Washington State Department of Transportation
PEDESTRIAN and BICYCLE SAFETY & SAFE ROUTES TO SCHOOL PROGRAMS
Legislative Transportation Committees Status Report
Highways & Local Programs Division
December 2013
Contact Information Kathleen Davis, H&LP Director, (360) 705-7871
WSDOT Highways & Local Programs PEDESTRIAN and BICYCLE SAFETY &
SAFE ROUTES TO SCHOOL PROGRAMS Legislative Transportation Committee
Status Report
To meet the conditions outlined in ESSB 5024 Section 311(6), WSDOT hereby submits the attached status report for the Pedestrian & Bicycle Safety and Safe Routes to School programs.
WSDOT Highways & Local Programs, through a criteria based process, identifies cost-effective projects to improve the conditions for biking and walking. Highways & Local Programs provides technical assistance and oversight to ensure delivery of the projects.
Pedestrian & Bicycle Safety Program Since 2006, including projects awarded funding in the 2013-15 biennium, approximately $44 million in federal and state funding has been made available to 55 local agencies for 105 projects. To date, two projects were cancelled and 52 projects are complete and being utilized by the public.
The remaining 51 projects are in various stages of development from design to construction (status – underway). For recently selected projects, agencies are currently executing the agreements necessary to start the projects (status – approved). A brief description and status about each of these projects is detailed in Table 1.
Safe Routes to School Program Since 2006, including projects awarded funding in the 2013-15 biennium, over $49 million in federal and state funding has been made available to 88 local agencies for 136 projects. To date, one project was cancelled and 49 projects are complete and being utilized by the students and their families.
The remaining 87 projects are in various stages of development from design to construction (status – underway). For recently selected projects, agencies are currently executing the agreements necessary to start the projects (status – approved). A brief description and status about each of these projects is detailed in Table 2.
2
3
Table 1 Active Pedestrian & Bicycle Safety Projects
Award Year
Location Leg
District
Project Title Award
Amount
Status
Project Description
2011
Aberdeen
19
US Hwy 101 Pedestrian Crossing Safety Project
665,000
Underway
The project includes curb extensions, pedestrian lighting, crosswalks, improved routes to transit at four non-signalized intersections, brochures, local media coverage, signage and enforcement.
2011
Auburn
31
SR 164 Auburn Way South Corridor Improvement Plan
740,830
Underway
The project includes pedestrian lighting, relocating utility poles, landscaped median, mid-block crossing with flashing beacons, countdown pedestrian signal heads, pedestrian safety education campaign, and targeted enforcement.
2011
Bainbridge Island
23
Madison Avenue Non- motorized Safety Improvement Project
240,000
Underway
The project includes shoulder, sidewalk and sign improvements, ditch and storm drainage relocation, pavement repair, solar powered speed indicator signs, and education at bicycle safety fair.
2013
Bainbridge Island
23
Olympic Drive Non- Motorized Improvements
764,200
Approved
This project provides for pedestrian and bicycle improvements on Olympic Drive SE / SR305 from Winslow Way to Harborview Drive.
2009
Bellevue
41
124th Ave SE Connection to the I-90 Trail
605,000
Underway
Project includes a shared use path, a mid- block crossing, a pedestrian refuge island, improved drainage, signage, and a safety education program.
2011
Bellevue
48
Northup Way Pedestrian Crossing Safety Enhancements
355,000
Underway
The project includes crosswalks, curb ramps, signal poles, pedestrian lighting, accessible countdown pedestrian signals, curb extensions, and distribution of pedestrian safety information sheets.
2011
Bellingham
40
Indian Street Pedestrian and Bicycle Safety Project
193,000
Underway
The project includes curb extensions, curb ramps, pedestrian lighting at intersections, signage, parking removal, public awareness and education campaign, safe bicycling classes, enhanced traffic enforcement.
2011
Bellingham
40
Samish Way Pedestrian and Bicycle Safety Improvement Project
400,000
Underway
The project includes flashing beacons, pedestrian refuge islands, neighborhood public awareness and safety campaign, targeted speed and crosswalk enforcement.
2007
Bonney Lake
31
Sidewalk Extension and Safety Education Program
384,000
Underway
Project includes sidewalk and curb and gutter, targeting schools with walking and biking safety curriculum and photo enforcement.
2013
Bremerton
26
Washington Avenue/11th Street Sidewalk Connector
1,700,000
Approved
The project installs curb, gutter, sidewalks, pedestrian scale lighting, street trees, and bike lanes between 5th Street and the Manette Bridge.
2009
Buckley
31
State Route 410 and Mason Avenue Pedestrian Crossing Improvement
170,620
Underway
Project includes flashing beacons at the crosswalk, sidewalk, curb, gutter, pedestrian lighting, pavement markings, and a safety education program.
2012
Chewelah
7
Lincoln Ave Sidewalks
6,525
Underway
Project includes construction of new sidewalk from 3rd St to East of 7th St, including minor street lighting.
2012
Chewelah
7
Main St - Pedestrian and Bicycle Safety
51,555
Underway
Project includes reconstruction of roadway, new sidewalks and street lighting.
4
Award Year
Location Leg
District
Project Title Award
Amount
Status
Project Description
2013
Ellensburg
13
5th Ave Sidewalk
92,000
Underway
Construct sidewalk and ADA improvements along the north side of 5th Avenue between N Railroad Ave and N Wenas St.
2007
Everett
21
W Marine View Dr Shared Use Path
426,000
Underway
Project includes a shared use path, distribution of materials on safe pedestrian and bicycle travel and radar speed feedback signs.
2011
Everett
38
Evergreen Way (SR99) Airport Rd to 112th Street Pedestrian Safety
390,000
Underway
The project includes sidewalk reconstruction, curb ramps, speed feedback signs, bicycle detection, accessible pedestrian signals, brochures, events, additional police patrols and speed enforcement.
2011
Everett
38
North Everett Pedestrian and Bicycle Safety
410,000
Underway
The project includes curb ramps, radar speed feedback signs, bicycle detection, pedestrian accessible signals, sidewalk, educational materials, safety patrols and speed enforcement.
2013
Everett
38
Everett Downtown Streetscape Improvements - Phase II
554,520
Approved
The project constructs curb, gutter, wide sidewalk, ADA improvements, curb extensions, street trees, street furniture, pedestrian scale lighting, and bike lanes along Hoyt Avenue between Pacific Avenue and Wall Street.
2013
Fife
25
Pacific Highway E (SR 99) Pedestrian and Bicycle Safety Improvements
1,660,800
Approved
The project will construct curb, gutter, sidewalk with planter strip, and stripe a bike lane along the north side of Pacific Highway E (SR 99) between 54th Avenue E and 65th Avenue E.
2009
Jefferson County
24 Rick Tollefson Memorial Trail
441,514
Underway Project includes a shared use trail, two bridges, and a safety education program.
2013
Jefferson County
24
Quilcene Complete Streets Project
884,165
Approved
The project will construct enhanced pedestrian crossings, sidewalks on the east side, and bicycle lanes on both sides of US 101 from MP 294.5 to MP 295.0, including landscaping, pedestrian-scale lighting, design charrette-style workshops, and a video to document the project.
2011
Kent
47
Kent Kangley Pedestrian Safety Project
416,200
Underway
The project includes two pedestrian crossings, pedestrian refuge islands, flashing beacons, crosswalks, curb ramps, accessible signals, countdown pedestrian signals, pedestrian safety campaign and materials, and pedestrian enforcement patrols.
2013
King County Metro Transit
43
King County Bike Share Program Launch University District (Target Area B)
750,000
Approved
The project pays for capital costs of equipment associated with the installation of approximately 12-15 bike share stations in the University District of Seattle.
2011
Lacey
22
College Street and 22nd Avenue Traffic Calming Project
1,750,000
Underway
The project includes a roundabout, sidewalks, curb ramps, pedestrian lighting, landscaping, education program expansion, enforcement, pace car campaign.
2009
Leavenworth
12
Chumstick Highway Shared Use Trail
200,000
Underway
Project includes a shared use trail, landscaping, retaining walls, sidewalk, ADA curb ramps, striping, signs, crosswalk markings, speed feedback signs, and flashing beacons.
5
Award Year
Location Leg
District
Project Title Award
Amount
Status
Project Description
2011
Longview
19
15th Ave at Douglas and Hemlock Streets
200,000
Underway
The project includes curb extensions, curb ramps, countdown pedestrian signal heads with audible warnings, educational materials, and enhanced enforcement.
2013
Newport
7
SR 2 – 4th Street to 7th Street Non-Motorized Transportation Improvements
646,200
Underway
The project will construct curb, gutter, and sidewalk, mark crosswalks at intersections, and install bike lanes and lighting along the north side of SR 2 from 4th Street to 7th Street.
2011
Olympia
22
Cooper Point Road Pedestrian Crossing Improvement
199,520
Underway
The project includes crosswalks, pedestrian refuge island, signage, educational handouts.
2013
Omak
7
Main Street/SR 215 & SR 155 Complete Street Project
340,425
Approved
The project will construct curb extensions, install bicycle racks, construct curb, gutter, sidewalk, preserve or replace existing street trees, and install pedestrian scale lighting on SR 215 (Main Street) between 3rd Avenue W and Bartlett Avenue E,
2011
Redmond
48
SR 202 Rechannelization
400,000
Underway
The project makes channelization improvements from 4-lanes to 3-lanes with bike lanes, curb ramps, driveways and sidewalks to ADA standards, education, and targeted enforcement.
2013
Redmond
48
Redmond Central Connector Phase 2
500,000
Approved
The project constructs a paved shared-use path and modifies two railroad bridges along the former BNSF railroad corridor between the Sammamish River Trail and DigiPen Institute of Technology. The project includes ADA improvements, and installs wayfinding signs.
2006
Renton
11
SR 167/S 4th Pl to SR 900/SB Ramps to SR 405 Safety Improvements
200,000
Underway
Project improvements include the construction of sidewalks, improving the lighting for pedestrian, landscape medians, pedestrian refuge islands, planted buffer strips, benches, kiosks and transit shelters.
2007
Renton
11
Rainier Ave S/S 4th Pl Safety Improvements
230,000
Underway
Project includes pedestrian lights, signs, refuge islands, medians, replacing deficient sidewalk, informational mailer to alert area travelers and increased police patrols.
2011
Seattle
36, 37, 43, 46
2011 Pedestrian Safety Education Campaign
260,000
Underway
The project is a pedestrian safety education campaign rolled out during the holiday season, multiple media outlets, and crosswalk compliance operations.
2011
Seattle
46
Aurora Ave N and N 95 St New Signal
585,000
Underway
The project includes a traffic signal, pedestrian countdown signals, curb ramps, marked crosswalks, public awareness campaign, and crosswalk enforcement.
2011
Seattle
36, 37, 43, 46
2011 Accessible Pedestrian Signals
246,000
Underway
The project includes accessible signals and curb ramps at 14 locations, education and enforcement campaign.
2011
Seattle
37
Rainier Beach Pedestrian Improvements
275,000
Underway
The project includes rechannelization from 4-lanes to 3-lanes with bike lanes and parking, signal timing adjustments, education and enforcement campaign.
2011
Seattle
37
South Fisher Place at Rainier Ave S Sidewalk
509,000
Underway
The project includes sidewalk, pedestrian lighting, landscaping, group walks, and targeted speed enforcement.
6
Award Year
Location Leg
District
Project Title Award
Amount
Status
Project Description
2013
Seattle
34
Delridge Multimodal Path
337,000
Approved
The project will reduce the northbound lane of Delridge Way SW to provide for a shared- use path with new curb, gutter, ADA improvements, lighting, signage and crosswalks between SW Andover Street and the West Seattle Bridge Trail, and will raise the intersection of Delridge Way SW and 23rd Avenue SW to the level of the new shared-use path.
2013
Shoreline
32
Shoreline – Interurban Trail/Burke-Gilman Connectors
540,000
Underway
The project includes filling curb, gutter, and sidewalk gaps, ADA improvements, bike lanes, sharrows, wayfinding, and shared- use path connections citywide in residential and commercial areas.
2013
Snohomish
44
Centennial Trail and 2nd St Intersection Project
760,000
Underway
The project will reduce existing street pavement width, construct a shared-use path, curb, gutter and sidewalk, and install curb extensions, street lighting and a traffic signal to improve a crossing of the Centennial Trail across 2nd Street at Lincoln Avenue.
2013
Snoqualmie
5
Town Center Phase II: Pedestrian and Bicycle Improvements
1,885,000
Approved
The project will construct a shared-use path, sidewalk, pedestrian scale lighting, pedestrian crossings, and install shared lane markings and bicyclist wayfinding from SE Northern Street to SE Newton Street.
2011
Spokane
3, 6
North Division Street (US 2)
214,035
Underway
The project includes sidewalk, crosswalks, pedestrian refuge islands, public service safety segments, health benefits outreach, informational handouts, and traffic enforcement.
2011
Spokane
3
Browne St / Division St Couplet
410,000
Underway
This project includes curb extensions, pedestrian countdown signal heads, curb ramps, public service safety segments, health benefits outreach, and traffic enforcement.
2011
Spokane
3, 6
Comprehensive Education Project
116,450
Underway
The project includes a safety media campaign, materials, events, safety display, pedestrian and bicycle safety classes, mountable camera to study behavior, targeted enforcement.
2011
Spokane
3
Monroe Street
80,600
Underway
The project includes countdown pedestrian signals, public service safety segments, health benefits outreach, and traffic enforcement.
2011
Spokane
3
Nevada Street
100,460
Underway
The project includes school zone flashers, sidewalk, signage, crosswalk relocation, safety education, health benefits outreach, and traffic enforcement.
2009
Tacoma
29
Pedestrian and Bicycle Safety Crossing Signals
835,500
Underway
Project includes minor grading, conduit, new ADA curb ramps, traffic signal, pedestrian countdown timers, crosswalk markings, curb extensions, a safety education program.
2011
Vancouver
49
Mill Plain Blvd - Hybrid Pedestrian Beacons and Lead Pedestrian Intervals
499,000
Underway
The project includes two flashing signal beacons, timing adjustments, pedestrian and bicycle safety classes, public outreach, and speed enforcement.
7
Award Year
Location Leg
District
Project Title Award
Amount
Status
Project Description
2013
Wilkeson
31
Foothills Trail Extension
475,000
Approved
The project will construct a shared-use path and sidewalks, refurbish a rail trestle, stripe bike lanes, and install crossings with lighting and flashers from just south of Hill Street across Wilkeson Creek, through the Wilkeson Town Center, to Railroad Avenue/Ash Street.
2013
WSDOT Northwest Region
21
SR 104/Edmonds - Mid Block Pedestrian Crossing
465,000
Approved
The project will construct a midblock pedestrian crossing across SR 104 in the vicinity of Edmonds City Park between the intersection of Pine St and Dayton St by installing a hybrid pedestrian beacon (HAWK signal) with ADA improvements, a median traffic island with pedestrian pass- through, crosswalk striping, raised pavement markings, and signage.
TOTAL $25,560,119
8
Table 2 Active Safe Routes to School Projects
Award Year
Location Leg
District
Project Title Award
Amount
Status
Project Description
2011
Airway Heights
6
Sunset Elementary Safe Routes Grant 2010
223,692
Underway
The project includes sidewalk, flashing beacons, fence, crosswalk markings, bicycle and pedestrian safety classes, materials and events, speed feedback signs, and additional police patrols.
2011
Anacortes
40
Anacortes Safe Routes Bike and Pedestrian Safety, Education and Enforcement Improvements-Locations Vary
675,000
Underway
The project includes sidewalk, pavement markings, signage, curb extensions, bike racks, shared use path, pedestrian and bicycle safety classes, events and materials, additional police patrols.
2013
Anacortes
40
Anacortes Safe Routes to Schools - Covered Bike Parking and Mid-Block Crossing
221,000
Approved
The project includes mid-block crossing, pavement markings, flashing beacons, curb extensions, curb ramps, covered bike parking, drainage, street lighting, educational materials and events, and emphasis patrols.
2011
Auburn
47
Lea Hill Safe Walking/Cycling Route Improvements
398,500
Underway
The project includes sidewalk, bike lanes, bicycle racks, curb ramps, pedestrian countdown signal, crosswalk, public education materials, bicycle and pedestrian safety classes and events, crossing guards, increased police patrols, photo speed enforcement, and speed feedback signs.
2013
Battle Ground
18
School Zone Safety Improvements, City Wide Battle Ground
66,206
Underway
The project includes crosswalk pavement markings, rear flashing beacon strobe lights, flashing beacon, guided walk groups and crossing guards, student/parent education, and speed emphasis patrols.
2013
Bellevue
48
West Lake Sammamish Parkway Sidewalk Connection
260,000
Approved
The project includes sidewalk, curb, gutter, planter strip, educational materials and events, walking school bus, and emphasis patrols.
2007
Bellingham
42
Shuksan - Birchwood Safe Routes to School Program
780,600
Underway
Project includes a roundabout, crosswalks, pedestrian and bicycle safety education program, increased police patrols and radar speed feedback signs.
2013
Bellingham
40
Carl Cozier Safe Routes to School Program
237,300
Approved
The project includes sidewalk, curb, gutter, drainage, curb ramps, crosswalk markings and signage, curb extensions, flashing beacons, bicycle racks, educational materials and events, increased school zone crosswalk and speed emphasis patrols.
2007
Bonney Lake
31
Bonney Lake Shared use path & Sidewalk Extension
1,098,000
Underway
Project includes a shared use path, sidewalk, pedestrian bridge, safety promotion activities, distribution of educational materials, photo enforcement and increased police patrols.
2013
Brewster
12
Ferry Street Safety Improvements
282,700
Approved
The project includes sidewalk, curb, gutter, curb ramps, street lights, drainage, flashing beacons, and emphasis patrols.
2009
Carnation
5
Pedestrian Improvements on Tolt Avenue (State Route 203) at Elementary
148,000
Underway
Project includes flashing beacons, speed feedback sign, overhead “crosswalk” sign, pedestrian and bicycle safety education and events and increased police patrols.
9
Award Year
Location Leg
District
Project Title Award
Amount
Status
Project Description
2011
Castle Rock
20
Castle Rock's Safe Routes to School Improvements
322,000
Underway
The project includes sidewalk, path, crosswalk with signal, signage, shelter, pedestrian and bicycle safety classes, events and materials, crossing guards, photo speed enforcement, crosswalk enforcement and additional police patrols.
2011
Centralia
20
Centralia 2010 School Safety Enhancement Program
297,750
Underway
The project includes school zone signs, crosswalk in-ground flashing beacons, pedestrian and bicycle safety classes, maps, public service announcements, additional police patrols.
2011
Chelan
12
Bradley Street - Morgen Owings Elementary to Gibson Ave
423,413
Underway
The project includes shared use paths, on street parking, narrow/reduce travel lane width, planter strips, bike racks, crosswalks, curb extensions, flashing beacons, pedestrian and bicycle safety classes and materials, parent education, additional police patrols and crossing guards.
2013
Clark County
49
Sacajawea Elementary Pedestrian Safety
302,000
Underway
The project includes sidewalk, curb, gutter, crosswalk pavement markings, crossing guard safety equipment, walking school bus program, educational materials and events, speed feedback signs and emphasis patrols.
2013
Edmonds
32
Madrona Elementary Walkway Project
494,000
Approved
The project includes sidewalk, curb, gutter, drainage, curb ramps, sharrow markings, flashing beacon, educational materials and events, and emphasis patrols.
2013
Edmonds
32
15th St. SW from Edmonds Way (SR-104) to 8th Ave. S
374,000
Underway
The project includes sidewalk, curb, gutter, drainage, curb ramps, sharrow markings, flashing beacon, bicycle rack, educational materials and events, and emphasis patrols.
2013
Edmonds
32
238th St. SW from 100th Ave. W to 104th Ave. W
591,000
Underway
The project includes sidewalk, curb, gutter, drainage, curb ramps, sharrow markings, flashing beacon, bicycle rack, educational materials and events, and emphasis patrols.
2009
Everett
38
Horizon Elementary School Walk Route Safety
415,000
Underway
Project includes overhead school zone signs, speed feedback signs, pedestrian countdown signal heads, lighting, pedestrian and bicycle safety education, and increased police patrols.
2013
Everett
38
Hawthorne Elementary Safe Routes to School
256,000
Underway
The project includes sidewalk, curb, gutter, crosswalk markings, curb ramps, flashing beacon, educational materials and events, and speed emphasis patrols.
2011
Federal Way
30
Mark Twain Elementary - Safe Routes to School Program
386,057
Underway
The project includes walkway, school zone signs, crosswalk markings, flashing beacons, curb ramps, walk and bike to school day events and materials, crosswalk enforcement, and speed feedback signs.
2011
Federal Way
30
Lakota Middle School- Safe Routes to School Program
1,039,080
Underway
The project includes a traffic signal, pedestrian countdown signals, pavement markings, curb ramps, sidewalk, planter strip, bike lanes, lighting, bicycle and pedestrian safety classes, events and materials, and crosswalk enforcement.
10
Award Year
Location Leg
District
Project Title Award
Amount
Status
Project Description
2013
Federal Way
30
Lakota Middle School - 13th Avenue SW Sidewalk Connection
270,119
Approved
The project includes sidewalk, curb, gutter, curb ramps, school zone flashing beacons, website article, press release, assembly with in classroom follow up discussion, educational materials, pedestrian decoy operation, and school zone speed enforcement.
2013
Federal Way
30
Federal Way Pedestrian Connection
775,000
Underway
The project includes sidewalk, curb, gutter, curb ramps, planter strips, sharrow markings, street lights, roundabout, and flashing beacons.
2012
Jefferson County
24
SR 19 Pedestrian Crossing Improvement, Trail Connection, and Student Encouragement Project
438,669
Underway
The project includes multi-use path, flashing beacons, signage, bike racks, parent and student pedestrian and bicycle safety classes, events and materials, and crosswalk enforcement.
2009
Kirkland
45, 48
Making the Connection
498,000
Underway
Project includes sidewalk, pedestrian safety education and events, radar speed feedback trailer and increased police patrols.
2011
Kirkland
48
Peter Kirk Elementary
456,600
Underway
The project includes sidewalk, curb ramps, crosswalk, bike racks, maps, walk to school day events and materials, and increased police patrols.
2011
Kirkland
48
Lakeview Elementary
348,000
Underway
The project includes sidewalk, crosswalk, flashing beacons, curb ramps, bicycle racks, bicycle and pedestrian safety classes, and additional police patrols.
2013
Lake Forest Park
46
NE 178th Street Sidewalk Improvements
569,000
Approved
The project includes sidewalk, curb, gutter, curb ramps, removal of guardrail, curb extensions, crosswalk markings, flashing beacons, signage, bike lanes, bicycle racks, educational materials and events, and crossing guard equipment.
2011
Lakewood
29
Dower Elementary - Safe Routes to School Project
257,000
Underway
The project includes sidewalk, curb ramps, flashing beacons, walk to school day events and materials, maps, and additional police patrols.
2011
Leavenworth
12
Cascade School District Safe Routes Program
338,000
Underway
The project includes sidewalk, curb ramps, signage, pavement markings, intersection re-alignment, no parking zones, school zone flashing beacons, pedestrian and bicycle safety seminars, crossing guard training, flagger safety classes, bicycle safety education, walking school bus, radar speed feedback signs and additional police patrols.
2011
Longview
19
Washington Way at 28th Avenue
150,000
Underway
The project includes in-pavement flashing beacons, curb ramps, pedestrian crossing audible warning, educational materials, in- classroom pedestrian safety education, increased enforcement, and photo enforcement.
2013
Lynden
42
Jim Kaemingk Sr. Trail Extension
273,000
Underway
The project includes shared use path, sidewalk, curb, gutter, planter strip, speed feedback signs with flashing beacons, and educational materials and events.
2011
Lynnwood
32
Creating Walking and Cycling Paths in Lynnwood
250,000
Underway
The project includes sidewalk, curb ramps, bike lanes, crossing flags, lighting, flashing beacons, pedestrian and bicycle safety classes and events, extra police patrols and crosswalk enforcement, and speed feedback signs.
11
Award Year
Location Leg
District
Project Title Award
Amount
Status
Project Description
2011
Mount Vernon
10, 40
Mount Vernon Safe Routes to School 2010
308,100
Underway
The project includes sidewalk, speed zone signs, narrow/reduce travel lanes, bike lanes, on street parking, crosswalk, pedestrian safety education events and materials, bicycle safety instruction equipment, parent education, drivers safety education classes, public service announcements, extra police patrols, and crossing guards.
2013
Mount Vernon
10, 40
Bike Walk Mount Vernon 2013
389,500
Approved
The project includes bike lanes, a bike signal, a trail crossing improvement, a roundabout, and enforcement.
2011
Mountlake Terrace
1
54th Avenue West Sidewalk Improvement Project
330,304
Underway
The project includes sidewalk, curb ramps, bicycle safety classes, speed feedback signs, increased police patrols, and crossing guards.
2009
Oak Harbor
10
Safe Routes to Oak Harbor Schools
339,925
Underway
Project includes sidewalk, flashing crosswalk beacons, bicycle racks, bike route designation, signs, bicycle and pedestrian safety education, School Share, increased police patrols, and radar speed feedback trailer.
2009
Ocean Shores
24
Ocean Shores Safe Routes to School Program (State Route 115)
635,000
Underway
Project includes a sidewalk, crosswalks, school zone flashing beacons, pedestrian and driver safety education and neighborhood watch program.
2011
Olympia
22
Garfield Elementary School, Safe Walking Routes
58,700
Underway
The project includes school speed zone signs, flashing beacons, bicycle racks, bicycle education equipment, walk and bike to school day events and materials, maps, health education, public service announcements, neighborhood speed watch, and extra police patrols.
2013
Olympia
22
22nd Avenue Sidewalk Project
1,076,000
Approved
The project includes sidewalk, planter strip, education materials and events, walking school bus.
2013
Port Townsend
24
Sheridan Street Sidewalk and Crossing Improvements
497,913
Approved
The project includes sidewalk, curb, gutter, curb extensions, planter strips, crosswalk markings, signage, educational materials and events, and emphasis patrols.
2011
Poulsbo
23
North Kitsap Schools Poulsbo Campus Complex Safe Routes Program
298,000
Underway
The project includes sidewalk, curb ramps, bicycle lane, narrow/reduce travel lane width, flashing beacons, pedestrian railing, pavement markings, walk and bike to school day events and materials, maps, speed feedback signs, and additional police patrols.
2007
Puyallup
25
Wildwood Park Elementary School Safety Improvements
245,650
Underway
Project includes improving a pedestrian path, crosswalk, signs, walking school bus, bicycle safety program, school walk route map, outreach program, increased police patrols and citizen's patrol and traffic hotline.
2013
Puyallup
25
Meeker Elementary, Aylen Junior High and Stewart Elementary School Crosswalk Improvements
210,000
Underway
The project includes flashing beacons, street lights, curb ramps, educational materials and events, and speed emphasis patrols.
2013
Quincy
13
Quincy Valley K-7 Pathway
292,000
Underway
The project includes shared use path, bollards, enclose irrigation ditch, fencing, landscaping, bicycle racks, educational materials and events, walking school bus, adult crossing guard equipment, and emphasis patrols.
12
Award Year
Location Leg
District
Project Title Award
Amount
Status
Project Description
2007
Redmond
48
Traffic & Pedestrian Improvements
350,000
Underway
Project includes traffic signals, pavement markings, bike lanes, pedestrian safety campaigns, announcements, changes to the driver’s education program and increased police patrols.
2009
Seattle
11
2009 Focus School, Concord Elementary School
315,150
Underway
Project includes sidewalk, planter strips, pedestrian and bicycle safety education and event, increased police patrols, speed feedback signs, and evaluation.
2011
Seattle
37
Hawthorne Hike and Bike
132,000
Underway
The project includes chicanes, pedestrian crossing flags, bike racks, pedestrian and bicycle safety education and encouragement materials and events, maps, additional police patrols, and speed feedback sign.
2011
Seattle
34
Roxhill Elementary - Feet, Food and Fitness
564,000
Underway
The project includes sidewalk, curb ramps, curb extensions, parent and teacher education, bicycle and pedestrian safety classes, materials, and events, public service announcements, additional police patrols, and speed feedback sign.
2011
Seattle
37
Dearborn Park Elementary School Sidewalk
587,000
Underway
The project includes sidewalk, planter strip, curb ramps, walk and bike to school day events and materials, additional police patrols, and speed feedback sign.
2011
Seattle
46
Olympic Hills Elementary Sidewalk
424,500
Underway
The project includes sidewalk, planter strip, bicycle and pedestrian safety classes, walk to school day events and materials, parent and teacher safety education, additional police patrols, and radar speed gun spot speed study.
2013
Seattle
37
Beach Square Safe Routes to School
248,000
Approved
The project includes school speed zone signage, flashing beacons, crosswalk markings and stop bar, pedestrian refuge island, curb extensions, street lighting, pedestrian countdown signals, educational materials and events, and speed control campaign.
2013
Seattle
36
Greenwood Neighborhood Greenways Go to School
153,000
Approved
The project includes curb extensions, rectangular rapid flashing beacons, educational materials and events, speed enforcement, speed feedback signs, and a speed control campaign.
2013
Seattle
46
Wedgwood Elementary Children and Neighbors
439,000
Approved
The project includes sidewalk, curb, gutter, planter strip, drainage, educational materials and events, speed feedback signs, and emphasis patrols.
2013
Seattle
11
Beacon Hill Neighborhood Greenways Go to School
597,000
Approved
The project includes a shared use path, educational materials and events, and a speed control campaign.
2013
Sedro Woolley
39
SR9 Pedestrian/Bicycle Safety Improvements
300,000
Underway
The project includes sidewalk, curb, gutter, bike lane, stormwater improvements, educational materials and events, emphasis patrols.
2012
Sedro-Woolley
39
SR9 Pedestrian/Bicycle Safety Improvements Project
400,000
Underway
The project includes sidewalk, bike lanes pedestrian safety education for children in grades 1-4 and additional police patrols.
2013
Shelton
35
Evergreen Elementary Safe Routes to School Program
497,700
Approved
The project includes sidewalk, curb, gutter, curb ramps, curb extensions, signage, educational materials and events, walking school bus, speed feedback signs, crossing guard equipment and emphasis patrols.
13
Award Year
Location Leg
District
Project Title Award
Amount
Status
Project Description
2013
Shoreline
32
Einstein Safe Routes
435,000
Approved
The project includes sidewalks, curb, gutter, curb ramps, educational materials and events, and emphasis patrols.
2013
Spokane
6
Hamblen Elementary School
592,232
Underway
The project includes sidewalk, curb, gutter, planter strips, curb ramps, educational materials and events, and emphasis patrols.
2013
Spokane
6
Westview Elementary School
555,935
Underway
The project includes, curb, gutter, planter strip, curb ramps, educational materials and events, and increased traffic patrols
2011
Spokane County
7
Northwood Middle School and Farwell Elementary School Safety Project
373,794
Underway
The project includes a traffic signal, crosswalks, sidewalk, pedestrian and bicycle safety classes, events and materials, maps, public service announcements, additional police patrols and crosswalk enforcement.
2011
Spokane County
4
Pasadena Park Elementary School Pathway Project
451,992
Underway
The project includes sidewalk, crosswalk, flashing beacons, bike racks, pedestrian and bicycle safety classes, events and materials, parent education, additional police patrols, and crosswalk enforcement.
2012
Spokane County
6
Prairie View Elementary School Sidewalk Project
408,465
Underway
The project includes sidewalk with curb, sidewalk with seperation/planter strip, crosswalk markings, signage, parent education, pedestrian and bicycle safety classes, events and materials, maps, additional police patrols, crosswalk enforcement, and crossing guards.
2012
Spokane Valley
4
Wellesley Ave Sidewalk and Adams Road Sidewalk
635,000
Underway
The project includes sidewalk, curb extensions, curb ramps, pedestrian and bicycle safety classes, additional police patrols, crossing guards, and crosswalk enforcement.
2013
Stanwood
10
Cedarhome Elementary Safe Routes to School
171,750
Approved
The project includes sidewalk, curb, gutter, planter strip, parking lane, educational materials and events, speed feedback signs, and emphasis patrols.
2013
Swinomish Indian Tribal Community
10
Swinomish to La Conner Safe Routes Project
744,610
Approved
The project includes sidewalk, curb, gutter, bicycle lanes, signage, sharrow markings, crosswalk markings including stop bars, flashing beacons, bicycle and pedestrian safety education training, crossing guard training, speed feedback signs and emphasis patrols.
2011
Tacoma
27
Sheridan Elementary - Safe Routes to School Project
379,960
Underway
The project includes sidewalk, curb extensions, curb ramps, bike racks, educational materials, maps, walk and bike to school day events and materials, additional police patrols, speed feedback sign, and neighborhood speed watch.
2012
Tukwila
11
Cascade View Elementary Safe Routes Demonstration Program
427,588
Underway
The project includes multi-use path, assembly, walk to school event and walking school buses.
2013
Tukwila
11
Thorndyke Elementary Safe Routes to School Application
457,000
Underway
The project includes sidewalk, curb, gutter, drainage, widen road to 10 ft., walking school bus, educational materials, maps and events.
14
Award Year
Location Leg
District
Project Title Award
Amount
Status
Project Description
2009
University Place
28
40th Street Sidewalk Gap Project
697,000
Underway
Project includes sidewalk, lighting, bike lanes, speed feedback signs, school zone signs, pedestrian and bicycle education and events, and increased police patrols.
2009
University Place
28
Grandview Drive Improvement Project
782,000
Underway
Project includes bike lanes, sidewalk, speed feedback signs, flashing crosswalk mast arms signs, lighting, pedestrian and bicycle education and events, and increased police patrols.
2011
University Place
28
Beckonridge Drive Safe Routes to School Project
830,000
Underway
The project includes sidewalk, lighting, planter strip, curb ramps, flashing beacon, pavement markings, signage, maps, pedestrian and bicycle safety materials and events, increased police patrols and speed feedback signs.
2011
University Place
28
27th Street Safe Routes to Schools Project
910,000
Underway
The project includes sidewalk, pedestrian lighting, planter strip, curb ramps, signal, pavement markings, signage, maps, pedestrian and bicycle safety education events and materials, additional police patrols and speed feedback signs.
2013
University Place
28
56th Street Safe Routes to Schools Project
464,000
Approved
The project includes sidewalk, curb, gutter, street lights, curb ramps, crosswalk markings, signage, pedestrian refuge island, educational materials and events, speed feedback signs, and emphasis patrols.
2013
University Place
28
44th Street Safe Routes to Schools Project
820,000
Underway
The project includes sidewalk, curb, gutter, bike lane, street lights, curb ramps, signage, educational materials and events, speed feedback signs and emphasis patrols.
2013
University Place
28
Cirque Drive Safe Routes to Schools Project
1,040,000
Underway
The project includes sidewalk, curb, gutter, bike lane, planter strip, street lights, crosswalk markings, signalized crosswalks, curb ramps, educational materials and events, speed feedback signs and emphasis patrols.
2013
Vancouver
17
Endeavour Elementary Pathway and Safety Improvement Program
209,654
Underway
The project includes a shared use path, educational materials and events, speed feedback sign, and emphasis patrols.
2006
Vashon Island School District
34
Safer Walking & Bicycling Routes for Students, McMurray Middle & Chautauqua Elementary Schools
236,500
Underway
Project includes sidewalks, crosswalks, signage, lighting, bicycle racks, bicycle safety program, pedestrian/pedometers program, and speed feedback trailers.
2013
WA State Dept of Health
N/A
State Student Travel Survey
173,052
Approved
Project conducts a statewide student travel survey to support state, regional and local project development and performance measurement.
2013
WA State Office Superintendent of Public Instruction (OSPI)
N/A
Safe Routes to School Bicycle & Pedestrian Safety Education Program
500,000
Approved
The project includes a shared use path, educational materials and events, speed feedback sign, and emphasis patrols.
2011
Walla Walla County
16
Safe Routes to Prospect Point Elementary School
330,000
Underway
The project includes shared use path, sidewalk, bike lanes, curb extensions, curb ramps, speed tables, pavement markings, signage, retaining wall, pedestrian and bicycle safety classes, materials, and events, parent education, speed feedback signs, crossing guards, and crosswalk enforcement.
15
Award Year
Location Leg
District
Project Title Award
Amount
Status
Project Description
2013
Washougal
18
Jemtegaard Trail Improvements
599,305
Approved
The project includes multi-use path, pedestrian bridge, sidewalk, curb, gutter, walking and biking mobility and safety trainings, staff and volunteer training, active transportation mentor/role model project, bicycle and pedestrian education materials, encouragement activity, incentives, bicycle parking, increased traffic patrols, and pedestrian decoy crosswalk operations.
2013
Wenatchee
12
Okanogan and Red Apple Road Sidewalk and Pedestrian Enhancements
354,420
Approved
The project includes sidewalk, curb, gutter, crosswalk signs, pavement markings, curb ramps, flashing beacons, speed feedback signs, walking school bus, crossing guard equipment, educational materials and events, and emphasis patrols.
2013
Woodland
20
South Woodland Safe Walking Route
306,473
Underway
The project includes sidewalk, curb, gutter, crossing improvements, crossing guards, and walking school bus program.
2013
Yakima
14
West Valley Middle School Vicinity Improvements
544,000
Approved
The project includes sidewalk, curb, gutter, drainage, traffic signal, pedestrian safety and crosswalk public service announcements, television, radio and print media efforts, and pedestrian crosswalk decoy operation.
TOTAL $ 38,032,858
16