New paint, new glass, new landscape, new flagpole, and new paving

Before AfterEntry

Page 3: Park School Modernization Summer 2012

New retaining wall, fence, and walkway around tree made of pavers

Before AfterSidewalk dead ends into tree

Page 4: Park School Modernization Summer 2012

New paint, new asphalt, new lights, new railings, stairs, ramps, seat walls, planters, and planting

Before AfterSouthern entrance into school

Page 5: Park School Modernization Summer 2012

New window glazing, water fountain, paint, asphalt, lighting and playground striping

Before AfterBack of school

Page 6: Park School Modernization Summer 2012

New addition to building adding 3 restrooms, covert old restroom to storage room, new planter with seat walls, plants, and new concrete walkways

Before AfterOld boys restroom

Page 7: Park School Modernization Summer 2012

New seat walls, planters, planting, walkways, asphalt, paint, new glazing, and covered walkway

Before AfterPlanter

Page 8: Park School Modernization Summer 2012

New ball walls, seat walls, planters, planting, walkways, asphalt, paint, new window glazing, and covered walkway

Before AfterCampus

Page 9: Park School Modernization Summer 2012

New seat walls, planters, planting, asphalt, concrete walkways, paint, new window glazing, and covered walkway

Before AfterCampus

Page 10: Park School Modernization Summer 2012

New ball walls, seat walls, planters, planting, asphalt, concrete walkways, paint, new window glazing, and covered walkway

Before AfterCampus

Page 11: Park School Modernization Summer 2012

New Exit stairs, paint, and playground striping

Before AfterExit stairs

Page 12: Park School Modernization Summer 2012

New exit stairs and playground striping

Before AfterExit stairs

Page 13: Park School Modernization Summer 2012

New siding on Annex Building

Before AfterOld siding on Annex Building

Page 14: Park School Modernization Summer 2012

New ADA compliant ramp and retaining wall

Before AfterRamp

Page 15: Park School Modernization Summer 2012

New entry store front, paint and railing

Before AfterEntry

Page 16: Park School Modernization Summer 2012

New Paint

Before AfterCeiling at front entry

Page 17: Park School Modernization Summer 2012

New casework and paint

Before AfterResource room

Page 18: Park School Modernization Summer 2012

New white boards, pin up boards, column cover, carpet, storage closet, ceiling lighting, and heater

Before AfterLower level classroom

Page 19: Park School Modernization Summer 2012

New casework, flooring, in-fill walls, sink, lighting, paint and pin-up boards

Before AfterLower level classroom

Page 20: Park School Modernization Summer 2012

Flooring, paint, pin-up panels, restroom addition, convert old restroom to storage room, and new fire alarm with sprinkler

Before AfterHallway

Page 21: Park School Modernization Summer 2012

Building addition for three restrooms, new water fountain, fire alarm with sprinkler, flooring and paint

Before AfterHallway

Page 22: Park School Modernization Summer 2012

New carpet, paint, door, counter, pin-up panels

Before AfterAdministrative offices

Page 23: Park School Modernization Summer 2012

New wall creating nurse station, new paint, flooring, doors

Before AfterAdministrative Office

Page 24: Park School Modernization Summer 2012

Remove wall, new casework, new sink

Before AfterStaff work room

Page 25: Park School Modernization Summer 2012

New window glazing where windows failed

Before AfterTypical Classroom

Page 26: Park School Modernization Summer 2012

New projector, screen, speakers, clock, paint, carpet, fire alarm with sprinkler, ceiling fans, and thermostat controls for radiator

Before AfterTypical classroom

Page 27: Park School Modernization Summer 2012

New storefront exit system, larger landing with abrasive action carpet new railing

Before AfterExit stairs

Page 28: Park School Modernization Summer 2012

All new fixtures and finishes

Before AfterTypical upper restroom