8/10/2019 Post Installation of Crm(90)
1/27
Steps to perform post installation activities
Logon to the system with
Client : 000
Usr : ddic
Password: master password
8/10/2019 Post Installation of Crm(90)
2/27
Check the performance of installation by using tcode : sick
8/10/2019 Post Installation of Crm(90)
3/27
It will display installation completed with no errors
8/10/2019 Post Installation of Crm(90)
4/27
To configure transport organizer
Use tcode se06
8/10/2019 Post Installation of Crm(90)
5/27
Select standard installation radio button
Perform post installation actions
8/10/2019 Post Installation of Crm(90)
6/27
To configure the transport routes at first the transport organizer is installed
Click on yes to reinstall the change transport system(CTS)
8/10/2019 Post Installation of Crm(90)
7/27
8/10/2019 Post Installation of Crm(90)
8/27
Tcode stms
Give the transport domain controller as this particular system
8/10/2019 Post Installation of Crm(90)
9/27
Give ECS as system
Description as system ECS and save it . domain controller is defined
8/10/2019 Post Installation of Crm(90)
10/27
After configuring the transport management system is displayed
To create systems and routes
Select overveiw tab --> systems --> create --> virtual system
8/10/2019 Post Installation of Crm(90)
11/27
8/10/2019 Post Installation of Crm(90)
12/27
Give first virtual system as CV1
And description as crm virtual quality system (quality system)
Save it
Create another system as virtual system
System name as CV 2
Description as crm virtual production system
Save it
8/10/2019 Post Installation of Crm(90)
13/27
After giving system names the domain controller,quality and
production system as defined
8/10/2019 Post Installation of Crm(90)
14/27
to define transport routes
stms
overview>systems>environment>transport routes
configuration > display change( set to change mode)
configuration > standard configuration > three system group .
8/10/2019 Post Installation of Crm(90)
15/27
To check transport tool
overview > systems
sap system > check > transport tool ( check whether all are in green tick)
8/10/2019 Post Installation of Crm(90)
16/27
to check transport directory
overview > system
Sap system > check > transport directory( check all are in green tick )
8/10/2019 Post Installation of Crm(90)
17/27
8/10/2019 Post Installation of Crm(90)
18/27
Give the transport routes
Environment -> transport routes
8/10/2019 Post Installation of Crm(90)
19/27
8/10/2019 Post Installation of Crm(90)
20/27
8/10/2019 Post Installation of Crm(90)
21/27
8/10/2019 Post Installation of Crm(90)
22/27
To distribute and activate the configuration to all 3 systems click on yes
8/10/2019 Post Installation of Crm(90)
23/27
Transport routes are created
Ecs to cv1 ( consolidate route)
Cv1 to cv 2 ( delivery route )
8/10/2019 Post Installation of Crm(90)
24/27
8/10/2019 Post Installation of Crm(90)
25/27
Generate sap license
To create a sap license tcode : SLICENSE
Click on new licenses
Goto > determine new hardware key Request the license key from sap
Sap will send u text file
Click on install and upload the appropriate file and key is generated.
8/10/2019 Post Installation of Crm(90)
26/27
8/10/2019 Post Installation of Crm(90)
27/27
Configure sap load generator
Use transaction code : sgen
Click on the radio button ( generate all objects of selected software components)
Select the required software components Schedule the job in the background
Client copy
Use the transaction scc4 to create a client
Client : 000
User : ddic
Password: master password
Click on change mode
Choose new entries
Client name : 200
Description : quality
Logon to this client with sap * user in the created client(200)
Tcode : sccl ( local client copy )
Profile sap_ all ( save it )
By giving tcode: scc3 ( to check the log files after creation of client )