architecturePORTFOLIO
Vincent Jacoby
Vincent JacobyIntern architect23 year old
81 route du Boiron1260 NyonSuissep/ +41 79 915 98 13e-m/ [email protected]
Web portfoliohttp://issuu.com/vincentjcbyhttp://vincentjacoby.tumblr.com/
2
Formation
2015 Bachelor degree in Architecture from the cole polytechnique fdrale de Lausanne (EPFL), Switzerland
2011 / 2015 Ecole polytechnique fdrale de Lausanne (EPFL) section ArchitectureL. Ortelli, D. Perrault, D. Dietz
2011 Swiss army ER inf 2
2008 / 2010 Federal Maturity Baccalaurat, A level equivalent, at gymnase de Nyon, Switzerland. Option biology/chemistry
Leisure
2006 / 2009 BBC Nyon cadet at basket-ball club in Nyon
2009 / 2011 Boxing-club in Nyon
Holder of a driver licence
Languages
French / mother tongue English / C1German / academic level
Professional experiences
2015 PONT12 ArchitectsLausanne, Switzerlandwww.pont12.chInternship
CompetitionsMonitoring of projectsConstruction site
2014 / 2015 ARCHIZOOM achitectural exhibition at EPFLMontage of exhibitions, furniture design
2012 / 2013 ATE Architecture, PrverengesInternship / 6 months
Competitions for the Reposoir school in Nyon Psychiatric hospital of Prangins
2009 / 2011 Challande SA, NyonStorekeeper Construction materials, machinery, tools
Skills
AutocadVectorworksPhotoshopIllustratorInDesignRhino 3DSuite OfficeSketchup
Logic ProFinal Cut Pro
100%
3
Professional Project
Hydra
Competition for the Wankdorf, Bernwith Pont12 architects, 2015
Third Prize
5
6WANKDORF CITY II - Bern - ProjektwettbewerbHydra
Rosalia-Wenger-Platz
Hilfik
erst
rass
e
Gar
dist
rass
e
musikzimmer70m2
gewerbe 97m2
gewerbe 32m2
gewerbe 418m2
gewerbe 84m2
gewerbe 53m2
gewerbe 29m2
fitness 1'400m2
kche 175m2
verwaltung 85m2
gastronomie 230m2
empfang 145m2
BB4 b
BB4 a
BB7Grundriss Erdgeschoss 1.200Grundriss UG 2 1.1000 Grundriss UG 1 1.1000
BB4b mezzanine 1.200
vakuum auf Fitness
auto 98mofa/velo 200
Waschen/Trocknen BB4a 62 m2
Technik 472 m2Lager/Wscherei 353 m2
auto 102mofa/velo 275
Waschen/Trocknen BB4a 132 m2Technik BB4a 372 m2Technik BB4b 180 m2
Housekeeping 202 m2Personalrume 111 m2Kche 61 m2Ver- und Entsorgung 60 m2
programmatische Verteilung
Studentisches Wohnen
Longstay Appartments
Urbanes Wohnen
Bronutzung
Gewerbe / Retail
typologische Verteilung
BB4 a
Typologie 4.5 6 7.7%Typologie 3.5 36 46.1%Typologie 2.5 26 33.4%Typologie 1.5 10 12.8%
78
Longstay App. 20
Studio 40Wohngruppen 8 x 12 Zimmer 2 x 10 Zimmer
OG 1-4
OG 5
OG 6-8
OG 9-12
OG 13-15
Wohngruppen
Longstay Appartment
Studios
1.5 Zi-Whg
2.5 Zi-Whg
3.5 Zi-Whg
4.5 Zi-Whg
BB7
1er tage 15 HotelZimmer2me -8me 21 HotelZimmer
162
Volumen und Licht
Tagundnachtgleiche 8h, 10h, 12h, 14h, 17h Sommersonnenwende 8h, 10h, 12h, 14h, 17h
Licht und Rationalitt
1200m2 450/1200=0.37
180/944=0.19472m2472m2
4
BB4a Grundriss OG 1-4 1.200
BB4b Grundriss OG 1-2 1.200
BB7 Grundriss OG 1 1.200
Meetingrume 27m2
hausmeister 53m2
Meetingrume 27m2
Meetingrume 27m2
Meetingrume 27m2
Putz
rum
e 6m
2
Morphologie
Wie Cousins, doch nicht wie Brder, treten die beiden Gebude ber die Materialbeschafenheit und Typologie ihrer Fassaden in einen gemeinsamen Dialog, und ermglichen es durch ihren jeweils eigenen Rhythmus und die Proportionen der fnungen ihren programmatischen Unterschieden Ausdruck zu verleihen.
Die Baufelder BB4 a und BB4 b werden von einer Erschliessungsstrasse getrennt. Dieser Einschnitt vergrssert die Fassadenlnge und steuert dazu bei, sowohl die Typologien der Querfassaden zu optimieren als auch die ausgeprgten Formen der verschiedenen Programmeinheiten zu unterstreichen.
Baubereich BB4 a/b
Die plastische Bauform des Gebudes ist willentlich geprgt von der hybriden programmatischen Vielfalt seiner zuknftigen Nutzung und dem Streben nach dem Gleichgewicht zwischen wirtschaftlicher Eizienz und hoher Wohnqualitt. Die Dreigliederung Erdgeschoss, Sockel und aufragende Baukrper lsst die verschiedenen Programmeinheiten ausdrucksvoll in Erscheinung treten. Der Baukrper bleibt jedoch einfach und lsst die Ursprungsform des Parallelepipeden deutlich erkennen. Die Anordnung der Loggien, entfernt von den Gebudeecken, trgt zu diesem Formausdruck bei, da die geometrischen Kanten przise und ununterbrochen gestaltet werden knnen.
Die stdtebauliche Ordnung wird neu gestaltet, indem die vom maximal genemigten Bauvolumen berzhlige Geschosslche im Zentrum des Baus abgezogen wird. Ueberdimensionale Riegelbauten die durch ihre Gebudetiefe von 24m nur schwer den Anforderungen hochwertigem Wohnungsbaus entsprechen, werden zu kompakten leichtfrmigen Blcke, in denen die Wohnungen strahlen. Diese Gebudeform macht es mglich mit nur zwei Treppenhusern 78 Wohnungen zu erschliessen (bei einer doppelorientierten Wohnunstypologie, wrden dazu mindestens 6 Treppenhuser bentigt) und kompensiert somit den Standpunkt die GF nicht maximal auszuschpfen.
Der Raum zwischen den beiden herausragenden Baukrpern beluft sich auf 11 bis 12m die eine bliche urbane innenstdtliche Strassenbreite entspricht. Ein leichter Knick im Zentrum der Baukrper optimiert den Lichteinfall von Osten und Westen und vermindert gleichzeitig direkte Blicke zwischen den Wohnungen.
Hotel
Das Hotelgebude ist ein einfaches Parallelepiped. Die Breite des Baukrpers ist im Hinblick auf die maximale Baurichtlinie um 1,50m verringert. Damit entspricht die Geschosslche mit ihrer Grundlche von 900m2 der Grsse eines Brandabschnittes gemss der neuen Brandschutzrichtlinien 2015. Ein einziger Fluchtweg reicht somit aus. Die Flchenbilanz ist neutral, doch die damit erreichten Kosteneinsparungen wie auch die rumliche Grosszgigkeit sind prgnant. Die Hotelzimmer verteilen sich um einen zentralen berdachten Innenhof. Jede Etage verfgt ber eine fnung in der Fassadenhlle. Eine grosszgige Treppe verluft innerhalb dieser zentralen Innenhfe und verbindet die Eingangshalle mit den Tagungsrumen.
Typologien
Alle Wohnungen (mit Ausnahme der 1.5 Zimmer Wohnungen, alle mono-orientiert auf der Sdseite ) sind in den Ecken des Gebudes platziert und proitieren somit von einer doppelten Orientierung und Aussicht. Die Wohnungen die sich gegenberliegen, besitzen alle zumindest ein Zimmer, das zur Strasse hin zeigt. In einem Grossteil der Wohneinheiten gelangt man ber eine zentrale Diele direkt in den Wohn-, Schlaf- und Nassbereich. Zustzliche Zimmer grsserer Wohnungen werden ber eine weitere Diele oder direkt ber den Wohnraum erschlossen. Dies trgt zu einer optimalen Nutzung der Wohnlche bei, da Zirkulationslchen auf ihr Minimum reduziert werden knnen.
Die Longstay-Appartements sind indentisch gestaltet.
Studentenwohneinheiten
Die Wohneinheiten fr Studenten beinden sich im Sockel und erstrecken sich ber vier Etagen. Sie entwickeln sich um einen zentralen Innhof der sich zwischen den beiden aufragenden Gebudeteilen fnet. Ein zentraler Eingangsbereich fhrt jeweils in den grosszgigen Gemeinschaftsraum, der sich seinerseits zu einem bajonettfrmigen Raum zwischen Fassade und Innenhof weiterentwickelt. Letzterer Raum stellt den Zugang zu smtlichen Zimmern dar, welche sich auf beide Gebudeseiten verteilen.
Bauweise
Die gewhlte Bauweise ist rational und wirtschaftlich: eine Betonstruktur bestehend aus tragendenden Kernen welche gleichzeitig die Gebude aussteifen und die zentralen Erschliessungswege enthalten, sowie Sttzen, die in die Gebudehlle eingegliedert sind und Betondecken. Die Fassaden sind freizgig verglast, um den natrlichen Lichteinfall und die passive solare Wrmegewinnung zu maximieren.Die Brstungen sind stark isoliert und durch einen leicht gewellten Aluminiumblechmantel geschtzt. Dieses wirtschaftliche und nachhaltige Material ermglicht die Umsetzung einer einheitlichen fugenlosen Fassadenhllegestaltung, deren Oberlchenrelief je nach Sonneneinfall das Gebude lebendig wirken lsst.
Hydra Competition for a new area in Wankdorf Bern
The competition dealt with the conception of ats, student ats, longstay ats for businessmen, a hotel, administrative and commercial areas, all these items being split up into three buildings.We decided to merge all these accomodations in a single building consisting of two towers based on a hollow pedestal.The overlook between the towers is dramatically reduced thanks to the introduction of angle facades in order to avoid direct frontality. The contrecoeur of the facade evolves according to the privacy of the adjoining room so as to create a dynamic eff ect of heights moving from the outside.
7WANKDORF CITY II - Bern - ProjektwettbewerbHydra
Putz
rum
e 6m
2
BB4a Grundriss OG 6-8 1.200 BB4a Grundriss OG 9-12 1.200 BB4a Grundriss OG 13-15 1.200
Putz
rum
e 6m
2
BB4a Grundriss OG 5 1.200
BB7 Grundriss OG 5 1.200 BB7 Grundriss OG 8 1.200
Fassaden 1.50 Fassaden Schnitte 1.50
Stahl
Bodenbelag 2cmZementestrich 11cmTrittSchalldmmung 2cmStahlBeton 25cm
Opake Fassaden
Innen Potz 1cmZementBackstein 17cmWrmedmmung 25cmHinterltzung 3cmWellbleck 1.5cm
Dachdecken
Substrat 6cmDichtung 2cmWrmedmmung 30cmStahlBeton 25cm
Typologie 3.5 1.100
Zimmer 1 15.6 m2Zimmer 2 13 m2Nasszelle 1 5.7 m2Wohnen/Essen/Kche 36 m2Entree 7 m2Loggia 4.6 m2
Gesamt 77.3 m2
Typologie 4.5 1.100
Zimmer 1 15.5 m2Zimmer 2 13.5 m2Zimmer 3 12.9 m2Nasszelle 1 4.2 m2Nasszelle 2 4.2 m2Wohnen/Essen/Kche 44 m2Entree 14 m2Loggia 4.8 m2
Gesamt 108.3 m2
Studentisches Wohnen 1.100
Zimmer 1 12.9 m2Nasszelle 4 m2
HotelZimmer 1.100
HotelZimmer 24.8 m2
Longstay-Appartment 1.100
Zimmer 1 13.2 m2Nasszelle 1 5.7 m2Wohnen/Essen/Kche 41 m2Entree 7.6 m2Loggia 4.8 m2
Gesamt 67.5 m2
5
8WANKDORF CITY II - Bern - ProjektwettbewerbHydra
+551.30+550.82
+601.00
+551.90
+580.00
+566.00
+550.10
+580.00
+601.00
+551.10 +551.30 +550.82
+601.00 +601.00
+551.00
+580.00
+550.10
BB4 a/b Schnitte und BB7 Fassaden 1.200
BB4 a/b Schnitte und BB7 Fassaden 1.200BB7 Schnitte 1.200 BB4 a Fassaden 1.200 BB4 a Fassaden 1.200
3
WANKDORF CITY II - Bern - ProjektwettbewerbHydra
+551.30+550.82
+601.00
+551.90
+550.60
+580.00
+566.00
+550.10
+580.00
+601.00
+551.10 +551.30 +550.82
+601.00 +601.00
+551.00
+580.00
+550.10
BB4 a/b Schnitte und BB7 Fassaden 1.200
BB4 a/b Schnitte und BB7 Fassaden 1.200BB7 Schnitte 1.200 BB4 a Fassaden 1.200 BB4 a Fassaden 1.200
3
WANKDORF CITY II - Bern - ProjektwettbewerbHydra
Putz
rum
e 6m
2
BB4a Grundriss OG 6-8 1.200 BB4a Grundriss OG 9-12 1.200 BB4a Grundriss OG 13-15 1.200
Putz
rum
e 6m
2
BB4a Grundriss OG 5 1.200
BB7 Grundriss OG 5 1.200 BB7 Grundriss OG 8 1.200
Fassaden 1.50 Fassaden Schnitte 1.50
Stahl
Bodenbelag 2cmZementestrich 11cmTrittSchalldmmung 2cmStahlBeton 25cm
Opake Fassaden
Innen Potz 1cmZementBackstein 17cmWrmedmmung 25cmHinterltzung 3cmWellbleck 1.5cm
Dachdecken
Substrat 6cmDichtung 2cmWrmedmmung 30cmStahlBeton 25cm
Typologie 3.5 1.100
Zimmer 1 15.6 m2Zimmer 2 13 m2Nasszelle 1 5.7 m2Wohnen/Essen/Kche 36 m2Entree 7 m2Loggia 4.6 m2
Gesamt 77.3 m2
Typologie 4.5 1.100
Zimmer 1 15.5 m2Zimmer 2 13.5 m2Zimmer 3 12.9 m2Nasszelle 1 4.2 m2Nasszelle 2 4.2 m2Wohnen/Essen/Kche 44 m2Entree 14 m2Loggia 4.8 m2
Gesamt 108.3 m2
Studentisches Wohnen 1.100
Zimmer 1 12.9 m2Nasszelle 4 m2
HotelZimmer 1.100
HotelZimmer 24.8 m2
Longstay-Appartment 1.100
Zimmer 1 13.2 m2Nasszelle 1 5.7 m2Wohnen/Essen/Kche 41 m2Entree 7.6 m2Loggia 4.8 m2
Gesamt 67.5 m2
5
9WANKDORF CITY II - Bern - ProjektwettbewerbHydra
Putz
rum
e 6m
2
BB4a Grundriss OG 6-8 1.200 BB4a Grundriss OG 9-12 1.200 BB4a Grundriss OG 13-15 1.200
Putz
rum
e 6m
2
BB4a Grundriss OG 5 1.200
BB7 Grundriss OG 5 1.200 BB7 Grundriss OG 8 1.200
Fassaden 1.50 Fassaden Schnitte 1.50
Stahl
Bodenbelag 2cmZementestrich 11cmTrittSchalldmmung 2cmStahlBeton 25cm
Opake Fassaden
Innen Potz 1cmZementBackstein 17cmWrmedmmung 25cmHinterltzung 3cmWellbleck 1.5cm
Dachdecken
Substrat 6cmDichtung 2cmWrmedmmung 30cmStahlBeton 25cm
Typologie 3.5 1.100
Zimmer 1 15.6 m2Zimmer 2 13 m2Nasszelle 1 5.7 m2Wohnen/Essen/Kche 36 m2Entree 7 m2Loggia 4.6 m2
Gesamt 77.3 m2
Typologie 4.5 1.100
Zimmer 1 15.5 m2Zimmer 2 13.5 m2Zimmer 3 12.9 m2Nasszelle 1 4.2 m2Nasszelle 2 4.2 m2Wohnen/Essen/Kche 44 m2Entree 14 m2Loggia 4.8 m2
Gesamt 108.3 m2
Studentisches Wohnen 1.100
Zimmer 1 12.9 m2Nasszelle 4 m2
HotelZimmer 1.100
HotelZimmer 24.8 m2
Longstay-Appartment 1.100
Zimmer 1 13.2 m2Nasszelle 1 5.7 m2Wohnen/Essen/Kche 41 m2Entree 7.6 m2Loggia 4.8 m2
Gesamt 67.5 m2
Fassaden 1.50
5
Scool Projectsselected works
per semestrer
V - VI Housing Wien
Housing building and facilities of a park in the tradition of Wienerhfe studied during the semester and during a study tour in Vienna 2014/2015
IVSpiritual place on the EPFL campus
An underground building with a rest room, a lounge, a cafe and a reading-roomto best respond to the stress of studies, 2014
IIIA resauaurant under the Arlaud square
An underground project creating a transition from solitary to some friendlyarchitectural features, 2013
I - IIVegetable wash
The project is located in an ideal matrix where each student has to interact with itsneighbors in the most appropriate manner possible, 2012
ExtraGrubenmann bridge
Project for a two-span bridge in Schaffhausen, 2014
11
Housing Wien V - VI Project
Professor/ Luca OrtelliLocation/ Margaretengrtel, Vienne, AustriaProgram/ Social housing, collective equipment and facilities of an urban park
Social accomodation, collective equipment, landscaping of a city park.Following the analysis Wienerhofe, I kept in mind several ideas which will be used for the project. My analysis was based on Reismannhof. I found highly facinating the yards which articulate in the continuity of external spaces. Another interest is the impression of a world change while arriving in a viennese yard. Therefore, I decided to combine both characteristics into the building. I drew the building continuously on its three sides in order to merge into the surrounding urban fabric as well as an articulation at the subway exit. By this way, a yard is generated. This branch allows to separate the city yard while keeping a continuous space between both of them and clearly allow to create a world apart.Regarding the urban level, the idea was to put in place a guiding principle throughout the plot, that was missing so far. The trail along the channel being interrupted by this circulate node.
12
13
14
Vincent Jacoby. SP 2015. Critique finale. Atelier Ortelli
Plan RDC1:100
Plan tage type1:100
Coupe BB1:100
B
B
Axonomtrie1:100
15
Vincent Jacoby. SP 2015. Critique finale. Atelier Ortelli
Plan RDC1:100
Plan tage type1:100
Coupe BB1:100
B
B
Axonomtrie1:100
16
Composition des planchers intrieurs
- Parquet coll 20 mm- Chape sche 80 mm- Couche de sparation- Isolation contre les bruits dimpact 20 mm- Plancher entrevous (hourdis) en terre cuite 250 mm - Enduit de plafond 10 mm
Composition du mur de faade
- Crpis extrieur 20 mm- Brique isolente Thermocellit 430 mm- Enduit intrieur 10 mm
Composition des planchers des loggias
- Planches de bois 25 mm- Contre lattage 30 - 55 mm- Ls dtanchit - Triplis sapin 27 mm- Lattage de pente 30 - 55 mm- Plancher entrevous (hourdis) en terre cuite 250 mm - Enduit de plafond 10 mm
Dtail loggia1:20
Plan appartement type2 chambres coucher 83 m2
1:50
Dtail fentre1:20
Dtail mur1:20
Vincent Jacoby. SP 2014. Critique intermdiaire III. Atelier Ortelli.
Sjour et cuisine38 m2
WC2.4 m2
Salle de bain4.6 m2
Chambre enfant12.7m2
Chambre parents14.1 m2
Loggia6.5 m2
Elevation ct cour1:50
Elevation ct ville1:50
Coupe 1:50
Composition des planchers intrieurs
- Parquet coll 20 mm- Chape sche 80 mm- Couche de sparation- Isolation contre les bruits dimpact 20 mm- Plancher entrevous (hourdis) en terre cuite 250 mm - Enduit de plafond 10 mm
Composition du mur de faade
- Crpis extrieur 20 mm- Brique isolente Thermocellit 430 mm- Enduit intrieur 10 mm
Composition des planchers des loggias
- Planches de bois 25 mm- Contre lattage 30 - 55 mm- Ls dtanchit - Triplis sapin 27 mm- Lattage de pente 30 - 55 mm- Plancher entrevous (hourdis) en terre cuite 250 mm - Enduit de plafond 10 mm
Dtail loggia1:20
Plan appartement type2 chambres coucher 83 m2
1:50
Dtail fentre1:20
Dtail mur1:20
Vincent Jacoby. SP 2014. Critique intermdiaire III. Atelier Ortelli.
Sjour et cuisine38 m2
WC2.4 m2
Salle de bain4.6 m2
Chambre enfant12.7m2
Chambre parents14.1 m2
Loggia6.5 m2
Elevation ct cour1:50
Elevation ct ville1:50
Coupe 1:50
17
Composition des planchers intrieurs
- Parquet coll 20 mm- Chape sche 80 mm- Couche de sparation- Isolation contre les bruits dimpact 20 mm- Plancher entrevous (hourdis) en terre cuite 250 mm - Enduit de plafond 10 mm
Composition du mur de faade
- Crpis extrieur 20 mm- Brique isolente Thermocellit 430 mm- Enduit intrieur 10 mm
Composition des planchers des loggias
- Planches de bois 25 mm- Contre lattage 30 - 55 mm- Ls dtanchit - Triplis sapin 27 mm- Lattage de pente 30 - 55 mm- Plancher entrevous (hourdis) en terre cuite 250 mm - Enduit de plafond 10 mm
Dtail loggia1:20
Plan appartement type2 chambres coucher 83 m2
1:50
Dtail fentre1:20
Dtail mur1:20
Vincent Jacoby. SP 2014. Critique intermdiaire III. Atelier Ortelli.
Sjour et cuisine38 m2
WC2.4 m2
Salle de bain4.6 m2
Chambre enfant12.7m2
Chambre parents14.1 m2
Loggia6.5 m2
Elevation ct cour1:50
Elevation ct ville1:50
Coupe 1:50
Spiritual place IV Feasibility study
Professor/ Dominique PerraultLocation/ EPFL, Ecublens, SwitzerlandProgram/ Rest room, reading room, lounge, coffeeCo-worker/ Michael CasaresProject rewarded by UPIAV price in 2014
The project started with a faisibility study with the aim at finding the programs and functions the most appropriate while keeping at the compulsories for an underground spiritual place (underground being the main theme of the year)Here are some insights:
18
19
Spiritual place IV Project
The project consists of a main quiet space based on the spirit rest. We also find there sharing places such as a lounge, a cafe, an outside park. The whole project allows a clear circulation adapted to the different routes on the campus.We have defined the depth of our spaces as a function of their intimacy level. As a result, the most intimate the program is, the most remote it is from the surface, preventing all external pollution, in order to get to the absolute calm.The project taking part to a student campus, learning but also stress place, we then turn the project to that direction. In effect, the different programs which we are proposing have been chosen with the aim at responding to the stress usually generated by high education.
Plan masse1:1000
Axonomtrie
Composition de la toiture-Dalles en bton-Lit de gravier-Bton de pente-Dalle en bton-Etancheit -Isolation thermique-Enduit intrieur
Total
Composition du plancher du sous-sol-Revtement intrieur-Chape-Isolation thrmique-Etancheit-Dalle de fondation en bton-Bton de propret
Total
Le projet est compos dun espace principal silencieux ddi au repos de lesprit. On y trouve galement des lieux favorisant le partage et lchange tel quun salon, un caf et le parc extrieur. Lensemble du projet permet une circulation lisible et adapte aux diffrents
parcours dans le campus. Nous avons dfinit la profondeur de nos espaces en fonction de leur degr dintimit. De ce fait, plus un programme est intime, plus il sera loign de la surface, empchant ainsi toutes nuisances extrieur afin dobtenir un
calme absolu.Le projet se trouvant dans un campus dtudiants, lieu de savoir mais aussi de stress, nous avons alors orient notre projet dans cette direction. En effet, les diffrents programmes que nous proposons ont t choisis afin de
rpondre au mieux au stress li aux tudes.
50 mm40 mm50 mm300 mm
180 mm20 mm
640 mm
15 mm70 mm160 mm
250 mm 50 mm
545 mm
Michael CasaresVincent Jacoby
22.05.2014
SU
B_Lab
Dtail1:20
20
Plan du surface1:200
Plan niveau infrieur1:200
Michael Casares
Vincent Jacoby
22.05.2014
SUB_Lab
-2.0 m
0.0 m
-10.0 m
-7.0 m
-10.0 m
-11.0 m
Salon
Caf
Lecture
Dtente
21
Michael Casares
Vincent Jacoby
22.05.2014
SUB_Lab
Coupe diagonale
Coupe transversale
Coupe longitudinale
Coupe contextuelle transversale
1:100
1:100
1:100
1:200
22
Axonomtrie
Composition de la toiture-Dalles en bton-Lit de gravier-Bton de pente-Dalle en bton-Etancheit -Isolation thermique-Enduit intrieur
Total
Composition du plancher du sous-sol-Revtement intrieur-Chape-Isolation thrmique-Etancheit-Dalle de fondation en bton-Bton de propret
Total
Le projet est compos dun espace principal silencieux ddi au repos de lesprit. On y trouve galement des lieux favorisant le partage et lchange tel quun salon, un caf et le parc extrieur. Lensemble du projet permet une circulation lisible et adapte aux diffrents
parcours dans le campus. Nous avons dfinit la profondeur de nos espaces en fonction de leur degr dintimit. De ce fait, plus un programme est intime, plus il sera loign de la surface, empchant ainsi toutes nuisances extrieur afin dobtenir un
calme absolu.Le projet se trouvant dans un campus dtudiants, lieu de savoir mais aussi de stress, nous avons alors orient notre projet dans cette direction. En effet, les diffrents programmes que nous proposons ont t choisis afin de
rpondre au mieux au stress li aux tudes.
50 mm40 mm50 mm300 mm
180 mm20 mm
640 mm
15 mm70 mm160 mm
250 mm 50 mm
545 mm
Michael CasaresVincent Jacoby
22.05.2014
SU
B_Lab
Dtail1:20
23
24
25
26
27
Arlaud square III Project
Professor/ Dominique PerraultLocation/ Arlaud square, Lausanne, SwitzerlandProgram/ Restauant
I decided to establish the restaurant under the Arlaud square, square being of modest size below the Riponne square, the building partly merging with the Arlaud museum. I propose an innovant design of the underground passage reaching the restaurant. The customer gets in through the sustension wall of the square in which is dug a narrow access ramp, forcing him to be alone during the way down. At the end of his route, the customer arrives to a huge enlighted open pit space, the restaurant patio, symbolizing the breaking with the previously experienced loneliness. Then the customer crosses this space through a footbridge leading to the inside of the restaurant, a friendly space articulating around the patio that sheds its natural light.
28
29
30
31
Vegetable Wash II Conceptual project
Professor/ Dieter Dietz, Rudi NieveenLocation / Ideal matrixProgram / Fruits and vegetables washing plant
Concept : an architectural route through a vegetable treatment factory, offering along the way specific view of the key steps of the treatment process. The route carefully follows the whole manufacturing process.
32
33
34
35
Grubenmann bridgeExtra
Project
Location/ Schaffouse, SwitzerlandProgram/ Pedestrian bridgeCo-workers/ M. Casares, Y. Goy, A. Party, R. Thiebaud
In the course of the process, we imaginated four bridge versions. Heres the final version :This version is inspired by the same ideas as previously but with a major change. The plaiting is no longer a simple coating but it takes part to the structure of the bridge. All the parts are plaited so as to create a structural network. The plaiting wraps up the bridge in its entirety. The metallic roof is put over independently upon an autonomous structure.
38
7BSJBOUFmOBMF
$FUUFWBSJBOUFmOBMFSFQSFOEMFTNNFTJEFTRVFMBQSDEBOUFNBJTavec un changement majeur. Le tressage nest plus quun simple rev-tement mais devient structure. Lensemble des pices sont tresses de manire crer un systme structurel. Le tressage enveloppe lin-tgralit du pont. La toiture mtalique vient dsomais se poser de ma-nire indpendante sur une structure autonome. Labandon des fermes triangules permet la lecture du tressage lintrieur du pont. En ef-fet, une fois lintrieur, toutes les couches de tressage se dploient au-dessus de notre tte. On retrouve le langage extrieur du pont une fois lintrieur.
Etapes de montage
36
47
8. Reprsentation des variantes
37
35
38
36
Image conceptuelle
39
Vincent Jacoby81, Route du Boiron
1260 NyonSwitzerland
p/ +41 79 915 98 13e-m/ [email protected]://issuu.com/vincentjcby
Thanks