PRE-FEASIBILITY REPORT
OF
QUARTZITE (MASONRY STONE) MINING
PROJECT
(ML Area: 1.0 ha, M.L. No. 447/2003, Production
Capacity-1, 52,570 TPA)
Near Village: Dunga Ki Nangal,
Tehsil: Neem Ka Thana,
District: Sikar (Rajasthan)
PROJECT PROPONENT
Shri Amit Kumar Sharma
R/o Village- Dabla Tehsil- Neem Ka Thana District- Sikar (Raj.)
Contact Person: Amit Kumar
Contact No. +919783068123
INDEX
S. NO. PARTICULARS PAGE NO.
1.0 EXECUTIVE SUMMARY 1
2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 2
I Identification of Project and Project Proponent 2
II Brief Description of the Nature of Project 2
III Need for the Project & Its Importance to the Country/ Region 2
IV Demand – Supply Gap 2
V Imports vs. Indigenous Production 2
VI Export Possibility 2
VII Domestic/Export Markets 3
VIII Employment Generation (Direct and Indirect) due to the Project 3
3.0 PROJECT DESCRIPTION 3
1. Type of Project Including Interlinked And Independent Projects,
If Any
3
II Location (map showing general location, specific location, and
project boundary & project site layout) with coordinates 3
III Details of alternative site considered 5
IV Size and magnitude of operation 5
V Project Description with Process Detail 5
2. Geology of the area 6
3. Estimation Of Reserves 6
4. Mineable Reserves And Anticipated Life Of The Mine 6
5. Method of Mining 6
S. NO. PARTICULARS PAGE NO.
6. Proposed Year Wise Production Details Of The Next First Five
Years
7
7. Details of Blasting Parameters 7
8. Loading & Transport 8
9. Waste Generation & Disposal 8
10. Conceptual Plan 8
VI
Raw material required along with estimated quantity, likely
source, marketing area of final products, mode of transport of
raw material and finished product.
8
VII Resources optimization/recycling and reuse envisaged in the
project, if any should be briefly outlined 8
VIII Availability of water its source, energy/power requirement and
source 8
IX Quantity of waste be generated (liquid and solid) and scheme for
their management/disposal 8
4.0 SITE ANALYSIS 9
(I) Connectivity 9
(II) Land form, land use and land ownership 9
(III) Topography 9
(IV)
Existing land use pattern {agriculture, non-agriculture, forest,
water bodies (including area under CRZ), shortest distances
from the periphery of the project to periphery of the forests,
national park, wild life sanctuary, eco sensitive areas, water
bodies (distance from the HFL of the river), CRZ. In case of
notified industrial area, a copy of the gazette notification should
be given.
9
(V) Existing infrastructure 12
S. NO. PARTICULARS PAGE NO.
5.0 PLANNING BRIEF 12
(I)
Planning concept (type of industries, facilities, and
transportation etc.) Town and country planning/development
authority classification.
12
(II) Population projection 12
(III) Land use planning 12
(IV) Assessment of infrastructure demand (physical & social) 12
(V) Amenities/facilities 12
6.0 PROPOSED INFRASTRUCTURE 12
(I) Residential area (Non Processing Area) 12
(II) Green belt development 13
(III) Connectivity 13
(IV) Water Management (Source & Supply of water) 13
(V) Sewerage system 13
(VI) Industrial waste management 13
(VII) Solid Waste Management 14
(VIII) Power Requirement & Supply/ Source 13
7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN 13
(I)
Policy to be adopted (central/state)in respect of the project
affected persons including home oustees, land oustees and
landless labourers
13
8.0 PROJECT SCHEDULE & COST ESTIMATES 13
(I) Likely date of start of construction and likely date of completion 13
S. NO. PARTICULARS PAGE NO.
(II) Estimated project cost along with analysis in terms of economic
viability of the project
14
9.0 ANALYSIS OF PROPOSAL 14
10.0 ENVIRONMENTAL MANAGEMENT PLAN 14
10.1.1 AIR POLLUTION CONTROL 14
10.1.2 WATER MANAGEMENT 14
10.1.3 NOISE POLLUTION CONTROL 15
10.1.4 LAND RECLAMATION 15
10.1.5 SOLID WASTE MANAGEMENT 15
10.1.6 GREEN BELT DEVELOPMENT 15
LIST OF TABLES
TABLE NO. NAME OF TABLE PAGE NO.
1. Salient feature of the project 1
2. Salient feature of the project 5
3. Extent of Mechanization 7
4. Year wise production for next five year 7
5. Environmental settings 10
LIST OF FIGURES
FIGURE NO. NAME OF FIGURE PAGE NO.
1. Location map 4
2. Key plan 11
Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki
Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-feasibility
Shri Amit Kumar Page no.1
PRE – FEASIBILITY REPORT
1.0 EXECUTIVE SUMMARY
The proposal for Quartzite (Masonry Stone) Mining Project (Production Capacity-1, 52,570
TPA), M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki Nangal, Tehsil: Neem Ka
Thana, District: Sikar (Rajasthan).
This is an existing mining lease and Simplified Mining scheme has been approved by
Superintendent Mining Engineer Jaipur Circle, Jaipur vide letter no. SME/JAI/Mining plan/ P-
1229/ 13/1597 dated 02.06.2014 and Environmental Clearance is required from the Ministry
of Environment, Forest & climate change, New Delhi / SEIAA, Raj.
Table-1
Salient features of the Project
S. No. Particulars Details
A. Mining Lease Details
1. Name of the Project Quartzite (Masonry Stone) Mining Project (Production
Capacity-1, 52,570 TPA), M.L. No. 447/2003, ML Area 1.0 ha
2. Mineral Quartzite(Masonry Stone)
3. Mining Lease Number M.L. No. 447/2003
4. Mining Lease Area 1.0 ha
5. Lease Holder Shri Amit Kumar
6. Lease Validity 20 years
B Location
7. Village Dunga Ki Nangal
8. Tehsil Neem Ka Thana
9. District Sikar
10. State Rajasthan
11. Latitude & Longitude Latitude - 27°50'43.86"N to 27°50'50.41"N,
Longitude 75°58'13.00"E, to 75°58'15.21"E.
C. Other details
12. Cost of the project Rs. 50 Lakh
13. Cost for Environmental
Protection Measures
Rs. 0.50 lakh per annum
14. Seismic Zone II
Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki
Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-feasibility
Shri Amit Kumar Page no.2
2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION
(i) Identification of Project and Project Proponent
This proposal for Quartzite (Masonry Stone) Mining Project (Production
Capacity-1, 52,570 TPA), M.L. No. 447/2003, ML Area 1.0 ha. Near Village:
Dunga Ki Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan).
The project proponent is a private individual involve in mining with this
mining lease.
(ii) Brief Description of the Nature of Project
This proposal for Quartzite (Masonry Stone) Mining Project (Production
Capacity-1, 52,570 TPA), M.L. No. 447/2003, ML Area 1.0 ha. Near Village:
Dunga Ki Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan).
This is an existing mining lease and Simplified Mining scheme has been
approved by Superintendent Mining Engineer Jaipur Circle, Jaipur vide letter
no. SME/JAI/Mining plan/ P-1229/ 13/1597 dated 02.06.2014 and
Environmental Clearance is required from the Ministry of Environment, Forest
& climate change, New Delhi / SEIAA, Raj. As per MoEF Office Memorandum
No. J-13012/12/2013-IA-II (I) dated 24.12.2013 the project comes under B2
Category.
(iii) Need for the Project & Its Importance to the Country/ Region
The mineral Quartzite (Masonry stone) is used in various construction
activities and will be sold to nearby markets to fulfill the requirements of the
local people.
(iv) Demand – Supply Gap
Considering the demand of mineral sufficient availability of the mineral in the
area, it is essential to have quartzite (Masonry stone) mine to sustain the
supply of mineral for construction purpose.
(v) Imports vs. Indigenous Production
It is a cheap mineral used in construction activities in rural areas therefore
export is not possible
(vi) Export Possibility
There is no export possibility as these mineral is quite cheap and locally
available in abundance and used in rural areas.
Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki
Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-feasibility
Shri Amit Kumar Page no.3
(vii) Domestic/Export Markets
These minerals have only domestic market and will fulfill the requirement of
local. The stone may also be supplied to stone crusher proposed to be installed
outside the lease area.
(viii) Employment Generation (Direct and Indirect) due to the Project
The total 29 skilled and unskilled manpower needed to run the mine
3.0 PROJECT DESCRIPTION
(i) Type of Project Including Interlinked And Independent Projects, If Any
This is opencast semi-mechanized mining project. There is no interlinked or
interdependent project based on mineral produced. The mineral will be sold
directly.
(ii) Location (map showing general location, specific location, and project
boundary & project site layout) with coordinates
Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki
Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-feasibility
Shri Amit Kumar Page no.4
Figure1: Location Map
Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki
Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-feasibility
Shri Amit Kumar Page no.5
(iii) Details of Alternate Sites Considered
No alternative site has been taken into consideration due to availability of
mineral resources in the area and.
(iv) Size and magnitude of operation
The Production of Quartzite (Masonry Stone) 1, 52,570 TPA from the mine
located near Village: Dunga Ki Nangal, Tehsil- Neem Ka Thana District- Sikar
(Rajasthan)
(v) Project Description with Process Detail
(1) Salient features along with project vicinity details of the Mining
project is given below:
Table - 2
Salient Features of the Project
S. No. Particulars Details
1. Name of the Project Quartzite (Masonry Stone) Mining Project, M.L. No.
447/2003, ML Area 1.0 ha
2. Mineral Quartzite (Masonry Stone)
3. Mining Lease Number M.L. No. 447/2003
4. Mining Lease Area 1.0 ha
5. Lease Holder Shri Amit Kumar
6. Lease Period 20 years
7. Method of mining Opencast Semi-Mechanized
8. Geological reserve 1282690 tonnes
9. Mineable Reserves 1035690 Tonnes
10. Life of the Mine 7.0 Years
11. Bench Height & Width 6 m.
12. Ultimate Pit Slope angle 45°
13. Elevation Range 401 mRL to 387 mRL
14. General Ground Level 380 mRL
15. Ground Water table 80 meter bgl
16. Total excavated area at the
conceptual stage
0.85 ha
17. Total area converted into
water reservoir at the
conceptual stage
0.85 ha
Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki
Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-feasibility
Shri Amit Kumar Page no.6
(2) GEOLOGY OF THE AREA
Regional Geology
The regional stratigraphic succession of rocks is as follows
REGIONAL STRATIGRAPHIC SUCCESSION
Recent Soil
Post Delhi Pegmatite, Granite, Albetite
Delhi Super group Ajabgarh Group Brecciated quartzite, quartzite,
Ortho Quartzite, phyllite,
Impure marble, amphibolites,
Carbonaceous phyllite,
quartzite, calc silicate
Alwar group Massive quartzite, schist,
conglomerate, quartzite, calc-
silicate
Local Geology
Recent Soil
Post delhi Absent
Delhi
Super
Group
Ajabgarh Group Quartzite
(3) ESTIMATION OF RESERVES
Proved reserves : 418190 tonnes
Probable reserves : 617500 tonnes
Mineable Reserves : 247000 tonnes
(4) MINEABLE RESERVES AND ANTICIPATED LIFE OF THE MINE
The Mineable reserves of Quartzite (Masonry Stone) have been calculated by taking
into account the reserves in proved and probable category only. The mineable
reserves are 1035690 tonnes and life of mine is 7 years.
(5) Method of Mining
The mining will be done by semi-mechanized opencast method. The height & width
of bench will be 6 meters at a time . For the systematic working of opencast mines,
benching will be done. The main work will be systematic benching. This benching
will also give the desired production of the mineral. Hydraulic excavator/loader and
tippers are proposed for removal and loading of mineral in tippers/trucks.
The haul/ approach roads will be provided up to the proposed working, site
services, site of dump and site of stock from the nearest tar road.
Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki
Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-feasibility
Shri Amit Kumar Page no.7
The mineral is proposed to transport by tractor trolley and tippers.
Table-3
EXTENT OF MECHANIZATION
S. Machinery Number
1. Hydraulic Excavator/Loader with rock breaker
arrangement
1
2. Air compressor tractor mounted or wheel
mounted
1
3. Jack hammer 2
4. Drill roads as required
5. Water tank trroley munted 1
6. Tippers 2
7. Hand tools as required
Source: Approved Mining Scheme
(6) PROPOSED YEAR WISE PRODUCTION DETAILS OF THE NEXT FIRST FIVE YEARS
The proposed Year-wise production plan for next five years is mentioned in the
table given below:
Table – 4
Year Wise Production for Next Five Years
Year Quartzite (Masonry Stone)
(tones)
I 1,52,000
II 1,52,470
III 1,52,380
IV 1,52,470
V 1,52,570
Source: Approved Mining Scheme
(7) Details of Blasting Parameters
Board blasting parameters
Dril, road- 3 meters effective lengh
Diameter of hole – 54 mm
Spacing- 2.0 meters
Hole per blasting round-8
Blasting pattern – The blasting pattern entirly depends on situator of joints present
in the rock.
Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki
Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-feasibility
Shri Amit Kumar Page no.8
(8) LOADING & TRANSPORT
Tyre mounted Hydraulic machinaries will be deployed from time to time as
and when required. Trucks and tracor troley will be deployed for
transportation of masonry stone from working to consumer.
(9) WASTE GENERATION & DISPOSAL
Waste will be used as a second grade mineral and sold out by the lessee as well
as used for maintenance of roads and top will be used for plantation purpose.
(10) CONCEPTUAL PLAN
At the end of the five years of mine 7, 61,890 tonnes of Quartzite (Masonry
stone) mineral will be excavated from the lease area. At the end of the life of
mine some area will be backfilled and remaining area will be used as water
reservoir.
At the five year of life of mine, total excavated area will be about 0.85 ha, which
will be converted in to water reservoir and 0.15 ha will be covered by
plantation.
(vi) Raw Material Required Along With Estimated Quantity, Likely Source,
Marketing Area of Final Products, Mode of Transport of Raw Material and
Finished Product
This is Quartzite (masonry stone) Mining Lease. The mineral will be used for
construction purposes. No raw material will be required to dependent
industries.
(vii) Resources Optimization/ Recycling and Reuse Envisaged in the Project, if
any, should be briefly Outlined
� No waste water will be generated from mining operation
� Domestic sewage water generated from office toilet will be disposed in soak
pits via septic tank.
(viii) Availability of Water Its Source, Energy /Power Requirement and Source
A. Water requirement:
Total water requirement for the project will be 3.0 KLD which will be sourced
from nearby villages.
B. Power requirement:
The electric power will not be use for the process of mining. Only HSD Fuel will
be required for operating machineries.
(ix) Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for
Their Management/Disposal:
Domestic sewage water generated from office toilet will be disposed in soak
pits via septic tank.
Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki
Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-feasibility
Shri Amit Kumar Page no.9
4.0 SITE ANALYSIS
(i) Connectivity
The lease area about ~ 19.0 km. from Neem Ka Thana. Dispensary, hospital and
educational facilities are available in Dabla. Railway station is available in Dabla which
is at a distance of ~5.0 km NW direction from the Mine site.
(ii) Land Form, Land Use and Land Ownership
Existing Land Use Pattern
The total ML area of 1.0 ha comprises of Gair Mumkin Pahar Sawai Chak..
(iii) Topography
The lease area comprises undulated terrains. The highest contour is 401 mRL and
lowest is 387 mRL. General ground level is 380 mRL.
(iv) Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water Bodies
(Including Area Under CRZ)}, Shortest Distances From The Periphery Of The
Project To Periphery Of The Forests, National Park, Wild Life Sanctuary, Eco
Sensitive Areas, Water Bodies (Distance From The HFL Of The River), CRZ. In
Case Of Notified Industrial Area, A Copy Of The Gazette Notification
Table – 5
Environmental Settings
S. No. Particular Details
1. Nearest Village Village Dunga Ki Nangal at distance of ~2.0 km. in SE
direction from the Mining lease area
2. Nearest city/ town Neem Ka Thana at distance of ~19.0 km. in SW direction
from the Mining lease area.
3. National Highway/State Highway SH-37B is approx ~5.0 km in South direction from the
mine site.
4. Nearest Railway Station Dabla Railway Station at a distance of ~5.0 km. in NW
direction from Mining Lease area.
5. Nearest Airport Sanganer Air Port, Jaipur at a distance of around ~115
km. in South direction from Mining Lease area.
6. Archaeological Important Place None, within 10 km radius area of mine site.
7. Ecological Sensitive Areas
(National Park, Wildlife
Sanctuary, Biosphere Reserve
etc.)
There is no National Park, Wild Life Sanctuaries,
Biosphere Reserves, Tiger Reserves, Wildlife Corridors,
etc. within 10 km radius
8. Reserved/Protected Forest
within 10 km radius
� Dokan Protected forest at a distance of ~2.0 km
in SW direction.
� Patan Protected forest at a distance of ~3.0 km in
South direction
Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki
Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Pre-feasibility
Shri Amit Kumar Page no.10
� Kharjo Protected forest at a distance of ~2.0 km
in SE direction.
� Protected forest at a distance of ~4.0 km in
North direction.
� Protected forest at a distance of ~8.0 km in SE
direction.
� Mina Ka Nangal Protected forest at a distance of
~7.0 km in SE in direction.
� Balupur Protected forest at a distance of ~7.5 km
in SE direction.
9. Nearest River / water body � Chandravati River at a distance of ~1.0 km in NE
direction.
� Raipur dam at a distance of around ~9.0 km. in
South direction from Mining Lease area.
� Dokan Dam at a distance of around ~8.5 km. in
SW direction from Mining Lease area.
� Jhilo Dam at a distance of around ~8.0 km. in SW
direction from Mining Lease area
Source: preliminary site visit
Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki Nangal, Tehsil: Neem Ka Thana, District:
Sikar (Rajasthan)
Form - 1 / Appendix – I
Shri Amit Kumar page no 11
Figure 2: Key plan
Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki
Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Form - 1 / Appendix – I
Shri Amit Kumar page no 12
(v) Existing Infrastructure:
There is no building & structure within mining lease area except some
vegetations existing on the lease area which will be cleared when required.
Total lease area is Gair Mumkin Pahar Sawai chock.
The lease area about ~19.0 km from Neem Ka Thana. Post and Telegraph,
Hospital, Bank, Education and all market facilities are available at this place.
Nearest Airport is Sanganer Air Port, Jaipur is (~115 km.) from the mine site.
Railway station is available in Dabla which is at a distance of ~5.0 km NW
direction from the Mine site.
5.0 PLANNING BRIEF
(i) Planning Concept (Type of Industries, Facilities, and Transportation etc.)
Town and Country Planning/Development Authority Classification
This is a mining Project
(ii) Population Projection
Manpower required will be engaged from nearby areas. No significant influx of
people is anticipated in the area.
(iii) Land Use Planning
The extent of proposed mining lease area is 1.0 ha. The area comprises of Gair
Mumkin Pahar Sawai Chok . At the five year of life of mine, total excavated area
will be about 0.85 ha, which will be converted in to water reservoir and 0.15
ha will be covered by plantation.
(iv) Assessment of Infrastructure Demand (Physical & Social)
Lessee will assess the demand of infrastructure (Physical & Social) in nearby
area of the mine site and same will be developed under social work
(v) Amenities/Facilities
Mining Management will develop the Amenities/Facilities in the nearby area of
the mine site as per requirement of local people of the nearby area under
corporate social responsibility programs.
6.0 PROPOSED INFRASTRUCTURE
(i) Residential Area (Non Processing Area)
This is not required as mine workers comes from nearby villages. Rest
shelter to the workers will be provided outside the lease area.
Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki
Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Form - 1 / Appendix – I
Shri Amit Kumar page no 13
(ii) Green Belt
Green Belt/plantation will be developed equal to 33% of total Mining lease
area. The dead plants will be replaced by fresh plants. Native Plant species
will be planted.
(iii) Connectivity
The lease area about ~19.0 km from Neem Ka Thana. Post and Telegraph,
Hospital, Bank, Education and all market facilities are available at this place.
Nearest Airport is Sanganer Air Port, Jaipur is (~115 km.) from the mine site.
Railway station is available in Dabla which is at a distance of ~5.0 km NW
direction from the Mine site.
(iv) Water Management (Source & Supply of water)
Total water requirement for the project will be 3.0 KLD which will be used
for domestic as well as dust supression purpose and sourced from nearby
village .
(v) Sewerage System
Domestic sewage water generated from office toilet will be disposed in soak
pits via septic tank. Outside discharge is not envisaged.
(vi) Industrial Waste Management
No industrial waste water will be generated from this mine during mining
operation.
(vii) Solid Waste Management
Waste will be used as a second grade mineral and sold out by the lessee as
well as used for maintenance of roads and top soil will be used for plantation
purpose.
(viii) Power Requirement & Supply/Source
Electric power will not be required in mining operations.
7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN
(i) Policy To Be Adopted (Central/State) In Respect Of The Project Affected
Persons Including Home Oustees, Land Oustees And Landless Laborers
(Brief Outline To Be Given)
Not Applicable as the lease area falls in government.
8.0 PROJECT SCHEDULE & COST ESTIMATES
(i) Likely Date Of Start Of Construction And Likely Date Of Completion (Time
Schedule For The Project To Be Given)
Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki
Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Form - 1 / Appendix – I
Shri Amit Kumar page no 14
The mining activity will be started after obtaining Environmental Clearance
from MoEF, New Delhi and acquiring the valid mining lease from Mines and
Geology Department of the State Government.
(ii) Estimated Project Cost Along With Analysis In Terms Of Economic
Viability of the Project
Cost of the project : Rs. 50 lakh
Cost for Environmental Protection Measures : Rs. 0.5 lakhs
9.0 ANALYSIS OF PROPOSAL
���� The Masonry Mining Lease will result in growth of the surrounding areas by
increasing direct and indirect employment opportunities in the region
including ancillary development and supporting infrastructure. Special
emphasis on Financial and Social benefits will be given to the local people
including tribal population, if any, in the area.
���� Development of social amenities will be in the form of medical facilities,
education to underprivileged and creation of self help groups.
���� No major adverse effect on environment is envisaged as the required
mitigation measures are inbuilt in the project.
10.0 ENVIRONMENTAL MANAGEMENT PLAN
10.1.1 AIR POLLUTION CONTROL
���� Wet drilling with sharp drill bits will be done for drilling to reduce generation
of dust.
���� Green Belt will be developed on periphery of the lease boundary and haul
roads,
���� Periodical water spraying on the haul roads will be done.
10.1.2 WATER MANAGEMENT
���� There is no surface water body in and around the mining lease area.
���� The rain water collected in mining pit will be diverted in the abandoned
existing and the area used in spraying.
���� Domestic waste water generated from office toilet will be disposed in soak pits
via septic tank.
10.1.3 NOISE POLLUTION CONTROL
���� Proper maintenance of all machines will be carried out which will reduce noise
generation during operations.
Quartzite (Masonry Stone) Mining Project, M.L. No. 447/2003, ML Area 1.0 ha. Near Village: Dunga Ki
Nangal, Tehsil: Neem Ka Thana, District: Sikar (Rajasthan)
Form - 1 / Appendix – I
Shri Amit Kumar page no 15
���� Workers exposed to high noise levels will be provided with ear defenders.
10.1.4 LAND RECLAMATION
���� Total mining lease area is 1.0 hectares.
� At the five year of life of mine, total excavated area will be about 0.85 ha, which
will be converted in to water reservoir and 0.15 ha will be covered by
plantation.
10.1.5 SOLID WASTE MANAGEMENT
Waste will be used as a second grade mineral and sold out by the lessee as well as
used for maintenance of roads and top soil will be used for plantation purpose.
10.1.6 GREEN BELT DEVELOPMENT
���� Local species will be preferred for plantation
���� Tree guards will be provided for production
���� Green Belt/plantation will be developed equal to 33% of total Mining lease
area. The dead plants will be replaced by fresh plants. Native Plant species will
be planted.