Transcript

7

Construction Activities This Month (with photos)

Photographs of Events and Construction progress

A1 Earthwork Excavations

(27th September, 2014)

Temporary Site Toilet(Jinja Side)

(20th September, 2014)

Temporary Site Toilet(Njeru Side)

(20th September, 2014)

7

Construction Activities This Month (with photos)

Placement of Oil-Silt fence

(28th September, 2014)

Engineer Office (Jinja Side)

(29th September, 2014)

Engineer Office (Jinja Side)

(29th September, 2014)


Recommended