Summary1- Problem Definition2-Design Evolution3-Robot Operation4- Fabrication Method5-Design Analysis/Team Analysis6-Technical Analysis
MCC
MONROE COMMUNITY COLLEGE
Problem Definition
Initial problem (robot testing 1and 2)Task assigning. To come up with a design.To program the design .To test and correct all faults so the robot can pick and dump 3 balls.Then build the final design
MCC
MONROE COMMUNITY COLLEGE
123Design Evolution
MCC
MONROE COMMUNITY COLLEGE
Robot OperationBoth designs were based of the same pick up mechanism
12
MCC
MONROE COMMUNITY COLLEGE
-- The first design had a carriage built to hold three balls while The second stored the 12 balls in a tube that is bent at an angle to let the ball freely roll into the box .
MCC
MONROE COMMUNITY COLLEGE
Robot Navigation
MCC
MONROE COMMUNITY COLLEGE
First design
MCC
MONROE COMMUNITY COLLEGE
Second Design
MCC
MONROE COMMUNITY COLLEGE
Fabrication Method
MCC
MONROE COMMUNITY COLLEGE
Fabrication Methods
CNC - AluminumLathe AluminumRoller/trim/bend Aluminum , Steel
MCC
MONROE COMMUNITY COLLEGE
Fabrication Methods Band saw Aluminum , pvc
Grinder Aluminum , Steel
MCC
MONROE COMMUNITY COLLEGE
Design AnalysisRobot testing 1 Robot testing 2 Robot testing 3 Robot testing 4
Co$T
$30,00Environmental Impacts
MCC
MONROE COMMUNITY COLLEGE
1st testing2nd testing3rd and 4th
MCC
MONROE COMMUNITY COLLEGE
Team AnalysisConsLack of CommunicationLack of PlanningLack of OrganizationLack of Motivation
ProsGetting togetherGot along GREATChangesMeet/set weekly goalsIncreased team diversitySeek guidanceDont Procrastinate
MCC
MONROE COMMUNITY COLLEGE
Team DynamicsQuestion (a)-We were understanding and respectful of each others ideas(Anthony) the project manager.I mostly worked on the hardware while Marcus worked on the soft wear.Question (b)-Building and assembling of base parts Ideas of new partsDesigning of custom parts solidworks (Anthony)Building of custom parts Final assembly and correction of FaultsQuestion (c)-The most difficult task was coming up and building the custom parts for it to be able to perform the task.
MCC
MONROE COMMUNITY COLLEGE
Technical Analysis
What didnt work?
Ball-transfer systemBig, heavySolenoid was too weakDifficult to adjust lack Distance sensorsUnreliable, too much power consumption
What worked?
The initial programMultiple motors with same dimensions -> dont have to redesign motor bracketsThe dump mechanism
MCC
MONROE COMMUNITY COLLEGE
MCC
MONROE COMMUNITY COLLEGE
Bill of MaterialsPart NamePart DescriptionSupplierQuantity usedUnit Price ($)Total cost($)The ConveyorConveyorJohn111.511.5BeltDeere seed Belt part #a67976130Tubing2 inch PVC pipe 1.39/ft6Batteries9 volt24.989.97TapeElectrical tape 1.99 155Zinc42.00Aluminium51.50
25.85
MCC
MONROE COMMUNITY COLLEGE
Sustainability AnalysisMaterial UsedMass Carbon Footprint(kg Co2)Energy Consumed (MJ)Air Acidification (kg SO2 )Water Eutrophication (kg PO42 inch PVC pipe 1.39/ft 715.34.5790.0122.3E-3Belt334.11.7244.7E-34.5E4Conveyor Collector21.13.867.0151.1E-3Pin14.80.0490.5381.6E-41.5E-5Screw75.90.2542.88.3E-47.5E-5
MCC
MONROE COMMUNITY COLLEGE
Sustainability Analysis
Conveyor Collector
Pin
2 inch PVC pipe 1.39/ftScrew
MCC
MONROE COMMUNITY COLLEGE
Robot competition Results2013 Robot Testing 4Overall Scores (All items are formula driven, DO NOT TYPE ON THIS SHEET)TeamExhibitTestingTotalTeam #Team NameScoreScorePointsRank6The Crossbow0.005.005.0071The Slightly But Not Entirely Above Average Joes0.00180.30180.3032Adeptus Mechanicus0.00195.00195.0025FireBreathing Rubber Duckies0.0014.0014.0063Gobbler0.00262.00262.0014ICosaHedron0.0050.0050.0047Caddy Wampus0.0045.0045.0058Unsensored0.000.000.0089The Wingnut Collective0.000.000.00810Balls of Fury0.000.000.00811Platinum Warriors 0.000.000.008
MCC
MONROE COMMUNITY COLLEGE
Project AssessmentPerformanceThe performance of robot was very disappointing compared to the others during the performance in class and during the competition
Cost-The batteries added significantly to the cost since we had to get many for the trials .
Sustainability- The PVC tubing which was used to transfer the ball from the conveyor to the box had the greatest carbon foot print.
- Compared to the other materials this had a low carbon foot print the pvc tubing could be our best pick and to the fact that it was it was at our reach to no extra cause
MCC
MONROE COMMUNITY COLLEGE
Design Features The greatest strength of our design was the pic up mechanism it didnt fail to picked up the balls nicely.
No changes could really improve the design because it was thought off thoroughly, except it is another design which can take about 2 weeks to be fully functional.
MCC
MONROE COMMUNITY COLLEGE
MCC
MONROE COMMUNITY COLLEGE
MCC
MONROE COMMUNITY COLLEGE
Thanks for Listening Have a nice day
MCC
MONROE COMMUNITY COLLEGE