Why?
To satisfy AER 2003-01 regulations which
ensure that all injected fluid other than
potable water be isolated from the
production casing, above the production
packer.
AER has three cases for the test and the
results are then uploaded into the DDS.
Packer tests are required annually.
SSI conducts packer tests to satisfy AER,
OGC and SER regulations.
Failed Packer Isolation TestFound during packer isolation test
Another identified issue with packer isolationIn many instances it is not the packer that leaks, it’s an issue with corroded tubing.
Remote AccessSurface Solutions can access sites with quad or side x side in very remote areas.
Safety Overview
Surface Solutions is committed to
maintaining a high standard in health and
safety. All company specific orientations
and standard PPE requirements.
Along with:
BC First Aid
Alberta Safety Council ATV training
Bear Awareness (Enform)
www.SurfaceSolutions.ca
Mike Beck
Business Development Manager
Mark Jickling – Northern Sales
Gil Kleven – Calgary Sales
GRANDE PRAIRIE - HEAD OFFICE
RED DEER | ESTEVAN | CALGARY