NYCT Capital Program2010-2014 Program
Track$1.4
Rolling Stock(Rail & Bus Fleets)
21%
Track13%
Bus Facilities 4%
Stations18%
Infrastructure & Facilities
11%
Signals &Communication
24%
Other9%
$11.6B
NYCT Capital ProgramProposed Program 2015-2019
Track$1.4
Rolling Stock(Rail & Bus Fleets)
18%
Track13%
Bus Facilities 4%
Stations19%
Infrastructure & Facilities
18%
Signals &Communication
20%
Other8%
$17.1B
4
Proposed Program 2015-2019
Track$1.4
Rolling Stock(Rail & Bus Fleets)
18%
Track13%
Bus Facilities 4%
Stations19%
Infrastructure & Facilities
18%
Signals &Communication
20%
Other8%
$17.1B
Track$1.4
Rolling Stock(Rail & Bus Fleets)
21%
Track13%
Bus Facilities
4%
Stations18%
Infrastructure & Facilities
11%
Signals &Communication
24%
Other9%
$11.6B
2010-2014 Program
NYCT Capital Program
Projected Capital Program Work2015-2019
Carry over
2015-2019
Sandy
Program Areas
• Recovery & Resiliency• Signals & Systems• Infrastructure and Facilities • Station Rehabilitation • Systems & Security
Infrastructure & FacilitiesSandy Recovery & Resiliency
Infrastructure & FacilitiesSandy Recovery & Resiliency
8
1. Greenpoint TubeBrooklyn Crosstown G Line – Awarded 2013 - COMPLETED
2. Montague TubeBroadway R Line – Awarded 2013 - COMPLETED
3. Steinway TubeFlushing 7 Line – Awarded 2013
4. Cranberry TubeFulton A/C Line – Award 2014
5. 53rd Street TubeQueens M/E Line – Award 2014
6. Joralemon TubeLexington 4/5 Line – Award 2015
7. Canarsie Tube14th Street L Line – Award 2016
8. Rutgers Tube6th Av F Line – Award 2016
9. Clark Street TubeClark Street 2/3 Line – Award 2016
Sandy: Addressing the Tunnels
9
10
11
12
13
14
Recovery Projects:Rockaway Park Yard-Power Cables 2014207 Street Yard-Power Cables 2015148th Street Yard-Power 2015Coney Island Yard-Power Cables2016
Resiliency Projects:207th Street Yard 2015148th Street Yard 2015Coney Island Yard 2016 Yards will be addressed in multiple contracts with varied schedule.We are providing near term protection at the yards. Coney Island Temporary parameter protection was awarded this year. Similar plans for 207th Street and 148th Street Yards in early 2015.
Sandy: Addressing the Yards
16
Sandy: Coney Island Yard
Sandy: South Ferry Rehabilitation
Sandy: South Ferry Rehabilitation
Sandy: South Ferry Rehabilitation
Signals and SystemsSignals and Systems
21
Supports all Signal work in the Tunnels
• Rutgers and Cranberry Tubes which are planned for award in 2015; and the Canarsie Tube.
Signals will take the lead in the modernizing of the Yard Projects:
• 207th St Yard (including 200th St Interlocking) is planned for award for 2016. This will be the first major capital investment in the yard since the 1930s
• 148th St Yard would follow next in 2017/18
• Rockaway Park would be awarded in 2018
• Coney Island Yard, the largest of the 4 yards would be done in a phased approach to minimize operational impact.
(note Yard projects – over $1B in work)
Sandy Restoration and Resiliency
Replace 11 Interlockings •Flushing (Awarded)•Culver (Awarded)•Queens Blvd (2012 Award)•Dyre Ave (2012 Award)•34th, W4th and York Sts
Deploy CBTC •Flushing (Awarded)•Culver Test Track (Awarded)
Equip Fleets w/CBTC Equipment•#7 Line Fleet (Awarded)•Queens Blvd Fleets
CBTCImplementation Roadmap
2010-2014
Replace 13 Interlockings• 8th Ave(2)• 6th Ave(4)• 63rd Street(4)• Culver(2)• Broadway(1)
Deploy CBTC • Qns Blvd Line (QBL) CBTC• 6th Avenue Line CBTC (incl. 63rd St)• Culver Line CBTC
Equip Fleets w/CBTC Equipment• 6th Avenue Line Fleet• 8th Avenue Line Fleet
Based on Full 2015-2019 Program Projects Full Funded
2015-2019 CBTCImplementation Roadmap
Infrastructure & FacilitiesInfrastructure & Facilities
30
• Construct 3 new substations in Staten IslandSupport new technology trains
• Construct 3 new substations on Canarsie Line
Support increased ridership demands • Begin design for new substations in Manhattan
(6th and 8th Ave Lines)• Support CBTC Rollout • Upgrading Traction Power system• Address substations which are beyond useful life• Rehabilitating four substations
Substations and Power Upgrades
31
New Dorp Substation, Staten Island
32
Clifton Substation, Staten Island
Upgrade HVAC systems
Overcoat painting
Stations RehabilitationStations Rehabilitation
Number of Stations
Category 2010-14 2015-19
Component 126 176
Renewal 38 20
ADA Accessibility 9 14
Elevators/Escalators 13 34
Total 186 244
36
Numbers of Projects 2014 2015
SBMP-Tier 1 24 20
SBMP Tier 2 11 13
SBFP 15 9
Small Business Mentoring Projects
225 Street – Broadway-7th Ave Line
Before
After
Platform Canopy20
104 Street Jamaica LineStreet stair and canopy
Hunters Point Avenue Flushing LineStation renewal
ADA Accessibility
Systems and SecuritySystems and Security
New Bus Command Center
• Design, furnish, and install a new digital bus radio communications system for NYCT and MTA Bus.
• Design and construct a modern, secure command center for NYCT and MTA Bus operations.
45