Transcript
Page 1: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Heechul Yun +, Rodolfo Pellizzoni*, Prathap Kumar Valsan+ +University of Kansas

*University of Waterloo

1

Page 2: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

High-Performance Multicores for Embedded Real-Time Systems

• Why?

– Intelligence more performance

– Space, weight, power (SWaP), cost

2

Page 3: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Challenge: Shared Memory Hierarchy

3

Core1 Core2 Core3 Core4

Memory Controller (MC)

Shared Cache

• Hardware resources are contented among the cores

• Tasks can suffer significant memory interference delays

DRAM

Page 4: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Memory Interference Delay • Can be extremely high in the worst-case

4

8.0

33.5

45.8

0

5

10

15

20

25

30

35

40

45

50

ARMCortex A15

IntelNahelem

IntelHaswell

solo

+ 1 co-runner

+ 2 co-runners

+ 3 co-runners

No

rma

lized

exe

cuti

on

tim

e

45.8X slowdown

DRAM

LLC

Core1 Core2 Core3 Core4

bench co-runner(s)

banks

Page 5: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Modeling Memory Interference

• Common (false) assumptions on COTS systems – A single resource

• Reality: multiple parallel resources (banks)

– A constant memory service cost • Reality: it varies depending on the DRAM bank state

– Round-robin arbitration, in-order processing • Reality: FR-FCFS can re-order requests

– Both read and write requests are treated equally • Reality: writes are buffered and processed opportunistically

– One outstanding request per core • Reality: an out-of-order core can generate parallel reqs.

5

Addressed in This Work

Addressed in [Kim’14]

[Kim’14] H. Kim, D. de Niz, B. Andersson, M. Klein, O. Mutlu, and R. R.Rajkumar. “Bounding Memory Interference Delay in COTS-based Multi-Core Systems,” RTAS’14

Page 6: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Our Approach

• Realistic memory interference model for COTS systems – Memory-level parallelism (MLP) in COTS architecture

– Write-buffering and opportunistic batch processing in MC

• DRAM bank-partitioning – Reduce interference

• Delay analysis – Compute worst-case memory interference delay of the

task under analysis

6

Page 7: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Outline

• Motivation

• Background

– COTS multicore architecture

– DRAM organization

– Memory controller

• Our approach

• Evaluation

• Conclusion

7

Page 8: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Memory-Level Parallelism (MLP)

• Broadly defined as the number of concurrent memory requests that a given architecture can handle at a time

8

Page 9: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Last Level Cache (LLC)

DRAM DIMM

Memory Controller (MC)

Core1

Core2

Core3

Core4

Request buffers Read Write

Scheduler

MSHRs

CMD/ADDR DATA

COTS Multicore Architecture

Out-of-order core: Multiple memory requests

Non-blocking caches: Multiple cache-misses

MC and DRAM: Multiple banks

Bank 4

Bank 3

Bank 2

Bank 1

MSHRs MSHRs MSHRs MSHRs

9

Page 10: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

DRAM Organization

LLC

DRAM DIMM

Memory Controller (MC)

Bank 4

Bank 3

Bank 2

Bank 1

Core1 Core2 Core3 Core4

Mess

• intra-bank conflicts

• Inter-bank conflicts

10

Page 11: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

DRAM Bank Partitioning

L3

DRAM DIMM

Memory Controller (MC)

Bank 4

Bank 3

Bank 2

Bank 1

Core1 Core2 Core3 Core4

• Private banking

– OS kernel allocates pages from dedicated banks for each core

Eliminate intra bank conflicts

11

Page 12: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Bank Access Cost

Row 1

Row 2

Row 3

Row 4

Row 5

A DRAM Bank

Row Buffer activate

precharge

Read/write

• State dependent access cost – Row hit: fast

– Row miss: slow

READ (Bank 1, Row 3, Col 7)

Col7

12

Page 13: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Memory Controller

13

Read request buffer

Write request buffer

Bank 1 scheduler

Channel scheduler

Bank 2 scheduler

Bank N scheduler

DRAM chip

Memory requests from cores

Writes are buffered and processed opportunistically

Page 14: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

“Intelligent” Read/Write Switching

• Intuition

– Writes are not in the critical path. So buffer and process them opportunistically

• Algorithm [Hansson’14]

– If there are reads, process them unless the write buffer is almost full (high watermark)

– If there’s no reads and there is enough buffered writes (low watermark), process the writes until reads arrive

14 [Hansson’14] Hansson et al., “Simulating DRAM controllers for future system architecture exploration,” ISPASS’14

Page 15: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

FR-FCFS Scheduling [Rixner’00]

• Priority order

1. Row hit request

2. Older request

• Maximize memory throughput

15

Bank 1 scheduler

Channel scheduler

Bank 2 scheduler

Bank N scheduler

[Rixner’00] S. Rixner, W. J. Dally, U. J. Kapasi, P. Mattson, and J. Owens. Memory access scheduling. ACM SIGARCH Computer Architecture News. 2000

Page 16: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Outline

• Motivation

• Background

• Our approach

– System model

– Delay analysis

• Evaluation

• Conclusion

16

Page 17: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

System Model • Task

– Solo execution time C – Memory demand (#of LLC misses): H

• Core – Can generate multiple, but bounded, parallel requests

• Upper-bounded by L1 cache’s MSHR size

• Cache (LLC) – Assume no cache-level interference

• Core-private or partitioned LLC • No MSHR contention

• DRAM controller – Efficient FR-FCFS scheduler, open-page pollicy – Separate read and write request buffer

• Watermark scheme on processing writes

17

Page 18: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Delay Analysis

• Goal – Compute the worst-case memory interference delay of a

task under analysis

• Request driven analysis

– Based on the task’s own memory demand: H – Compute worst-case per request delay: RD – Memory interference delay = RD x H

• Job driven analysis – Based on the other tasks’ memory requests over time – See paper

18

Page 19: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Key Intuition #1

• The #of competing requests Nrq is bounded – Because the # of per-core parallel requests is bounded.

– Example • Cortex-A15’s per-core bound = 6

• Nrq = 6 x 3 (cores) = 18

19

Page 20: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Key Intuition #2

• DRAM sub-commands of the competing memory requests are overlapped

– Much less pessimistic than [Kim’14], which simply sums up each sub-command’s maximum delay

– See paper for the proof

20

Page 21: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Key Intuition #3

• The worst-case delay happens when – The read buffer has Nrq requests – And the write request buffer just becomes full

• Start a write batch

– Then the read request under analysis arrives

21

RD = read batch delay + write batch delay

Page 22: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Outline

• Motivation

• Background

• Our approach

• Evaluation

• Conclusion

22

Page 23: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Evaluation Setup

• Gem5 simulator – 4 out-of-order cores (based on Cortex-A15)

• L2 MSHR size is increased to eliminate MSHR contention

– DRAM controller model [Hansson’14]

– LPDDR2 @ 533Mhz

• Linux 3.14 – Use PALLOC[Yun’14] to partition

DRAM banks and LLC

• Workload – Subject: Latency, SPEC2006

– Co-runners: Bandwidth (write)

23

DRAM

LLC

Core1 Core2 Core3 Core4

subject co-runner(s)

Page 24: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Results with the Latency benchmark

• Ours(ideal): Read only delay analysis (ignore writes) • Ours(opt): assume writes are balanced over multiple banks • Ours(worst): all writes are targeting one bank & all row misses

24

0

5

10

15

20

25

30

Measured [Kim'14] Ours(ideal) Ours(opt) Ours(worst)

No

rmal

ize

d R

esp

on

se T

ime

underestimate

overestimate

[Kim’14] H. Kim, D. de Niz, B. Andersson, M. Klein, O. Mutlu, and R. R.Rajkumar. “Bounding Memory Interference Delay in COTS-based Multi-Core Systems,” RTAS’14

Page 25: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Results with SPEC2006 Benchmarks

• Main source of pessimism: – The pathological case of write (LLC write-backs) processing

25

Page 26: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Conclusion

• Memory interference delay on COTS multicore – Existing analysis methods rely on strong assumptions

• Our approach – A realistic model of COTS memory system

• Parallel memory requests • Read prioritization and opportunistic write processing

– Request and job-driven delay analysis methods • Pessimistic but still can be useful for low memory intensive tasks

• Future work – Reduce pessimism in the analysis

26

Page 27: Parallelism-Aware Memory Interference Delay Analysis for COTS Multicore Systems

Thank You

27


Recommended