DESIGN OF OFFICE BUILDINGS & GREEN BUILDINGS LEED CERTIFECATED PRESENTED BY :KHALED SAMAHA ; KHALED ELSADANY AHMED SALAH ; ELSAYD OSAMA AHMED SHOUKRY DOAA REDA ; SARA ABD ELKHALEAA RAGHDA HASSAN ; SOMAYA ASHRAF DINA AMER OFFICE BUILDINGPRESENTED TO:DR \ AMANY RAGHEB
To view this presentation, first, turn up your volume and second, launch the self-running slide show.1
:
:
OFFICE BUILDINGS
LEED CERTIFCATION ( ) LEED
To view this presentation, first, turn up your volume and second, launch the self-running slide show.2
Presentations are a powerful communication medium.
3
. .. . . . . . . :
For more than 20 years, Duarte has developed presentations4
: : . : :
.. . .
. :Planning grid 1.35m related to facade divisions Standard office module: 2.7m x 5.4m plus 1.8m corridor Column grid To suit 1.35m planning grid an 8.1m column grid centre to centre. Parking bays must be fully clear of columns.
Planning Grids
to launch products, 6
1- : .- . - .2- : . . ( 16 ). .3- : .4- : .5- : .7- : . :
align employees, 9
: - : . :1- .2- .3- ( ).4- .5- . :1- .2- .3- .4- .5- .6- .
increase company value,10
and propel11
.:1- ().2- .3- .4- (). :1- .2- () .3- ( )4- .5- . . . :
global causes.12
200 05,1 25,0 165,0 200 35,1 30,0 165,0
: : : . :
: . :
15 10 400
: 40 200 100 200 125 . . .
Elevator Design & Configuration
90% . . :1. 1.72.2. 2.30 2.3. 2.502.4. 102.5. 92.6. 52.7. 2.5 2 .8. 15 2 : 25 2.9. 282. 4.5 : 6 . :
: 6 7.5 24 40 . 8 20 . 1.90 3.70 . :
3.75 7.50 9.25 1.00 3.25 6.00 1.50 2.00 2.50 1.75 2.50 3.25 2.50 4.00 5.00
MEETING SPACES
Parking Bay minimum size 2.3 x 5.0m (min. 0.5m between wall/column and car side) min. 1.2m access along one side of the car for disabled parking bay PARKINING
UNIT OF TOLITS
GREEN ARCHITECTURE : .
SC3Smith Carter Office
5
2004 . . .SC3 4600 . 150 50 . Xero-scaping
Along the way weve discovered25
MATRIALSFOROBTAINABLYProjectLEEDsolutions
CERTIFICATIONSC32
five simple rules for creating world-changing presentations.26
SC3The conditions have been made in building sc3 to win a certificate platinum leed...
Materials
Structure Poured-in-place concrete, precast concrete, structural steelExterior Wood panel cladding, and stainless steel cladding, curtain wall, Solera skylights by Advanced GlazingsInterior Ceilings by Armstrong, raised floor system with carpet tile, low-VOC paint; Toto EcoPower Faucets and Grohe faucets, Water Matrix waterless urinals, dual flush toilets; lighting by Lithonia, Ledalite, and Color Kinetics, lighting controls by LutronHVAC McQuay air handling units, geothermal heating and cooling, natural gas boilers, building controls by Siemens
The first rule is: Treat your audience as king.27
Project PerformanceEnergy Intensity [building + Process Energy] 505MJ/m2 /yearSaving relative to model building 51%Based on energy model. Actual use may vary slightl.Water Consumption from municipal sources 82 litres/m2 /yearSaving relative to model building 47%Local materials [800 km radius] by value 26%Recycled material content 40%
2
DIAGRAMS FOR SC3 0FFICE
THE Edgegreenestmost
2intelligentbuilding
The second rule is: Spread ideas and move people.30
Why it is better ?!
1
the edge BREEAM 98.4. . 28000 . . 7 .
Along the way weve discovered31
ATRIUM
STAIRSSTAIRSELEVATORSTAIRS & ELEVATOR
The edge 2 The edge . . . . ..
DIAGRAMS FOR THE EDGE 0FFICE
GEOMETRY
PRACTICEDESIGN
DECORATION
4
Rule number 4: Practice design, not decoration.36
THANKS FOR ALLDESIGN OF OFFICE BUILDINGS & GREEN BUILDINGS LEED CERTIFECATED
As tempting as it is to fill your slides with stuff, often de-decorating is the best policy.39