North Western Railway
mRrj ifpe jsyos
RATE ADVICE No 2 OF 2009
nj lwpuk dzekad 2 & 009
t;iqj 30 twu ] 009
gfj oYYk 'kekZ
eq[; okf.kT; cUkd
Jaipur, 30 JUNE , 2009
H.V.SHARMA
Chief Commercial Manager
RATE ADVICE ASSURANCE SHEET
Rate advice received on date______________________________________
We, the following staff have gone through the Rate Advice No. ...................... and Noted the content of the same.
Sr. No.
Name
Designation
Signature
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
(Note: This sheet is to be signed by all the concerned Supervisors and Staff for having understood the contents.)
INDEX
CL
No
Subject & Authority
Page No.
THROUGH RATE CIRCULAR (COACHING)
2
Up- gradation of Kishangarh Balawas (KGBS) Halt station from halt to B Class station.
(Authority ;Sr,DOM /BKN No676-T/Plan/Conv.KGBS/xing STN/09 of dt 31.03.09)
(Authority: Sr.DCM /BKN No.Coml/CC-1/186 of date 02.4.09)
(Authority: CCM/NWR No.C.171/ Halt station /KGBS of dt.07.04.2009)
20
3
Notification of trains services for rationalization of rates for Parcel & Luggage traffic.
(Authority: CCM/NWR No.C.375/3/Vol of dt.26.05.2009)
20-25
4
Notification of train services for rationalization of rates for parcel & Luggage traffic.
(Authority: CCM/NWR No.C.375/3/Vol of dt.28.05.2009)
26
5
Corrigendum-Notification of train services for rationalization of rates for parcel & Luggage traffic.
(Authority: CCM/NWR No.C.375/3/Vol of dt.03.07.2009)
26
THROUGH RATE CIRCULAR (GOODS)
13
Introduction of Round the clock working at Sirsa (SSA) goods shed .
(Authority: -CCM/NWR No. C-491/B&W Hrs. Vol-I of date 08/4/09)
28
14
Notification of Kharia Khangar Cement Siding on through distance basis.
(Authority: -CCM/NWR No. C-491/22 of date 08/4/09)
28
15
Opening of Bhagega Station (BAGA) for outward and Inward traffic both in rake load.
(Authority: -CCM/NWR No. C-498/I/Vol.II of date13/04 /09)
28-29
16
Opening of FL-RGS-RE section of Jaipur division for through goods traffic.
(Authority: -CCM/NWR No. C-498/I/Vol.II of date 22/04 /09)
29
17
Operation of container trains by Private Container Operator (PCO) in Railway owned terminals.
(Authority: -CCM/NWR No. C-387/PCO/Container/1 of date 22/04 /09)
29
18
Opening of Nasirabad Station for outward and Bhilwara Station for inward water traffic.
(Authority: -CCM/NWR No. C-498/3/1/AII of date 27/04 /09)
29
19
Opening of Uttarlai station for Coal Traffic.
(Authority: -CCM/NWR No. C-498/2/1/JU of date 27/04 /09)
30
20
Opening of Nawa City (NAC) station as CRT for chassis stuffing /destuffing
(Authority: COM/NWR No. T-2/Goods/550/7 Vol.II /09 of date 11/05/09)
(Authority:CCM,NWR No.387/PCO/Container/1of dt 11.05.2009)
30
LRA COACHING
21
The Railways (Extent of Monetary liability and Prescription of Percentage charge) Amendment Rules,2009.
(Authority: CCM / NWR No. C- 375/7 Misc dt 04.05.2009)
32-33
22
e-tickets-Photo ID. (Commercial Circular No.14 of 2009 )
(Authority: Railway Board Letter No. 2008/TG-I/10/P/E-Ticketing ID of dt.27.04.2009)
(Authority: CCM / NWR No. C-156/E/Ticketing/09 of dt 05.05.2009)
33
23
Cash Incentive to the ticket checking staff for good performance. (COMMERCIAL CIRCULAR NO.16 OF 2009)
(Authority: Railway Board Letter No. 2006/TG-V/1036/I Of dt.22.05.2009)
(Authority: CCM / NWR No. C-549/TC/Cash incentive/2009 of dt 05.06.09)
33-34
24
Priority Schedule for allotment of VPs. (Freight Marketing Circular No. 11 of 2009)
(Authority: Railway Board Letter No. 2005/TC(FM)/11/4 Of dt.19.05.2009)
(Authority: CCM / NWR No. C-375/6/Vol.II of dt 08.06.2009)
34-35
25
Policy for running of Teevra Gati Sewa (TGS) train by multiple consignors from multiple originating points.(F.M.Circular No. 12 of 2009)
(Authority: Railway Board Letter No. 2009/TC(FM)/11/7 Of dt.21.05.2009)
(Authority: CCM / NWR No. C-375/6/Vol.II of dt 08.06.2009)
33-38
LRA GOODS
64
Distance based concession on Iron Ore Pellet booked at Class 200 X.
(Authority: Railway Board Letter No. TCR / 1078/2007/3 of dt. 20.03.2009)
(Authority: CCM / NWR No. C- 493/6/431 dt 01.04.09)
40
65
Freight concession for Iron ore traffic (Class 200X) ( Rates Circular No. 25 of 2009.
(Authority: Railway Board Letter No. TCR /1618/2008/14 dt. 30.03.2009)
(Authority: CCM / NWR No. C- 493/6/431 dt 02.04.2009)
40-41
66
Charges for providing Brake Vans in WIS rakes. (Freight Marketing Circular No. 07 of 2009)
(Authority: Railway Board Letter No. 2007/TC(FM) / 4 / 3 dt. 20.03.2009)
(Authority: CCM / NWR No. C- 88 / 0 (Policy) dt.06.04.2009)
41
67
Policy Guidelines Freight Incentive Schemes and Transportation Products .
(Authority: Railway Board Letter No.TCR/1078/2008/15 dt. 31.03.2009)
(Authority: CCM / NWR No. C- 429/0 dt. 06P.04.2009)
42
68
Rebate in freight rates on Caustic Soda Lye traffic transported in the privately owned BTCS wagons.(Rates Circular No. 27 of 2009)
(Authority: Railway Board Letter No.TCR/1644/2006/1 dt. 31.03.2009)
(Authority: CCM / NWR No. C- 433/2 dt. 08.04.2009)
42
69
Haulage Charge recoverable for movement of containers in privately owned wagons.(Rates Circular No. 26 of 2009)
(Authority: Railway Board Letter No.2007/TC-I/302/IPT.H of dt. 31.03.2009)
(Authority: CCM / NWR No. C- 78/1/54/CONCOR Vol II of dt 08.04.2009)
43
70
Movement of Railway Material Consignments (RMC) Rates and rules in regard to.(Rates Circular No. 23 of 2009)
(Authority: Railway Board Letter No.TCR/1078/2006/13 of dt. 20.03.2009)
(Authority: CCM / NWR No. C- 423/2 of dt 01.04.2009)
43-46
71
Siding working hours for POL unloading siding.
(Authority: Railway Board Letter No.2005/TT-II/13/P (Siding) of dt. 13.03.2009)
(Authority: CCM / NWR No. C- 491/1 Vol.III of dt 20.04.2009)
47-50
72
Standard rake size of BG/MG wagons for grant of trainload rate benefit. (Corrigendum No. 14 Rates Circular No.25 of 2008)
(Authority: Railway Board Letter No.TRC/1078/2008/15 of dt.13.04.2009)
(Authority: CCM / NWR No. C- 4291/0 22.04.2009)
51-53
73
Tareweighment of empty wagons supplied to colliery sidings and steel plants. ( Rates Circular No. 28 of 2009)
(Authority: Railway Board Letter No.TRC/1394/83/6 Pt. of dt.13.04.2009)
(Authority: CCM / NWR No. C- 611/0 of date 23.04.2009)
53-54
74
Permissible Carrying Capacity of BG wagons. (R.C No. 29 of 09)
(Authority: Railway Board Letter No.TRC/1394/2003/11 of dt.15.04.2009)
(Authority: CCM / NWR No. C- 176.4 Vol.III of date 23.04.2009)
54
75
Adjustment in Classification of commodities.(Rates Circular No. 30 of 2009)
(Authority: Railway Board Letter No.TRC/1015/2009/2 of dt.22.04.2009)
(Authority: CCM / NWR No. C- 70/1 Vol.II of date 23.04.2009)
54-55
76
Empty haulage charges for newly manufactured privately owned wagons for delivery .
(Authority: Railway Board Letter No.TRC/2205/96/1 of dt. 13.04.2009)
(Authority: CCM / NWR No. C- 176/5 of date 30.04.2009)
55-56
77
Additional Free time .
(Authority: Railway Board Letter No.TC-I/2005/201/2 of dt. 13.04.2009)
(Authority: CCM / NWR No. C- 299/0(Policy) of date 30.04.2009)
56-57
78
Tare weighment of empty wagons supplied to colliery sidings.
(Authority: Railway Board Letter No.TCR/1394/83/6 PT of dt. 20.04.2009)
(Authority: CCM / NWR No. C- 611/0 of date 30.04.2009)
57-58
79
Amendment No.7 to Rates Circular No. 76 of 2007- Permitting running of freight trains on CC+6 routes universalisation
(Authority: Railway Board Letter No.TCR/1394/2004/2 of dt. 13.04.2009)
(Authority: CCM / NWR No. C- 176/4 Vol.III of date 04.04.2009)
58-59
80
Heavy detention of BCN mango rakes on account of weighment of wagons at many points.
(Authority: Railway Board Letter No.2009/TC(FM)/11/6 of dt 22.04.2009)
(Authority: CCM / NWR No. C- 611/0 of dt05.05.2009)
59
81
Operation of CC+8+2/CC+6+2 trains.
(Authority: Railway Board Letter No.2007/CE-II/TS/8 of dt 27.04.2009)
(Authority: CCM / NWR No. C- 611/0 Vol II of dt 11.05.2009)
59-61
82
Heavy detention of BCN mango rakes on account of weighment of wagons at many points.(Authority: Railway Board Letter No.2009/TC(FM)/11/6 of dt 30.04.2009)
(Authority: CCM / NWR No. C- 611/0 Vol II of dt 25.05.2009)
61-62
83
Classification of Spiral Welded Pipes and Charging of C.I. Pipes.
(Authority: Railway Board Letter No.TCR/1078/2005/3 of dt 01.05.2009)
(Authority: CCM / NWR No. C- 70/1 Vol II of dt 25.05.2009)
62
84
All India Engine Hour Cost(AIEHC) for recovery of siding/ shunting Charges. (Rates Circular No.31 of 2009)
(Authority: Railway Board Letter No.TC-/2002/214/5 of dt 30.04.2009)
(Authority: CCM / NWR No. C- 491/4 of dt 26.05.2009)
62-63
85
Adjustments in classification of commodities. (R.C. No. 32 of 2009)
(Authority: Railway Board Letter No.TCR/1015/2009/4 of dt 18.05.2009 )
(Authority: CCM / NWR No. C- 70/1 Vol.II of dt 26.05.2009)
63-64
86
CORRIGENDUM-Adjustments in classification of commodities-- Colours and Dyes at Class LR1. (Corrigendum to Rates Circular No. 32 of 2009 )
(Authority: Railway Board Letter No.TCR/1015/2009/4 of dt 19.05.2009 )
(Authority: CCM / NWR No. C- 70/1 Vol.II of dt 26.05.2009)
64
87
Withdrawal of inflation in distances for charge of Pimpalkutti- Adilabad section on South Central Railway. (Rates Circular No. 33 of 2009)
(Authority: Railway Board Letter No.TCR/1099/92/2 of dt 18.05.2009 )
(Authority: CCM / NWR No. C-543/16 of dt 27.05.2009)
64
88
Adjustments in the classification of Iron Ore. (Rates Circular No. 34 of 2009)
(Authority: Railway Board Letter No.TC-I/2009/201/1 of dt 22.05.2009 )
(Authority: CCM / NWR No. C-124/0 of dt 28.05.2009)
64-65
89
Write off of stacking charge .(Rates Circular No. 35 of 2009).
(Authority: Railway Board Letter No.TC-I/2009/201/1 of dt 22.05.2009 )
(Authority: CCM / NWR No. C-124/0 of dt 28.05.2009)
65
90
Revision in rates of Locomotive Detention/Wagon Detention Charges, Permissible free Time for loading/unloading of wagons etc. in reference to clause-22.1 &22.2 of the India-Nepal rail services Agreement (21.5.2004
(Authority:RailwayBoard LetterNo.2004/TT.III(F)/72/NPL/05 of dt.15.05.09 )
(Authority: CCM / NWR No. C-249/0 of dt 29.05.2009)
65-66
91
Classification of Iron Ore (RATES CIRCULAR NO.36 OF 2009)
(Authority:RailwayBoard LetterNo.TCR/1078/2007/3 of dt.01.06.2009 )
(Authority: CCM / NWR No. C-423/1 Vo.III of dt 02.06.2009)
66-71
92
Haulage Charge recoverable for movement of containers in privately owned wagons (Rates Circular No. 37 of 2009)
(Authority:Railways Board LetterNo.2007/TC-I/302/1 Pt.H of dt.01.06.2009)
(Authority: CCM / NWR No. C-78/1/54/CONCOR Vol. IIof dt 05.06.2009)
71-73
93
Uniform working hours and Business hours for goods sheds and sidings.
(Authority:Railways Board Letter No. TC-I/94/114/1-Pt. A of dt.22.05.2009)
(Authority: CCM / NWR No. C-491/B&W/Hrs of dt 11.06.2009)
73-74
94
Punitive charges for overloading.
(Authority:Railways Board Letter No. TC-I/2006/109/6 Pt.II of dt.08.06.2009)
(Authority: CCM / NWR No. C-611/0 of dt 12.06.2009)
74
95
Revision of Minimum Weight Condition for Mangoes when loaded in BCN/BCX/BCNA wagons.(F.M. Circular No.14 of 2009)
(Authority:Railways Board Letter No. TC-II/2046/8/MWC of dt.09.06.2009)
(Authority: CCM / NWR No. C-375/6/Vol-II/09 of dt 16.06.2009)
74
96
Free time for movement of BOXN rakes at Haldia Port (Rates Circular No.38 0f 2009)
(Authority:Rly Boards letter No. TC-I/2004/201/4 Pt.B of dt. 15.06.2009)
(Authority: CCM / NWR No. C-299/0Policy of dt 18.06.09)
75
97
Adjustment in classification of commodities Timber Waste.(Rates circular No. 39 of 2009).
(Authority:Railways Board Letter No. TCR/1015/2009/4 of dt. 17.06.2009)
(Authority: CCM / NWR No. C-70/1 Vol.II of dt 18 .06.2009)
75-76
98
Clarification regarding Permissible Carrying Capacity (PCC) and Standard rake size of BCNMI and BCNAMI wagons.
(Authority:Railways Board Letter No. TCR/1394/2003/11 of dt. 09.06.2009)
(Authority: CCM / NWR No. C-176/4 Vol.III of dt 22 .06.2009)
76
99
Policy for leasing of parcel space of Brakevans (SLRs) Assistant Guards Cabin (AGC) and Parcel Vans (VPHs/VPs/VPUs) Clarification to leave / non loading rules.
(Authority:Railways Board Letter No. 2007/TC(FM)/10/12 of dt. 05.06.09)
(Authority: CCM / NWR No. C-375/Sale Tax/VAT/06 of dt 23 .06.2009)
76-77
100
Free time for unloading of Hopper Wagons in case of seven old steel plants. (Rates Circular No. 40 of 2009)
(Authority:Railways Board Letter No. TC-I/2005/201/2Pt. D of dt. 23.06.2009)
(Authority: CCM / NWR No. C-299/0 (Policy) of dt 25 .06.2009)
77-78
101
Corrigendum No. 15 to Rates Circular No. 25 of 2008Standard Rake Size for combination of BTPN and BTCS wagons.
(Authority:Railways Board Letter No. TCR/1078/2008/15 of dt. 24.06.09)
(Authority: CCM / NWR No. C-429/0 (Policy) of dt 25 .06.2009)
78
102
Corrigendum No. 16 to Rates Circular No. 25 of 2008- Two point combinations for steel traffic and composition of CONCORD traffic.
(Authority:Railways Board Letter No. TCR/1078/2008/15 of dt. 24.06.2009)
(Authority: CCM / NWR No. C-429/0 (Policy) of dt 25 .06.2009)
78-79
103
Revision in rates of Locomotive Detention /Wagon Detention Charges, Permissible Free Time for loading /unloading of wagons etc. in reference to Clause -22.1 & 22.2 of the India-Nepal Rail Services Agreement (21.5.2004).
(Authority:Railways Board Lr. No.2004/TT.III(F)/72/NPL/05 of dt. 22.06.09)
(Authority: CCM / NWR No. C-249/0 of dt 30.06.2009)
79-80
SORTRC COACHING
11
1 -Opening of Mohapani Mal passenger Halt.
(Authority :- No.C/SEC Rly/BSP/CRC/8459 of dt.12.12.2007)
2-Opening of Khair-ranji passenger Halt.
(Authority :-No. C/SEC Rly/BSP/CRC/8466 OF DT 12.12.2007)
3-Opening of Changotola passenger Halt.
(Authority :-No. C/SEC Rly/BSP/CRC/8460 OF DT 12.12.2007)
(Authority :CCM/NWR No.C.-436/Opening Closing of stn/section of dt 09.04.09)
82-83
12
xkseks ta- jsyos LVsku dk uke cnydj usrkth lqHkk"kpUnz cksl taDku xkseksg fd;s tkus ds laca/k esa A
(izkf/kdkj %& eq0ok0iz0@iw0ea0js0 ds i= izkfIr iwejs@lhvkj,e@uke ifjorZu@05@ 07@,e1318 dk i= fnukad 24-12-08)
(Authority :-C-2566-R/E .C.Rly/2009.N.RLy NDLS of dt 3.02.2009)
(Authority :CCM/NWR No. C.-495/ Name change of station of dt 08.04.09)
83
13
1-Closing of train Halt on Ratlam (RTM) Divn.
(Authority :CCM W.Rly No.C.171/3/4/Vol.VI of dated 20.10.2008)
2-Re-opening of halt station Mahudha (MHUA) on ND-MDSA (BG) section of BRC Division.
(Authority :-C-436/Opening closing of station/section of dt 15.04.2009)
83-84
14
1-Opening of Someshwara Station Between Thondebhavi-Gauribidanur stations at Kms 69/950 on SBC-DMM section for passenger traffic on South Western Railway.
(Authority :CCM S. W.Rly No.C.143/New stn./SBC-DMM Section/07-08 of dated 20.08.2008)
2- Notification for opening of Obalapuram Block station for passenger traffic.
(Authority : CCM S. W.Rly No.C.210/OBM/UBL/07 of t06.03/08)
(Authority :-C-436/Opening closing of station/section of dt 15.04.2009)
84-85
15
nf{k.k ifpe jsyos esa ;k=h ;krk;kr ds fy, cSaxywj&/kekZoje [kaM ds ryaMHkkoh&xkSjhfcnuwj LVskuksa ds chp fdeh 69@950 ij fLFkr lksesoj LVsku dk 'kqHkkjEHk
(Authority : tslh@143@u;k LVsku@cSaxyksj&/kekZoje foHkkx@07&08 fnukad 30-06-2008 & 31-07-08)
(Authority:-C-436/opening closing of station/section of dt 22.04.2009)
85-86
16
lksuiqj eaMy ds lksuiqj&Nijk [kaM ij vorkjuxj ,oa cM+kxksiky LVskuksa ds e/; iapifV;k nsofj;k gkYV (Panchpatia Deoria Halt ) LVsku dk [kksyk tkuk A
(Authority: la0&bZlhvkj@lhvkj,e@gkYV@005@03@,e&33@Hkkx AA fnukad 19-8-08)
(Authority:-C-436/opening closing of station/section of dt 22.04.09)
86-88
17
fo"k; %& eqxyljk; eaMy ds lklkjke&fcdzexat [kaM ij xk>k [kaM ij cygiqj gkYV ,oa euuiqj LVskuksa ds e/; ekuiqj frrkbZpd gkYV (Manpur Titaichak Halt) dk [kksyk tkuk A
(Authority:-la0&blhvkj@lhvkj,e@gkYV@005@03@,e&33@HkkxAAfnukad 06.02.08)
(Authority:-C-436/opening closing of station/section of dt 24.04.09)
100-101
25
nkukiqj eaMy ds nkukiqj&cDlj [kaM ij djhlkFk ,oa txthou gkYV LVskuksa ds e/; egrcfu;k gkYV(Mahatbania Halt) dk [kksyk tkuk A
(Authority :-la0&blhvkj@lhvkj,e@gkYV@005@03@,e&33@Hkkx AA fnukad 05.02.09)
(Authority:-C-436/opening closing of station/section of dt 23.04.2009)
102-103
26
nkukiqj eaMy ds fdy&>k>k [kaM ij dqUnsj gkYV ,oa HkyqbZ gkYV LVskuksa ds e/; 'kghn ftrsUnz gkYV xksikyiqj (Shaheed Jitendra Halt Gopalpur) dk [kksyk tkuk A
(Authority :-la0&blhvkj@lhvkj,e@gkYV@005@03@,e&33@Hkkx AA fnukad 06.02.09)
(Authority:-C-436/opening closing of station/section of dt 04.05.2009)
103-105
27
nkukiqj eaMy ds nkukiqj&cDlj [kaM ij MqejkWo ,oa c:.kk LVskuksa ds e/; dqkyiqj gjugk gkYV (Kushalpur Harbaha Halt) dk [kksyk tkuk
(Authority :-la0&blhvkj@lhvkj,e@gkYV@005@03@,e&33@Hkkx AA fnukad 06.02.09)
(Authority:-C-436/opening closing of station/section of dt 04.05.2009)
105-107
28
lksuiqj eaMy ds eqtQ~Qjiqj&leLrhiqj [kaM ij nqcgk ,oa [kqnhjke cksl iqlk LVskuksa ds e/; fo".kqiqj cFkqvk gkYV (Vishnupur Bathua Halt ) dk [kksyk tkuk
(Authority :-la0&blhvkj@lhvkj,e@gkYV@005@03@,e&33@Hkkx AA fnukad 05.02.09)
(Authority:-C-436/opening closing of station/section of dt 04.05.2009)
107-108
29
eqxyljk; eaMy ds lklkjke&ihjks [kaM ij legqrk gkYV] >kj[k.M egknso gkYV]uksukj gkYV] glucktkj LVsku gkYV] Hkkstiqj jksgrkl ckMZj gkYV] fkoiqj gkYV] ?kqfl;k gkYV] cSjh gkYV ,oa cjko eksj gkYV LVskuksa dks [kksys tkus ds laca/k esa A
(Authority :-la0&blhvkj@lhvkj,e@gkYV@005@03@,e&33@Hkkx AA fnukad04.12.2008)
(Authority:-C-436/opening closing of station/section of dt 06.05.2009)
108-111
30
;k=h ;krk;kr ds fy,] vkscykiqje CykWd LVsku dks [kksyus dh vf/klwpukA
(Authority :-la0&lh.210@ vkscykiqje @ gqcyh @7 .fnukad06.03.2008)
(Authority:-C-436/opening closing of station/section of dt 06.05.2009)
111
31
Re-opening of Ichchiputhur train halt (IPT) in Arakkonam-Renigunta section in Chennai Division-reg. (No.C.210/m/86/Vol.II)
(Authority :-CCM/S.Rly No.C.210/M/86/Vol.II of dt 16.10.2008)
(Authority:-C-436/opening closing of station/section of dt 07.05.2009)
111-112
32
eqxyljk; eaMy ds vkjk&lklkjke [kaM ij foexat&ihjksa CykWd [k.M dks ;k=h ;krk;kr gsrq [kksyk tkuk A
(Authority:-la0&blhvkj@lhvkj,e@gkYV@005@03@,e&33@HkkxAAfnukad03-12-08])
(Authority:-C-436/opening closing of station/section of dt 28.05.2009)
112
33
fnYyh e.My ij fnYyh 'kkgnjk&kkeyh lgkjuqiqj [k.M ij gjM+ Qrsgiqj gkYV dk [kksyuk
(Authority :- Dy. CCM/S Letter No. 51-RD/1536/2002 dt.19-09-2005)
(Authority:-la0&513@gjM+Qrsgiqj@05mjscMnkgkml u fnYyhAAfnukad 12.02.09)
(Authority:-C-436/opening closing of station/section of dt 28.05.2009)
112-113
34
Consolidated List of trains notified under Rajdhani Parcel Service :Premier Parcel Service and Standard Parcel Service for charging of Parcels and Luggage.
(Authority:-CCM S.C.Rly No.C.285/Mktg/Parcel Rates/Vol.III of dt 27.05.09)
(Authority:-CCM N.W.Rly No.C-375/3/Vol-I of dt 03.06.2009)
113-116
35
Services /Premier Parcel Services /Standard Parcel services of rates for Parcel traffic.
(Authority:-CCM KR.Rly No.KR./CO/C/3/11 of dt 26.05.2009)
(Authority:-CCM N.W.RLy No.C-375/3/Vol-I of dt 03.06.2009)
116
36
36 Opening of new sections betweenRajwinsher-Anantnag in J& K valley.
(Authority:-CCM/S.E,RlySpl Cir.No.RA.42/IA/Pt.X/IV of dt 06.04.2009)
(Authority: CCM/N.Rly No. 506-R/FZR/2006 dtd 23.10.08 and circular no. 13 of 08)
(Authority:CCM.NWR No.C-491/1/Parcel of dt 24.06.2009)
117
SORTRC GOODS
46
Opening of IOC siding served by lalkua station (B.G)
(Authority:CCM/N.E Rly No.c.19/2/31/RS dated 31-3-09)
(Authority :CCM/NWR No. C./543/1/7 NE Rly of dt 15.04.2009)
119
47
Two point combination of stations.
(Authority:CCM/N.F Rly No.c./71/RCM/12/Misc/Pt. XVII dated 02-01-09)
(Authority :CCM/NWR No. C./543/1/8 NF Rly of dt 01.05.2009)
119
48
Opening of Private Siding to serve M/s. Ambuja Cement Eastern Ltd., served by Tildanga station for inward traffic on temporary basis.
(Authority:CCM/E Rly No.c.490/549/BG of dated 24-02-09)
(Authority :CCM/NWR No. C./543/1/3 E. Rly of dt 01.05.2009)
119-120
49
Closure of Goods sheds over Samastipur Divn
(Authority:CCM/E.C Rly No.RA.42/3/E.C.Rly Pt.-I dated 26-11-08)
(Authority :CCM/E.C.Rly No. ECR/CRM/FMS/SPJ DIV /08HJPdt13.10.08 RC(goods)23 of 2008.)
(Authority :CCM/NWR No. C./543/1/3 E. C Rly of dt 0505.2009)
120-122
50
1-Opening of Gummidipundi (GPD ) station for Train Load traffic.
(Authority :CCM/S.Rly No. C.-37/II/147/Vol,VI of dt 19.02.2009)
2:-1 Opening of new BG line between stations MV-SY for Goods traffic.
2 Opening of Sirkazhi (SY) station for Wagon load and train load traffic.
(Authority : CCM/S.Rly No.C-37/II/148/Vol V of dt 30.01.2009)
3 Opening of Perundurai (PY )station for Handling Train load traffic.
(Authority :CCM/S.Rly No.C.37/II/150/Vol .I of dt 30.01.2009)
4. Extension of Nagappattinam station for Full Rake handling.
(Authority :-CCM/S.Rly No.C-37/II/148/Vol V of dt 06.02.2009)
(Authority :CCM/NWR No. C.-543/1/10/S Rly of dt 05.05.2009)
122-123
51
Opening of the Kanganuru Station (KGW ) for handling Inward goods traffic.
(Authority :CCM/S.W.Rly NO .C 208/TL/08-09 Vol.V of dt 30.04.2009)
(Authority:- CCM/NWR No.C/543/1/13/S.W.Rly of dt 5.5.2009)
123
52
Opening Adani Agri Logistics Ltd., Private siding served by Madukkarai as an Independent Booking Point for charging of freight on through distance basis.
(Authority :-CCM/S Rly NO C. 490/J/206 27.2.2009
(Authority :CCM/NWR No. C.-543/1/10/S Rly of dt 06.05.2009)
123-124
53
1- Closure of goods sheds over Bangalore division for handling goods traffic.
(Authority; CCM S.W.Rly No C.37/Goods Shed Working Hrs Vol.II of dt 31.03.2009)
2.-Closure of Hubli goods shed for handling goods traffic.
(Authority ;- CCM S.W.Rly No C.37/Goods Shed Working Hrs Vol.II of dt 30.03.09)
3.Opening of M/s Kalyani Steel Pvt Ltd siding served by Ginigera Railway station on Hubli Division for outward traffic in train loads.
(Authority :-CCM S.W.Rly No.C.490/Sdg/kalyani steel/GIN/08 of dt12.03.09)
4.Categorization of freight customers as per freight offered and exemption of WDRF.
(Authority :-CCM S.W. Rly No C.209/Registion of indents Vol.II)
(Authority :CCM/NWR No. C.-543/1/13/S W Rly of dt 11.05.2009)
125-126
54
1- Closure of Sambalpur station for all descriptions of traffic, except POL traffic-Reg.
(Authority:-CCM .E.Co.Rly No .CCM/19/Goods shed/Pt.IV of dt 20.02.2009)
2.:- Transportation of Iron & Steel by NTPC-Simhadri.
(Authority:-CCM,E.Co.Rly No.CCM/Sdg/ntpc/stpp/DVD of dt 11.02.2009
(Authority :CCM/NWR No. C.-543/1/4/E.Co Rly of dt 11.05.2009)
126-127
55
1-Notification of M/s National Thermal Power Corporation Siding served by Ramagundam Station (NTPC /RDM) for charging freight on through distance basis.
(Authority:-CCM, S.C.Rly No.C,490/SC/NTPC/RDM/69/III of dt 20.03.2009)
2-Opening of Gadchandur (GDCR) station for handling Inward and Outward godds traffic in train loads.
.(Authority:-CCM,S.C.Rly.No.C.473/990/TL/2009/Vol.VXI/Pt of dt 12.03.09)
3-Operation of container trains by PCOs in Railway-owned terminals- Notifiction of goods sheds as Container Rail Terminals (CRTs).
(Authority :-CCM,S,C.Rly No.C,307/OR/CRTs/07 of dt 04.03.2009 )
(Authority :CCM/NWR No. C.-543/1/10/S.C. Rly of dt 12.05.2009)
127-128
56
Allotment of Alphabetical Code of Industrial sidings over Eastern Railway.
(Authority:-CCM,E.Rly No.C.490/0/1/Vol.II/BG/Data of dt 27.02.2009)
(Authority :CCM/NWR No. C.-543/1/2/E. Rly of dt 12.05.2009)
128-129
57
1. Opening of Morinda+ kurali and Bassipathanan +kurali with two Point combination rakes for originating loading.
(Authority:-CCM,N.Rly No.C.1974/R/Rake handling/09/NR of dt 30.03.2009)
2.-Permission to use the siding of M/s Hari Fertilizers Ltd Siding Vyas Nagar By M/s SMJ EXIMP Ltd Chandauli and M/s Singrauli Finlease (P) Ltd., Varanasi for inward traffic of Coal.
(Authority:- CCM,N.Rly No.C.No.1-AC/143/Rates)N.R.B.H.NDLS of dt 2.04.2009)
(Authority :CCM/NWR No. C.-543/1/5/N. Rly of dt 12.05.2009)
129-130
58
Opening of Hindupur (HUP) station For Goods traffic.
(Authority :-CCM,S.W.Rly.No.C.206/TL/08-09 Vol.V of dt 07.04.2009)
(Authority :CCM/NWR No. C.-543/1/13/S.W. Rly of dt 12.05.2009)
130
59
1 Notification of M/s BPC/IBP POL siding served by Cherlapalli Station for handling LPG (Liquefied Petroleum Gas ) in trainloads.
(Authority :-CCM,S.C.Rly No.C.490/SC/BPC/IBP/CHZ/122 of dt 21.03.2009)
2. Notification of M/s Ramakrishnapuram Mines Colliery Siding served by Mandamari Station (SCRM/MMZ) for charging freight on through distance basis.
(Authority :-CCM,S.C.Rly No.C.490/SC/M-359/Vol.II of dt 20.03.2009)
3.Notification of M/s Godavari Khani No.1 Incline Colliery Siding served by Ramagundam Station (GOSG/RDM) for charging freight on through distance basis.
(Authority :-CCM,S.C.Rly No.C.490/SCZ/SC/M-276/Vol.I of dt 20.03.2009)
(Authority :CCM/NWR No. C.-543/1/10/S.C. Rly of dt 12.05.2009)
130-131
60
Opening of private siding of M/s Ram Sarup Lohh Udypg Ltd.At Gokulpur Served By NMP Goods shed complex.
(Authority;-CCM S.E Rly No.C.650/RG-I/I Page of dt 19.03.2009)
(Authority :CCM/NWR No. C.-543/1/12/S.E. Rly of dt 13.05.2009)
131
61
1.Opening of Vardhman Fabrics Siding served by Budni station of Bhopal Division.
(Authority:-CCM ,W C RLY No C./Goods-82/Siding of Dated17.04.2009.)
2. Opening of Rewa, Hinota Ramban & Kaima stations over Jabalpur division on West Central Railway for Goods Traffic.
(Authority :- CCM ,W C RLY No C./Goods-423/Opening of station of dt 06.04.09.)
(Authority :CCM/NWR No. C.-543/1/16/W.C. Rly of dt 13.05.2009)
131-132
62
Two point combination of stations.
(Authority:-CCM,N,F,Rly No.C./71/RCM/12/Misc/Pt.XVII of dt02.01.2009
(Authority :CCM/NWR No. C.-543/1/16/W.C. Rly of dt 13.05.2009)
133
63
1. Opening of Shadnagar station for handling Inward coal Traffic also in trainload.
(Authority:-CCM,S.C.Rly No .C.473/990/TL/2009/Vol.VXI/Pt.of dt 26.02.2009)
2. Re-opening of M/s Bavana Sai Associates siding served by Uppaluru for handling goods traffic.
(Authority:-CCM,S.C.Rly No .C.490/BZA/BSAU/UPL/19 of dt20.02.2009)
3. Notification of M/s Bavana Sai Associates Siding served by Uppaluru on Through Distance Basis.
(Authority:-CCM,S.C.Rly No .C.490/BZA/BSAU/UPL/19 of dt20.02.2009)
4- Loading of Carbon Black Feeder stock in Tank container at JNPT holding line.
(Authority:-CCM,S.C.Rly No .C.307/OR/CRTs/07 of dt 18.02.2009)
5-Commencement of movement of goods traffic in tank and flat wagons between India and Nepal.
(Authority:-CCM,S.C.Rly No .C.307/OR/CRTs/07 of dt 13.2.2009)
6-Operation of Container trains by PCOs in Railway Owned terminals-Notification of Amgaon goods shed as Container Rail Terminal (CRT)
(Authority :railway Bds letter No.2007/TC-I/203/I of dt 23.09.2008)
(Authority:-CCM,S.C.Rly No .C.307/OR/CRTs/07 of dt 17.2.2009)
7.- Grant of Incentive under Long Term Special Incentive Scheme
(Authority:-CCM,S.C.Rly No .C. 493/Mktg/Fis/LTSIS/P/08/07of dt 03.03.2009)
( Authority :CCM/NWR No. C.-543/1/10/S.C. Rly of dt 15.05.2009)
133-135
64
1. Stations/Goods sheds notified for Inward/outward traffic.
(Authority:-CCM,SECR.No.C.SECR/BSP/GS/Full&Half rake/1674 of dt 13/03/2009)
2- Allotment of Alpha and Numerical Codes to The private Siding of M/s NTPC-SAIL Power Co.Pvt. Ltd./Bhilai served by Kumhari.
(Authority:-CCM,SECR.No.C.SECR/BSP/Sdg/NSPCL/BIA/1630ofdt 12/03/09)
3-Re-notification of Sondad station from full rake to half rake. .
(Authority:-CCM,SECR.No.C.SECR/BSP/GS-Stn /opening/1313 dt 20/02/09)
4--Opening of Naila Goods Shed for Outward Traffic.
(Authority:-CCM,SECR.No.C.SECR/BSP/O&C/G.T/657 of dt 29/01/2009)
5-Opening Of WRS Goods shed Complex served by Raipur Store Depot (RSD).
(Authority:-CCM,SECR.No.C.SECR/BSP/O&C/G.T/1229 of dt 12/01/2009)
6- Opening of private siding of M/s NSPCL /Bhilai served by Kumhari.
.(Authority:-CCM,SECR.No.C.SECR/BSP/SDG/NSPCL/BIA/38 of dt 02/01/09)
(Authority :CCM/NWR No. C.-543/1/13/S.EC. Rly of dt 15.05.2009) )
135-137
65
Opening of Wadi goods Iron Ore siding for outward loading of Chana Husk traffic.
(Authority: CCM/SE Rlys No.RA.42/10/Pt.VIII /8 of dt 19.03.2009)
(Authority: CCM/C.Rys No.C.RB/205/TL-VII dtd 12.02.2009 under ARN No. 54 of 2009 (Goods) )
(Authority: CCM / NWR No. C.543/1/1/C.Rly of dt 14.05.2009)
137
66
Opening of New BG Siding for M/s Penna cement Industries ltd. served by Juturu Station on Guntakal division of S.C.Railway.
(Authority:CCM/SC Rly No.C.490/GTL/PCIL/JUR dtd 05.8.08)
(Authority: CCM / NWR No. C.543/1/10/SC.Rly of dt 29.05.2009)
137-138
67
1-Opening of shunting neck of FCI siding at Jarsuguda as a public siding.
(Authority :-CCM S.E.Rly No. RG.46/2007/1 of dt16.01.2009)
2- Opening of Line No.3 of RAKSIH STATION AS Public Siding Served by RAKSIH STATION.
(Authority :-CCM S.E.Rly SL No.RG.46/4447 of dt15.01.2009)
3.Opening if Line no.3 Raksih Station as Public Siding served by Raksih Station.
(Authority:-CCM/S.E.Rly.SL.No.12(G)/2009/Sp.Rates Cir.No.RA.41 /Rates /IA/G/.Pt.IV/7 of dt 21.01.2009)
4.-Inclusion of station/sidings in the list of Full/half rakes point on S.E.Railway.
(Authority:-CCM/S.E.Rly.SL.No.23(G)/2009.Sp.Rates Cir.No.RA.41/ Rates /IA/G/.Pt.IV/7 of dt 05.02.2009)
5-Notification of two point combination of ROP &JGM over KGP division.
(Authorit:-CCM/S.E.Rly.SLNo.57(G)/2009Sp.Rates Cir.No.RA.41/Rates /IA/G/.Pt.IV/6 of dt 04.03.2009)
138-139
68
1. Opening of Naila Goods shed for outward traffic .
(Authority:CCM/SEC Rly No. C/SECR/BSP/O&C/GT/657 dtd 29.01.2009 under rates circular no. 18 (G) /2009)
2-Opening of WRS Goods Shed complex served by Raipur Store Depot (RSD).
(Authority:CCM/SEC Rly No. C/SECR/BSP/O&C/GT/1229dtd 12.01.2009 under rates circular no. 08 (G) /2009)
(Authority :CCM/NWR No. C/543/1/13/SEC Rly dtd 29.5.09)
140
69
Southern Petrochemical Industries Corporation Ltd siding served by Marshalling yard of Port of New Tuticorin-Permission to use the siding by M/s. Mangalore Chemicals & Fertilisers Ltd Mangalore.
(Authority;-CCM.S.Rly letter No,C-490/U/94/BG/Vol II of dt 07.04.2009)
(Authority: CCM / NWR No. C.543/1/10/SC.Rly of dt 29.05.2009)
140-141
70
1- Allotment of Alpha Code to Vardhman Fabrics Siding at Budni Station of Bhopal Division.
(Authority: WCR/HQ/Comm/Goods-82/Sdg of date 06.05.2009)
2- Notification of actual distance of CFCS Siding Bhonra.
(Authority: CCM/WCRs No. WCR/HQ/Comm/Goods-358/Distance Table of date 30.04.09)
3- Notification of actual distance of CFCS Siding Bhonra .
(Addendum WCR JDT No.1 published on 01.4.2003)
(Authority: CCM/WCRs No. WCR/HQ/Comm/Goods-358/Distance Table of date 30.04.09)
4- Opening of Jaitwar (JTW) Station in Half rake for Goods.
(Authority: CCM/WCRs No. WCR/HQ/Comm/Goods-423/ Opening of station of date 22.04.09)
(Authority;-CCM.S.Rly letter No,C-490/U/94/BG/Vol II of dt 07.04.2009)
(Authority: CCM / NWR No. C.543/1/1/WC.Rly of dt 02.06.2009)
141-142
71
Opening of Adani Agri Logistics Ltd., Private siding served by Elavur station over Chennai Division.
(Authority;-CCM.S.Rly letter No,C-490/M/199 of dt 19.05.2009)
(Authority: CCM / NWR No. C.543/10/1S.Rly of dt 03.06.2009)
142
72
1- Opening of Regupalem (REG) station for handling Outward goods traffic in train loads/ wagon loads.
(Authority No.C.473/990/TL/2009/Vol.VXI/Pt Date:29/04/2009)
2- Notification of M/S Orient Cements Industries Ltd., siding served by Mandamarri Station for handling Inward traffic of Clinker Rakes.
(Authority No.C.490/SCZ/SC/72/Vol.II of Date:23/04/2009)
(Authority:CCM.NWR No.C/543/10/1 S.C.Rly of dt 5.6.2009)
142-143
73
1-Opening of Kariganuru Station (KGW) for handling inward goods traffic.
(Authority: .CCM S .W. Rly No.C.206/TL/08-09 Vol.V of dt 30.04.2009)
2-Opening of Nanjangud town station (NTW) for handling goods traffic.
(Authority: CCM /S .W. Rly No.C.206/TL/08-09 Vol.V of dt 23.4.2009)
(Authority:CCM.NWR No.C/543/13/1 S.W.Rly of dt 08.6.2009)
143
74
Opening of Robertsganj (RBGJ) station for outward Goods traffic . Time Limit extension.
(Authority: CCM/N.C Rlys No. 2003/Comml./M&R/201/O&C Pt-1 of date 06-04-2009)
(Authority:CCM.NWR No.C/543/06/1 N.C. Rly of dt 08.6.2009)
143-144
75
Extension of Daroji Station (DAJ ) for handling Inward goods traffic.
(Authority: CCM/S.W.Rly No. C.206/TL/08-09 Vol.V of dt 05.05.2009)
(Authority:CCM.NWR No.C/543/13/1S.W.Rly of dt 10.06.2009)
144
76
Opening of Additional Full Rake Siding at Saharsa.
(Authority: CCM/E.C. Rly No. ECR/CRM/FMS/2/SPJ Div/08 of dt 06.05.2009)
(Authority:CCM.NWR No.C/543/1 E.C .Rly of dt 11.06.2009)
144-145
77
1- Opening of Annupur Station for Goods Traffic.
(Authority :- CCM SEC Rly No.C.SECR/BSP/O&C/G.T/2327 of dt 09.04.09 )
2- Extension of permission for outward booking of non-programmed Coal from goods sheds/sidings.
(Authority :-CCM SEC Rly No.C.SECR/BSP/BKG/Coal/2076 of dt 31/03/09 )
3-Permission for outward booking of non-programmed coal from NTPC Exchange Yard/Gevra Road..
.
(Authority -CCM SEC RLy No.C.SECR/BSP/BKG/Coal/107 of dt 06.01.09 )
(Authority:CCM.NWR No.C/543/1/13/SEC .Rly of dt 11.06.2009)
145-146
78
1. Opening of Cooperganj Goods Shed (Kanpur Anwarganj ) For outward goods traffic over N.E.Rly.
(Authority:CCM.N.E.Rly No.C/147/0/3/Pt.X/TL(Loose)/RG of dt 19.02.09)
2-Corrigendum permission for unloading of Coal rakes at Nakaha Jungle Station of N.E.Railway.
(Authority:CCM.N.E.Rly No.C/147/0/3/Pt.X/TLoad (Loose)/RG of dt 05.03.2009)
3- Permission for unloading of Coal rakes at Nakaha Jungle Station of N.E Rly.
(Authority:CCM.NWR No.C/543/7/1 N.E .Rly of dt 12.06.2009)
146-147
79
Opening of Angamally for Kaladi station as FULL Rake Handling point.
(Authority: CCM/S.Rly No.C.37/II/153/Vol/VI of Date 01/06/2009)
(Authority:CCM.NWR No.C/543/7/1 N.E .Rly of dt 12.06.2009)
147
80
Opening of Amritsar Goods Shed for Inward Coal Rakes.
(Authority :-CCM N.Rly No.1329-R/O&C/Pt.XI N.R.B.H. NDLS dt 29.05.2009)
(Authority :-CCM NWR No.C./543/5/I N.Rly of dt 15.06.2009)
147-148
81
1- Booking of traffic on Train load class rate,
(Authority:-CCM N.C.Rly No.2003/Comml./M&R/8/TL/Pt.I of dt 09-02-2009)
2. Opening of Malwan (MWH) for Timber loading Time-Limit extension.
(Authority:-CCM/N.C.Rly No.2004/Comml./M&R/242/F.R.H./ of dt 18-02-09)
(Authority:CCM.NWR No.C/543/6/ N.C .Rly of dt 16.06.2009)
148
82
1- Implementation of Round the Clock Working Hours at Niduguntapalem Station on Vijayawada Division.
(Authority:CCM/SC Rly No. C.310/RGI/RTc. Wkg. Hrs/Vol.III of date 08-05-2009)
2. Opening of Yerragudipad (YGD) station for handling inward Coal traffic in train loads.
(Authority:CCM/SC Rlys No. C.473/990/TL/2009/Vol.VXI/Pt. of date 02-06-2009)
(Authority:CCM.NWR No.C-543/1/12 SC Rly of dt 25.06.09)
148-149
83
1-Opening of goods sheds/sidings for outward booking of non-programmed Coal.
(Authority:-CCM/SEC, Rlys No.C/SECR/BSP/BKG/Coal/3350 of dt 05 .06.09)
2.Siding charges on trainloads (freight trains) running through from and to Private siding/Exchange yard.
(Authority:-CCM/SEC, Rlys No.C/SECR/BSP/SDG/ACC/BIA/3324 of dt 04 .06.2009)
3. Discontinuation for handling of loose and bulk commodities at Raigarh goods shed.
(Authority:-CCM/SEC, Rlys No.C/SECR/BSP/GS/3322 of dt 03.06.2009)
(Authority: CCM / NWR No. C-543/1/13/SEC Rly of dt 26 .06.2009)
149-150
84
1 Siding charges on trainloads (freight trains) running through from and to Private siding/Exchange yard.
(Authority:-CCM/SEC, Rlys No.C/SECR/BSP/SDG/MCL/HGR/3331 of dt 04 .06.2009)
2- Opening of Ambikapur station for Goods Traffic.
(Authority:-CCM/SEC, Rlys No.C/SECR/BSP/O &C/3018 of dt 18 .05.2009)
3- Opening of Balco Capacity Power Plant siding of M/s. BALCO served by Gevra Road station for outward booking.
(Authority: CCM/SEC Rly No. C/SECR/BSP/BOG/Pt-II/3013 of date 18/05/2009)
4 Opening of Pvt. Siding of Sipat Super Thermal Power Plant (SSTPP) of M/s NTPC Ltd served by Gatora Station.
(Authority: CCM/SEC Rly No. C/SECR/BSP/SDG/NTPC/GTW/2933 of date 14/05/09)
5- Two Point combination over SEC Railway.
6- Opening of M/s. SKS Ispat & Power Ltd. siding served by RSD for both inward & outward traffic.
(Authority:CCM./SEC Rly No. C./SECR/BSP/SDG/SKS/RSD/2796 of date 04.05.2009)
7-Allotment of Alpha and Numerical Codes for Private Sidings.
(Authority:CCM./SEC Rly No. C/SECR/BSP/Sdgs/HEG-RSI-CCFL/2808 of dt 04.05.09)
(Authority: CCM / NWR No. C-543/1/13/SEC Rly of dt 29 .06.2009)
150-153
85
Inclusion of Stations / Sidings In the list of full /half rakes point on S.E.Railway.
(Authority: CCM /S.E.Rly Spl Rates Circular No.RA.41/Rates/ 1A/G/Pt.IV/7 dt 28.04.09)
(Authority: CCM / NWR No. C-543/1/12/S.E. Rly of dt 30 .06.2009)
153
86
Permission to use Katni Cement Siding by M/s. Laxmi Das Ramji.
(Authority: CCM /W.C R.ly No. WCR/HQ/Comm./Goods-20/Permission/L. Ramji dt 20.05.09)
(Authority: CCM / NWR No. C-543/16/1W.C . Rly of dt 30 .06.2009)
153
87
1-Implementation of Round the clock Working Hours at Tenali Goods Shed on Vijayawada Division.
(Authority:CCM/SC Rly No.C.310/RG1/Rc.Wkg Hrs/Vol.III of dt 07-05-09)
2- Opening of Krishnapatnam (KAPT) station for handling Outward Goods traffic in Trainloads and wagon loads for both local and through traffic for all commodities except POL.
(Authority:CCM/SC Rly No. C.473/990/TL/2008/Vol. XVI Part of date 15-05-09)
(Authority: CCM / NWR No. C-543/10/1 S.C. Rly of dt 30 .06.2009)
153-154
TRC COACHING
_______________________________________________________________
Para for THROUGH RATE CIRCULAR 2 (COACHING) of 2009
_______________________________________________________________
Sub;- Up- gradation of Kishangarh Balawas (KGBS) Halt station from halt to B Class station.
The halt station named Kishangarh Balawas (KGBS) which is situated at new Km 8.68 between Rewari-Jatusana station on Rawari-Bathinda section of Bikaner division has been upgraded to B Class station and commissioned from 16.00 hours of 31.03.09.
(Authority ;Sr,DOM /BKN No676-T/Plan/Conv.KGBS/xing STN/09 of date 31.03.09)
(Authority: Sr.DCM /BKN No.Coml/CC-1/186 of date 02.4.09)
(Authority: CCM/NWR No.C.171/ Halt station /KGBS of dt.07.04.2009)
________________________________________________________________
Para for THROUGH RATE CIRCULAR 3 COACHING) of 2009
_______________________________________________________________
Sub : Notification of trains services for rationalization of rates for Parcel & Luggage traffic.
Ref : FM circular no. 4 of 2009 issued vide Board letter no. TC-II/2046/06/1 dated 25.02.2009.
In reference to para no.4 of Boards above quoted letter, the enclosed list of Mail /Exp/Passenger trains originating from North Western Railway are re-classified as Rajdhani /Premier /Standard parcel services trains.
It may be ensured that charging of parcel & luggage by these notified trains is done as per notification. This classification will remain valid for a period 01.06.2009 to 31.5.2010.
Booking & charging of non leased parcel & luggage by newly introduced trains & trains run temporarily such as Summer special, Puja special, X-Mas etc. shall be charged as per FM circular No. 13 of 28.8.2008 (LRA 42 Coaching dated 02.09.2008)
Any discrepancies noticed in classification should be brought to the notice of this office immediately.
All concerned to note and act accordingly.
(Authority: CCM/NWR No.C.375/3/Vol of dt.26.05.2009)
Sub:- Rationalization of rates for parcel/luggage traffic as per F.M.Circular no 4 of 2009.
S.No.
Train No.
From
To
Scale for charging
Parcel
Luggage
1
2308A
BKN
HWH
R
L
2
4707
BKN
BDTS
R
L
3
6311
BKN
TVC
R
L
4
5631 A
BKN
GHY
R
L
5
3008
SGNR
HWH
R
L
6
2556
BNW
GKP
R
L
7
4724
BNW
CNB
R
L
8
5610
LGH
GHY
R
L
9
7038
BKN
SC
R
L
10
2464 A
BKN
DEE
R
L
11
2956
JP
BCT
R
L
12
2976
JP
MYS
R
L
13
2970
JP
CBE
R
L
14
2978
JP
ERS
R
L
15
2986
JP
SDAH
R
L
16
2974
JP
IND
R
L
17
2980
JP
BDTS
R
L
18
2968
JP
MAS
R
L
19
9771
JP
ASR
R
L
20
9781
JP
ASR
R
L
21
9708
JP
BDTS
R
L
22
4737
JP
BKN
R
L
23
9711
JP
SGNR
R
L
24
1MNR
RE
MUT
R
L
25
202
JP
AII
R
L
26
2990
AII
BCT
R
L
27
170
AII
ADI
R
L
28
2316
UDZ
SDAH
R
L
29
2396
AII
RJPB
R
L
30
5716
AII
KNE
R
L
31
6209
AII
MYS
R
L
32
8632
AII
RNC
R
L
33
2996
AII
BDTS
R
L
34
2996A
UDZ
BDTS
R
L
35
2413
AII
JAT
R
L
36
2464
JU
DEE
R
L
37
8474
JU
PURI
R
L
38
4854/64
JU
BSB
R
L
39
2479
JU
BDTS
R
L
40
2462
JU
DLI
R
L
41
6507
JU
SBC
R
L
42
6126
JU
MAS
R
L
43
2308
JU
HWH
R
L
44
5631
BME
GHY
R
L
45
2182
JP
JBP
P
L
46
201
AII
JP
P
L
47
2016
AII
NDLS
P
P
48
2466
JU
IND
P
L
49
492
JU
BPL
P
L
50
6533
JU
YPR
P
L
51
4060
JSM
DLI
P
L
52
4060A
BME
DLI
P
L
53
4738
BKN
JP
P
L
54
182
HSR
JP
P
L
55
2468
JP
BKN
S
S
56
9656
JP
AII
S
S
57
1768
JP
SHAMGARH
S
S
58
181
JP
HSR
S
S
59
196
JP
BXN
S
S
60
187
JP
HSR
S
S
61
200
JP
SOG
S
S
62
204
JP
FL
S
S
63
461
JP
LHU
S
S
64
711
JP
SGNR
S
S
65
485
JP
CUR
S
S
66
465
JP
LHU
S
S
67
9735
JP
LHU
S
S
68
165
JP
CUR
S
S
69
161
JP
SIKR
S
S
70
228
JP
JHS
S
S
71
355A
BKI
RKSH
S
S
72
324
BKI
MTJ
S
S
73
2 RNT
RE
TKJ
S
S
74
2 RD
RE
DLI
S
S
75
386
RE
DLI
S
S
76
2 RBN
RE
BNW
S
S
77
2RF
RE
FAZILKA
S
S
78
4RD
RE
DLI
S
S
79
6RD
RE
DLI
S
S
80
8 RD
RE
DLI
S
S
81
2 RB
RE
BTI
S
S
82
347
RE
SGNR
S
S
83
2 RH
RE
HSR
S
S
84
283
FL
RE
S
S
85
281
FL
RE
S
S
86
2 RDE
RE
DEE
S
S
87
493
RE
SDLP
S
S
88
495
RE
SDLP
S
S
89
282
RE
FL
S
S
90
284
RE
FL
S
S
91
2467
BKN
JP
S
S
92
4712
SGNR
HW
S
S
93
4526
SGNR
UMB
S
S
94
4722/2482
SGNR
NDLS
S
S
95
4795
BNW
KLK
S
S
96
4086
SSA
NDLS
S
S
97
4704
LGH
JSM
S
S
98
4702
BKN
JSM
S
S
99
4710
BKN
SDLP
S
S
100
4709
SDLP
BKN
S
S
101
4790
BKN
SDLP
S
S
102
4789
SDLP
BKN
S
S
103
9736
LHU
JP
S
S
104
9712
SGNR
JP
S
S
105
338
BKN
ABS
S
S
106
336
SGNR
UMB
S
S
107
2 SHB
SGNR
BTI
S
S
108
4 SHB
SGNR
BTI
S
S
109
344
HSR
JIND
S
S
110
188
HSR
JP
S
S
111
1DJH
HSR
DUI
S
S
112
1LJH
HSR
LDH
S
S
113
3LJH
HSR
LDH
S
S
114
5LJH
HSR
LDH
S
S
115
7LJH
HSR
LDH
S
S
116
1ALH
HSR
ASR
S
S
117
1RH
HSR
RE
S
S
118
1RBN
BNW
RE
S
S
119
2RKB
BNW
ROK
S
S
120
4RKB
BNW
ROK
S
S
121
184
BNW
MTJ
S
S
122
199
SOG
JP
S
S
123
2BSB
SOG
BTI
S
S
124
2SA
SOG
APH
S
S
125
4SA
SOG
APH
S
S
126
1SA
APH
SOG
S
S
127
3SA
APH
SOG
S
S
128
5SA
APH
SOG
S
S
129
6SA
SOG
APH
S
S
130
2DRB
BNW
DLI
S
S
131
496
HSR
RE
S
S
132
494
HSR
RE
S
S
133
348
SGNR
RE
S
S
134
712
SGNR
JP
S
S
135
1SHL
HMH
SOG
S
S
136
3SHL
HMH
SOG
S
S
137
1SCD
SDLP
DNA
S
S
138
1SHS
SDLP
SOG
S
S
139
488
SDLP
SIKR
S
S
140
1BC
SDLP
BKN
S
S
141
486
CUR
JP
S
S
142
2 SHL
SOG
SDLP
S
S
143
2 SHS
SOG
SDLP
S
S
144
4SHL
SOG
HMH
S
S
145
1SHR
SDLP
SOG
S
S
146
2SHR
SOG
SDLP
S
S
147
1HR
SDLP
RTGH
S
S
148
2RS
SRDR
RTGH
S
S
149
4RS
SRDR
RTGH
S
S
150
2BC
BKN
CUR
S
S
151
2BRD
BKN
DNA
S
S
152
1BR
SDLP
BKN
S
S
153
2BR
BKN
SDLP
S
S
154
1DR
RTGH
DNA
S
S
155
2HR
RTGH
SDLP
S
S
156
1RS
RTGH
SRDR
S
S
157
3RS
RTGH
SRDR
S
S
158
790
RTGH
SRDR
S
S
159
789
SRDR
RTGH
S
S
160
4BC
BKN
SDLP
S
S
161
3BC
CUR
BKN
S
S
162
466
LHU
JP
S
S
163
462
LHU
JP
S
S
164
2964
UDZ
NZM
S
S
165
2966
UDZ
GWL
S
S
166
6531
AII
YPR
S
S
167
2992
AII
UDZ
S
S
168
9654
AII
RTM
S
S
169
9656
AII
RTM
S
S
170
9656A
AII
JP
S
S
171
2991
UDZ
AII
S
S
172
9658
UDZ
IND
S
S
173
2982
UDZ
DEE
S
S
174
9943
UDZ
ADI
S
S
175
2JA
AII
JU
S
S
176
168
AII
BER
S
S
177
167
BER
AII
S
S
178
307
AII
UDZ
S
S
179
308
UDZ
AII
S
S
180
310
UDZ
COR
S
S
181
1766
UDZ
NMH
S
S
182
431
UDZ
ADI
S
S
183
452
MVJ
MJ
S
S
184
451
MJ
MVJ
S
S
185
484
MVJ
MJ
S
S
186
483
MJ
MVJ
S
S
187
472
MVJ
BI
S
S
188
471
BI
MVJ
S
S
189
4810
JU
JSM
S
S
190
2JPJ
JU
JSM
S
S
191
1JA
JU
AII
S
S
192
1JB
JU
BME
S
S
193
3JB
JU
BME
S
S
194
4888
BME
KLK
S
S
195
5JB
JU
BME
S
S
196
2JB
BME
JU
S
S
197
1BM
BME
MBF
S
S
198
6JB
BME
JU
S
S
199
RRD
DNA
RE
S
S
200
1SCD
DNA
SDLP
S
S
201
2DR
DNA
RTGH
S
S
202
1BRD
DNA
RE
S
S
203
4809
JSM
JU
S
S
204
1JPJ
JSM
JU
S
S
205
4701
JSM
BKN
S
S
206
340
JU
BTI
S
S
207
1089
JU
PUNE
S
S
208
4 JB
BME
JU
S
S
209
4703
JSM
BME
S
S
210
4888 A
BME
HW
S
S
211
172
JU
ADI
S
S
________________________________________________________________
Para for THROUGH RATE CIRCULAR 4 COACHING) of 2009
_______________________________________________________________
Sub:- Notification of train services for rationalization of rates for parcel & Luggage traffic.
Ref:- FM Circular no. 04 of 2009 issued vide Boards letter No. TC-II/2046 /06 /1 dt 25-02-2009.
In continuation of TRC 3 (Coaching) of 2009 dtd 26-05-2009 , Train No. 1089 (JU-PA) is to be charged as scale P and scale L instead of scale S and S and train no. 2966 (UDZ-GWL) is to be charged as scale P and scale L instead of scale S and S . Other information will remain unchanged.
(Authority: CCM/NWR No.C.375/3/Vol of dt.28.05.2009)
________________________________________________________________
Para for THROUGH RATE CIRCULAR 5 (COACHING) of 2009
_______________________________________________________________
Corrigendum
Sub:- Notification of train services for rationalization of rates for parcel & Luggage traffic.
Ref:-1. FM Circular no. 04 of 2009 issued vide Boards letter No. TC-
II/2046 /06 /1 dt 25-02-2009.
2. TRC 3 & 4(Coaching) of 2009
In continuation of TRC 3 (Coaching) of 2009 dtd 26-05-2009 , Train No. 2964 is to be charged as scale P and scale L instead of scale S and S. Other information will remain unchanged.
(Authority: CCM/NWR No.C.375/3/Vol of dt.03.07.2009)
TRC GOODS
________________________________________________________________
Para for THROUGH RATE CIRCULAR 13 (GOODS) of 2009
______________________________________________________________________
Sub:-Introduction of Round the clock working at Sirsa (SSA) goods shed .
Ref:- TRC 24 of 2008 (Goods) dated 30/10/2008
The competent authority has given approval for introducing round the clock working at Sirsa (SSA) goods shed of Bikaner Division of North Western Railway.
(Authority: -CCM/NWR No. C-491/B&W Hrs. Vol-I of date 08/4/09)________________________________________________________________
Para for THROUGH RATE CIRCULAR 14 (GOODS) of 2009
______________________________________________________________________
Sub:-Notification of Kharia Khangar Cement Siding on through distance basis.
Ref:- TRC 24 of 2008 (Goods) dated 30/10/2008
The competent authority has given approval for notification of siding distance of Kharia khangar Cement Siding (IRLS) to Kharia Khangar (KXG) station as 1.44 Kms.
Further, in case of rake load traffic when it is received in to/dispatched from the siding without being dealt with at the serving station duly fulfilling the requisite conditions, freight for traffic moved to & from the siding will be charged on through distance basis.
For any shunting done on partys account, separate shunting charges are leviable as per extant rules.
(Authority: -CCM/NWR No. C-491/22 of date 08/4/09)
__________________________________________________________________
Para for THROUGH RATE CIRCULAR 15 (GOODS) of 2009
______________________________________________________________________
Sub:-Opening of Bhagega Station (BAGA) for outward and Inward traffic both in rake laod.
Ref;- LRA No 20(Goods) of 2009 of dt 20.01.2009
The competent authority has sanctioned the opening of Bhagega (BAGA ) station of Jaipur Division of North Western Railway for all description of Goods traffic (except Coal, POL, live stock & Motor vehicle) both for outward and inward in rake laod on permanent basis w.e.f 15.04.2009
(Authority: -CCM/NWR No. C-498/I/Vol.II of date13/04 /09)
__________________________________________________________________
Para for THROUGH RATE CIRCULAR 16 (GOODS) of 2009
______________________________________________________________________
Sub:-Opening of FL-RGS-RE section of Jaipur division for through goods traffic.
Ref:- TRC No 28,29,30,of 2008 (Goods) TRC No.4 of 2009of (goods)
The competent authority has approved opening of FL-RGS-RE(BG) section for through goods traffic also with effect from 26.04.2009. Thus, the traffic can be booked by this route also subject to adherence of all instructions /rules on this subject
(Authority: -CCM/NWR No. C-498/I/Vol.II of date 22/04 /09)
___________________________________________________________________
Para for THROUGH RATE CIRCULAR 17 (GOODS) of 2009
______________________________________________________________________
Sub:-Operation of container trains by Private Container Operator (PCO) in Railway owned terminals.
Ref:- 1. Railway Boards Rate Circular No.49 of 2008
2. TRC 8 (Goods) of 2008 of date 15.4.2009
In reference to above, the competent authority has approved continuance of Daurai (DOZ) Group-I station of Ajmer Division and Gotan (GOTN)-Group-II station of Jodhpur Division as CRT for chassis /De stuffing only, till 30.9.2009.
(Authority: -CCM/NWR No. C-387/PCO/Container/1 of date 22/04 /09)
___________________________________________________________________
Para for THROUGH RATE CIRCULAR 18 (GOODS) of 2009
______________________________________________________________________
Sub:-Opening of Nasirabad Station for outward and Bhilwara Station for inward water traffic.
Ref:- TRC 24 of 2008 of date 30/10/2008
The competent authority has approved the following :
1. Opening of Bhilwara Station (BHL) for Inward water traffic in rakes with round the clock working , permanently.
2. Opening of Nasirabad Station (NSD) for outward water traffic in rakes with round the clock working, permanently.
(Authority: -CCM/NWR No. C-498/3/1/AII of date 27/04 /09)
___________________________________________________________________
Para for THROUGH RATE CIRCULAR 19 (GOODS) of 2009
______________________________________________________________________
Sub:-Opening of Uttarlai station for Coal Traffic.
The competent authority has approved the opening of Uttarlai station of Jodhpur Division of North Western Railway for Inward Coal in rakes for a period of three months
(Authority: -CCM/NWR No. C-498/2/1/JU of date 27/04 /09) _______________________________________________________________
Para for THROUGH RATE CIRCULAR 20 (GOODS) of 2009
______________________________________________________________________
Sub:-Opening of Nawa City (NAC) station as CRT for chassis stuffing /destuffing
Ref:- TRC 7 (Goods) of 2009 dtd 09/2/2009 and TRC 17 (Goods) of 2009 dtd
22.04.09.
The competent authority has accorded approval for notifying the NAWA CITY (NAC) station of Jodhpur Division of North Western Railway as CRT for chassis stuffing /destuffing of traffic till 30.09.2009.
All the relevant rules circulated from time to time on this matter will be inforce.
(Authority: COM/NWR No. T-2/Goods/550/7 Vol.II /09 of date 11/05/09)
(Authority:CCM,NWR No.387/PCO/Container/1of dt 11.05.2009)
LRA COACHING
Para for LOCAL RATE ADVICE 21 (Coaching) of 2009
______________________________________________________________________
Sub;- The Railways (Extent of Monetary liability and Prescription of Percentage charge) Amendment Rules,2009.
A copy of notification issued vide GSR 219 (E) dt. 30.03.2009 stating that levy of percentage charge on Scooter/Motor Cycles loaded in full rake of parcel Van consisting of a least 15 parcel vans or equivalent to 8 wheeled coaches is not compulsory is enclosed.
It is requested that a copy of this notification may be sent to all concerned including goods sheds / parcel offices for taking necessary action in the matter.
(Authority: Railway Board Letter No. 89/TC-III/1/6/RA/89(Sec 103) Pt. of dt. 16.04.2009)
(Authority: CCM / NWR No. C- 375/7 Misc dt 04.05.2009)
MINISRTRY OF RAILWAYS
(RAILWAY BOARD)
NOTIFICATION
NEW DELHI, 30TH MARCH 2009
G.S.R.219(E).- In exercise of powers conferred by sub-section (1) and clause (C) of sub-section (2), of section 112 of the Railways Act,1989 (24 of 1989 ), the Central Government hereby makes the following rules further to amend the Railways (Extent of Monetary Liability and Prescription of Percentage Charge ) Rules,1990 namely:-
1. Short title and commencement. (1) These rules may be called the Railways (Extent of Monetary Liability and Prescription of Percentage Charge )Amendment rules,2009
(2) They shall come into force on the date of their publication in the Official gazette.
2. Amendment of Schedule II.In the Railways (Extent of Monetary Liability and Prescription of Percentage Charge ) Rules 1990, in Schedule II, in Part I, in column (1), for serial number 5-A and the entries relating thereto, the following serial number and entries shall be substituted, namely :-
5-A. Scooter or Motor Cycle other than those booked in full rake of parcel van consisting of at least 15 parcel vans or equivalent to 8 wheeled coaches.
(F.No. 89/TC-III/1/6/rea/89 (Sec 103) Pt.)
SUNIL KUMAR, Executive Director Public Grievances
Note: The principal rules were published in the Gazette of India, Extraordinary, Part II, Section 3, Sub Section (i)vide, No.G.S.R.557 (E),dated the 7th June,1990 and subsequently amended,vide,-
(i), vide No G.S.R 90(E), dated the 26th February,1991 ; and
(ii) Vide No G.S.R 24 (E), dated the 13th January ,1999
______________________________________________________________________
Para for LOCAL RATE ADVICE 22 (COACHING) of 2009
______________________________________________________________________
Sub- e-tickets-Photo ID.
(Commercial Circular No.14 of 2009 )
Please refer to Railway Boards letter number 2008/TG-I/10/P/E-Ticketing ID dated 31.10.2008 on the above quoted subject wherein it has been advised that instructions dated 08.10.2008 issued vide Commercial Circular No.56 of 2008 regarding dispensing the condition of indicating proof of identity at the time of the booking e-ticket and carrying during the journey any one proof of identity mentioned in the scheme, may be given effect w.e.f 01.11.2008.
Since these instructions were issued for a period of six months, the matter regarding its extension has been examined and it has been decided that the facility of not indicating any proof of identity at the time of booking e-ticket and carrying any one proof of identity mentioned in the scheme during the journey may be extended up to 30.04.2010.
(Authority: Railway Board Letter No. 2008/TG-I/10/P/E-Ticketing ID of dt.27.04.2009)
(Authority: CCM / NWR No. C-156/E/Ticketing/09 of dt 05.05.2009)
______________________________________________________________________
Para for LOCAL RATE ADVICE 23 (COACHING) of 2009
______________________________________________________________________
Sub:- Cash Incentive to the ticket checking staff for good performance.
(COMMERCIAL CIRCULAR NO.16 OF 2009)
The Cash Incentive scheme for the good work done by the ticket checking staff was extended upto 31.03.2009 vide this office letter No.2006/TG-V/1036/1 dated 22.05.2008 on the terms and conditions as stipulated in Boards Commercial Circular No. 20/2004. It has been decided to extend the scheme further for 3 months from Aril,09 to June,09 with the following modified terms and conditions:
2(iii) : The minimum criteria for qualifying for incentive scheme will be Rs.30,000/- on account of penalty earnings and a minimum of 150 cases. Out of these cases,50 cases should be of ticket less travel.
2. The other terms and conditions of Incentive scheme as stipulated in Commercial Circular No.20/2004 will remain same.
3. Further extension of the scheme will be communicated after a review.
4. It is desired that the performance of the Cash Incentive Scheme indicating the Number of ticket checking staff given incentive. Amount of incentive paid, quantum of cases detected and amount of penalty collected may be furnished w.e.f.April,09 regularly.
5. The expenditure accrued on this account will debited under Head Demand No.9, Abstract Minor Head 500, Detailed head 530.
6. This issues with the concurrence of Finance Directorate of the Ministry of railways. .
(Authority: Railway Board Letter No. 2006/TG-V/1036/I Of dt.22.05.2009)
(Authority: CCM / NWR No. C-549/TC/Cash incentive/2009 of dt 05.06.2009)
_____________________________________________________________________
Para for LOCAL RATE ADVICE 24 (COACHING) of 2009
_____________________________________________________________________
Sub: Priority Schedule for allotment of VPs. (Freight Marketing Circular No. 11 of 2009)
Ref: (i) Freight Marketing Circular No. 28 of 2005 issued vide Boards letter No. 2005/TC(FM)/11/4 dated 14th September 2005
(ii) Freight Marketing Circular No. 02 of 2007 issued vide 2007/TC(FM)/10/3 dated 20.02.2007
1.0 Attention is invited to para 4 of Boards instructions contained in Freight Marketing Circular No. 28 of 2005 under Boards letter No. 2005/TC(FM)/11/4 dated 14th September 2005 {under reference (i) above} wherein definition of block rake of Parcel Vans (non-leased) has been given as minimum of 18 VPs.
1.1 Further, in para 2.0 of Boards letter No. 2007/TC(FM)/10/3 dated 20.02.2007 under Freight Marketing Circular No. 02 of 2007 {under reference (ii) above} it is stipulated that the reserve price for leasing of Parcel Express trains may be worked out with a minimum composition of 15 Parcel Vans (VPHs/VPs/VPUs) + one Brakevan (two compartments of 4 tonnes CC each).
2.0 The matter has been reviewed and it has been decided that the minimum composition of VP rake should be taken as 15 Parcel Vans (VPHs/VPs/VPUs) + one Brakevan (two compartments of SLR, having carrying capacity of 4 tonnes each) for both leased as well as non-leased Parcel Express trains. The freight of parcel capacity available in Brakevan will be collected and the party will be allowed to load the same.
2.1 Accordingly, the instructions contained in para 4 of Freight Marketing Circular No. 28 of 2005 under Boards letter No. 2005/TC(FM)/11/4 dated 14th September 2005 {under reference (i) above} are slightly modified and shall be as follows:-
The word 18 VPs appearing in the last line of Para 4 at page 2 of Boards letter No. 2005/TC(FM) /11/4 dated 14th September 2005 under Freight Marketing Circular No. 28 of 2005 may be replaced with the word 15 Parcel Vans (VPHs/VPs/VPUs) + one Brakevan.
3.0 These instructions will come into force with immediate effect.
(Authority: Railway Board Letter No. 2005/TC(FM)/11/4 Of dt.19.05.2009)
(Authority: CCM / NWR No. C-375/6/Vol.II of dt 08.06.2009)
________________________________________________________________
Para for LOCAL RATE ADVICE 25 (COACHING) of 2009
________________________________________________________________
Sub: Policy for running of Teevra Gati Sewa (TGS) train by multiple consignors from multiple originating points.(F.M.Circular No. 12 of 2009)
With a view to retrieve piecemeal traffic, which is presently moving by other modes of transportation, it has been decided to run Teevra Gati Sewa (TGS) trains consisting of Parcel Vans (VPHs/VPs/VPUs etc.) as a pilot project. The aim of the project is: -
(i) To increase parcel traffic by providing assured quick transit time.
(ii) To facilitate industry to avail time-tabled parcel service in Parcel Van load on nominated day.
(iii) To enable web booking of Parcel Vans.
The following policy guidelines should be followed for running of Teevra Gati Sewa (TGS) trains consisting of Parcel Vans (VPHs/VPs/VPUs etc.):-
1.0 Operational guidelines
1.1 The train shall connect two important stations having sufficient demand for parcel traffic in both directions.
1.2 The Teevra Gati Sewa (TGS) service will be provided on nominated day on a fixed schedule time-tabled path with guaranteed transit time.
1.3 The train will run from originating to destination station with provision for attachment/ detachment of VPs enroute as per pre-defined stoppage and number of VPs allocated for each station. However subject to availability of space in train more VP can be permitted from the intermediate or originating stations.
1.4 The time table for Teevra Gati Sewa (TGS) trains will be prepared by originating zonal railway in consultation with the other zonal railway through which the train passes and Railway Board. Time-table of Teevra Gati Sewa (TGS) trains will be circulated separately.
1.5 Loading/unloading of parcels at intermediate stations will not be permitted. Instead, Teevra Gati Sewa (TGS) trains shall run on specific streams with provision of schedule attachment/detachment of Parcel Vans enroute.
1.6 The Parcel Vans (VPHs/VPs/VPUs etc.) by Teevra Gati Sewa (TGS) service shall be allotted to multiple parties as per demand of registration for the nominated days service.
1.7 The VP booking will be on similar line as is available for the booking of reserved passengers in a train on First-come-first serve basis from these stations.
1.8 There shall be nominated enroute station(s) where attaching/detaching of Parcel Vans will be permitted. There will be 20 minutes stoppage at each enroute station to facilitate shunting operation.
1.9 The indents from the consignors shall be accepted for nominated days of service. It will be for specific date and shall be accepted upto 30 days in advance from the nominated day of service. 20% of the freight shall be collected in advance at the time of registration of indent. Registration fee for VP shall also be collected as per prescribed rules.
1.10 The frequency of service will be decided on the basis of demand.
1.11 The Teevra Gati Sewa (TGS) train shall run on nominated day of service as per its time table irrespective of its load.
1.12 Punctuality of Teevra Gati Sewa (TGS) train should be monitored by the Punctuality Cell of Divisions/Zonal Railways. The running position of the train should be updated in COIS. Daily monitoring position should also be conveyed telephonically to Parcel Monitoring Cell of Railway Board at Tel No. 43208 or 43674 (Rly).
1.13 TXR examination:- Each Parcel Van (VPH/VP/VPU etc.) attached in the Teevra Gati Sewa (TGS) train shall have break power. No pit line examination will be required for Parcel Vans attached in the Teevra Gati Sewa (TGS) train. Enroute any number of Parcel Vans can be attached/ detached in the train provided all attached Parcel Vans have been pre-examined and have full break power.
1.14 The Parcel Vans of Teevra Gati Sewa (TGS) train shall not be handled at passenger platform. The handling and loading/unloading operation shall be done at separate parcel shed/goods shed nominated by the railway administration for this purpose.
1.15 As this is a pilot project, Railway shall reserve the right to discontinue the service at any time with one month notice.
1.16 Free time as per extant rule shall be applicable for loading/ unloading of Parcel Vans at originating and destination station. However, at originating station the rake will be supplied with clear five hours for loading. The rake will be moved from loading line immediately after completion of five hours irrespective whether loading has been completed or not by the party. The railway shall notify the time schedule for loading and unloading.
2.0 Booking of Parcel Vans
2.1 Initially the booking of Parcel Van will be done as per the existing manual system but eventually it is expected that the process of booking for Parcel Vans (VPs) under the scheme, will be done through electronic means once the software is developed and the guidelines for the same will be issued separately.
2.2 Minimum space for booking shall be the entire carrying capacity of unit. However, any number of Parcel Vans can be booked in multiple of entire CC of one unit.
3.0 Charging of freight for Parcel Vans
3.1 The freight for Parcel Vans (VPHs/VPs/VPUs etc.), which are to be attached by Teevra Gati Sewa (TGS) train shall be charged at Scale-R on permissible carrying capacity of Parcel Vans.
3.2 In addition to above, 5% surcharge on the basic freight shall be collected at originating station as Teevra Gati surcharge at the time of loading. If the Railway Administration is not able to place the Parcel Vans for unloading at destination station upto two hours after the scheduled transit time of Teevra Gati Sewa (TGS) train, 5% surcharge collected as Teevra Gati surcharge will be refunded to the party at destination station.
3.3 20% of the freight shall be collected at the time of registration of indent. The remaining balance freight shall be collected at the time of booking at originating station.
3.4 Development charge or any other surcharge applicable for Parcel Van booking will also be levied as applicable. However, bulky surcharge will not be recovered.
3.5 The cases, where Teevra Gati surcharge have been refunded to the party at destination station on account of delayed placement of Parcel Vans of Teevra Gati Sewa (TGS) train should be analyzed by the zonal railways and responsibility should be fixed by the concern railway. The detailed report of such cases may be sent to Railway Board.
4.0 Cancellation of indent
4.1 In case of cancellation of indent or when the party does not load the Parcel Van after supply, the advance freight collected from him and the amount of registration fees of Parcel Van will be forfeited in full.
5.0 Other terms and conditions
5.1 The handling and loading/unloading of parcels shall be done as per extant rules.
5.2 Other rules and conditions and restriction applicable for booking of parcel traffic shall also be applicable under the service.
6.0 The pilot project will be done initially for four months and thereafter on the basis of performance its continuance or otherwise will be decided. To facilitate the review, train-wise details should be compiled and analyzed. The review should be completed by 31.08.2009 and the same should be sent to Boards office, complete in all respect, latest by 10.09.2009, in consultation with the Traffic Accounts office.
7.0 These instructions will come into force from 1st June 2009.
8.0 This issues with concurrence of Finance Directorate of the Ministry of
Railways.
(Authority: Railway Board Letter No. 2009/TC(FM)/11/7 Of dt.21.05.2009)
(Authority: CCM / NWR No. C-375/6/Vol.II of dt 08.06.2009)
LRA GOODS
______________________________________________________________________
Para for LOCAL RATE ADVICE 64 (GOODS) of 2009
______________________________________________________________________
Sub:- Distance based concession on Iron Ore Pellet booked at Class 200 X.
Clarification has been sought by South Western Railway in regard to the charging of Iron Ore Pellet if it is booked for export. Clarification has also been sought in regard to the eligibility of Iron Ore Pellet for distance based freight concession with reference to Rate Circular No. 63 and 82 of 2008 circulated vide LRA No. 140 of 2008& LRA No. 27 of 2009(Goods)- and also for its charging with reference to the Para 1.4 of Rates Circular No. 06 of 2008 Circulated vide 27 of 2008 (Goods)
It is clarified that the end use of Iron Ore and Iron Ore Pellets is the same namely in steel plants. Hence Iron Ore Pellets for export should be charged at Class 200 X , similar to Iron Ore for export. Secondly, as per Rates Circular No. 30 if 2008 Iron Ore moved for such pelletization (For export) should also be charged at class200X . The traffic of Iron Ore Pellets meant for export will also be eligible for distance based concession subject to the fulfillment of existing terms and conditions Iron Ore Pellets cannot be treated as not covered in the Goods Tariff and as such , question of its charging with reference to Para 1.4 of Rates Circular No. 06 of2008 does not arise.
(Authority: Railway Board Letter No. TCR / 1078/2007/3 of dt. 20.03.2009)
(Authority: CCM / NWR No. C- 493/6/431 dt 01.04.2009)
______________________________________________________________________
Para for LOCAL RATE ADVICE 65 (GOODS) of 2009
______________________________________________________________________
Sub:- Freight concession for Iron ore traffic (Class 200X) ( Rates Circular No. 25 of 2009.
Ref:- (i) Boards letter No. TCR/1078/2008/29 dated 24.12.2008(RC No. 80/2008) Circulated vide LRA No. 9/2009dt. 02.01.2009
(ii) Boards letter No. TCR/1618/2008/15 dated 30.12.2008(RC No. 81/2008) Circulated vide LRA No17/2009dt. 19.01.09
(iii) Boards letter No. TCR/1618/2007/10 dated 30.12.2008(RC No. 82/2008) Circulated vide LRA No27/2009dt. 03.02.2009
(iv) Boards letter even number dated 31.12.2008 (RC No.83/2008) Circulated vide LRA No18/2009dt. 19.01.2009.
(v) Boards letter No. TCR/1618/2008/18 dated 31.12.2008 (RC No. 84/2008) Circulated vide LRA No19/2009dt. 19.01.2009
(vi) Boards letter No. TCR/1618/2008/16 dated 21.01.2009 (RC No.
02/2009) Circulated vide LRA No28/2009dt. 04.02.2009
(vii) Boards letter No. TCR/1618/2008/14 dated 30.01.2009 (R.C. No. 4/2009) Circulated vide LRA No36/2009dt. 17.02.2009
1.0 In terms of Boards letter under reference, sanction was conveyed for grant /extension of freight concession for movement of iron ore booked at Class 200X from West Central Railway , East Coast Railway , South Western Railway , South Eastern Railway , South East Central Railway and South Central Railway respectively, subject to fulfillment of certain terms and conditions . These concessions are valid up to 31.03.2009.
2.0 Sanction is herby accorded to extend the validity of above-mentioned freight concessions granted to Iron ore traffic (Class 200X) booked from West Central Railway, East Coast Railway, South Western Railway, South Eastern Railway ,South East Central Railway and South Central Railway beyond 31.03.2009 up to 30.06.2009, subject to fulfillment of existing terms and conditions stipulated in the letters under reference.
3.0 This issues with the approval of Traffic Transportation Directorate and with the concurrence of Finance Directorate of the Ministry of Railways.
This is for information and necessary instructions may please be issued to all concerned. Please acknowledge receipt of this letter.
(Authority: Railway Board Letter No. TCR /1618/2008/14 dt. 30.03.2009)
(Authority: CCM / NWR No. C- 493/6/431 dt 02.04.2009)
______________________________________________________________________
Para for LOCAL RATE ADVICE 66 (GOODS) of 2009
______________________________________________________________________
Sub:- Charges for providing Brake Vans in WIS rakes.
(Freight Marketing Circular No. 07 of 2009)
Ref:- Railway Boards letter of even No. dated 19.04.07 Circulated vide LRA
No 69 of 2007(Goods) dt. 07.05.07 & 01.04.08 Circulated vide LRA No. 40 of 2008 (Goods) dt 04.04.08.
Interim orders of Board were for levying 0.5 % additional charges on Normal Tariff Rates ( Undiscounted freight )as payment for attaching Railways Brake Van to WIS rake. These orders were communicated to Zonal Railways vide above letters under reference . These instructions are valid upto 31.03.09.
Approval of Ministry of Railways (Railway Board) is hereby accorded for further continuance of the above orders for another one year. i.e. upto 31.03.2010 or the date when the WIS Customer procures the Brake Van and it is actually inducted, whichever is earlier.
It has also been decided that matter may be taken up with WIS Customers to expedite procurement of Brake Vans .
(Authority: Railway Board Letter No. 2007/TC(FM) / 4 / 3 dt. 20.03.2009)
(Authority: CCM / NWR No. C- 88 / 0 (Policy) dt.06.04.2009)
______________________________________________________________________
Para for LOCAL RATE ADVICE 67 (GOODS) of 2009
______________________________________________________________________
Sub : Policy Guidelines Freight Incentive Schemes and Transportation Products .
Ref:- Boards letter No TCR/1078/2008/15 dated 05.01.2009 (Corrigendum No 7 to RC No .25/2008)
1.0 Sanction is hereby accorded to extend the currency of the instructions contained in Corrigendum No 7 to Rates Circular No. 25 of 2008 issued vide Boards letter under reference . for a further period of three months beyond 31.03.2009 i.e upto 30.06.2009.
2.0 All other details of the Corrigendum No .7 to Rates Circular No 25 of 2008 will continue to apply unchanged .
3.0 This issues with the approval of Traffic Transportation Directorate and with the concurrence of Finance Directorate of the Ministry of Railways.
(Authority: Railway Board Letter No.TCR/1078/2008/15 dt. 31.03.2009)
(Authority: CCM / NWR No. C- 429/0 dt. 06P.04.2009)
___________________________________________________________________
Para for LOCAL RATE ADVICE 68 (GOODS) of 2009
___________________________________________________________________
Sub:- Rebate in freight rates on Caustic Soda Lye traffic transported in the privately owned BTCS wagons.(Rates Circular No. 27 of 2009)
Ref:-Railway Boards letter of even number dated 29.04.2008 (RC No.19/2008 circulated vide LRA No.53 of 2008 (Goods) dt15/5/08) and 24.10.2008 (RC No.60/2008 circulated vide LRA No.132 of 2008 (Goods) dt 06/11/08)
In continuation of Boards letter under reference, sanction is hereby accorded to extend the validity of the rebate in freight granted to M/s Grasim Industries Ltd. on transportation of Caustic Soda Lye when transported in privately owned wagons from specific streams as mentioned in Rates Circulars referred above, beyond 31.03.2009 for a further period of six month i.e upto 30.09.2009.
All other details of the Rates Circulars under reference will continue to apply unchanged.
This issues with the concurrence of Finance Directorate of Ministry of Railways.
(Authority: Railway Board Letter No.TCR/1644/2006/1 dt. 31.03.2009)
(Authority: CCM / NWR No. C- 433/2 dt. 08.04.2009)
_________________________________________________________________
Para for LOCAL RATE ADVICE 69 (GOODS) of 2009
______________________________________________________________________
Sub: Haulage Charge recoverable for movement of containers in privately owned wagons.(Rates Circular No. 26 of 2009)
Ref: Railway Boards letter No.2008/TT-III/73/8 dt.27.10.08 (Circulated vide LRA No.133 of 2008 (Goods)dt.06.11.2008) and No.2008/TT-III/73/8 Pt.I dt.24.12.08.(Circulated vide LRA No.13 of 2009 (Goods ) dt 12.01.09)
1.0 Vide Boards letter No.2008/TT-III/73/8 dt 27.10.2008, it was decided to grant a rebate of 10% for domestic traffic for weight categories above 20MTs upto 31.12.2008, subject to the condition that the applicable rate after rebate will not be less than the corresponding rate applicable as per Railway Boards letter No.2006/TT-III/73/12 dt.11.10.2006.(Circulated Vide letter No even dtd 23.10.06).
2.0 The aforementioned rebate was extended upto 31.03.2009 vide Boardsletter No.2008/TT-III/73/8 Pt.I dt.24.12.2008.
3.0 Sanction is accorded to further extend the rebate as prescribed vide Boards letter No.2008/TT-III/73/8 dt 27.10.2008 upto 30.6.2009.
4.0 It is reiterated that the rebate is applicable only to the domestic traffic and not to EXIM traffic.
5.0 This issues with the concurrence of Finance Directorate of the ministry of Railways.
(Authority: Railway Board Letter No.2007/TC-I/302/IPT.H of dt. 31.03.2009)
(Authority: CCM / NWR No. C- 78/1/54/CONCOR Vol II of dt 08.04.2009
______________________________________________________________________
Para for LOCAL RATE ADVICE 70 (GOODS) of 2009
_______________________________________________________