ORDER NO. R5-201X-XXXX ATTACHMENT F
APPROXIMATELIMIT OF CONSERVATION
EASEMENT
APPROXIMATEFACILITY BOUNDARY
PROPOSEDLANDFILLGAS WELL(TYP.)
ISOLATIONVALVE(TYP.)
LANDF ILL GASF ORCEMAINT RANSMISSIONLINE
ISOLATIONVALVE(TYP.)
TOENERGYPLANT#1
M -3
M -1
M -3
M -4
M -5
M -6
M -7
M -2
GP-112/GP-9
GP-113/GP-10
GP-114/GP-11
GP-115/GP-12
GP-116/GP-13
GP-117/GP-14
GP-118/GP-15
GP-119/GP-16
GP-120/GP-17
GP-121/GP-18GP-122/GP-19
GP-123/GP-20
GP-124/GP-21
GP-125/GP-22
GP-126/GP-23
GP-127/GP-24
GP-128/GP-25
GP-129/GP-26GP-101/GP-1
GP-103/GP-2
GP-104/GP-3
GP-105/GP-4
GP-107/GP-5GP-108/GP-6
GP-109/GP-7
GP-111/ GP-8
546RISER
551RISER
591RISER
471
491
568
570
578
569
583
566
551
5659
3
53
535
545
518
488541
483
554
501 539
553630
522
523
516
517
515
510
506
524
472
473477
54
565
502650
651652
653
654
661
660
663
662
658
657656
648649
647646
665
571
580
107
87550
490
503
486
71
508
548
529533
534
HC-108
540
528
582
579
487
451
664CI-3
610
589
590591
609
602
603
613
592
612
629
624
605
639
644
611
618617
631
637
638
643
641634
645
633
635
636
632
622
608
511 512
588
593
676
675674
682
687
688
CI-1
C I-2
666
668
667
686
685669
671670
672
673 683
684
677 678
679680
681
FA1 UNIT 1CLOSED AREA
ASBESTOSAREA
FILL AREA 2 UNIT 1BOUNDARY
FILL AREA 1 UNIT 2BOUNDARY
FILL AREA 1UNIT 1/UNIT 2
BOUNDARY
FILL AREA 1 UNIT 1BOUNDARY
250
SCALE IN FEET
125 0 250 500
EXISTING REMOTE WELLHEAD
1400
UNIT 2 APPROXIMATE LINER BOUNDARY
LEGEND
EXISTING 10' CONTOUREXISTING LANDFILL GAS PIPE - ABOVEGROUND
UNIT 1 APPROXIMATE LIMIT OF WASTE
EXISTING HEADER HIGH POINTHP
EXISTING CONTROL VALVE
EXISTING LFG EXTRACTION WELL
EXISTING LANDFILL GAS PIPE - BELOWGROUND
EXISTING REDUCER FITTINGEXISTING FLANGE CONNECTION
EXISTING BLIND FLANGE
EXISTING CONDENSATE PUMP STATIONEXISTING ROAD CROSSING
EXISTING PERIMETER GAS MONITORING PROBE
APPROXIMATE ASBESTOS AREA BOUNDARY
EXISTING LEACHATE COLLECTION PIPEEXISTING HORIZONTAL LFG COLLECTOR
EXISTING CAPPED PIPE
EXISTING CONDENSATE INJECTION WELL
EXISTING BELOWGROUND LEACHATE FORCE MAIN
GP-105/GP-4
CI -1
CS-
523
Drawing Reference: Geosyntec Consultants JTD Figures 32, 33, and 36 (30 July 2015)
FILL AREA 1- EXISTING LANDFILL GAS COLLECTION SYSTEM, FILL AREA 2- PROPOSED LANDFILL GAS COLLECTION SYSTEM, AND PERIMETER LANDFILL GAS PROBES Waste Management of Alameda County, Inc. Altamont Landfill and Resource Recovery Facility, Alameda County