ON
E &
OR
TAKO
Y D
EV
ELO
PM
EN
T
BE
SIK
TAS
FIS
HM
AR
KE
T
TRU
MP
CA
DD
E
TUR
GU
TRE
ISW
ATE
RF
RO
NT
NIK
KI B
EA
CH
DE
VE
LOP
ME
NT
TOP
KA
PI
CU
LTU
RA
L P
AR
K
HO
TEL
SW
ISS
OTE
L B
OD
RU
M B
EA
CH
RE
SO
RT
residential publicleisure urban planning
BU
ILT
CO
NS
TRU
CTI
ON
P
HA
SE
CO
NC
EP
T
PH
AS
E
TYP
E
DO
NE
ON
GO
ING
ON
GO
ING
2008 2009 2010 20112007 2012 2013 2014
2013 TRUMP Towers Cadde
Outdoor Shopmix Concept *
built, commercial, 2.000sqm total construction area , $4M Position: Project Manager all phases from concept through completion
Main responsibilities: conception of retail brand experi-ences and displays which both meet and exceed the expectations of both client and consumerdevelop appropriate specifica-tions to suit the design solution and/or local conditions, indepen-dently, with operator and/or with external consultants.
* awards2014 International Property Awards, Award for Leisure Archi-tecture2014 German Iconic Awards, Award for Retail Architecture
[prototypical studies]
EXECU
TIONS
[prototypical studies]
EXECU
TIONS
[prototypical studies]
EXECU
TIONS
DESIGN BRIEF A
[prototypical studies]
EXECU
TIONS
[prototypical studies]
EXECU
TIONS
[prototypical studies]
EXECU
TIONS
DESIGN BRIEF A
[prototypical studies]
EXECU
TIONS
[prototypical studies]
EXECU
TIONS
[prototypical studies]
EXECU
TIONS
DESIGN BRIEF A
3M EXHIBITION UNITPop-up unit concept
concept, exhibition, 15sqm Position:Freelance concept design concept& design development phase
Main responsibilities overall design, developmentmanaging & presentation of design concepts and design development
TOPKAPI Cultural Park Performance Hall & Urban Planning
concept, cultural & urban planing, 45.000sqm total construction area $60M Position: Project Manager,concept phase
Main responsibilities first point of contact for client and other project consultants. managing overall design and de-velopment
GAD globalarchitecturaldevelopment
SOSYAL TESİS
OTOPARKLEVEL 1
MİNİBUSGARAJI
PERFORMANS1.KAT
PERFORMANSGİRİŞ KAT
VENUE, GİRİŞ ALANI
PERFORMANS OTURMA ALANI
SİRKÜLASYON
OFİS
KULİS VE HAZIRLIK ALANI
DEPO
ISLAK MEKAN
GİŞE, GÜVENLİK BİRİMİ
TEKNİK ALAN
TİCARET
VIP
MUTFAK
KAFE
OTOPARKLEVEL 2
OTOPARKLEVEL 3
[izometri]
venue seating circulation officebackstageWC storage entrance technical rooms retail VIP kitchen cafe
performance hall 1st floor
performance hall groundfloor
venue 1st floor
minibus park ground floor
-1
-2
-3
NIKKI Beach Bodrum
Hotel& Resort Development **
ongoing, leisure, 20.000sqm, $80M Position: Project Architect tender documentation phase
Main responsibilities
assist where required in the co-ordination of the internal design team
** awards2014 International Property Awards, Award for Mixed-use Ar-chitecture
A BLOCK
ARCHITECTURE C
TURGUTREIS Coast Development
Public Development
concept, urban planning, 90.000sqm project area Position:Project Manager concept& design development phase
Main responsibilities overall design, developmentmanaging & presentation of design concepts and design development
SWISSOTEL Bodrum Beach Hotel&Resort Development ongoing, leisure,&residential 26.600sqm total construction area , $80M Position: Project Manager all phases from concept through constrution
Main responsibilities Design Development of Hotel – Operator Re-questsTender Document CoordinatorMockup-villa and mock-up hotel room & detail-ingLiaised and coordinated with client and consult-ant team
• ensured that project was designed and de-tailed to comply with statutory regulations and requirements (building regulations, town plan-ning standards, fire and other technical stand-ards)• co-ordinated the project with fellow profes-sionals and consultants • supported and guided the project teams in the development of construction information in the pre-construction and construction stages• prepared specification documentation in com-pliance with project requirements, acceptable standards, legal obligations, rules, codes and regulations
ONE& ORTAKOY Housing Development |***
built, residential & mix-use, 56.100sqm total con-struction area , $40M Position: Project Architect, Chef Site Architect, all phases from concept through completion main responsibilities Involved in project concept and designDocumentation and Coordinated tender pack-ages
• responsible for construction phase • senior point of contact between client, the team and contractors• coordinated the project teams on a daily basis, tracking progress against budgets and sched-ules. • monitoring of incoming and outgoing infor-mation between team and external suppliers, reporting back on project progress, • dealing with town planners and development control (subject to status and complexity of the project) *** awards:2012 International Property Awards, Highly Commended Architecture Multiple Residences with One & Ortakoy for Europe, 2012 Green Good Design Awards for One & Orta-koy, The European Centre for Architecture & The Chicago Athenaeum
BESIKTAS FISH MARKET Public Development | ****
built, commercial & public, 260sqm total construction area , $200K Position:Project Architect, Site Architect, documentation to completion
main responsibilities prepare 2D and 3D drawings, models as required to suit project stageproduce technical design solutions for problems on site
**** awards2012 International Architectural Award, The Chicago Athenae-um
Recommended