NECPasolink Radio Training course

NESIC Cairo Training Center 

NESIC CAIRO

Page 2: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 2/63

1- Installation The standard installation follow the following flow

1.1 Preparation.

1.2 Indoor Installation

1.3 Outdoor Installation.

1.4 Cable Termination.

2- Test 

2.1- Equipment Power ON/ OFF and Setting

2.2 Antenna Orientation

Training course contents:- 

NESIC Cairo Training Center  NESIC CAIRO

Page 3: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 3/63

NEC Pasolink Radio Training course

NESIC CAIRO

 

1- INSTALLATION 1.1 PREPARATION 

NESIC Cairo Training Center 

Page 4: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 4/63

1.1 PREPARATION  

Before going to any site,

please be sure you completely prepared the following items:1-The installation tools.

2-The test equipment ,materials ,and tools.( for test work only)

3-Site installation drawings.

4-All labels/stickers (hard and soft copy)5-Frequency plan and system configuration documents.

6-Test procedure and test data sheets .( for test work only)

7-Confirm access to site/station.

8-Check the condition of the vehicle to be used.

9-Make sure you and your staff are in good conditions(physically)

10-Confirm the site/station entrance conditions.

11-Move to site/station safely.

NESIC CAIRO

Page 5: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 5/63

NEC Pasolink Radio Training course

NESIC CAIRO

 

1- INSTALLATION 1.2 INDOOR INSTALLATION 

NESIC Cairo Training Center 

Page 6: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 6/63

 

IF Cable

Connection 

IDU Grounding Connection 

Connect the Power Follow Start up and set upProcedure 

Follow The

termination Procedure  IDU Mounting  

19" rack fixing 

Unpacking of 19"

rack (if supplied) 

IF Connector & Power Connector termination 

Unpacking of 

Accessories Unpacking

of IDU 

Refer to the IDU fixing

Procedure Photos 

Rack Earthing

Connection 

Confirm 19" Rack Location

& DC-Power Source 

1-INDOOR 

INSTALLATIO 

N  

NESIC CAIRO

Page 7: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 7/63

Indoor Installation 

-The installation procedure for the IDU is

shown below.

(1) 2M Interface setting(2) IDU Mounting

(3) Cable Connection and Wiring

NESIC CAIRONESIC Cairo Training Center 

Page 8: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 8/63

(1) 2M Interface setting 

1-Confirm the user 2M Interface if it is 75 or 

120 Ohm

2-Remove the IDU Top cover 3-Set the shown switches S3 to the required

Interface

120 Ohm

75 Ohm

NESIC CAIRO

(The factory Setting almost match the user requirement)

Page 9: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 9/63

IDU Type Samples 

Ohm Interface)120& 75MB (2x4

Ohm Interface)120MB (2x16

 ) IDU Mounting 2 ( 

NESIC CAIRO

Page 10: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 10/63

Fix each side of the IDU to therack with the twoscrews.

NESIC CAIRO

Page 11: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 11/63

To mount the IDU in a 19-inch rack, allow space more

than 200mm to the rear

section and space for oneunit to the top and bottom

NESIC CAIRO

Page 12: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 12/63

(3) Cable Connection and Wiring

-Fix the DDF Frame and 2M termination Block (terminal Block, 75 Ohm

DDF or any other …) 

-Proceed the 2M wiring

-Connect the other cables as shown in next Page

NESIC CAIRO

Page 13: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 13/63

5-Connectthe Power

Cable

4-Connectthe IFCable

3-Connectthe 2M Cable

6-Putthe

Labels

2-Connect theframe Earthing

1-Fix the 4screw (2 foreach side)

(3)Wiring

NESIC CAIRO

Page 14: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 14/63

NEC Pasolink Radio Training course

NESIC CAIRO

 

1- INSTALLATION 1.3 OUTDOOR INSTALLATION 

NESIC Cairo Training Center 

Page 15: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 15/63

NEC PAOLINK TRAINING MANUAL

Installation workOutdoor Installation

1- Installation Flow Chart.

2- Unpacking and check points for ODU &

 Antenna.3- (V – H ) Polarity setting.

4-Antenna Bracket assembly.

5- ODU mounting.6- Cables connections and laying

NESIC CAIRO

Page 16: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 16/63

 

IF Cable

Connection 

ODU Grounding Connection 

IF Cable LayingConnect to IDU & FollowStart up and set up Procedure 

Follow The

termination Procedure  ODU Mounting  

Unpacking of 

Antenna 

IF Connector  

Unpacking of 

Accessories Unpacking

of ODU 

Refer to the IDU fixing

Procedure Photos 

Remove the ODUcover, Confirm the

Polarity 

Antenna bracketassembling,

Confirm the Polarity 

- INSTALLATIO 

FLOW CHART  

NESIC CAIRO

Refer to the Antenna

assembling guide 

Page 17: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 17/63

2- Unpacking and check Points 

-You Have to check the following (according

to link budget)

(1) Frequency band & sub band(2) Antenna size

(3) Antenna height

NESIC CAIRONESIC Cairo Training Center 

Page 18: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 18/63

ODU Check Points

NESIC CAIRO

FrequencyBand

FrequencySub Band

Serial No

 Also you have to check :-

Type HighOR Low

Page 19: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 19/63

 Antenna Check Points

NESIC CAIRO

Type

Diameter

Frequency

Serial No

Page 20: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 20/63

3.(V-H) Polarization Setting

NESIC CAIRO

 V to top

 Vertical Pol

H to top

Horizontal Pol.

3.1- ODU Polarization

Depends on the V-H Mark direction

Page 21: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 21/63

3. (V-H) Polarization Setting

NESIC CAIRO Vertical PolHorizontal Pol.

3.2- Antenna Polarization

Depends feed horn Position

Note the

Position

Page 22: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 22/63

How to Change the Antenna Polarization

NESIC CAIRO

1- Carefully remove the four screws using

the suitable driver 

2-Carefully change the feed horn position

1- Remove the 4 screw2-Change the feed

horn position

Page 23: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 23/63

4- Antenna Bracket Assembly

NESIC CAIRO

1- Fix the Bracket using the supplied screws

2- Make sure the Screws are well tighten.

1- Tighten the Screws2- Insure it’s well tighten

Mainly, you have to follow the antenna instruction Guide

Page 24: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 24/63

5- ODU MOUNTING 

NESIC CAIRO

1- Place the ODU to the antenna in the

required polarization2- Make sure the Screws are well tighten.

2- Tighten the Screws

Page 25: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 25/63

5- ODU MOUNTING 

3- Place the ODU to the antenna in

the required antenna height4- Make sure the Screws are welltighten.

3- Fix the ODU to the Mast

NESIC CAIRO2- Insure it’s well tighten

Page 26: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 26/63

6-Cables connections and laying 

1- Connect the IF cable and

grounding cable to the ODU2- Cover the IF connector with vinyltape

NESIC CAIRO

IF Cable Connection

Grounding CableConnecting point

Page 27: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 27/63

6-Cables connections and laying 

3- Carefully lay the IF cable going

to the IDU4- Be sure there is no sharppending in the IF cable route.

NESIC CAIRO

Page 28: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 28/63

NEC Pasolink Radio Training course

NESIC CAIRO

 

1- INSTALLATION 1.4 Cable Termination 

1.4.1 IF Cable Termination 

NESIC Cairo Training Center 

Page 29: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 29/63

CABLE TERMINATION

1-IF Connector Termination 1-Connector Material

CheckVerify that all connector 

 Accessories are complete as

1- Lock Nut2- Washer 

3- Gasket

4- Clamp A

5- Clamp B

6- Center Conductor 

7- Insulation

8- Connector Shell

NESIC CAIRO

Page 30: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 30/63

Clamp B

Clamp A

Insulation

Gasket

Washer 

Luck Nut

Center Conductor 

Connector Shell NESIC CAIRO

Page 31: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 31/63

IF Cable Termination

1-First, Fit the Lock Nut, Washer 

and Gasket on the Cable as

shown

Gasket

washer 

Lock Nut

NESIC CAIRO

Page 32: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 32/63

2-Strip Back the cable

sheath,

taking care not todamage the braided

shield.

Fit Clamp A

NESIC CAIRO

Page 33: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 33/63

3-Fold back the Braided

shield,

Separating the strands of the braid. Cut the

extra length,

to fit to

Clamp A

NESIC CAIRO

Page 34: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 34/63

4-Cut away the insulation

from the center 

conductor and fit the

clamp B.

Be sure not to cut or 

scratch the conductor while stripping the

insulation

NESIC CAIRO

Page 35: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 35/63

5- Cut the center conductor to fit

the connector center contact

(~1.2cm).

6- Mount the center contact ontothe center conductor 

7- Mount the Insulation onto the

center contact.

Taper the end of the center 

conductor using a file

Insulation

NESIC CAIRO

Page 36: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 36/63

8-Insert the cable into the

connector shell

9- Tighten the Lock Nut.

Insure the good tighten condition using the suitable 

wrench 

NESIC CAIRO

Page 37: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 37/63

10- Check the connector-cablecontinuity suing millimeter.

11- Cover the outdoor connector with rubber tape.

12- Cover the rubber tape with allweather vinyl tape.

13- The connector is ready for use.

NESIC CAIRO

Page 38: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 38/63

NEC Pasolink Radio Training course

NESIC CAIRO

 

1- INSTALLATION 1.4 Cable Termination 

1.4.2 Power Cable Termination 

NESIC Cairo Training Center 

Page 39: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 39/63

Page 40: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 40/63

NESIC Cairo Training Center 

CONNECTOR &POWER

CABLEPower 

Connector 

Power Cable

Socket Contact

NESIC CAIRO

1 R 3 0 3 5 f

Page 41: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 41/63

1-Remove 3.0 to 3.5 mm of 

Insulation

2- Set the socket contact to

the following position onto

the hand crimping tool

1

Hand Crimping tool

(57026-5000)

Positionia. of CabledCrimping Type

57026-5000 Ф 1.5 to 1.8 1

  Ф 1.8 to 2.2 257027-5000 Ф 2.3 to 2.6 1

  Ф 2.6 to 3.1 2

NESIC CAIRO

2

3 Squeeze the handle of the hand crimping tool

Page 42: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 42/63

3- Squeeze the handle of the hand crimping tool,insert cable into socket contact

4- Cable should fit, so insulation and bare wire arearranged as shown,

5- Squeeze the handle of the hand crimping tool untilratchet is released.

NESIC CAIRO

Page 43: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 43/63

 

6- Insert socket contacts

to power connector till

they locked and be

sure it is well fixed.

5-Squeeze the

handle of the hand

crimping tool until

ratchet Is released

(0 V)

(-48 V)

NESIC CAIRO

Page 44: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 44/63

Power Connector  The Connector is ready to use

NESIC CAIRO

Page 45: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 45/63

NEC Pasolink Radio Training course

NESIC CAIRO

 

2-TEST  

NESIC Cairo Training Center 

Page 46: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 46/63

NEC PAOLINK TRAINING MANUAL

To Proceed Pasolink setting and testingwe recommend the following TestingFlow :-

1-Before going to site check

1.1Test tools

1.2 Test equipment1.3 Link budget

1.4 Site access permission

The Test Work

NESIC CAIRO

1 Visual2 PasoLink Test

Page 47: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 47/63

 

4-Equipment setting & testing 

5-Antenna Orientation & Link Test 

The link is ready to put in service 

3-IDU Start Up

1-Visual

Inspection 

Refer to the detailed

Procedure 

2- DC Input Voltage Check  

2-PasoLink Test 

Flow Chart  

NESIC CAIRO

Refer to Start Up

Procedure 

Page 48: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 48/63

Visual Inspection  

Visual Inspection purpose is to insure all installationand wiring work were done in proper way

1-Check the appearance and label

2-Check the ODU &Antenna frequency based onfrequency plan

3-Check the fixing way of rack and equipment

4-Check the cable connection and power Polarity

NESIC CAIRO

Page 49: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 49/63

Please refer to your equipment Instruction manual

2-DC input Voltage value & Polarity  1-Check the DC input voltage in IDU is connected correctly

and in the accepted range

Power requirement: +/- 20 to +/- 60

Or (+/-20 to +/- 72)

NESIC CAIRO

Confirm the

Polarity before

insert the power 

Cable

+-

Page 50: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 50/63

1-Never switch it Off before at least 30 sec2-Never connect or disconnect the IF Cable

while the equipment is powered On

3-Leave the equipment to warm up

3- IDU Start up  1-Be sure the power cable and IF cable are connected in

Proper way

2- Carefully Poll out the Power On / Off toggle switch and put

in ON position.

2- To shutdown the IDU switch the toggle switch to Off 

Position

NESIC CAIRO

4 E i t tti d t t

Page 51: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 51/63

You will need to set only one time

4- Equipment setting and test  

1- Set the HyperTerminal on your PC as follows :-

From start menu follow the route

Programs…..Accessories….Communication……

HyperTerminal

NESIC CAIRO

HyperTerminal

H T i l tti

Page 52: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 52/63

PTT

HyperTerminal setting 

1- Double click HyperTerminal icon and follow the instructions

NESIC CAIRO

Type your 

Connection

Name

Select connect using

“direct to COM1” 

H T i l tti

Page 53: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 53/63

HyperTerminal setting 

Select the setting items:

NESIC CAIRO

1-Bits/Second:9600

5-Flow Control

Hardware

2-Data Bits

8

3-Parity

None

4-Stop bits

2

6- Press OK

H T i l tti

Page 54: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 54/63

HyperTerminal setting  

From File menu select “ Properties” 

NESIC CAIRO

1-Select“windows

keys” 

3-Press“ASC II setup 

2-Select

“VT100”

VT100

500

4-Select “Send line

ends with line feed” 

5-Select

“Append line …” 

then OK

7- OK 8- OK

IDU Setting 

Page 55: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 55/63

g Connect your PC to the IDU using supplied RS232 cable.

Start up your HyperTerminal connection

Follow the Commands as – Press Ctrl+D

 – You will be requested to enter password, Press enter directly

 – You will be asked to change password, you can change or keep itnone

 – From main menu you can select any of:

1-Setting 2-Maintenance 3-Monitoring 4-Exit

NESIC CAIRO

Double

Click

Password

1-Setting

2-Maintenance

3-Monitoring4- Exit

IDU Setting

Page 56: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 56/63

IDU Setting 

From Setting menu you have to set the following.

NESIC CAIRO

1-Bit Rate

9- Frame ID

4- TX/RX

Frequency CH

5- TX Attenuation

7- BER Alarm point

(1E-3)

This setting is just for test purpose

For more details, please refer to instruction manual

IDU Setting 

Page 57: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 57/63

g From Main menu select Monitoring menu (No.3)

Select No.3 “Inventory” to insure the equipment type,

inventory,..

Start your antenna orientation and link test.

NESIC CAIRO

-Select Item 3 to Monitor 

4-Main Menu

1- Data (Monitoring

Voltage)

2- Alarm/Status

3- Inventory

Page 58: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 58/63

NEC Pasolink Radio Training course

NESIC CAIRO

 

After finish setting of the IDU in Both sites, Start the antenna orientation until get the designed Receive 

Signal Level (RSL) 

NESIC Cairo Training Center 

Page 59: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 59/63

NEC PAOLINK TRAINING MANUAL

ANTENNA ORIENTATION

1.Insure your safety condition

Pasolink

Monitor Pasolink Monitor 

connecting point

2-Connect Pasolink Monitor to the ODU

NESIC CAIRO

Page 60: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 60/63

NEC PAOLINK TRAINING MANUAL

ANTENNA ORIANTATION

3.1-Loose the bolts fixing the

horizontal movement3.2-Adjust the antenna azimuth

until get max. receive signal level

3-Start horizontal adjustment

Follow the antenna installation guide

NESIC CAIRO

Page 61: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 61/63

NEC PAOLINK TRAINING MANUAL

ANTENNA ORIANTATION

4.1-Loose the bolts fixing the

vertical movement3.2-Adjust the antenna vertically

until get max. receive signal level

4-Start Vertical adjustment

Follow the antenna installation guide

NESIC CAIRO

Page 62: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 62/63

Repeat the previous steps in both sitesseparately until get the designed RSL

Resume all connection and cover the IFConnector and ODU monitor 

Start Link test based on test procedure

NESIC CAIRO

ANTENNA ORIANTATION

NESIC Cairo Training Center 

Page 63: Pasolink Training

7/28/2019 Pasolink Training

http://slidepdf.com/reader/full/pasolink-training 63/63

NEC Pasolink Radio Training course

NESIC Cairo Training Center 

THANK YOU