OCSD Effluent Reuse Study SP-173 Cost Share
Water Issues Committee
April 8, 2015
1
2
Background
►GWRS currently has 70 mgd treatment capacity
►Initial Expansion under construction will provide additional 30 mgd, for a total of 100 mgd
►Environmental Impact Report evaluated ultimate facility producing up to 130 mgd
Flow Availability Issues for Final Expansion
3
► Availability of sufficient quantities of secondary treated wastewater from OCSD Need approx. 173 mgd of secondary treated wastewater to produce
130 mgd of GWRS purified water This amount is not available from OCSD Plant No. 1 OCSD Plant No.1 cannot produce 173 mgd even if more flow could
be diverted to it Additional flow required must come from OCSD Plant No. 2 and
those flows contain water from SARI Ability to bring flows from Plant No.2 to GWRS don’t currently exist SARI recycling prohibited in current GWRS permit
GWRS Final Expansion to 130 MGD Supplemental Feedwater Alternatives
►If SARI Line cannot be recycled must segregate SARI at OCSD Plant 1 or Plant 2, prevent
comingling with remaining recyclable wastewater
►If SARI Line could be recycled recycle OCSD Plant 2 flows, and/or bring SARI into OCSD Plant 1
4
Feedback from NWRI Independent Advisory Panel for GWRS
► Panel meets annually to review GWRS operations & water quality ► Reviewed information on SARI dischargers & water quality in
August 2014 ► Preliminary Panel feedback
Additional water quality data for overall SARI needed Additional information re: Stringfellow Hazardous Waste Site needed Interested in results from follow-up audit of SAWPA source control Further analysis should be done of segregating SARI flows in OCSD system
5
OCSD SP-173 Effluent Reuse Study
► OCSD Board Five Year Strategic Plan approved in November 2013 includes goal to recycle all Plant No. 2 water
► OCSD staff has prioritized the GWRS Final Expansion to help fulfill their board’s strategic plan
► OCSD Effluent Reuse Study SP-173 developed to help identify how to provide flows necessary for the GWRS Final Expansion
► SP-173 would identify projects and costs to get flows both with and without SARI water to GWRS
6
7
OCSD Effluent Reuse Study SP-173
Scope of Work & Deliverables from OCSD Effluent Reuse Study
► Plant No. 1 and Plant No. 2 Hydraulic Models Final Hydraulic Model Report
► GWRS Final Expansion Implementation Plan and Report Plant No. 2 Secondary Water Quality Report SARI/Sidestream Separate Process Treatment Concept Design Plant No. 2 GWRS Pump Station Concept Design Flow Equalization Concept Design Permit and Environmental Impacts Implementation Plan (Costs and Schedule)
► Collection Diversions Opportunities Report Would increase flows to OCSD for GWRS Potentially segregate municipal domestic sewage away from SARI in Orange County
8
OCSD/OCWD with SARI Location Map
OCSD Plant No. 2
OCWD GWRS Facility
OCSD Plant No. 1
SARI Line
SARI Diversion Line
OCSD Plant No.1 - SARI Segregation Option
A
B
OCSD Plant No.2 - SARI Segregation Option A
OCSD Plant No.2 - SARI Segregation Option B
OCSD Effluent Reuse Study Award and Schedule
► OCSD request for proposals (RFP) issued January 2015 ► Three proposals received: CDM Smith/Brown and Caldwell, RMC/B&V
and MWH/Carollo ► Staff selection was for the CDM Smith/Brown and Caldwell team ► Study to begin in May 2015 and draft report available May 2016 ► OCWD staff will participate in project meetings and review project
deliverables ► OCSD has requested OCWD cost share in study (total negotiated study
cost is $2,008,510)
13
►Agendize for April 15 Board meeting: Set aside $1,004,255 from current operating reserves and authorize payment in the same amount to Orange County Sanitation District (OCSD) for the District’s 50% share of the Agreement to CDM Smith for the OCSD Effluent Reuse Study SP-173.
Recommendation
15
End of Presentation