Transcript

KIR

BY F

AM

ILY G

AZEB

O

KENW

OO

D P

LAZA P

AR

K

KENW

OO

D, C

ALIF

OR

NIA

No. 2800

Exp. 8-31-13ST A

T EO F C A L I F OR N

I A

* *

RE

GI

ST

ER

E DL A N D S C A P E

A

RH

I TE C

TC

DO

NA

LG. MA C

NA

D

RI

C 2013 MACNAIR LANDSCAPE ARCHITECTURE,NOT FOR GENERAL USE OR PUBLICATION, ALLRIGHTS RESERVED. THESE DRAWINGS ANDSPECIFICATIONS ARE THE PROPERTY OFM A C N A I R L A N D S C A P E A R C H I T E C T U R E .MACNAIR LANDSCAPE ARCHITECTURE IS NOTRESPONSIBLE FOR THE ACCURACY OF ANYPLANS OR SURVEYS NOT DIRECTLY PREPAREDBY THEM. SITE DIMENSIONS, GRADES, WATERPRESSURES AND GENERAL CONDITIONS SHALLBE VERIFIED PRIOR TO BEGINNING OF ANYWORK ON SITE. WRITTEN DIMENSIONS SHALLT A K E P R E C E D E N C E O V E R S C A L E DDIMENSIONS.

L A N D S C A P E A R C H I T E C T U R E

P O S T O F F I C E B O X 2 5 1 K E N W O O D, C A 9 5 4 5 2

TEL (707) 833-2288

RLA #2800 [email protected]

KENWOOD PLAZA PARK KENWOOD, CA

NTS

100.00

96.33

95.17

100.10

100.32

100.37

99.87

102.0

100.86

100.53

100.15

100.16

100.30

103.59

103.64

100.26100.25100.19

100.39

100.43

98.498.2

97.85

95.57

95.42

94.96

94.94

95.11

94.93

94.98

94.86

95.3

95.8095.86

96.63

96.91

96.84

97.01

96.9596.93

97.46

97.23

98.01

101.15

101.22

100.79

100.63

100.66

100.62

100.65

100.68

100.49

100.03 100.05100.04

99.1999.20

99.5799.39

99.31

98.2

96.36

97.3897.43

96.03

98.22

98.01

98.04

98.67

98.56

98.51

96.72

96.7396.61

96.4296.38

96.41

96.44

96.75

96.72

96.17

96.86

96.7

96.85

96.4296.26

98.3599.22

100.8100.7

100.6

98.5

97.998.2

97.02

97.01

97.0397.04

97.6497.65

97.57

100.10

99.6299.52

98.49

97.41

96.79

96.8197.04

95.52

97.0996.74

95.25

95.18

95.07

94.20

93.34

95.195.06

94.88

95.02

95.28

95.47

95.59

96.48

97.23

97.33

94.36

94.28

95.3395.33

94.77

95.13

95.03

95.0694.98

95.22

94.23

95.00

95.14

95.39

95.72

96.1496.33

96.42

96.28

97.63

96.43

93.85

94.7293.16

96.54

92.88

96.38

95.35

95.36

95.38

97.78

98.5696.12

95.97

96.00

97.76

97.49

95.0096.25

94.84

95.00

94.64

94.43

94.2293.66

94.68

94.90

97.4197.29

97.01

96.3095.5194.94

95.16

95.1595.06

95.20

95.32

94.9194.87

94.69

94.89

95.40

95.66

95.42

94.57

95.7195.63

95.7395.82

95.01

96.1395.58

95.40

95.43

95.43

95.3795.63

96.13

95.03

94.85

95.34

95.64

97.12

95.91

95.68

95.99

96.31

96.57

96.34

97.39

97.27

96.8796.59

96.22

96.5196.50

96.46

96.26

95.63

95.6895.89

97.05

97.05

97.49

97.55

97.63

97.82

97.99

97.98

97.97

97.97

98.07

98.32

98.30

98.24

98.22

98.2898.30

98.5998.57

98.5398.46

98.50

98.59 98.65

98.78

98.58

98.60

98.25

98.08

97.93

97.96

97.91

97.32

97.20 98.89

99.3199.22

99.74

99.72

99.70

98.91

99.00

99.31

99.40

99.34

99.59

99.72

99.65

98.72

98.88

98.32

95.00

95.10

96.87

92.04

92.35

93.92

93.5793.83

98.89

98.35

97.90

97.68

97.45

98.30

98.4498.43

98.41

98.2197.8498.02

98.55

98.59

99.30

98.3398.0697.81

98.31

100.47

101.82100.83100.6298.74

98.58

100.67

96.77

99.91

100.07

99.98

98.75

99.23

99.71

100.21

100.29

99.1497.9197.9598.28

98.0797.7297.78

108.86

109.80 103.97

100.00

96.33

94.47

98.37

95.59

95.17

96.33

94.46

95.62

97.39

97.58

99.9499.14

99.0198.68

103.55

95.14

95.61

94.47

100.

08

97.02

97.01

97.38

98.92

95.14

93.97

93.54

97.80

99.61

100.79

99.49

CP1 60D

CP2 PK NAIL

CP6 60D

CP 7 PK NL

EP CR

BLRD

12" CMP SILTED

STMP 38" EFT

JP OHP NS

HB WD BLRD

HB BLRD

CC WLK BC

JP

CC HDWL

CC HDWL

CC WLK BCCC WLK POC

CC WLK EC

CC WLK

CC WLK

CC WLK POC

CC WLK EC

CC WLK POC

CC WLK EC

CC WLK BC

CC WLK EC

CC WLK POC

CC WLK EC

CC WLK BC

CC WLK POC

CC WLK EC

CC WLK POC

CC WLK POCCC WLK POC

CC WLK POC

CC WLK BC

CC WLK POCCC WLK EC

CC WLK POCCC WLK EC

CC WLK BC

CC WLK POC

CC WLK EC

CC WLK POC

CC WLK EC

CC WLK POC

CC WLK POC

CC WLK EC

CC WLK BC

CC WLK EC

CC WLK BC

CC WLK POC

CC WLK BC

CC WLK POCCC WLK EC

IRR BOXIRR BOX 8"DIRR BOX 8"D

UTIL BOX

UTIL BOX

DL

ELECT RISER

4"VERT PIPE EFT

4"VERT PIPE EFT

IRR BOX 1*1.2

CL CC MOW STRP7"

CL CC MOW STRP7" CL CC MOW STRP7"

CL CC MOW STRP7"

CL CC MOW STRP7"

CL CC MOW STRP7"

CC SW BC

CC SW POC

CCC SW BC

CCC SW BC

CC SW POC

CC SW BCCC SW EC

CC SW POC

CC SW EC

CC PAD POC

CC SW

DI 1*1

CC SW AP

CC PAD POCCC PAD POC

IRR BOX 1.8*1.3

IRR V EFT

IRR BOX 1X1.2NS

IRR BOX 8"D

IRR BOX

CC WLK BC

CC WLK POCCC WLK AP

WTR BOX 10D

IRR BOX 8"D

IRR BOX 8"DIRR BOX 1.8X1.4

GUY ANCR

GUY ANCR

GUY POST

EP POC

EP ECTB

HB WD BLRD

EP@CC WLK

TB END

HB WD BLRD

BLRD ROW END12" CMP TP

BLRD ROW BGNTB BGN

12" CMP TP

HB WD BLRD

EP

BLRD ROW POC12" CMP TP

CL CC BDRCL CC BDR

CL CC BDR

CL CC BDR

CL CC BDR

CL CC BDR

CL CC BDR

CL CC BDR

BDR END CC

IRON BLRD

TB END

WD BLRD ROW

IRR BOXIRR BOX

IRR BOX 8"D

IRON BLRD

IRON BLRD

IRR BOX1.4X1.8EW

IRR BOX 10"D

BLRD ROW BGN

BLRD ROW END

CL CC BDR 8"W

CL CC BDR 8"W

CL CC BDR 8"W

CL CC BDR 8"W

CL CC BDR 8"W

CL CC BDR 8"W

CL CC BDR 8"W

CL CC BDR 8"W

CL CC BDR 8"W

TG TB

FL 6" PP

EP POCCMP 12 TOP SILT

HD WLL CC TOP

CMP 12" FL

HD WLL CC 10"

EP AP CC C

EP AP CC C

EP POC

EP AP CC C

CL CLCL CRSS WLK

CL CRSS WLK

FOG @ CRSS WLK

FOG END

EP POC

TB CMP 12" TOP SILT

TB AP

TB

TB END

FL

FL FLCMP 12" TOP SILT

TB BGN

TB

WD BLRD ROW BGN

HB

4*4 WD W/ELCT

HB WD BLRD

HBHB WD BLRD

WV 12" DIA

WV 1.5EW * 2.3

WM

UT CAGE

UT CAGE

IRR CTRL BX

IRR CTRL BX

WD BLRD ROW

WD BLRD ROW

WD BLRD ROW ENDSTLL BLRD 4"

STLL BLRD 4"

WD BLRD ROW END

IRR VLV 10" DIA

IRR VLV 10" DIA

IRR VLV BOX

IRR VLV BOX

CC BDR CL 8" BC

CC BDR @ CC WLK

CC WLK POC

CC WLK BCC

CC WLK POC

CC WLK POC

CC WLK BC

CC WLK

CC WLK @ CC BDR

STP SGN

CC BDR CL 8" POC

CC BDR CL 8" POC

CC BDR CL 8" POC

CC BDR @ CC WLK

CC WLK POC

CC WLK POC

CC WLK POC

CC WLK EC

CC WLK BC

CC WLK POC

CL CC BDR 8" POCCL CC BDR 8" EC

CL CC BDR 8" BC

CL CC BDR 8" POCCL CC BDR 8" EC

CL CC BDR 8" POC

CL CC BDR 8" EC

CL CC BDR 8" BCCL CC BDR 8" POC

CL CC BDR 8" BC

CL CC BDR 8" POC

CL CC BDR 8" POC

IRR VLV 10" DIA

IRR BOX

CC WLK C

CC WLK POC

CC WLK EC

CC WLK BC

EP AP CC CCC WLK POCCC WLK EC

CC WLK POC

CC WLK C

CC WLK C

CC WLK POC

CC WLK EC

CC WLK POC

CC WLK POC

EP AP CC C

EP AP CC C

EP AP CC POC

EP AP CC POCCC WLK

CC WLK POC CC WLK POC

CC WLK C

CC WLK C

CC WLK POC @ CCC WLK POC @ C

CC WLK POC

CC WLK

CC WLK POC

CC WLK POC

CC WLK POC

CC WLK PRC

CC WLK ECCC WLK C

COM BOX1.7EW*1.2

UT BOX 1.7EW*1.2

IRR BOX

IRR BOX

FN C WD

CC PAD ROUND

CC PAD ROUND

CC PAD ROUND

CC PAD ROUND

CC PAD 3 ROUND

CL CC BDR 8" POC

CL CC BDR 8" POC

CL CC BDR 8" EC

CL CC BDR8" POC

CC BDR @ CC WLK

FLG PLE EFT

TB

4" PERF PIPE TOP

TB @ CC WLK

TO

TO

GB DLT

GBGB

4*4 PST WD

4*4 PLTR WD

4*4 PLTR WD

4*4 PLTR WD

4*4 PLTR WD

CL 4" PLTR@CC

CL 4" PLTR C

CL 4" PLTR END

CL 4" PLTR END

PLNTR @ CC WLK

MEMORIAL C

MEMORIAL C

CC WLK@ CC PAD 3 CC PAD ROUND

CC PAD 3 ROUND

CL CC BDR 8" POC

CL CC BDR 8" EC

CL CC BDR 8"

EP POC

EP @ CRSS WLKFOGFOG @ CRSS WLK

FOG @ CRSS WLK

FOG END

FOG

FOG @ CRSS WLK

CMP 12" SILT

JP GUY

JP

BLRD ROW END

JP GUY

JP GUY

WD BLRD ROW BGN

WD BLRD ROW AP

SGN PLZA PK

WD BLRD ROW AP

WD BLRD ROW END

HB4" STEEL BLRD

WD BLRD ROW BGN

WD BLRD ROW END

4" STEEL BLRD

OH ELED EFT

OH ELED EFT

HD WLL TOP

CP1

CP2

CP3

CP4

CP5

CP6

CP2

CP 3 CHK

CP 5 CHK

BORDER AT WLK

BORDER AT WLK CHK

COM BOX CHK

UT BOX CHK

JP GUY CHK

JP GUY CHK

HD WLL C CHK

DRN PIPE CHK

CP5 CHK F 6

CP 3 CHK F 6

CP 7

CHK

IRR BOX CHK

IRR BOX CHKCC WLK C CHK

CC WLK C CHK

WV 10 IN DIA CHK

DLT CHK

FL

CC COR

EP

TO HDWL

TO HDWL

EXISTING VALLEY

OAK

PLAZA

EXIS

TIN

G

BR

IDG

E

J

J

J

WW

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH OH

IRR

IRR

COM

UNK

IRRIR

IRRIRR

IRIR

IRRIRR

IRRIR

IR

IRIR

IRR

IRRIRR

IR

IR

IRIRR

COM

UNK

IRR

IRRIR

IRIRR

IR

IRR

IRR

WARM SPRINGS ROAD

CHANNIN

G R

OW

PAR

K R

OW

GRISWOLD AVENUE

0

0

SLOPE

DOWN

@ 4.75%

2%

2%

93.00

93.00

94.00

94.00

96.00

96.00

96.00

96.00

96.00

96.00

96.00

97.00

97.00

97.00

97.00

97.00

97.00

97.00

97.00

97.00

98.00

98.00

98.00

98.00

98.00

98.00

98.00

98.00

98.00

99.00

99.00

99.00

99.00

99.00

99.00

99.00

99.00

99.00

101.00

101.00

101.00

101.00

95.00

95.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

100.00

PROPOSED KIRBY FAMILY GAZEBO

CHANNING ROW PARK ACCESS

SCALE: 1/8" = 1'

SCALE: 3/8" = 1' ±

EXISTING OAK

EXISTING OAK

EXISTING OAK

EDGE OF EXISTING CONCRETE SIDEWAlk

KIRBY GAZEBO PLAN DETAIL

IRR BOX 8"DIRR BOX 8"DUTIL BOX

UTIL BOX

IR

IR

COM

25'

12" WIDE CONCRETE MOW CURB

5' WIDE ACCESSIBLE PATH TO FINISH FLOOR

TYPIC

AL

5' WIDE PATH TO BOTTOM OF STAIRS

HANDRAIL

5' X 6' CONCRETE LANDING

NEW CONCRETE ELECTRICAL BOX

EXISTING CONCRETE ELECTRICAL BOX FOR FUTURE ELECTRIC POINT OF CONNECTION

INSTALL TWO 1" PVC CONDUITS BETWEEN EXISTING ELECTRICAL BOX AND NEW ELECTRICAL BOX; REFER TO SHEET L-2 FOR ELECTRICAL ROUGH-IN

LAWN

LAWN

KIRBY GAZEBO CONCEPT

LAWN

2'

8'

5:12 ROOF PITCH TYPICAL

STEEL RAILING, ADD ALTERNATE ITEM

REFER TO DETAIL SHEET L-4

ROOFING MATERIAL TO BE ASPHALT SHINGLE

STONE VENEER OVER CONCRETE PERIMETER

FOOTINGTERRACE STYLE STEPS

AT STAGE SIDE OF GAZEBO

COPPER CAP; 20 OZ COPPER, 6 PANEL, STANDING SEAM WITH HIDDEN ATTACHMENT TABS

STONE VENEER OVER CONCRETE COLUMN;

ADD ALTERNATE ITEM

PIP CONCRETE CAP ON CONCRETE

COLUMN

INTERNAL STEEL COLUMN

COPPER CAP AT EDGE OF ROOF

DECKING, CONTINUOUS AROUND PERIMETER

TAPERED MDF COLUMN AROUND

STEEL COLUMN

SPECIAL INSPECTION BY OWNERS TESTING AGENCY

Special inspections and testingshall be performed by an approved agency in accordance with California Building Code (CBC) Sections 1703, 1704, 1707 and 1708, and with the Statement of Special Inspections as required by CBC Sections 1704.1.1 and 1705 for building structural elemnts summarized as follows: 1. Structural steel constructionper CBC Sections 1704.3, 1707.1, 1708.3 and Table 1704.3 including material identification, shop and field welding.

SHEET INDEXL-1 SITE PLANL-2 FOUNDATION DETAILSL-3 STRUCTURAL DETAILSL-4 SITE WORK AND DETAILS

DATE: 2/13/13 JOB: 2012-18 SCALE: AS SHOWN DRAWN: DM SHEET

L-1

SHEET 1 OF 4

SIT

E P

LAN

FINISH FLOOR @ 101.68 (2' ABOVE GRADE)

fs 101.56

100.7 existing

ts 101.56

bs 99.56

5'

STAIRS 4 - 6" RISERS 3 - 16" TREAD

STAIRS 4 - 6" RISERS 3 - 16" TREAD

3.1 %

STAGE OPENING