James Berry BA (hons.)Portfolio
UniversityAs part of my degree I completed a variety of individual design projects. These varied from a residential design to a commercial office/retail design and ahealthcare centre.(top right example; 3D visual of Six Dials Primary Healthcare Centre
bottom right example; floor plan of Six Dials Primary Healthcare Centre)
N.B – further university work can be shown at request.
UP
A
B
C
D
E
F
G
H
I
J
990 1360 2361 910 1828 1810 1930 1800 1010 1800 1010 1800 1275
1640
67
1
13
00
13
60
29
61
13
60
18
10
19
99
2510
57
12
5890910
14
46
5014
14
43
760
1360
3711136021291360196313601280875
32
37
660
875
87
51
45
19
10
17
25
91
05
55
91
01
52
51
81
01
47
21
81
07
90
GP
Room16sqm
GP
Room16sqm
GP
Room16sqm
GP
Room16sqm
GP
Room16sqm
GP
Room16sqm
GP Training
Room 23sqm
GP Treatment
Room 24sqm
Clerical/Records
(a)27sqm
Reception
24sqm
Store
8sqm
Sluice
6sqm
Waiting
area (a)
57sqm
entrance lobby
12sqm
Multi-purpose
room
48sqm
Dispensary
48sqm
FD 60/60
Female W/C Male W/C
Ambulant W/C
Specimen W/C
FD 60/60
Bicycle racks
B
AA
B
B
1 2 3 4 5 6 6b 7 8 9 105b
A
B
C
D
E
F
G
H
I
J
755.4693
Records/Clerical room
(b) 47sqm
Nurse
treatment room
24sqm
Nurse Interview
room 8sqm
Nurse support
room 8sqm
Plant room
16sqm
Nurse
consulting
room 12sqm
Nurse
treatment
room
24sqm
Staff common
room 24 sqm
Staff
Meeting
room/library
16sqm
Practice
Manager
14sqm
Waiting room
(b) 28sqm
Nurse
consulting
room 12sqm
FD 60/60
Disabled
refuge
1200mmx
1200mm
Unisex W/C
Ambulant W/C
waiting
space
A
A
B
R
e
f
u
s
e
B
in
James Berry
Site:
Six Dials
Date:
22/01/13
Drawn by:
James B.
Drawing No:
PRJ150/01
Drawing:
Ground floor plan,
First floor plan,Roof plan &
Site Plan
Scale:
1:100, 1:200 & 1:500
Rev:
-
Project:
Six Dials Primary Health
Surgery
Ground floor
plan 1:100
First Floor plan 1:200
Roof plan 1:200
Site plan 1:500
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PR
OD
UC
ED
B
Y A
N A
UT
OD
ES
K E
DU
CA
TIO
NA
L P
RO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Professional CareerRPA:Group
RPA:Group Working in various teams on strict deadlines across a broad range of projects and sectors.
Predominately working within the retail teams I have been tasked from creating feasibility designs based on clients first requirements through to complete drawing packs ready for construction.
(top right; example designed floor plan layout
bottom right; example shop front elevation)
N.B – further professional work can be shown at request.
VM/POSACCS ACCS
M1
CustomerLft
1 2 3 4 5 6 7
13 12 11 10 9 8141516
PROJECT INFORMATION May '15
Permit timeline TBC
Landlord approved timeline TBC
Listed building NO
Planning restrictions No projecting signage
Landlords restrictions TBC
Others considerations TBC
scale: 1:100 @ A3issue date : 01.12.15drawn by : JB
DESIGN FEASIBILITY PLAN
PROPOSED GROUND FLOOR PLAN floor areas % incl void
Off sales
Stock
Sales
11%
29%
52%
0 2 4 5m1 3
NEW CONCEPT CASHDESK& BACKWRAP:Allow to install new concept cashdeskand backwrap.
STOCKRACKING:install new static stockracking as shown.WILLOWBROOK WALLBAYS:
Allow to install new perimeter wallbaysaround sales area.
SASHWORK:Retain existing glazing and auto slidingdoors.
Sales areas
Stock areas
Off sales areas
Sales circulation
COLOUR KEY
Void area
Decorate wall red
ceiling height3200mm
Circulation 7%NEW GRAPHICAllow to install new graphic to externalface of glazing. Void .6%
NOTE:New gate to be installed by Landlordand remain closed for security.
ground floor stock area
= 118 sqft / 11 sqmrts
=516 units
ground floor sales area
= 764 sq ft / 71 sqmtrs
wall bay total = 36
+ 48 floating
first floor sales area
= 1066 ft / 99 sqmrts
total floor sales area
= 1830 sq ft / 170 sqmrts
first floor stock area
= 893 sqft / 83 sqmrts
= 11,138 units
total floor stock area
= 1012 sqft / 94 sqmrts
= 11,654 units
ground floor off sales area
= 65 sq ft / 6sqmtrs
first floor off sales area
= 323 sq ft / 30 sqmrts
total floor off sales area
= 388 sq ft / 36 sqmrts
total area = 3466sq ft /
322 sqmrts (excl void)
shopfront overall length
= 22815mm
shopfront opening
= 1740mm
ground floor circulation =
118 sq ft / 11 sqmrts
first floor circulation
= 118 sq ft / 11 sqmrts
total floor circulation
= 237 sq ft / 22 sqmrts
NEW STAIRCASE:Allow to install new staircase to existingstair opening.
NOTE:Existing gate to be retained and remainopen during trading hours.
AWNINGS:Retain existing 6No awnings at groundfloor level. Allow to replace fabric withFoot Locker branded Fabric.
total void area =
11sq ft / 2 sqmrts
Existing wall.
Existing drywall.
Dimension in (mm): Existing structure of the store.
BLUE dimension in (mm): CK concept layouts.
MAGENTA dimension in (mm): CK power.
New drywall.
Power (responsibility of house).
Existing items are indicated in red.
?mm
?mm
?mm
LEGENDLEGENDLEGENDLEGEND
AAAA
AAAA
Next ShopNext ShopNext ShopNext Shop Next ShopNext ShopNext ShopNext Shop
LoopLoopLoopLoop
LoopLoopLoopLoop
440 1992 400
647
2100
1077
3823
650 2182
601
2000
50
1172
2832
660 1512 660
36
565
Womens
largesleepwear
rail
Womens
small
sleepwearrail
Womens
small
sleepwearrail
All wall and fixture finish are to meet the fire rating statedin the Landlord general requirements documentation.
100
1800
100
119
30
1770
30
150
565 1617
CCCCCCCC
BBBB
BBBB
1451010145
Non illuminated suspendedlogo panel.
3800
1800
1172 50 100 1800 100
2400
2400
100
1500
1800
Paint existing column and wall in RAL 9016 satin finish
360 360 360 360 180180
2090
825 250
200
450
3150
Non illuminated suspended logo panel.
1200
650
150 1000 150
100
2000
3800
200
450
3150
1200210
366 366 366 366 183183
1244
1362
Written dimensions within this drawing package should take precedence overscale dimensions. All dimensions and conditions stated must be verified by thecontractor prior to the commencement of any works on site. It is the contractorsresponsibility to inform Calvin Klein Europe of any discrepencies discoveredon site. All drawings remain the sole property of Calvin Klein Europe - a PVHBusiness group. Copyright is reserved by them and the drawing is issued onthe basis that it will not be copied, reproduced, retained or disclosed to anyunauthorised person, either wholly or in part without written consent fromCalvin Klein Europe. A3
Drawn By:
Checked By:
Dubai - Galeries Lafayette - CKU - WomensDubai - Galeries Lafayette - CKU - WomensDubai - Galeries Lafayette - CKU - WomensDubai - Galeries Lafayette - CKU - Womens Floor PlanFloor PlanFloor PlanFloor Plan
L1L1L1L1Galeries Lafayette, The Dubai Mall, Dubai, UAE 21.08.1521.08.1521.08.1521.08.15
Rev - 1Rev - 1Rev - 1Rev - 1
Store Development
DSDSDSDS
JBJBJBJB
AREAS SCHEDULE
Name Area
SALES AREA 10.83 m²
Fixture Capacity Schedule - Underwear SIS
Ref Description QtyNo of
options
Units peroption Total Product
UW-F03 Womens small sleepwear rail 2 8 4 64 Hanging
UW-F04 Womens large sleepwear rail 1 12 4 48 Hanging
UW-L03 Calvin klein underwear logo 3 0 0 0 N/A
0 m0 m0 m0 m 5555 mmmm
1:501:501:501:50
1 : 50
Floor Plan
1
1 : 50
Elevation A
2
1 : 50
Elevation C
4
1 : 50
Elevation B
3
Professional CareerEuromaster Engineering ltd.
EuromasterEngineering ltd.
Example of freelance venture in assisting drawing lift interiors and creating 3D representations .
From left to right;
- example floor plan of inside lift car
-3D visual of designed interior lift car
N.B – further professional work can be shown at request.
Euromaster (Engineering) Ltd.Tel: 020-8312 2907Fax: 020-8312 4908
EC/16084
The International Quarter
For Information
30.11.15 JB BB
B
Proposal For Lift Architraves
Sectional Plan view (1:5)
1. All details & dimensions subject to site survey
confirmation
2. Arrangement shown based on architraves
being installed before plasterboard wall finish,
skirting & ramped floor section between
entrance
3. Details as shown is for 2 speed lift entrance
with slam to left hand side - adjacent lift
opposite hand
4. Seperate detail to be provided for
a) top floor - to suit E + I contral panels
b) ground floor - to suit firemans control box
5. Plasterboard may require 'edge trim' around
architrave where it butts against outside edge.
ARevised to suit clientcomments 16-11-15 BB
16.1
1.15
BFinal revision and redrawnin CAD format JB
01.1
2.15
Elevation 1:20 Sectional Side View 1:10
Additional Information
Certificate of completion
Carl BassPresident, Chief Executive Officer
Recommended