Winter 160 MW
3 lignite boilersbase operation
TA9
TA8
1,2 bar
SRM GN
TRANSGAZ
Ash deliveryAshbunk
deposit
CHP Vilcetproject
CET Govora Oct 2011
CET GOVORA – ENVIRONMENT PROBLEMS Environment problem - Objectives Conformation Term
Ecologic evacuation, depositing and utilisation of ash, slag and desulphurization products – technology of dense fluid
dec. 2012Ash certification for
concrete and for cementCO2 certificates for the period 2008 – 2012 dec. 2012
SolvedDust emissions below 50 mg/NmcElectrofilters retrofit
Boilers 5 and 6 – dec. 2011Leasing tender in process
Boiler 7– dec. 2010partially solved
SO2 emissions below 200 mg/Nm3
Actual emissions = 6000-9000 mg/Nmc Boilers 5 and 6 – dec. 2013
Boiler 7 – dec. 2011SOP Environment
NOx emissions below 200 mg/Nm3
Actual emissions = 250 mg/Nm3Boilers 5 and 6 – dec 2013
Boiler 7 – dec. 2011SOP Environment
Waste water neutralising and evacuation to dense fluid installation dec. 2011partially solved
Waste management – Selective collecting, temporary depositing permanentSolved
MAIN CLIENTS OF CET GOVORA
CET Govora Oct 2011
CET Govora delivers electricity produced in cogeneration based on contracts with the distributors CEZ, ENEL and some divisions of ELECTRICA S.A. as well
on the concurential markets (day ahead market and equilibration market).
OOltchimltchim:: delivery of steam based on an energetic agreementand on yearly contracts;
District Heating Rm. ValceaDistrict Heating Rm. Valcea:: CET Govora has a concession contract for CET Govora has a concession contract for DH servicesDH services for 25 years, having direct comercial relationships with the clientsfor 25 years, having direct comercial relationships with the clients -- individual consumers, institutions individual consumers, institutions and and companies;companies;
Sodic factories Govora Ciech (U.S.G.):Sodic factories Govora Ciech (U.S.G.): delivery of steam based on delivery of steam based on aa 10 years 10 years ccontractontract (2007-2017);(2007-2017);
CLIENT – DISTRICT HEATING
• SSource: CET Govora –ource: CET Govora – able to deliver up to 225 MW;able to deliver up to 225 MW;• Transport network 29 km - belongs to CET GovoraTransport network 29 km - belongs to CET Govora an was partially retrofited;an was partially retrofited;• 40 thermal points – concession from the municipality Rm. V40 thermal points – concession from the municipality Rm. Vââlcealcea -- retrofited retrofited 100%100% and fully automaticand fully automatic• Distribution network – 250 km –Distribution network – 250 km – concession from the municipality Rm. Vconcession from the municipality Rm. Vââlcealcea –– retrofitedretrofited partially• Investment of CET Govora during 2002Investment of CET Govora during 2002 -- 2010 = 15 milion2010 = 15 milionss Euro Euro
CET Govora Oct 2011
CONSUMERSCONSUMERS
Total population Rm. VTotal population Rm. Vââlcea: 130.000 inhabitans, 33.000 dwellings;lcea: 130.000 inhabitans, 33.000 dwellings;Connected to DH : 90.000 inhabitants, 28.000 dwellings;Connected to DH : 90.000 inhabitants, 28.000 dwellings;Disconections : Disconections : 6%6%Yearly deliveries = 280.000 Gcal = 325.000 MWh;Yearly deliveries = 280.000 Gcal = 325.000 MWh;Base consumptionBase consumption - hot tap water = 18 MW; summer operation 5000 h/an- hot tap water = 18 MW; summer operation 5000 h/anAverage winter – heat and hot tap water = 100 MW;Average winter – heat and hot tap water = 100 MW;PeakPeak – heat and hot tap water– heat and hot tap water =160 MW; peak operation 1500 h/an; =160 MW; peak operation 1500 h/an;
THE DH SYSTEM:THE DH SYSTEM:
SOURCES OF HEAT FOR DH
CET Govora Oct 2011
Single sourceSingle source CET Govora CET Govora with the equipments with the equipments: : - Boiler nr.Boiler nr. 77 on lignite retrofited and boiler nr.on lignite retrofited and boiler nr. 44 on natural gason natural gas asas reserve as winter source.reserve as winter source. A rehabilitation project funded by SOP Environment - New cogeneration plant on - New cogeneration plant on biomasbiomass as summer souces as summer souce ““ECOCET Govora”ECOCET Govora”
The investments program for retrofit of boiler nr.7The investments program for retrofit of boiler nr.7 is financed by is financed by SOP Environement SOP Environement == 70 70 milio milionns euro s euro (incl TVA) and includes(incl TVA) and includes::-- AA desulphurization plant to achieve SO2 emissionsdesulphurization plant to achieve SO2 emissions 2 24343 mg/Nm mg/Nm33-- Retrofit of the combustion installations to achieveRetrofit of the combustion installations to achieve NOx NOx emissionsemissions 197197 mg/Nm mg/Nm33 -- Ret Retrofit of two feed water pumps of the boiler by installing frequency convertersrofit of two feed water pumps of the boiler by installing frequency converters- Retrofit of the transport pumping system by installing 4 new pumps with frequency Retrofit of the transport pumping system by installing 4 new pumps with frequency converters.converters.
Additional investments program for retrofit DH systemAdditional investments program for retrofit DH systemInvestment estimatedInvestment estimated = 30= 30 milion Euro (cofinancing 50% SOP Enviromilion Euro (cofinancing 50% SOP Environnment)ment)
CET Govora Oct 2011
CET GOVORA – THE CONFIGURATION OF THE SOURCE FOR DH AFTER 2013
C7
BV1
BV2
40 Gcal/h
40 Gcal/hEPRTf I EPRTf V
BB3
80 Gcal/h
TA6
G
50 MW
EPRTf Tr.II
Retur
Tur
CET Govora – Coal and gas – Winter surce
Sursa en.termica
biomasa
ORC Turnine
Boiler VaraEPRTt V
G4.6 MW
ECOCET Govora – CHP Biomass- summer surce
Acumulator caldura
PROJECT FOR SUMMER SOURCE - THE BIOMASS PLANT
CET Govora Oct 2011
The yearly deliveries of the biomass plants will be:- Heat = 120.000 MWh;
- Electricity = 34.000 MWh;The yearly biomass demand 81.500 tons
1. The wood availabilities in an area of 150 km are of 120.000 t/year wood wastes fromwood industries
2. During the 3 last years some quantities of biomass were coincinerated with coal in the coal boilers:- year 2008 = 40.000 t- year 2009 =16.000 t- year 2010 = 12.500 t
3. The investment is mandatory by the strategy for DH of the city Rm. Vâlcea.
4. The investment in the plant and annex facilities (biomass storage, grinders, transporters) is estimated at 22.5 mil euro and is feasible until december 2013; the repay of the credit will be
realised by selling the green certificates on the market, in aproximatively 5 years after start up.
Thank you for your attention !