Download ppt - Pre Qualification 2

Transcript
Page 1: Pre Qualification 2

Alu Nasa Pre – Qualification

Page 2: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Index

General Company Information

Introduction 1

Organization Chart 2

Fabricator License 3 Company

Resources (Staff & Manpower & Management CV’s) 4 Company

Resources (Plant, Equipment & Factory) 5 List

of Completed Project 6

Page 3: Pre Qualification 2

1.General Company InformationIntroduction

General Information

Operating Company Alu Nasa – Doha, Qatar Alu Nasa – Dubai, UAE

Address P.O. Box 22120, Doha, Qatar P.O. Box 5560, Dubai, UAE

Telephone +974 460 2791 +971 4 8804500

Facsimile +974 460 1905 +971 4 8804501

E-mail [email protected] [email protected]

Factory and Office Location Street No. 23, Gate No. 53, Industrial Area, Doha, Qatar

Office: Showroom No. 3, Ras Al Khor Complex, Ras Al Khor, Dubai, UAE Factory: Plot No. 599-1132, Dubai Investment Park, Jebel Ali, Dubai, UAE

Contact Person Osama Odeh – Regional General ManagerE-mail: [email protected] No. +971 50 4502771

Ayman Shawki – Contracts Manager – Doha Manager In chargeE-mail: [email protected] No. +974 58 40850

Pre – Qualification Document

Alu Nasa

Page 4: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Company History

Alu Nasa, a Qatari Company specialize in Civil Aluminium Works, is a division of the Salam International Investment Limited. The Parent organization is mainly involved in contracting, trading, technical and industrial services.

Established in 1992, Alu Nasa has established its reputation as one of the prominent companies in the field of aluminium works by offering high quality products and services.

The growth of the company has been achieved by the owners’ desire to build the company into a world class organization dedicated to design, produce and supply quality products which conform to specification required by the customer, fulfils all legal and regulatory requirements as well as independent International Standards and to enhance customer satisfaction. It is the company vision to build upon its resources using latest technology, customer value and employee satisfaction, as part of Alu Nasa grown to become one of the leading specialist companies in its field.

The Board of Directors of Salam International decided to transform Alu Nasa to new era by upgrading the company facilities in Doha, starting new business unit in Dubai and employing new management team and department heads with international exposure and vast experience in this field.

The new facilities in Dubai will be operational on May 2007 in Salam new facilities at Jebel Ali Industrial Area with a total built up area of 16,000 m2 using the state of art machinery.

Page 5: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Alu Nasa areas of Work interest include:

Unitized Curtain Wall System (2 – side and 4 – side structural glazing) Stick System Curtain Wall Frameless Point Supported Glazing Aluminium Composite / Stainless Steel Cladding Skylights Aluminium and Stainless Steel Handrails Motorized Roller Shutters Frameless Glass for Shop Fronts Partitions for Commercial Shop and Offices

Associated Companies Alu Nasa represents:

Installux Gulf – Alu Nasa is the only exclusive authorized fabricator and installer forInstallux Aluminium Systems in Qatar

Schuco International – Alu Nasa is the only official licensee of the International Group for Schuco Aluminium Systems for the fabrication of doors, windows

and facades in Qatar.

In addition Alu Nasa has established a close relation with the following renowned suppliers:• Dorma (Hardware)• Wacker (Sealant)• Al Clad (Cladding)• Schott (Glass)

• Emirates Glass (Glass)• Gulf Glass Industries (Glass)• Tremco (Sealant)• Dow Corning (Sealant)• Fujairah Rockwool (Insulation)

Page 6: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

2 Organization Chart

Page 7: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Page 8: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

3 Fabricator License

Page 9: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Fabricator License

Page 10: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

4 Company Resources (Staff & Manpower & Management CV’s)

Page 11: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Company Personnel

Resources – Personnel

Management 14

Engineers/Technical Staff 25

Finance and Administration 10

Supervisors/Foreman 15

General Services 10

Skilled Workers 341

Semi – Skilled Workers 75

Labourer 50

Total 540

Page 12: Pre Qualification 2

Management CV’S

1. Regional Manager - Osama Y. Odeh

2. Contracts Manager - Ayman Shawki

3. Technical Manager - Hasan Baig

4. Projects Manager - Dietmar Reimer

5. Production Manager - Peter O’Reilly

6. Tendering & Sales Manager - Dubai - Syed Imtiaz

7. Tendering & Sales Manager - Doha - Philippe Karam

8. Design Head – Doha - Sreekumar Damodaran

9. Project Manager - C. R. Manjunath

10. Installation Manager - Fernando Manuel Gutierrez

11. Head of Engineering – Dubai - Ramanujalu Sarangapany

12. Senior Planning Engineer - Idi Nazir

13. QA/QC Engineer - Fhelvie Nebre

Pre – Qualification Document

Alu Nasa

Page 13: Pre Qualification 2

Profile of Mr. Osama Y. Odeh – Regional General Manager

Pre – Qualification Document

Alu Nasa

Nationality Jordanian

Academic Qualification M.S. Structural Engineering from Nebraska State University at Lincoln – USA

B.S. in Civil Engineering from Jordan University At Amman, Jordan

No. of Experience 23 years of experience in Aluminium field

Employment History

Managing Director - 2 years with Schmidlin LLCManaging Director - 6 years with Mero Middle EastTechnical Manager - 4 years with Mero Asia Pacific – SingaporeTechnical Manager - 8 years with Alico Middle EastProject Manager - 4 years with M. Odeh EstablishmentStructural Engineer - 3 years with Saprico Construction Company

Page 14: Pre Qualification 2

Profile of Mr. Ayman Shawki – Contracts Manager / Doha In-Charge

Pre – Qualification Document

Alu Nasa

Nationality Egyptian

Academic Qualification Master in Project Management – Texas A and M, USAB.Sc. in Civil Engineering from Cairo University, Egypt

No. of Experience 20 years of experience in construction field

Employment History

Projects Manager - 3 years with Thinet International Doha, QatarProjects Manager - 3 years with AIC International and Partners

Muscat, OmanSeveral Managerial - 14 years with Arabian International Construction Co.Positions Cairo, Egypt

Page 15: Pre Qualification 2

Profile of Mr. Hasan Baig – Technical Manager

Pre – Qualification Document

Alu Nasa

Nationality British

Academic Qualification BS in Mechanical Engineering

No. of Experience Total 35 years, 5 years in Aeronautics Engineering 30 years in Curtain Walling Industry

Employment History

Design Manager - 16 years with Schmidlin LLCTechnical Manager - 2 years with Alico UAEDesign and Development Manager - 2 years with Altai-seer Group – Riyadh, KSA

Design Engineer - 10 years with Alupco – Dammam, KSAAssistant Supervisor - 5 years with Hindustan Aeronautics

Page 16: Pre Qualification 2

Profile of Mr. Dietmar Reimer – Projects Manager

Pre – Qualification Document

Alu Nasa

Nationality German

Academic Qualification B Tech. in Mechanical Engineering

No. of Experience 24 years of experience in construction field in Europe and Middle East

Employment History

Installation Manager - 20 years with Schmidlin LLCMechanical Engineer - 4 years with Teldec GmbH Nortorf Germany

Page 17: Pre Qualification 2

Profile of Mr. Peter L. O’Reilly – Production Manager

Pre – Qualification Document

Alu Nasa

Nationality Canadian

Academic Qualification Robert Clack Grammar School, England

No. of Experience 38 years of experience in Aluminium Field

Employment History

Project Manager - 10 years with Skylight Design and DraftingProduction Manager - 10 years with Mannai Aluminium and Glass Ltd.Freelancer - 5 years with Own Business in CanadaDesign Manager - 2 years with Petina Ltd.Work Study Engineer - 4 years with Henderson DoorsTechnician & Draftsman - 6 years with Henderson Doors

Page 18: Pre Qualification 2

Profile of Mr. Syed Imtiaz – Tendering & Sales Manager

Pre – Qualification Document

Alu Nasa

Nationality Indian

Academic Qualification Diploma in Electrical Engineering

No. of Experience 18 years of experience in Aluminium Field

Employment History

Tendering & Sales Manager - New AppointmentEstimation Manager - 3 years with Schmidlin LLCEstimation Manager - 2 years with Gotz GmbHEstimation Manager - 2 years with Gartner/PermestlisaEstimation Manager - 19 years with Alupco

Page 19: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Profile of Mr. Philip Karam – Tendering & Sales Manager– Doha

Nationality Lebanese

Academic Qualification B. S. in Architect

No. of Experience 31 years of experience in Aluminium Field

Employment History

Project Manager - 1 year with Alu Nasa DohaConstruction Manager - 3 years with Aluminium Gulf RayAssistant Manager - 3 years with Najwal AluminiumMarketing Manager - 4 years with Nakhle Zgheib and CompanyAssistant Manager - 1 years with Domotec – Techno GroupSenior Architect - 6 years with Architect Design Unit OfficeArchitect - 1 year with Ziad AKL OfficeArchitect - 1 year with Bonifils OfficeArchitect - 1 year Mr. Joseph Karam Office

Page 20: Pre Qualification 2

Profile of Mr. Sreekumar Damodaran – Design Head, Doha

Pre – Qualification Document

Alu Nasa

Nationality Indian

Academic Qualification B. Tech in Civil Engineering

No. of Experience 20 years of experience in Aluminium Field

Employment History

Design Head - 13 years with Alu Nasa Doha, QatarStructural Engineer - 3 years with Own BusinessSite Engineer - 4 years with Government of Indian and Private Projects

Page 21: Pre Qualification 2

Profile of Mr. C. R. Manjunath – Project Manager

Pre – Qualification Document

Alu Nasa

Nationality Indian

Academic Qualification Bachelor of Science in Civil Engineering

No. of Experience 19 years of experience in Aluminium Field

Employment History

Project Manager - 2 years with Schmidlin LLCProject Manager - 3 years with Mero Middle East LLCProject Manager - 5 years with Al Balagh Trading and Contracting

CompanyExecutive Construction - 3 years with Larsen and ToubroConstruction Engineer - 8 years with Nuclear Power Construction of India

Page 22: Pre Qualification 2

Profile of Mr. Fernando Manuel Gutierrez – Installation Manager

Pre – Qualification Document

Alu Nasa

Nationality Filipino

Academic Qualification Bachelor of Science in Civil Engineering

No. of Experience 28 years of experience in Aluminium Field

Employment History

Senior Installation Manager - 2 years with Schmidlin-TSK AGInstallation Manager - 1 year with Schmidlin LLCInstallation Manager - 5 years with Schmidlin AGInstallation Manager - 2 years with GOTZ Middle EastInstallation Manager - 2 years with MBM GmbH GermanyAssistant Installation Manager - 6 years with NALFAB Co.Foreman/Supervisor - 12 years with Alupco

Page 23: Pre Qualification 2

Profile of Mr. Ramanujalu Sarangapany – Design Head, Dubai

Pre – Qualification Document

Alu Nasa

Nationality Indian with Singapore Citizen

Academic Qualification Master in Engineering (Structures)

No. of Experience 21 years of experience in Aluminium Field

Employment History

Technical Head - 1 year with MeroDesign Manager - 6 years with DG Consulting Engineers, SingaporeSenior Design Engineer - 4 years with DG Consulting Engineers, SingaporeDesign Engineer - 1 year 6 months with DG Consulting Engineers,

SingaporeSite Engineer - 9 years with Natarajan Firm India

Page 24: Pre Qualification 2

Profile of Mr. Idi Nazir – Senior Planning Engineer

Pre – Qualification Document

Alu Nasa

Nationality Indian

Academic Qualification Bsc. In Civil EngineeringSSM College of Engineering

No. of Experience 10 years of experience in Construction Field

Employment History

Planning Engineer - 2 years with Schmidlin LLC, Dubai, UAEPlanning Engineer - 6 years with Azmeel Contracting & Const. Corp., KSAProject Engineer - 1 year with Nassir Manea Wabran Co. and Partners.

SEC Constracts, KSASite Engineer - 1 year with Construction Engineering, Kashmir, India

Page 25: Pre Qualification 2

Profile of Ms. Fhelvie Nebre – QA/QC Engineer

Pre – Qualification Document

Alu Nasa

Nationality Filipino

Academic Qualification Bsc. In Civil Engineering

No. of Experience More than 5 years of experience in Construction Field

Employment History

QA/QC Engineer - 1 year & 3 months with Alu-NasaQA/QC Engineer - 2 years & 4 months with Al Abbar Aluminium

Dubai, UAEQA/QC Engineer - 2 years & 3 months with Sumicon Philippines Corp.

a subsidiary of Sumitomo Mitsui Construction Co.,Makati City, Philippines

Page 26: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

6 Company Production Facility & Capacity

Page 27: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Production Facilities - Doha

Page 28: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Production Facilities - Dubai

Page 29: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Plant – PremisesAlu Nasa – Doha, Qatar

Offices 400 m²

Workshop 3500 m²

Stock Yard 1000 m²

Stores 500 m²

TOTAL 5400 m²

Plant – PremisesAlu Nasa – Dubai, UAE

Offices 2200 m²

Workshop/Aluminium 8000 m²

Workshop/Steel 1400 m²

Stores & Assembly 1400 m²

Reserved Facilities for further Expansion 6000 m²

TOTAL 19000 m²

Company Resources (Plant, Equipment & Factory)

Page 30: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Machinery and Equipment - Dubai

Sl.No Description Manufacturer

1 (Isomat) Thermal Break Machine Schuco

2 DG244Double Cutter Elumatec

3 Chip Vacuum Proc

4 SBZ 40 CNC Machining Centre Elumatec

5 Chip Vacuum Proc

6 EP424 (4) Corner Crimping M/c Elumatec

7 Chip Vacuum Proc

8 SA 142 Automatic Saw Elumatec

9 Chip Vacuum Proc

10 AF 223 End Milling M/c Elumatec

11 (2) Spindle Copy Router Elumatec

Page 31: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Sl.No Description Manufacturer

12 Chip Vacuum Proc

13 AKS 134 Notching Machine Elumatec

14 Chip Vacuum Proc

15 TS 161 Table (Cut Off) Saw Elumatec

16 Chip Vacuum Proc

17 EP 124 Crimping M/c Elumatec

18 DHGM Hydraulic Shear Elumatec

19 RGM 40-120 Sheet Bender Elumatec

20 4R HS 15-150 Hydraulic Sheet Roller Elumatec

21 Holz-her CNC Panel M/c (16.5Amp) Schuco

22 Chip Vacuum Proc

Machinery and Equipment - Dubai

Page 32: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Machinery and Equipment - Dubai

Sl.No Description Manufacturer

23 Top Cut, (Rip Saw) Proc

24 Chip Vacuum Proc

25 PBT Profile Bender Elumatec

26 Light Gantry [Uni Glass Lifter] Proc

27 Heavier Gantry [ Uni, Units to Racks] Proc

28 Lisec Sealant Pump & Freezer Proc

29 Lisec Sealant Pump & Freezer Proc

30 Lisec Sealant Pump & Freezer Proc

31 Fork Truck Proc

32 Tape Machine Proc

33 Jib Crane [Uni Loading] 1500 to 3000 Proc

Page 33: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Machinery and Equipment - Doha

Sl.No Description Manufacturer

1 Punching Machine Edwards

2 Pillar Drill Scantool

3 Auto Cutting Machine 380Ø Elumatec

4 AS170 Single Spindle Copy Router Elumatec

5 Transom Punching Press #280 020 Schüco

6 Notching Machine – Double Blade 450Ø - 400Ø Elumatec

7 CNC SBZ 140 Machine Elumatec

8 Double Saw Cutting Machine (Saw Dia. 420mm) Elumatec

9 (SIMCO) Double Meter Saw Emmegi

10 Crimping Machine 55134 Installux

11 Single Crimping Machine Elumatec

Page 34: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Sl.No Description Manufacturer

12 Cutting Machine (Saw Dia 500mm) Matricola

13 Panel Rolling Machine

14 Sheet Bending Machine Lienhsien

15 70H2 Profile Bending Machine Tauring Alfa

16 AK304 Cladding Bending Machine MG

17 Q11Y Shearing Machine MAC

18 Press Break Machine MAC

19 Vertical KGS300 Cladding Grooving Machine Striebing

20Cladding Panel Cutting Machine (Saw Dia 250mm) Striebing

21 Router Machine Rinald

22 End Milling Machine Dixi

Machinery and Equipment - Doha

Page 35: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Sl.No Description Manufacturer

23 297 838 Notching Machine Schüco

24 Pillar Drill Chin

25 B1 MEF 220 Protection Tape Kemin

26 Racer Milling Machine

27 Punching Machine 58106 Installux

28 Cutting Machine (Saw Dia 250mm) Elumatec

29 Crimping Machine Elumatec

30 Punching Machine 55132 Installux

31 Punching Machine 55133 Installux

32 Punching Machine 59166 Installux

33 Punching Machine 59165 Installux

Machinery and Equipment - Doha

Page 36: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Machinery and Equipment - Doha

Sl.No Description Manufacturer

34 TAL-50PU-B Sealant Glass Bonding Pump Lisec

35 TAL-50SI-B Sealant Glass Bonding Pump Lisec

36 Four Corner Crimping Machine Schüco

37CNC Cladding Panel Machine Centre (Matrix Table) Holzher

38 KS. 28 Screw Compressor 12bar, REC=1000L Air Krone

39 Compressor 12bar, REC=1000L Terrugia

40 Compressor 10bar, REC=500L Terrugia

Page 37: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

7 List of Completed Projects

Page 38: Pre Qualification 2

QATAR NAVIGATION TOWER

List of Projects

OwnerArchitectContractor

Product Description

LocationContract ValueBuilding Height

Qatar NavigationMZ & PartnersSEG Qatar Ltd.

Unitized Curtain Wall, Spider System, Cladding, Doors and Windows

West Bay, Doha-QatarQrs. 57,000,000.00200 m (54 floors)

Pre – Qualification Document

Page 39: Pre Qualification 2

List of Projects

BEVERLY HILLS TOWER

OwnerArchitect

Contractor

Product Description

LocationContract ValueContract Duration

Al AsmakhGHD Management Engineering Environment

Al Jaber Trading and Contracting

Curtain Wall, Cladding, Revolving Doors, Doors and Windows

West Bay, Doha-QatarQrs. 21,500,000.00September 2005 toSeptember 2006

Pre – Qualification Document

Page 40: Pre Qualification 2

List of Projects

MOVENPICK HOTEL

OwnerArchitect

Contractor

Product Description

LocationContract ValueContract Duration

Al AsmakhGHD Management Engineering Environment

Ramco Trading and Contracting

Curtain Wall, Cladding, Revolving Doors, Doors and Windows

West Bay, Doha-QatarQrs. 10,500,000.00March 2005 toSeptember 2006

Pre – Qualification Document

Page 41: Pre Qualification 2

List of Projects

AL SULAITI TOWER

OwnerArchitect

Contractor

Product Description

LocationContract ValueContract Duration

Ahmed Al SulaitiGHD Management Engineering Environment

JTC

Curtain Wall (4500m2), Doors and Windows, Automatic Sliding Doors

West Bay, Doha-QatarQrs. 2,500,000.00April 2003 toDecember 2003

Pre – Qualification Document

Page 42: Pre Qualification 2

List of Projects

DOHA TOWER

Owner

Contractor

Product Description

LocationContract ValueContract Duration

His Excellence Mr. Said Al KhayareenAl Huda Engineering

Curtain Wall, Cladding, Revolving Door

West Bay, Doha-QatarQrs.5,700,000.00December 2004 toSeptember 2005

Pre – Qualification Document

Page 43: Pre Qualification 2

List of Projects

GULF TOWER

Owner

Architect

Contractor

Product Description

LocationContract ValueContract Duration

Sh. Hamad Bin Jassim Bin FaisalArab Engineering BureauAl Darwish Engineering

Curtain Wall, Cladding, Stainless Steel Handrail, Automatic Revolving Door, Doors and Windows

West Bay, Doha-QatarQrs. 7,200,000.00April 2002 toDecember 2003

Pre – Qualification Document

Page 44: Pre Qualification 2

List of Projects

QIC TOWER

Owner

Architect

Contractor

Product Description

LocationContract ValueContract Duration

Qatar Insurance CompanyArab Engineering BureauGulf Housing & Construction

Automatic Sliding Door, Doors and Windows

West Bay, Doha-QatarQrs. 8,500,000.00November 2005 toSeptember 2006

Pre – Qualification Document

Page 45: Pre Qualification 2

List of Projects

QIPCO OFFICE TOWER

OwnerArchitectContractor

Product Description

LocationContract ValueContract Duration

QIPCO GroupMZ & PartnersMidmac Contracting

Curtain Wall, Cladding, Stainless Steel Handrail, Doors and Windows

West Bay, Doha-QatarQrs. 18,750,000.00May 2005 toSeptember 2006

Pre – Qualification Document

Page 46: Pre Qualification 2

List of Projects

SALAM TOWER

OwnerArchitectContractor

Product Description

LocationContract ValueCompletion DateCompletion Period

Salam HoldingRice Perry EllisITC

2-Side Structural Glazing (5200m2), Composite Cladding (4500m2), Handrail,, Window Cleaning Equipment, Doors and windows

West Bay, Doha-QatarQrs. 8,400,000.00.00December 199714 Months

Pre – Qualification Document

Page 47: Pre Qualification 2

List of Projects

Owner

Architect

Contractor

Product Description

LocationContract ValueContract Duration

Qatar Insurance CompanyQatar Design ConsortiumAlu Nasa

Curtain Wall (5600m2), Cladding (1450m2), Window Cleaning Equipment

West Bay, Doha-QatarQrs. 5,372,000.00September 2003 toMarch 2004

QIC TOWER

Pre – Qualification Document

Page 48: Pre Qualification 2

List of Projects

MERCEDES SHOWROOMOwnerArchitectContractorProduct Description

LocationContract Value

NBJ & SonsAdnan SaffariniNICCCurtain Wall, Cladding, Spider System and Stainless SteelSalwa Road, Doha-QatarQrs. 3,050,000.00August 2004 to May 2006

Pre – Qualification Document

Page 49: Pre Qualification 2

List of Projects

NISSAN SHOWROOM

OwnerArchitectContractorProduct Description

LocationContract ValueContract Duration

Al Mana GroupAl Mana & MZ Partners Gulf Housing and ConstructionCurtain Wall, Cladding, Automatic Sliding Door, Doors and WindowsSalwa Road, Doha-QatarQrs. 2,900,000.00May 2005 to March 2006

Pre – Qualification Document

Page 50: Pre Qualification 2

List of Projects

OwnerArchitectContractorProduct Description

Location

Contract ValueContract Duration

Al AsmakhGHD Management Engineering Environment Ramco Trading and ContractingCurtain Wall, Cladding, Automatic Sliding Door, Doors and WindowsAl Sadd, Doha-QatarQrs. 3,950,000.00August 2005 to November 2005

CENTERPOINT

Pre – Qualification Document

Page 51: Pre Qualification 2

List of Projects

AQUATIC CENTER

OwnerArchitectContractorProduct DescriptionLocationContract ValueContract Duration

Hamad Aquatic CenterProjcasAl Jaber Trading and ContractingCurtain Wall, Cladding, Doors and WindowsKhalifa Stadium, Doha-QatarQrs. 1,800,000.00January 2005 to March 2006

Pre – Qualification Document

Page 52: Pre Qualification 2

List of Projects

AL ARABI CLUB

OwnerArchitectContractorProduct DescriptionLocationContract ValueContract Duration

QNOCECGITCCladding, Doors and WindowsAl Hilal Road, Doha-QatarQrs. 3,000,000.00May 2005 to November 2006

Pre – Qualification Document

Page 53: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Project Name Location(City, Country)

Contract Value(Qatar-Riyal)

PeriodFrom

(Month/Year)

PeriodTo

(Month/Year)Product Descriptions Architect Contractor

Owner Name/Contact Representative

QIC Office Tower

Doha, Qatar 8,500,000.00 November

2005December

2006

- Curtain Wall- Cladding- Doors & Windows- Automatic SlidingDoor

Arab Engineering

Bureau

Gulf Housing and

Construction

Qatar Insurance Company

Beverly Hills Tower

Doha, Qatar 21,500,000.00September

2005December

2006

- Curtain Wall- Cladding- Doors & Windows- Stainless Steel Handrail

GHD Management Engineering Environment

Al Jaber Trading and Contracting

Al Asmakh

Retail Complex Doha, Qatar 3,950,000.00August 2005

November 2005

- Curtain Wall- Cladding- Doors & Windows- Automatic SlidingDoor

GHD Management Engineering Environment

Ramco Trading and Contracting

Al Asmakh

QIPCO Twin Towers

Doha, Qatar 18,750,000.00 May 2005December

2006

- Curtain Wall- Cladding- Doors & Windows- Stainless Steel Handrail

MZ and PartnersMidmac

ContractingQIPCO Group

Al Arabi Sports Club – Phase II

Doha, Qatar 3,000,000.00 May 2005December

2006- Cladding- Doors & Windows

ECG ITC QNOC

Nissan Car Showroom

Doha, Qatar 2,900,000.00 May 2005 March 2006

- Curtain Wall- Cladding- Doors & Windows- Automatic Sliding Door

Al Mana and MZ Partners

Gulf Housing and

Construction

Al Mana Group

Al Asmakh Tower

Doha, Qatar 8,750,000.00March 2005

December 2006

- Curtain Wall- Cladding- Doors & Windows- Revolving Door

GHD Management Engineering Environment

Al Jaber Trading and Contracting

Al Asmakh

List of Completed Project

Page 54: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Project Name Location(City, Country)

Contract Value(Qatar-Riyal)

PeriodFrom

(Month/Year)

PeriodTo

(Month/Year)Product Descriptions Architect Contractor

Owner Name/Contact Representative

Mercedes Car Showroom

Doha, Qatar 3,050,000.00August 2004

May 2006

- Curtain Wall- Cladding- Spider System- Stainless Steel

Andan Saffarini NICCNBK and

Sons

Ramada Renovation

Doha, Qatar 400,000.00 April 2004December

2004

- Curtain Wall- Doors & Windows- Automatic Sliding Doors

Design ConsultGulf Housing

and Construction

Ramada Hotel

United Car Showroom

Doha, Qatar 1,000,000.00January

2004November

2004

- Curtain Wall- Cladding- Revolving Doors

n/aAl Huda

Engineering

His Excellence Mr. Said Al Khayareen

Qatar Scientific Club

Doha, Qatar 500,000.00November

2003December

2005

- Curtain Wall- Frameless Door- Sliding Door

Bin Ghanem Consulting

Al ManaAl Mana

Real Estate

Racing and Equestrian Club

Doha, Qatar 1,200,000.00October

2003December

2004

- Curtain Wall (1500m2)- Doors & Windows- Automatic Sliding Doors- Handrails

AscoAl Sraiya

Trading and Contracting

Qatar Horse Race

QIC Façade Renovation

Doha, Qatar 5,372,000.00September

2003March 2004

- Curtain Wall (5600m2)- Cladding (14500m2) - Window Cleaning Equipment

Qatar Design Consortium

Alu NasaQatar

Insurance Co.

International School of Choueifat

Doha, Qatar 1,000,000.00September

2003September

2004- Doors and Windows- Steel Doors

Khatib and Alami

Al Jaber Trading and Contracting

International School of Choueifat

List of Completed Project (Continuation)

Page 55: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Project Name Location(City, Country)

Contract Value(Qatar-Riyal)

PeriodFrom

(Month/Year)

PeriodTo

(Month/Year)Product Descriptions Architect Contractor

Owner Name/Contact Representative

Energy Center at Khalifa Sports City

Doha, Qatar 1,020,000.00 July 2003December

2004

- Cladding- Louvers- Windows

TalibertMarbu

ContractingQNOC

Khalifa Sports Academy – Roof Structure

Doha, Qatar 3,950,000.00 July 2003December

2004-Cladding Talibert

Al Huda Engineering

Mr. QNOC

B + G + 2 Office Building

Doha, Qatar 550,000.00 June 2003 March 2004- Curtain Wall- Cladding- Windows

Al Saad Consultancy

Al Madar Contracting

Abdulla Al Salat

FYMC 03A Doha, Qatar 120,000.00 June 2003 March 2004 - Windows U.S. ArmyContrack

InternationalU.S. Army

First Finance Office Building

Doha, Qatar 1,000,000.00 May 2003 June 2004- Curtain Wall- Cladding- Doors and Windows

Petra DesignAl Huda

EngineeringFirst Finance

Khalifa Sports Academy

Doha, Qatar 10,200,000.00 May 2003December

2004

- Curtain Wall- Cladding- Doors and Windows- Stainless Steel Handrails

TalibertAl Huda

EngineeringMr. QNOC

Al Sulaiti Tower II

Doha, Qatar 2,500,000.00 April 2003 December

2003

- Curtain Wall (4500m²)- Doors and Windows- Automatic Sliding Doors

GHD Management Engineering Environment

JTC Ahmed Al

Sulaiti

List of Completed Project (Continuation)

Page 56: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Project Name Location(City, Country)

Contract Value(Qatar-Riyal)

PeriodFrom

(Month/Year)

PeriodTo

(Month/Year)Product Descriptions Architect Contractor

Owner Name/Contact Representative

Doha International Airport - Arrivals Extension

Doha, Qatar 1,800,000.00 December

2002 April 2003

- Curtain Wall (850m²)- Doors and Windows- Automatic Sliding Doors- Cladding (4200m²)

Dar Al Handasah

Gulf Housing and

Construction

Qatar Airways

Doha International Airport - Departure Terminal

Doha, Qatar 1,500,000.00 December

2002 December

2003

- Handrails- Glass Balustrades- Partitions

Meinhardt Gulf Housing

and Construction

Qatar Airways

Bilal Suites Doha, Qatar 1,600,000.00 November

2002 May 2003

- Curtain Wall (2200m²)- Doors and Windows- Automatic Sliding Doors

GHD Management Engineering Environment

Dorra Constructions

Ahmed Hassan Bilal

Central Plant Building

Doha, Qatar 820,000.00 November 2002

September 2003

- Louvers- Doors and Windows

Keo International

Gulf Housing and Construction

Qatar Foundation

Hotel Holiday Inn

Doha, Qatar 3,000,000.00 October 2002

December 2003

- Composite Cladding (600m²)- Curtain Wall (3000m²)- Window Cleaning System- Revolving Door- Automatic Sliding Doors- Stainless Steel Handrails- Toilet Partitions

CEG Mannai

Engineering

H.E. Sheik. Khalid Bin Hamad Al

Thani

Qatar Central Bank

Doha, Qatar 472,000.00 May 2002 September

2002 -- Doors and Windows- Skylights

United Consultants

Tadmur Trading and Contracting

QCB

List of Completed Project (Continuation)

Page 57: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Project Name Location(City, Country)

Contract Value(Qatar-Riyal)

PeriodFrom

(Month/Year)

PeriodTo

(Month/Year)Product Descriptions Architect Contractor

Owner Name/Contact Representative

Gulf Tower Doha, Qatar 7,200,000.00 April 2002 December

2003

- Cladding (14500m²)- Curtain Wall (5600m²)- Automatic Sliding Door- Stainless Steel Handrails

Arab Engineering

Bureau

Al Darwish Engineering 

Sheik Hamad Bin Jassim Bin

Faisal 

Nurses Accommodation

Doha, Qatar 700,000.00 January 2002

May 2003

- Curtain Wall- Skylights- Stainless Steel Handrails

- Doors and Windows

John Harris Associates

Al Sraiya Trading and Contracting

Ministry of Municipal

Affairs

Landmark Shopping Mall

Doha, Qatar 600,000.00 December

2001 July 2002 - Skylights (700m²) Doha Consult Amana Landmark

Qaradawi Office Building

Doha, Qatar 750,000.00 October 2001

May 2002 - Curtain Wall- Revolving Doors- Handrails

GHD Management Engineering Environment

Tadmur Trading and Contracting

Yousef Al Qaradawi

Ras Laffan Commercial Complex

Doha, Qatar 270,000.00 August 2001

May 2002 - Curtain Wall- Skylights

Petra Design Al Muftah

Contracting Qatar

Petroleum

Mesaieed Commercial Center

Doha, Qatar 890,000.00 March 2001

October 2001 - Frameless Shop fronts- Automatic Sliding Doors

Qatar Design Consortium

Al Jaber Trading and Contracting

Qatar Real Estate

Al Kubaisi Tower Doha, Qatar 1,875,000.00 January 2001

September 2002

- Curtain Wall (3500m²) CICO Al Darwish

Engineering Mr. Khalifa Al

Kubaisi

Blue Saloon Complex

Doha, Qatar 550,000.00 December

2000 November

2001

- Curtain Wall (450m²)- Doors and Windows- Automatic Sliding Doors

Planning International

Marbu Contracting

Blue Saloon

List of Completed Project (Continuation)

Page 58: Pre Qualification 2

Pre – Qualification Document

Alu Nasa

Project Name Location(City, Country)

Contract Value(Qatar-Riyal)

PeriodFrom

(Month/Year)

PeriodTo

(Month/Year)Product Descriptions Architect Contractor

Owner Name/Contact Representative

Q-Chem Buildings Project

Doha, Qatar 605,000.00 October 2000

December 2001

- Doors and Windows Asco Midmac

Contracting Q-Chem

Villa for H.E. Sheik Soud Bin Khalid

Doha, Qatar 950,000.00 August 1999

December 2001

- Doors and Windows Gulf Design

Concept ITC

H.E. Sheik Soud Bin Khalid Al

Thani

Villa for H.E. Sheik Khalid Bin Hamad Al Thani

Doha, Qatar 510,000.00 August 1999

December 2001

- Doors and Windows- Skylights

Gulf Design Concept

ITC

H.E. Sheik Khalid Bin Hamad Al

Thani

Al Fardan Plaza Doha, Qatar 1,200,000.00 April 1999 May 2000

- Curtain Wall (1100m²)- Doors and Windows- Automatic Sliding Doors- Revolving Door- Window Cleaning System

Arab Engineering Bureau

Construction Development Co.

Fardan Real Estate

20 Storey Building for Ministry of Interior

Doha, Qatar 2,500,000.00 February

1999 March 2000

-- Curtain Wall (2800m²)- Skylight (15m Ø)- Window Cleaning System (2sets)- Doors and Windows

Arab Engineering

Bureau

Construction Development

Co.

Ministry of Interior

List of Completed Project (Continuation)

Page 59: Pre Qualification 2

Pre – Qualification Document

Alu Nasa


Recommended