at Entertainment City Project
INVESTORS’ CONFERENCE
The New
09 February 2017 | Makati Shangri-La, Philippines
Opening RemarksAtty. Grace Quevedo-PanagsaganChairperson, Nayong Pilipino Foundaiton
Message from the Department of Tourism Hon. Wanda Corazon Tulfo-Teo
The New Nayong Pilipino: Vision and ConceptJoseph Anthony QuesadaExecutive Director, Nayong Pilipino Foundation
For the 21st Century
The New
To put Philippine history, heritage, and culture on a global stage, but with the unforgettable impact and experience of a theme park with a Filipino brand.
The historic and current Filipino culture… that are enduring or just starting for the first time.
…An immersive adventure and creative cultural encounter with our past, our present, and our future.
DATIDrawing inspiration from our
past to creatively tell the story of our historical culture
Our intent is to make sure that historic elements of our culture do not die out but thrive in today’s world and kept relevant through our people.
…shared in a manner that other nationalities can still find relevant.
Through the use of Filipino musicality, drama, technology, and creative storytelling, this space should be able to dramatize the Filipino spirit and soul and draw the fascination of foreign guests.
Ipakita ang dati nang may dating
DATING
Space for Cultural Innovation and Creation
BUKAS
Create future culture by encouraging contemporary executions of traditional skills for a 21st century audience.
…intersections of culture, technology, theatricality, and traditional artisanship create possibilities that are incredible.
Main Loop,Lagoon,
Amphitheater & Parking
Conceptual Design
Nature District
Conceptual Design
ThematicLayout
Historical District
Conceptual Design
Performance District
Conceptual Design
Food & Beverage
Conceptual Design
Creative ChallengeHow do we design a Nayong Pilipino for the 21st
century that will captivate the world through various elements of our historic and contemporary culture?
How can we take significant elements of our history, heritage, and culture and present it with flair and impact?
How do we take a broad range of visitors through an immersive cultural adventure?
HOW?
By gathering the most creative, theatrical, entertaining, and innovative professionals inside or outside our country.
WHY?
at Entertainment City Project
INVESTORS’ CONFERENCE
The New
09 February 2017 | Makati Shangri-La, Philippines
Because…
Overview of the Project Terms, PPP Bidding Process and Next StepsAtty. Mia Mary G. SebastianPublic-Private Partnership Center
General InformationImplementing Agencies (IAs)
ü Department of Tourism and Nayong Pilipino Foundation
Applicable Procurement Law
ü RA No. 7718 or the Philippine Amended BOT Law
Bidding Type
ü Two-Stage Bidding Process (Pre-Qualification and Bidding Proper)
PPP Scheme: Build-Transfer-Operate-MaintainPRIVATE PARTNER IMPLEMENTING AGENCIES
Financing, detailed design and construction of main parks and
recreation facility
Delivery of project site and conceptual master plan
Operation and maintenance of facility General oversight and supervision of operation
Annual and quarterly program content compliant with principles set in
contract
Special cultural and educational workshops
Ticket pricing and distribution channels
Contract management - Compliance review with KPIs and other regulations
Marketing and promotions
Project Details
Estimated Project Cost (based on conceptual design)
ü Php 1.47 billion
Concession Period
ü 20-year concession period, exclusive of estimated 3-year construction period
Repayment SchemePrivate Partner will be remunerated through the following:
ü Operating revenue from parks and recreation facility; and
ü Operating revenue from food and beverage section and other ancillary facilities
At the option of the IAs, milestone payment representing a certain percentage of construction cost may be paid
Repayment scheme will be finalized in draft concession agreement during bidding proper
Bidding ParameterContract will be awarded to bidder who will submit:
ü highest government share in gross operating revenue from main parks and recreation facility; or
ü at the option of the IAs and as communicated to the bidders during bid proper, lowest one-time milestone lump sum payment after construction
Bidding parameter will be finalized in draft concession agreement during bidding proper
Indicative TimelineActivities Date
Advertisement March 2017PQ Documents Submission July 2017Bid Submission December 2017Issuance of Notice of Award February 2018Contract Signing April 2018Issuance of Notice to Proceed October 2018Estimated Construction End Date October 2021
at Entertainment City Project
INVESTORS’ CONFERENCE
The New
09 February 2017 | Makati Shangri-La, Philippines
OPEN FORUM
Closing RemarksUsec. Ferdinand A. PecsonPublic-Private Partnership Center
at Entertainment City Project
INVESTORS’ CONFERENCE
The New
09 February 2017 | Makati Shangri-La, Philippines