PIPELINE BRIDGE
CROSSING FOR MINING
TRUCKS
Bernard Shen
2015 Small Bridges Conference
Melbourne
26 November 2015 1Pells Sullivan Meynink
Pells Sullivan Meynink
Overview
• Project introduction
• Design criteria
• The design
• Loads
• Analysis
• Construction
26 November 2015 2
Pells Sullivan Meynink
Project Introduction
26 November 2015 3
ABOVE GRADE PIPELINES
CROSSING LOCATIONS
BURIED PIPELINES
Pells Sullivan Meynink
Options
• Option 1 Relocate pipelines (buried)
– Uneconomical $$$
• Option 2 Above grade crossing (bridge)
– Selected option
26 November 2015 4
Pells Sullivan Meynink
The Challenge
• Asset owner requirements
• To provide 2 m x 5 m access envelope
around the pipes for minor works
• Crossing able to be dismantled within 24
hours for emergency access
26 November 2015 5
Pells Sullivan Meynink
Plant
26 November 2015 6
• CAT 785
250t fully loaded
mining truck
(Frequent)
• CAT 5230
300t mining
excavator
(Occasional)
Pells Sullivan Meynink
Ideas
• Off the shelf or prefabricated culverts
• Beams over 1m3 mass concrete blocks
• Formed walls and slab (selected option)
26 November 2015 7
Pells Sullivan Meynink
Concept
26 November 2015 8
Pells Sullivan Meynink
Design
26 November 2015 9
WATER MAINS
FILL
RESIDUAL SOIL
BEDROCK
MINING TRUCK
CAT 785C (250 TONNE)
Pells Sullivan Meynink
Load Distribution
26 November 2015 10
Pells Sullivan Meynink
Load Consideration
26 November 2015 11
LINE LOAD
UDL
Pells Sullivan Meynink
Load On Structure
• Vertical load – Simplistic methods
probably sufficient
• Lateral load (earth pressure) – 6 methods
were considered
26 November 2015 12
Pells Sullivan Meynink
Lateral Earth Pressure
• 6 methods considered
Method 1 – Line load
Method 2 – Rankine active earth pressure theory
Method 3 – Surcharge
Method 4 – Semi-infinite load with elastic theory
Method 5 – Loaded strip with elastic theory
Method 6 – Finite element method
26 November 2015 13
Pells Sullivan Meynink
Lateral Earth Pressure
26 November 2015 14
Method 1
Method 4
Method 5
Pells Sullivan Meynink
Lateral Earth Pressure
26 November 2015 15
• What to design for?
Pells Sullivan Meynink
Adopted In Design
• Method 3 for structural design
• Method 6 to check stability
26 November 2015 16
Pells Sullivan Meynink
Passive Earth Pressure
26 November 2015 17
Pells Sullivan Meynink
Analysis (Stability)
• Hand calculation (overturning) – FOS>2
• 2D Finite element – Loaded to “failure”
26 November 2015 18
Pells Sullivan Meynink
Analysis (Deformation)
26 November 2015 19
6 mm
17 mm
“POOR” BACKFILL CASE
UNDER SERVICE LOAD
Pells Sullivan Meynink
Structural Design
26 November 2015 20
Pells Sullivan Meynink
Construction
26 November 2015 21
Pells Sullivan Meynink
Construction
26 November 2015 22
Pells Sullivan Meynink
Construction
26 November 2015 23
Pells Sullivan Meynink
Construction
26 November 2015 24
Pells Sullivan Meynink
Construction
26 November 2015 25
Pells Sullivan Meynink
Construction
26 November 2015 26
Pells Sullivan Meynink
Construction
26 November 2015 27
Pells Sullivan Meynink
In Operation
26 November 2015 28
Pells Sullivan Meynink
• Donaldson Coal
• Hunter Water Corporation
Acknowledgements
26 November 2015 29
Pells Sullivan Meynink
Thank You