Towering – Powering – Energising – Innovating
NewMoving to
FrontiersMANAGEMENT
SYSTEMS
EXECUTIVE CHAIRMAN & GROUP MANAGING DIRECTOR’s MEssAGE
TAN sRI A.K. NATHAN
Moving To New Frontiers
2
The history of Eversendai goes back to 1984 and after three decades of unparalleled experience, engineering, technical expertise and a strong network across various countries, we are recognised as a leading global organisation in undertaking turnkey contracts; delivering highly complex projects with innovative construction methodologies for high rise buildings, power & petrochemical plants as well as composite and reinforced concrete building structures in the Asian and Middle Eastern regions.
We have a dedicated workforce of over 10,000 people and an impressive portfolio of more than 290 accomplished projects in over 14 different countries with 5 steel fabrication factories located in Malaysia, Dubai, Sharjah, Qatar and India, with an annual capacity of 150,000 tonnes. With our state-of-the-art steel fabrication factories, we have constructed some of the world’s most iconic landmark structures. These include the Burj Khalifa in Dubai, Petronas Tower 2 in Malaysia, New Doha International Airport in Qatar, Kingdom Centre in Saudi Arabia and Republic Plaza in Singapore.
Our expansion plans, primarily our foray into the engineering, construction, procurement, fabrication and installation services for the Oil & Gas industry, which include process modules and self-elevating jack up platforms, is very much integral to our core operations. We will also be venturing into new markets which include Africa, Canada, Australia as well as other countries in the Middle East. We are proud to acknowledge that today, we have the capability of handling total integrated multi-disciplinary construction packages involving all phases of construction work which include civil and building, structural and steel fabrication and erection, mechanical piping, tankage, process equipment erection and electrical and instrumentation works.
As we move to new frontiers, we are certain we will be able to provide our clients the certainty and comfort of knowing that their projects are in capable and experienced hands. These developments will complement our vision, mission and core values and simultaneously allow us to remain one of the most successful organisations in the Asian and Middle Eastern Region and beyond with corresponding efficiency and reliability. The successful and timely completion of our projects accompanied by soaring innovation, creativity and our aspiration to move to new frontiers have been the key drivers for achieving continuous growth through the years and we remain committed to these values. This stamps our firm intent to dominate the various industries which we are involved in and also marks the next phase in our development to be amongst the undisputed global market leaders.
Eversendai has proven that it is possible to build a successful business and sound track record of exceptional technical ability by not compromising on our core values and commitment to our clients. Our strength lies in our resilient workforce whose skills, commitment and dedication serve the needs of our clients. An established management which overlooks the areas of planning, procurement, HSE and execution, combined with experienced managers, engineers alongside our workforce has made Eversendai a leading and innovative global organisation.
We are pleased to realise our aspirations of growing our business and we shall continually seek opportunities to globally expand our existing scope of operations.
This is just the beginning
3
4 5
OUR GLOBAL NETWORK
OUR CORE VALUEs
OUR MIssION
OUR VIsIONTO MAINTAIN OuR CORE vAluES AND CONTINuOuSly INNOvATE AS WE MOvE TO NEW fRONTIERS
Compliance to sAFETy• Conformance to qUALITy
• Adherence to sCHEDULE • Consistent CLIENT sATIsFACTION
To excel in delivering our commitment to our clients while strengthening and forging new ties. We endeavour to maintain and enhance our consistent performance, work culture and standards. We strongly believe in maximising the value of human capital and aligning it with company initiatives as a fundamental element of our business objective
MALAysIA
DUBAIsHARjAH
ABU DHABIqATAR
sAUDI ARABIA
INDIA
sRI LANKA
sINGAPORE
RAs AL KHAIMAH
AzERBAIjAN
OMAN
• Eversendai Offshore RMC FzE (Ras Al Khaimah)
EVER
sEND
AI• Vahana Constructions Pvt Ltd (Sri lanka)
Subsidiary companyAssociated company
• Eversendai Engineering LLC (Dubai)
• EVs Construction LLC (Dubai)
• Eversendai Engineering LLC (Abu Dhabi)
• Eversendai Engineering FzE (Sharjah)
• Eversendai Engineering saudi LLC (Saudi Arabia)
• Eversendai Construction (s) Pte Ltd (Singapore)
• Eversendai Technics Pte Ltd (Singapore)
• shin Eversendai Engineering (M) sdn Bhd (Malaysia)
• Eversendai Offshore sdn Bhd (Malaysia)
• ECB Properties sdn Bhd (Malaysia)
• Eversendai Oil & Gas (M) sdn Bhd (Malaysia)
• Vahana Constructions sdn Bhd (Malaysia)
• Technics Oil & Gas Ltd (Singapore)
• Eversendai Engineering Pte Ltd (Singapore)
• Eversendai Construction Pvt Ltd (India)
• Eversendai Engineering qatar WLL (Qatar)
ENGINEERING
6 7
structural, Connection Design & shop DrawingEversendai Corporation Offices at India, Dubai and Qatar provides technical services for all types of structures: -
• We are equipped with state of the art design and detailing software, with 3D modeling capabilities for structural design, connection design, temporary erection engineering for high-rise, industrial buildings & equipment support structures, shopping malls, convention centers and infrastructure projects.
• Shop drawings for structural steel and rebar engineering.• Value engineering for member sizing, connections and innovative erection
methodologies tailored to meet the project and the clients’ requirements.• Complete 3 Dimensional model of structures and connections, exporting the nested
cutting plans to various CNC machines directly using 3D model software to ensure accuracy in fabrication and erection of myriad of bolted joints.
• Structural steel erection engineering determining centre of gravity for intricate assemblies to assist in complex heavy lifts including in some of the tallest structures.
• Temporary structures as part of the model to eliminate fouling of members and cables during site assembly and erection.
• Complete material list, bolt list, stud bolt list extracted from model in advance for early and bulk procurement and effective site management.
Eversendai is equipped with software such as STAADPRO, ETABS, fASTRAK, DESCON for Structural Design and custom made spread sheets for Connections and TEKlA STRuCTuRES, BOCAD, RC-CAD and ACAD for Structural Steel and Rebar Detailing.
We carry out our own Research and Development, seeking new methodologies to improve deliverables, work processes, automation and procedures to enhance the engineering and fabrication drawing output using cutting edge 3D model technology.
Eversendai has a team of experienced design engineers and detailing personnel including experienced 3D structural model creators and checkers.
The majority of the projects for design and detailing conform to British and American Standards and our experienced team of
people have versatility in addition to the standards from uBC, IBC, JIS, Canada, Australia, Europe and India.
We have the expertise to deal with pipe profile structures, unfolding drawings with 3 dimensional curvature and Multiplane joints.
Eversendai has been awarded with prestigious awards, such as the Golden Award for Best and Complex Models from Tekla Structures for various projects.
We provide electronic communications with a dedicated 24 hours, 7 days a week fTP server with high speed internet connections and voice over internet protocol (vOIP) across the different regions. Our engineering capability with almost three decades of experience in our chosen field of products and services ensure that our clients and customers are offered one-stop shop service to meet their varying needs.
FABRICATION FACILITIEs
8 9
In keeping with Eversendai Corporation’s objective to enhance its premier position in the business through engineering excellence and specialist construction services, the company has further developed its fabrication capacity to accommodate Eversendai’s growing number of projects, boasting a combined annual fabrication capacity of over 150,000 metric tonnes.
Eversendai produces high quality fabricated structures and has the accreditation and certification from ASME Boiler and Pressure Code u, u2, S and the R Symbol from the National Board of Boilers and Pressure vessel Inspectors, for our facility at Hamriyah free Zone, Sharjah, u.A.E .
All our fabrication factories are strategically located and have the capability and the capacity to fabricate and export high quality fabricated structures to any parts of the world on time.
Eversendai Corporation has fabrication factories at: -
Open Yard Area : 40,761 sq metres
Fabrication Capacity : 24,000 tonnes
Total Area : 65,412 sq metres
Total Building Area : 24,651 sq metres
Al Qusais Industrial Dubai
Rawang Malaysia
Open Yard Area : 4,000 sq metres
Fabrication Capacity : 12,000 tonnes
Total Area : 12,000 sq metres
Total Building Area : 8,000 sq metres
Ham
riyah
Fre
e Z
one
Sha
rjah
Tota
l Are
a :
211,
168
sq m
etre
s
Tota
l Bui
ldin
g A
rea
: 63
,781
sq
met
res
Op
en Y
ard
Are
a
: 14
7,38
7 sq
met
res
Fab
ricat
ion
Cap
acity
:
60,0
00 t
onne
s
All our fabrication facilities are certified with global standards and fabrication works are being carried out in accordance with the internationally recognized ISO 9001-2008 OHSAS 18001-2007 and ISO 14001-2004 standards under an Integrated Management System to maintain the highest global standards for Quality, Health & Safety and Environmental Management systems.
The factories are equipped with the latest state-of-the-art CNC (Computer Numerical Controlled) machines which enable production of premium quality steelwork components by facilitating quality material preparation activities with optimum usage of time and materials and with high accuracy by avoiding all possible human errors, for the subsequent assembly and welding activities as part of the fabrication process.
We are also equipped with all the required precise CNC machinery and highly skilled personnel to face any kind of challenges in the fabrication of complex structures in order to turn the architect’s dreams into reality. This has been acknowledged by many renowned architects /designers throughout the world and we have been provided with many opportunities to get involved in iconic projects in the Middle East as well as in other parts of world where we serve various clients.
In order to meet complex requirements of developing a 2D concept into a 3D real time model, we adopt precise fabrication methods and quality standards to incorporate the required free hand curves/bends drawn by the architects onto the steel components.
In this process, we use highly precise total stations to co-ordinate each and every structural component being placed in multiple planes, as extracted from the 3D real time models, and maintain the architectural intent by deploying highly précised CNC machinery as well as an experienced workforce and supervisory staff. The efforts being extended to make the control assemblies wherever required, on the shop floor itself, eliminates all kinds of mismatches as well as related time losses to attend to any mismatches on site.
Our ability to convert concepts such as the rose bud in Rose Tower in Dubai, the complex wave form roof structures at Dubai Mall, the air craft shape at the New Doha International Airport (NDIA), desert flower at Qatar National Museum, and leaning tower at Capital gate at Abu Dhabi shows our strength to meet any kind of complex requirements.
The operator of our machines shall receive the NC data generated from the 3D TEKLA detailing software directly from the engineering office.
The details of the various high precise CNC machinery set up at our factories are as follows:
Ind
ustr
ial A
rea
Do
ha Q
atar
Tric
hy In
dia
Tota
l Are
a :
39,4
79 s
q m
etre
s
Tota
l Bui
ldin
g A
rea
: 16
,128
sq
met
res
Tota
l Are
a : 1
56,3
35 s
q m
etre
s
Tota
l Bui
ldin
g A
rea
: 9,0
40 s
q m
etre
s
Op
en Y
ard
Are
a
: 14
7,29
4 sq
met
res
Fab
ricat
ion
Cap
acity
:
30,0
00 t
onne
s
Op
en Y
ard
Are
a
: 18
,720
sq
met
res
Fab
ricat
ion
Cap
acity
:
24,0
00 t
onne
s
Plate Cutting MachineCNC Controlled Plate cutting/profiling machine supplied by SATO Cutting Systems, Germany, has the capability to process plates up to 24m long x 5m wide of 200 mm thick (max) by using oxy/acetylene or plasma cutting facilities.
10 11
Bending Machine Eversendai has got one of the world’s largest section bending machine. This machine is capable of rolling all kinds of I sections & channels (on both axis) and pipes etc. Its operating range includes a maximum of 800mm diameter in pipes and 1000mm depth in sections.
Gantry Welder Heavy built-up requirements shall be carried out by using the automatic SAW Gantry Welding machine to build “H” beams, “I” beams and other hollow sections like rectangle and square box sections. This machine has been provided with two arms and accordingly two built-up sections can be welded simultaneously.Tube Profiling Machines
The pipe profiling machine supplied by Muller Opladen, Germany is a six axis CNC controlled machine utilizing plasma or oxy/acetylene for cutting the profiles on hallow sections. The machine has the ability to make profiles on pipes and square hallow sections with/without weld bevels.
12 13
Rolling Machine This is the technologically advanced, versatile and precise 4-roll plate bending machine that can be controlled effectively through NC & CNC systems. Its operating range is a maximum of 3050mm in width and 60mm in thickness.
surface Treatment Equipment The shops are provided with dedicated auto blasting machines with openings – 1500mm width x 200m height and 1200mm width x 1200mm height and manual blasting chambers (5m x 5m x 14m) to cater the needs for the blast cleaning of the steelwork prior to application of project specific paint systems.
Plate Punching, Drilling& Cutting Machine The plate processing machine supplied by Peddinghaus, u.S.A, has the ability to punch, drill, mark and cut plates using plasma or oxy/acetylene of thickness up to 75 mm.
saw, Drill & Notching Line This heavy duty saw and drill supplied by Kaltenbach, Germany has the ability to cut sections of width 1340mm and height 730mm, capable of sawing at variable metering and automatic drilling with three axis drill facility up to a dia of 40 mm. The coping machine which is part of the setup is capable of coping and cutting the sections, angles, channels, tubes and hollow sections using its 6 axis robotic arm mounted with plasma and or oxy/acetylene cutting torch options.
15
AWARDs & CERTIFICATIONs
MALAysIAN CONsTRUCTION INDUsTRy EXCELLENCE AWARDs 2005 – INTERNATIONAL ACHIEVEMENT AWARD
By the Construction Industry Development Board Malaysia
By Business Initiatives Directions, france
By the Trade leaders Club, Madrid, Spain
GOLDEN CONsTRUCTION AWARD 2008
INTERNATIONAL sTAR AWARDFOR LEADERsHIP IN qUALITy 2009
14
OUR EXPERTIsE
High-Rise Buildings
long Span & Roof Structures
Bridges
Industrial, Petrochemical & Power Plants
Retail & Commercial
OUR GLOBALPORTFOLIO
16 17
Our expertise is in the following areas:
Integrated Structural Steel Works
Composite Structures
value Engineering & Erection Methodology
Offshore Process Modules Jack-up PlatformsliftboatsJackets for Oil & Gas
Mechanical Installation Work for Power & Petrochemical Plants
Caltex Tower, Singapore
1918
HIGH-RIsE BUILDINGsOUR GLOBAL PORTFOLIO
Republic Plaza, Singapore The Paragon, SingaporeHitachi Tower, Singapore
20 21
Petronas Twin Tower 2, MalaysiauE Square, Singapore Kuala lumpur Tower, Malaysia
22 23
Burj Al Arab, DubaiTH Perdana Tower, Malaysia Tornado Tower, Qatar
24 25
uP Tower, Dubai Marina Crown, DubaiBurj Khalifa, Dubai
26 27
Al Mas Tower, Dubai Princess Tower, Dubai The Index, Dubai JW Marriott Marquis Hotel, Dubai
28 29
Gate Building, Dubai
Al Jalilah Hospital, Dubai
Burj Dubai Annexe, Dubai
Gate District Tower, Abu Dhabi
30 31
Cleveland Clinic, Abu DhabiEmirates Office & Hotel Towers,Dubai
Rose Rayhaan Rotana, Dubai
32 33
ADNOC Headquarters, Abu Dhabi Al Sham Tower, Abu DhabiCapital Gate Tower, Abu Dhabi
34 35
Al Moayyed Tower, BahrainAl Nasser Headquarters,Abu Dhabi
Kingdom Centre, Saudi Arabia Capital Market Authority Tower, Saudi Arabia
36 37
Worli Tower, India Marathon futurex, India Crescent City, Azerbaijan Empire Tower, Indonesia
38 3938 39
LONG sPAN AND ROOF sTRUCTUREs
Changi Airport Terminal 3, Singapore
Tuas Checkpoint, Singapore
Indoor Stadium, Singapore
Bintulu Airport, Malaysia
40 41
New Doha International Airport - Phase 1, Qatar
New Doha International Airport - Phase 2, Qatar
Kuala lumpur International Airport Main Terminal, Malaysia
Kuala lumpur International Airport Contact Pier, Malaysia
42 43
New Doha International Airport - Phase 1, 2 & 3, Qatar
Salalah Airport, Oman King Abdulaziz International Airport - Railway Station, Saudi Arabia
Chhatrapati Shivaji International Airport, India
44 45
Subang Airport Hangar, Malaysia
Qatar Airways Hangar, QatarAbu Dhabi Airport, Abu Dhabi
Chek lap Kok Airport Extension, Hong Kong
46 47
felda Multi-Purpose Hall, Malaysia
Rawang - Ipoh Double Track, Malaysia
Kl Sentral Station, Malaysia
48 49
Doha Convention Centre, Qatar
Khalifa International Stadium, Qatar
Customs, Immigration & Quarantine Complex, Malaysia
Convention Center Extension - Education City, Qatar
50 51
Qatar National Museum, Qatar
Salalah Ampitheatre, Oman
Qatar faculty of Islamic Studies, Qatar
52 53
Ski Dubai, Dubai
Sheikh Zayed Cricket Stadium, Abu Dhabi
King Abdullah Petroleum Studies & Research Centre, Saudi Arabia
RETAIL & COMMERCIAL
55
Putrajaya Convention Centre, Malaysia
Suria KlCC, Malaysia
54
PKT logistics Warehouse, Malaysia
Asian Institute of Medicine, Science & Technology, Malaysia
5756
TNRD Bangi Project, Malaysia
Kulim Wafer Plant, Malaysia
5756
Motor City, Dubai
festival City, Dubai
58 59
Dubai Mall, Dubai
Dragon Mart, Dubai
Burj Al Salam Carpark, Dubai
floating Restaurant - Etihad Towers, Abu Dhabi
6160
yas Mall, Abu Dhabi
Masdar Institute of Science & Technology, Abu Dhabi
6160
Qatar Science & Tech Park, Qatar
Qatar foundation Research & Development Complex, Qatar
BRIDGEs
63
Jalan Tun Razak viaduct, Malaysia
KLIA - Pan Pacific Hotel Linkbridge, Malaysia
Kuala lumpur lRT Bridge, Malaysia
62
KlIA 2 Sky Bridge, Malaysia
Petronas Twin Towers Sky Bridge, Malaysia
Bamban Bridge, Philippines
Mabalacat Bridge, Philippines
INDUsTRIAL, PETROCHEMICAL & POWER PLANTs
6564
3 X 700 MW Manjung Power Plant, Malaysia
Proton National Car Plant, Malaysia 3 X 700 MW Manjung Power Plant, Malaysia - Boilers
3 X 700 MW Manjung Power Plant, Malaysia - Electrostatic Precipitator
3 X 700 MW Manjung Power Plant, Malaysia - Stockyard
3 X 700 MW Tanjung Bin Power Plant, Malaysia
6766
69
2 X 700 MW Jimah Power Plant, Malaysia
68
1 X 1000 MW Manjung Power Plant - Unit 4, Malaysia
7170
1 X 1000 MW Tanjung Bin Power Plant - Unit 4, Malaysia
Sabah Oil & Gas, Malaysia Petronas fertiliser Complex, Malaysia
Sultan Salahuddin Abdul Aziz Power Station Phase II & III, Malaysia
7372
MLNG 3, Malaysia
2 X 300 MW EMCO Thermal Power Plant, India
2 X 600 MW North Chennai Power Station, India
Perwaja Steel Mill Plant Extension, Malaysia
7574
Nakilat Damen Shipyard Phase 4, Qatar Nakilat Damen Shipyard Phase 4A, Qatar
Algeria fertiliser Plant, Algeria
76 77
Senoko Power Plant, Singapore
Palm Oleo, Malaysia
76
Polycrystalline Silicon Plant, Malaysia
2X 500MW NTPL Tuticorin Project, India
78 79
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
1991Caltex Towers - 33 Storey Office/Commercial Building at Collyer Quay, Singapore.
Erection of Structural Steel Works including Decking and Stud welding.
Obayashi Corporation - Nippon Steel Corporation Consortium 4,700
1992Clarke Quay Restoration and Redevelopment, Singapore
Shop Drawing, Blasting to SA 2.5, Primer Painting, Fabrication, 3 coat Paint system and Erection of Structural Steel Works
Singapore Piling & Civil Engineering Pte. ltd.
450 tonnes. (Roof Structure consists of Hollow Section)
1992 Republic Plaza, Singapore Erection of Structural Steel Works Shimizu Construction - Nippon Steel Corporation Consortium 8,000
1993
Pulau Seraya Power Station Stage III C.W. Conduits, Pumphouse & Water Treatment Plant, Singapore
Blasting and Painting of Sheet Piles, H-Piles and Z-Piles
Singapore Piling & Civil Engineering Pte. ltd.
Surface Area 180,000 m2 + 2,500 tonnes
1993 Pulau Seraya Power Station Stage III, Singapore
Welding of Box Piles and H-Pile shoes
Singapore Piling & Civil Engineering Pte. ltd.
3,500 Box Piles and 1,200 H-Pile shoes
1993 Shell Easter Petroleum Pulau ular, Singapore Erection of Structural Steel Works Chiyoda Corp - Mitsui-Keppel
Consortium 500
1993 ATM Towers, Thailand
Erection of Structural Steel, Alignment, olting, Deck Installation, Stud Bolt Welding, Civil work- laying of wire mesh, setting rebars, form work and concreting works
Pan Pacific Construction Engineering Pte ltd 4,200
1993Balawan Combined Cycle Power Plant Block II, Medan, Indonesia
fabrication & Erection of Structural Steel, Blasting and Painting SIEMENS / Kian Sukses 750
1993 Kl Tower, Malaysia Erection of Structural Steel, Alignment, Bolting and Installation of Secondary Steel
Wayss & fretag & victor Buyck Steel Construction Sdn Bhd 1,600
1994 Petronas Twin Tower 2, Malaysia
Erection of Structural Steel inclusive of embedded plates
Samsung - Kukdong - Jasatera Jv/Samsung Heavy Industries 8,000
1994 Perwaja Steel Mill Plant Extension, Malaysia
Erection of Structural Steel, Alignment Bolting and Welding
Hazama - Tomoe Corporation - Mech-Mar Keppel 4,000
1994 Kl Tower (Antenna Mast), Malaysia Erection of Antenna Mast Wayss & fretag & victor Buyck
Steel Construction Sdn Bhd 100
1994 Temasek Polytechnic (Phase II), Singapore
fabrication and Erection of Structural Steel Works
Singapore Piling & Civil Engineering Pte ltd. 1,000
1994 Empire Tower, Indonesia Erection of Structural Steel, Alignment, Bolting, Welding, Deck Installation and Stud Bolt Welding
PT Total Construction 3,000
1995 Petronas Tower 2 - Sky Bridge, Malaysia
Site Assembly and Erection, Alignment and Bolting of the Bridge connecting both the towers
Samsung - Kukdong - Jasatera Jv/Samsung Heavy Industries 500
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
1988 Singapore Indoor Stadium fabrication and Erection of Temporary Steel Structure
Ssangyong Guan Ho - Nippon Steel Corporation Consortium 400
1988 Singapore Indoor Stadium Erection of Main Keel Truss and NS Space frame Structures
Ssangyong Guan Ho - Nippon Steel Corporation Consortium 1,200
1988
Pulau Seraya Power Station Stage II C.W. Conduits, Pumphouse & Water Treatment Plant, Singapore
Blasting and Painting to sheet piles, H-Piles and Z-Piles
Singapore Piling & Civil Engineering Pte. ltd. 900
1989 Pulau Seraya Power Station Stage II, Singapore
A)Blasting to SA 2.5 , Painting 3 coats of paint 375microns DFT to Sheet Piles, H-Piles and Z-Piles. B)Welding of Box Piles and H-Pile shoes
Singapore Piling & Civil Engineering Pte. ltd.
A)Surface area 80,521 Sq.Mtrs B) 1100 Box Piles and 600 H-Pile.
1989Senoko Station Gas Turbine Power Plant, Singapore
Erection of Structural Steel Siemens - Kim Seng Heng Engineering & Construction Pte. ltd.
300
1989 Reconstruction of Sir Arthur Bridge, Singapore
Piling of H-Piles and Sheet-Piles, fabrication, Erection of Temporary Steel Bridge and Strutting works for Cofferdam
Singapore Piling & Civil Engineering Pte. ltd. 300
1989 Restoration of National Museum, Singapore
fabrication and Erection of Structural Steel Roof
Singapore Piling & Civil Engineering Pte. ltd. -
1989 Pulau Seraya Power Station Stage II, Singapore
fabrication, Strutting, Dismantling and Erection of Structural Steel works
Singapore Piling & Civil Engineering Pte. ltd. 900
1990
Pulau Seraya Power Station Stage II - foundation & Building Works, Singapore
Painting to the Erected Turbine Steel Structures
Singapore Piling & Civil Engineering Pte. ltd. 5,800
1991
Amphitheatre with 2 storey ancillary building and South East Asian Birds Walk-in Aviary for Jurong Bird Park, Singapore
fabrication and Erection of Structural Steel Works
Singapore Piling & Civil Engineering Pte. ltd. 450
1991 Comcenter (Singapore Telecoms), Singapore
Erection of Steel Strutting at Basement
Singapore Piling & Civil Engineering Pte. ltd. 1,100
1991Hitachi Towers - 37 Storey Office/Commercial Building at Collyer Quay, Singapore.
Erection of Structural Steel Works including Decking and Stud welding.
Obayashi Corporation - Nippon Steel Corporation Consortium 5,600
lISt of BUSINESS PRoJECtS
80 81
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
1997 Kl Sentral Station - Roof Structure, Malaysia
Conceptual Design, Supply Material, Engineering, fabrication, Erection of Structural Steel, Alignment, Bolting and Site Welding Works
Ekovest – KMZ – Dragages Jv 1,350
1997 vision City, Malaysia Erection of Structural Steel, Alignment and Bolting Works
victor Buyck Steel Construction Sdn Bhd 700
1997 Hitachi Nippon Steel Semi Conductor, Singapore
Erection of Structural Steel and Installation of Deck. Kajima - Nippon Steel Consortium 4,300
1997 Trellis Tower, Singapore Installation of Precast Panels Shimizu Corporation 7000 nos.
1997 Singapore Manufacturing Project , Singapore Erection of Structural Steel Works. Chiyoda Corporation - Sumitomo
Construction Consortium 1,200
1997Pipe Bridge and Catwalk for Singapore Manufacturing, Singapore
Supply, fabrication and Erection of Structural Steel Works.
Chiyoda Corporation - McConnell Dowell S.E.A. Consortium 100
1998 Petronas fertiilzer Complex, Guru, Malaysia
Erection of Structural Steel, Alignment and Bolting Works
Mitsubishi Heavy Industries/Cleveland EON Asia Sdn. Bhd. 4,100
1998Hong Kong Airport Extension C304 Project, Hong Kong
Site Assembly, Erection of Structural Steel, Alignment and Bolting Works
Zen Pacific / Geahin Engineering Berhad 1,350
1998 Kerteh Aromatics Project , Malaysia
Installation of Structural Steel, Equipment, Tank and Piping Works
Toyo Engineering - Nam fatt fabricators Consortium 1,250
1998Telekom Building - Sky Garden Steel Trusses, Malaysia
Supply Material, Engineering, fabrication and Erection of Structural Steel Works
Daewoo Corporation 1,150
1998 Telekom Building - Helipad, Malaysia
Erection of Steel and Aluminium Structures Daewoo Corporation 460
1998 Jalan Tun Razak viaduct, Kuala lumpur, Malaysia
Site Assembly and Erection of Structural Steel viaduct including Bearing Installation Works
Percon Corporation - Namfatt 6,481
1998 Grande legenda Resort, Malaysia
Erection of Structural Steel, Alignment and Bolting Works Geahin 2,100
1998Cyberjaya Multimedia Super Corridor for Telekom university , Malaysia
fabrication and Erection of Structural Steel, Alignment and Bolting Works
MK farlin Development - Perwaja Steel 1,200
1998 Emirates Tower - Hotel, Dubai
Site Assembly and Erection of Structural Steel, Alignment, Bolting and Site Welding Works
Besix - Ssangyong Jv/Murray & Roberts - Cleveland Bridge Jv 3,500
1998 Emirates Tower - Offices, Dubai
Site Assembly and Erection of Structural Steel, Alignment, Bolting and Site Welding Works
Besix - Ssangyong Jv/Murray & Roberts - Cleveland Bridge Jv 6,500
1998 Kl Sentral Station, Malaysia
Engineering, Supply Material, fabrication and Erection of Built-up Beams for Substructure
Ekovest - KMZ - Dragages Jv 1,000
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
1995 Suria KlCC, Malaysia Erection of Structural Steel, Alignment, Bolting, Welding, Deck Installation and Stud Bolt Welding
victor Buyck Steel Construction Sdn. Bhd. 18,000
1995
Kuala lumpur International Airport, Main Terminal Building and Contact Pier, Malaysia
Erection of Structural Steel, Alignment, Bolting and Welding Works
Taisei/Tomoe Corporation 9,305
1995 uE Square, Singapore Erection of Structural Steel Works Kajima Corporation - Tomoe Corporation Consortium 1,900
1996 JKR Building, labuan, Malaysia
Erection of Structural Steel, Alignment, Bolting, Welding, Deck Installation and Stud Bolt Welding
Pernas Construction Sdn Bhd &Cleaveland EON Asia Sdn Bhd 1,600
1996Sultan Salahuddin Abdul Aziz Power Station - Phase III, Kapar, Malaysia
Erection of Structural Steel, Bridge, Crane, Heat Exchangers and Starge Tanks , Bolting & Welding, Alignment, Installation of Decks, and Shear Studs
Cleaveland EON Asia Sdn. Bhd 6,000
1996 Burj Al Arab, Dubai
Erection Methodology, Site Assembly, Erection of Structural Steel, Alignment, Bolting and Welding Works
Al Habtoor/fletcher/ Murray & Roberts Jv 9,200
1996 TPC II/Bl-2 Project, Pulau Ayer Merbau, Singapore
Erection of Structural Steel, Installation of Deck and Edge Plates
JSW & Sumitomo Construction Co. ltd 700
1996 Tuas Checkpoint Tubular Structures, Singapore
Supply, fabrication, and Erection of Tubular Structures.
Gtm - Wansoon - Woh Hup - Mero Consortium 4,200
1997 light Rail Transit Bridges, Malaysia
Assembly and Erection of Structural Steel, Alignment and Bolting Works
victor Buyck Steel Construction Sdn. Bhd. 2,800
1997 Malaysia Airlines Hangar, Malaysia
Site Assembly, Erection of Structural Steel, Alignment and Bolting Works
Strarch & Geahin Engineering Berhad 2,100
1997Kuala lumpur International Airport Pan Pacific Hotel - link Bridge, Malaysia
Structural Design, Supply Material, Engineering, fabrication, Erection, Alignment and Bolting Works
Peremba – Multiplex Jv 300
1997 Sharp Roxy, SMM & SREC Warehouse, Malaysia
Erection of Structural Steel, Alignment and Bolting Works
Shimizu Corporation - Geahin Engineering Berhad 600
1997 TNRD Bangi, Malaysia Erection of Structural Steel, Alignment and Bolting Works Geahi n Engineering Berhad 2,700
1997langzem Cement Plant Extension, langkawi, Malaysia
Erection of Structural Steel, Alignment and Bolting Works Nam fatt fabricators Sdn. Bhd. 800
1997 Palm Oleo 2 Project, Malaysia
Process Building, Tank farm, Pipe Rack, Erection of Structural Steel, Alignment and Bolting Works
Geahin Engineering Berhad 900
1997 KlIA Cargo Terminal - CSS Structure , Malaysia
Erection of Structural Steel, Alignment and Bolting MHE – Demag logistics Sdn Bhd 1,100
82 83
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
2000Kl Sentral Station Maintenance System, Malaysia
Erection of Structural Steel & Aluminium Works TK Gondala Pte. ltd. 150
2000 Reefer Stack Access Gantry Structures, Malaysia
Erection of Structural Steel, Alignment and Bolting Works Namfatt fabricators Sdn. Bhd. 600
2000 Kingdom Trade Centre, Riyadh, Saudi Arabia
Structural Re-design, Engineering, Supply Material, fabrication, Erection of Structural Steel, Metal Deckingand Fire Proofing Works
Kingdom Holding Company, El Seif - Impregilo Jv 6,027
2000Thermal Energy Storage Tank - KTC, Riyadh, Saudi Arabia
Structural Re-design, Engineering, Supply Material, fabrication and Installation of Tank
El Seif - Impregilo Jv 380
2000 Al faisaliah Roof feature - Riyadh, Saudi Arabia Erection of Structural Steel Works. AIC / Saudi Binladin Group Jv 350
2000 Secondary School at fenvale link, Singapore
Supply, fabrication, and Erection of Steel Structure Works. Synergy Construction Pte. ltd. 125
2000 Zhongghua Primary School, Singapore
Supply, fabrication and Erection of Structural Steel Works. Synergy Construction Pte. ltd. 65
2000 4 Storey single-user factory for Dupont, Singapore
Supply, fabrication and Erection of Structural Steel and Installation of Dect.
McConnell Dowell 1,400
2000ISBl & OSBl Super Structure for Dupont, Singapore
Supply, fabrication and Erection of Structural Steel Works. McConnell Dowell 100
2000Additions & Alterations to Existing St Margaret’s Primary School, Singapore
Supply, fabrication and Erection of Structural Steel Works. Synergy Construction Pte. ltd. 260
2000 Zhongghua Primary School, Malaysia
Supply, fabrication and Erection of Structural Steel Works. Synergy Construction Pte. ltd. 175
2001Manjung 3 x 700 MW Coal fired Power Plant - Boiler Package, Malaysia
Erection of Mechanical Works for Boiler Plant, consisting of Boiler Pressure & Non Pressure Parts, Steel Structure, ducting, Piping, Gas Air Heater, Electrostatic Precipitator, Mill Plant, Coal Bunker, Insulation & Refractory, Painting, Cladding, Control and Instrumentation Works.
Alstom Export Sdn Bhd 40,000
2001 uP Tower, Dubai Erection of Structural Steel and Pre-cast Concrete Slabs
Nasa Multiplex/Emirates Building Systems 1,600
2001 MlNG Tiga, Malaysia
Erection of Structural Steel for Pipe Racks, Pipe Sleepers, Accessories, Platforms and Access Ways
Dotanah Engineering & Contracting Sdn. Bhd. 850
2001Manjung 3 x 700 MW Coal fired Power Plant - fGD Package, Malaysia
Erection of Mechanical Works for fuel Gas Desulphurisation Plant, consisting of Steel Structure, Ducting, Piping, Insulation & Refractory, Painting, Control and Instrumentation Works.
Alstom Export Sdn Bhd 4,500
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
1998 Institut Teknologi Petronas, Malaysia
Erection of Structural Steel, Alignment and Bolting Works Geahin Engineering Berhad 200
1998
Pinatubo Hazard urgent Mitigation Project - Mabalacat & Bamban Bridges, Philippines
Erection of Steel Arch Bridge for Bamban and Plate Girder Mabalacat Bridge
Mitsubhishi Heavy Industries 1,900
1998Polyvinyl Alchol Plant (PvA), Pulau Sakra, Singapore
Supply, fabrication, Painting and Erection of Structural Steel Works Kuraray Engineering Co. ltd. 160
1998 One Raffles Link, Singapore
Erection of Structural Steel and Installation of Deck
Gammon Pte ltd & Wescol Asia Pacific Pte Ltd 2,200
1998 Bank of China, Singapore Installation of Precast façade Panels
Shimizu corporation - lWC Industries Consortium 1600 nos.
1998 Paragon Tower, Singapore Erection of Structural Steel Works Nishmatsu - TTJ Consortium 2,800
1998 Proton City- Phase 1-A4 Malaysia Erection of Structural Steel Works Cleveland Eon Asia Sdn Bhd 3,500
1999
Sultan Salahuddin Abdul Aziz Power Station- Refurbishment upgrading & Extension of Coal Handling System, Malaysia
Engineering, fabrication and Installation of Conveyor Structures and Mechanical Erection Works
TNEC - Hartasuma - KTK Consortium 900
1999 Dubai Airport Control Tower, Dubai
Erection of Structural Steel, Alignment and Bolting Works Besix/Al Nasr 900
1999 Ritz Carlton Hotel, Doha, Qatar
Erection of Structural Steel, Alignment and Bolting Works Midmac Contracting/AIC 900
1999 Silicon Wafer fabrication facilities
Site-Assembly and Erection of Structural Steel, Alignment and Bolting Works
flour Daniel - Kvaerner Cleveland 2,300
1999 King Center foot Bridge ,Singapore
Shop Drawings, fabrication and Erection of Bridge Structures Chin leong Construction Pte. ltd. 125
1999 Robertson Quay foot Bridge, Singapore
Shop Drawings, fabrication and Erection of Bridge Structures Hon Construction Pvt. ltd., 130
1999 Inchcape Warehouse Project, Singapore Erection of Structural Steel Works Shimizu Corporation - NKK
Corporation Consortium 600
2000 TH Perdana, Malaysia Connection Design, fabrication and Erection of Structural Steel and Fire Proofing Works
Maju Holdings Sdn Bhd 4,000
2000 felda Multi-Purpose Hall, Malaysia
Connection Design, Engineering, Supply Material, fabrication and Erection of Structural Steel
felda Ekovest Sdn Bhd 425
2000 Kl Sentral Station Roof Top Trellis, Malaysia
Structural Design, Engineering, Supply Material, fabrication and Erection of Structural Steel Works
EKD Construction Sdn. Bhd. 100
84 85
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
2002 Opera Estate Primary School, Malaysia
Supply Material, Engineering, fabrication, Galvanizing and Erection of Steel Works
Synergy Construction Pte ltd 400
2002 BP Nam Con Son Gas Project, vietnam
Supply Material, Engineering, fabrication & Export of Structural Steel Works
McConnell Dowell Constructor (Aus) Pty ltd 1,050
2002 Abu Dhabi Conference Hall, Abu Dhabi Erection of Structural Works Al-Nasr Engineering/Belhasa Six
Construct 1,300
2002 Jebel Ali ‘K’ Station Phase II, Dubai
Strengthening works for Service Building
Department of Electricity and Water, Six Construct ltd.
2002 Jebel Ali ‘K’ Station Phase II, Dubai
Dismantling & Erection of Structural Steelwork
Department of Electricity and Water, Six Construct ltd. 350
2002 21st Century Tower, DubaiStructural Design, Engineering, Supply Material, fabrication and Erection of Structural Steel Works
Arabtec / Al Rostamani Jv 300
2002 Grosvenor Hotel & Apartments, Dubai
Engineering, Supply Material, fabrication and Erection of Steel Works
Nasa Multiplex l.l.C 300
2002Dubai International finance Centre - Gate Building, Dubai
Design, Supply, fabrication and Erection of Structural Steel Works Nasa Multiplex l.l.C 2,000
2002Service Bridges Over Sg Klang and Sg Kerayong, Malaysia
Erection of Steel Bridge Namfatt fabricators Sdn Bhd 215
2002
Tuanku Jaafar Power Station Port Dickson Rehabilitation Project Phase 1, Malaysia
Erection of Structural Steel Works Sri Pelagat - Taisei Jv 3,800
2002 Sharp Warehouse - Jebel Ali, Dubai
Site Assembly and Erection of Steelwork for Car Park and Roof Structure
Shimizu Corporation, Japan lumpsum
2002Proposed Redevelopment of Kampong Java Market , Singapore
Shop Drawings, Supply, fabrication and Erection of Structural Steel Works.
Hor Kew Private limited - EAC Enterprise Pte ltd Consortium 1,000
2002upgrading of Market/Hawker Centre at Toa Payoh, Singapore
Design, Supply, Shop Drawing, fabrication, Assembly and Installation of Space frame Structures.
Hor Kew Private limited - EAC Enterprise Pte ltd Consortium 300
2002Additions & Alterations of Chua Chu Kang Primary School, Singapore
Shop Drawings, Supply, fabrication and Erection of Structural Steel Works
Synergy Construction Pte ltd 105
2002 River valley Primary School, Singapore
Shop Drawings, Supply, fabrication and Erection of Structural Steel Works
CPG - Precise Development Pte ltd Consortium 280
2002 Nan Hua Secondary School, Singapore
Shop Drawings, Supply, fabrication and Erection of Structural Steel Works
CPG - Precise Development Pte ltd Consortium 380
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
2001
Manjung 3 x 700 MW Coal fired Power Plant - Coal And Ash Package, Malaysia
Erection of Mechanical Works for Coal & Ash Handling System, consisting of Steel Structure, Transfer Towers, Conveyor Belts, Silos, Trippers, Piping, Refractory, Painting, Cladding, Control and Instrumentation Works
Alstom Export Sdn Bhd 6,500
2001 Matriculation School - Gambang, Malaysia
Connection Design, Engineering, Supply Material, fabrication and Erection of Structural Steel Works.
Maju Holdings Sdn Bhd 4,500
2001 Gelugor Power Station, Malaysia
Supply Material, Engineering fabrication and Erection of Chimney Stack.
Mudajaya Construction Sdn. Bhd. 650
2001
Manjung 3 x 700 MW Coal fired Power Plant - Coal Stock yard Package, Malaysia
Erection of Mechanical Works for Coal Stockyard consisting of Steel Structure, Stacker, Reclaimer, Transfer Towers, Conveyor Belts, Painting, Cladding, Control and Instrumentation Works
KOCH Industrial (M) Sdn Bhd 3,500
2001Electrified Double Track Project between Rawang and Ipoh, Malaysia
Supply Material, Engineering, fabrication and Erection of Structural Steel Works
IJM Corporation Bhd 2,415
2001 Philip Morris - Greenfield Project, Philippines
Supply Material, Engineering, fabrication and Erection of Structural Steel Works
leighton Contractors (Philipppines) Inc. 4,200
2001 Putrajaya Convention Centre, Malaysia
Supply Material, Engineering, fabrication and Erection of Structural Steel Works
IJM Corporation Sdn. Bhd. 6,800
2001 New Bintulu Airport, Malaysia
Supply Material, Engineering, fabrication and Erection of Structural Steel, Metal Sheet Roofing and Ceiling Works
Global upline Sdn Bhd 1,000
2001 Peiying Primary School, Singapore
Supply, fabrication and Erection of Structural Steel Works Seng Hock Heng 183
2002
Panglima 720 MW Combined Cycle Power Plant - Electrochilorination Plantm Malaysia
Erection of Mechanical & Electrical Works
Siemens Power Generation AsiaPac Sdn Bhd / DAIKI Engineering Co ltd
-
2002Asian Institute of Medicine, Science and Technology (AIMST), Malaysia
Erection of Structural Works SP Setia Bhd 8,500
2002 Sheikh Zayed Cricket Stadium, Abu Dhabi Erection of Structural Works Al-Habtoor/Murray & Roberts Jv 800
2002 Skywalk Tower link Bridge Project, Dubai Erection of Structural Works Emirates Building Systems l.l.C 140
2002 Al Moayyed Tower , Bahrain Erection of Structural Works fujairah National Construction
l.l.C. 2,000
2002 Kastam Kompleks, Kelana Jaya, Malaysia
Connection Design, Engineering, Supply Material, fabrication and Erection of Structural Steel Works.
Maju Holdings & lal Engineering Sdn Bhd 1,860
86 87
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
2004Tanjung Bin Power Plant - Coal Bunker Assembly Package, Malaysia
Pre-assembly and Erection of Coal Bunkers. IHI/ISHI Power Sdn Bhd 1,370
2004Customs, Immigration & Quarantine Complex Package 3, Malaysia
fabrication and Erection of of Structural Steel Works. Hl Engineering 850
2004 Sky Train - Dubai Airport, Dubai
Structural Design, Engineering, Supply Material, fabrication and Erection of Structural Steel Works
fujitec Co. ltd - Dar-al-Handashah 350
2004 Bright Start Tower, Dubaifabrication, Site Assembly and Erection of Roof feature and Side frames.
Bright Start Holdings, Dubai Contracting Company l.l.C 500
2005 Dubai Mall, DubaiConnection Design, Engineering, Supply Material, fabrication, Erection of Structural Steel Works
AlICO ltd 13,000
2005 Burj Dubai - link Beams, Dubai
Engineering, Supply Material, fabrication and Erection of link Beams
Samsung / Besix / Arabtec Jv 1,500
2005 Canon factory, Singapore Supply and lay TPO membrance Integrated Systems. Shimizu Corporation 34,000 m²
2005Teluk Salut 180 MW Combined Cycle Power Plant, Malaysia
Engineering, fabrication and Erection of Steel Structure, Boiler Casings, Ducts and Stacks
Mitsubishi Corporation - Mitsubishi Heavy Industries Consortium 1,050
2005 Tecom Tower, DubaiConnection Design, Engineering, Supply Material, fabrication, Erection of Structural Steel Works
Belhasa 55
2005 Chelsea Tower, DubaiConnection Design, Engineering, Supply Material, fabrication, Erection of Structural Steel Works
Dubai Contracting Company l.l.C 140
2005 Sport City Tower, Qatar Engineering, Supply Material, fabrication and Erection of Secondary Steel Works
Besix Midmac Jv 400
2005 Salalah Amphitheater, Oman
Site Assembly and Erection of Cantilever Stadium Roof Structure Gharbia Enterprises/IHGT 550
2005 Qatar Airways Hangar, Qatar
Site Assembly and Erection of Structural Steel Works Stamsteel/Strarch 1,650
2005 Qatar Science & Technology Park, Qatar
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Qatar Petroleum /Qatar foundation 13,000
2005 Marina Heights Tower, Dubai Marina, Dubai
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Roof feature Structural Steel
Dutco Balfour Beatty l.l.C. 80
2005 Rose Rotana Tower, Dubai
Structural Design, Engineering, Supply Material, fabricaition, Site Assembly and Erection of Structural Steel Works and Metal Deck
Arabian Construction Company 6,500
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
2002Catholic Primary & Secondary School, Singapore
Shop Drawings, Supply, fabrication and Erection of Structural Steel Works
NEO Corporation 300
2003Electrified Double Track Project - IPOH Station, Malaysia
Erection of Main Roof & Main Column Torsco Berhad 350
2003Convocation Centre for Kustem university, Malaysia
Structural Design, Engineering, Supply Material, fabrication & Erection of Structural Steel Works
Ibai Bina Sdn Bhd 450
2003 Ski Dubai - Mall of Emirates, Dubai Erection of Ski Dome Structure Al Naboodah laing O’Rourke 3,700
2003 Ski Dubai - Mall of Emirates, Dubai
Structural Design, Supply Material, fabrication and Erection of Temporary Structural Steel Works
Al Naboodah laing O’Rourke 700
2003 Marina Crown, Dubai
Structural Design, Supply Material, fabrication & Erection of Structural Steel including Concrete Core Wall Design and Construction
Transemirates Contracting 3,200
2003 Dragon Mart, DubaiConnection Design, Engineering, Supply Material, fabrication and Erection of Structural Steel Works
Al Shafar Transport & Contracting Co 20 ,000
2003 Khalifa Olympic Stadium, Doha
Structural Design for Temporary Towers, Engineering, Supply Material, fabrication and Erection of Structural Steel Works
Midmac/ Six Construct 3,300
2003 Changi Water Reclamation Plant, Singapore
Supply, Shop Drawings, fabrication and Erection of Structure Steel Woks
lum Chang Building Contractors Pte. ltd. 700
2003Changi Airport Main Terminal 3 Building, Singapore
Supply, Shop Drawings, fabrication and Erection of Structure Steel Woks
Shimizu corporation 5,700
2003Circle line Stage 1 C-824 Boulevard Station, Singapore
Supply, Shop Drawings, fabrication and Erection of Structure Steel Woks
lum Chang Building Contractors Pte. ltd. 800
2004 Dubai International Airport - Conveyor Bridge, Dubai
Structural Design, Engineering, Supply Material, fabrication, Erection of Structural Steel Works
Al Habtoor / Murray & Roberts 33
2004 DIfC Gate Building 1 to 4, Dubai
Connection Design, Engineering, Supply Material, fabrication, Erection of Structural Steel Works
ACT - Peremba J.v. 2,000
2004 DIfC Gate Building 5 & 6, Dubai
Connection Design, Engineering, Supply Material, fabrication, Erection of Structural Steel Works
Nasa Multiplex 180
2004Customs, Immigration & Quarantine Package 2, Malaysia
fabrication and Erection of of Structural Steel Works. Hl Engineering 1,450
2004Tanjung Bin Power Plant - Boiler Erection Package, Malaysia
Erection of Mechanical Works for Boiler Plant, consisting of Boiler Pressure & Non Pressure Parts, Steel Structure, ducting, Piping, Gas Air Heater, Electrostatic Precipitator, Mill Plant, Coal Bunker, Insulation & Refractory, Painting, Cladding, Control and Instrumentation Works.
IHI/ISHI Power Sdn Bhd 61,250
88 89
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
2007 Al Shams Sky Tower, Abu Dhabi
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Arabian Construction Company 7,750
2007 Princess Tower, Dubai
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Arabian Construction Company 2,500
2007 united Tiara Towers, Dubai
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Arabian Construction llC 9,200
2007 Anantara Palm Jumeirah & Tiara Residences, Dubai
Structural Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Arabian Construction llC 1,000
2007 Capital Gate Building, Abu Dhabi
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Al Habtoor Engineering 13,320
2007 Dubai Tower, Dubai
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Al Habtoor/Al Jaber Jv 12,500
2007 Al Salam TECOM Tower, Dubai Erection of Structural Steel Works DCC, Ws Atkins 100
2008 New Doha International Airport (Phase II), Qatar
Site Asembly and Erection Structual Steel Works Taisei /TAv, Bechtel 21,110
2008 Tamouh Site Office, Abu Dhabi
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Zelan Holdings Sdn Bhd 420
2008 Burj Khalifa - Annex Building, Dubai
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works and Metal Decking
Samsung/Besix/Arabtec Jv 850
2008 Dubai Mall Hotel & Health Club Roof, Dubai
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Emaar Properties PJSC 125
2008New Doha International Airport, Extension Works (Phase I Expansion), Qatar
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Taisei /TAv, Bechtel 19,500
2008 Emirates Park Tower Hotel, Dubai
Reinforced Concrete Structural Works for Twin 80 storey tower, Blind Concrete Works, form Works, Concreting, Block and all Civil Works
Nasa Multiplex llC
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
2005 Dubai festival City,Dubai
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Al futtiam Carillion 6,200
2005 MAG 214, Jumerah lake Tower, Dubai
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Trans Emirates Contracting 200
2006Jimah 2 X 700MW, Coal fired Power Plant - Boiler Erection Package, Malaysia
Erection of Mechanical Works for Boiler Plant, consisting of Boiler Pressure & Non Pressure Parts, Steel Structure, ducting, Piping, Gas Air Heater, Electrostatic Precipitator, Mill Plant, Coal Bunker, Insulation & Refractory, Painting, Cladding, Control and Instrumentation Works.
ISHI Power Sdn Bhd / IHI Corporation 38,000
2006
Jimah 2 X 700MW, Coal fired Power Plant - ESP & fGD Erection Package, Malaysia
Erection of Structural Steel and Mechanical - fuel Gas Desulphurization Equipment, Electrostatic Precipitator, Ducting, Piping & Painting Works
ALSTOM Power Asia Pacific Sdn Bhd / Alstom K.K, Japan 6,000
2006 The Index Building, Dubai
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Nasa Multiplex llC 6,000
2006 Almas Tower, Dubai
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Taisei Corporation/ACC Jv 3,500
2006New Doha International Airport (Phase 1)- Main Terminal Building, Qatar
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Taisei Corporation/TAv Jv 25,000
2006 Tornado Tower, Qatar
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Midmac - Six Construct Jv 4,250
2006 Burj Al Salam Car Park, Dubai
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Belhasa Engineering & Contracting Co 1,800
2007Shin Eversendai Engineering Office, Rawang, Malaysia
Design and overall construction of a single storey Warehouse with a 2 storey Office, Canteen, TNB Sub-Station and Suction Tank
Shin Eversendai Engineering (M) Sdn Bhd 456
2007 Motor City, Dubai
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Nasa Multiplex llC 3,500
2007 Burj Khalifa (Spire), Dubai
Connection Design, Engineering, Supply Material, fabrication, Site Assembly and Erection of Structural Steel Works
Samsung/Besix/Arabtec Jv 4,000
90 91
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
2009 Pentominium Tower, Dubai
Connection Design, Engineering, Supply Material, fabrication, Surface Preparation & Painting, Erection of Steel Structure
Arabian Construction Company 2,616
2009 Al Nasser Headquarters, Abu Dhabi
Connection Design, Engineering, Supply Material, fabrication, Surface Preparation, Painting, Metal Decking, Erection of Steel Structure and Intumescent Fireproofing Worksescent Fireproofing Works
Al Rostamin Pegel llC 3,450
2009 Dubai Pearl Phase 1 Civil Works, Dubai
All Structural Concrete Work, formwork, Reinforcement Work, Block Work and Skeleton Civil Work
Al-Habtoor - leighton Jv RCC Works
2009 The OPuS, Dubai Civil - Insitu Structural frameworks (Concrete) Brookfield Multiplex Construction
2009Central Market Redevelopment - Khalifa Podium, Abu Dhabi
Connection Design, Engineering, Supply Material, fabrication, Surface Preparation, Painting, Metal Decking and Erection of Steel Structure
Arabian Construction Company 1,320
2009 2x500 MW NTPl Tuticorn Thermal Power, India
Erection, Painting, Testing and Commissioning of Boiler Structures, Pressure Parts, No-pressure parts and Rotating Equipments
Bharat Heavy Electricals ltd (BHEl) 18,031
2009 Burj Khalifa - Gate House, Dubai
Connection Design, Engineering, Supply Material, fabrication, Surface Preparation & Painting and Erection of Steel Structure
Samsung/Besix/Arabtec Jv 65
2009Mumbai International Airport - South West Pier, India
Engineering, Material Supply, fabrication, Surface Preparation and Painting, Transportation and Erection of Structural Steel
larsen & Toubro 3,410
2009 Stacker Reclaimer B Restoration Work, Malaysia
Dismantling and Refurbishment of Stacker Reclaimer, Mechanical and Electrical Equipment and Instrumentation Work
Jimah Energy venture Sdn Bhd 195
2010 NKOM- Nakilat-Keppel Offshore & Marine, Qatar
fabrication and Assembly of Dry Dock structures. Qatar Gas Transport Company 346
2010 Emiri Terminal - Steel Roof Structure, Qatar
Connection Design, Engineering, Supply Material, fabrication, Surface Preparation & Painting Works
Al fasi Construction Singapore (ACS) 180
2010 North Central Plant - Education City, Qatar
Connection Design, Engineering, Supply Material, fabrication, Surface Preparation & Painting, Site Assembly and Erection of Steel Structure
Gulf Contracting Company Wll 620
2010 Algeria Oman fertilizer Plant, Algeria
Engineering, fabrication, Surface Preparation & Paintingand Export of Steel Structures of fOB basis
Shapoorji Pallonji Mideast llC 3,477
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
2008Khalifa Central Market and Tower Development, Abu Dhabi
Connection Design, Engineering, Supply Material, fabrication, Surface Preparation & Painting, Metal Decking, Erection and Intumescent Fireproofing Works
Arabian Construction Company 3,340
2008New Doha International Airport, CP10 AGl Substation, Qatar
Connection Design, Engineering, Supply Material, fabrication, Surface Preparation & Painting, Transportation and Erection of Structural Steel
Sinohydro-Gamuda-WCT (SGW) Jv 200
2008Cabot Material Research upgrading Project, Malaysia
Piping and Mechanical Installation Construction Works CMR Sdn Bhd -
2008 Al Rafi Car Park, Dubai
Connection Design, Engineering, Supply Material, fabrication, Surface Preparation & Painting, Metal Decking, Erection of Steel Structure
Dubai Contracting Company l.l.C 1,827
2009 Cinema upper Roof - Dubai Mall, Dubai
Connection Design, Engineering, Supply Material, fabrication, Site Assembly, Erection of Steel Works and Fireproofing
Emaar Properties PJSC 800
2009 Saadiyat Island, Abu Dhabi
Connection Design, Engineering, Supply Material, fabrication, Site Assembly amdErection of Steel Works
Al Jaber legt Engineering & Contracting (AlEC) llC 1,400
2009
Convention Centre Extension and link Bridge to QSTP - Education City, Qatar
Civil Works - foundation Works, Connection Design, Supply Material, Engineering, fabrication, Site Assembly and Erection of Structural Steel Works
Qatar Petroleum/Qatar foundation 15,000
2009 Arzanah Development - Rihan Heights, Abu Dhabi
Structural Design, Engineering, Supply Material, fabrication, Erection and Dismantling of Temporary Steel Platform Support for Transfer Beam Construction
Silver Coast - Sunway Jv 1,183
2009uAE university New Campus PPP Development - Al Ain, Abu Dhabi
Engineering, Supply Material, fabrication and Erection of Secondary Steel Works
OGER Abu Dhabi llC 400
2009 2x600 MW North Chennai Power Station, India
Engineering, fabrication & Erection of Structural Steel works for Turbine Building, Coal Bunker, Mill Bay Structure, Pipe Rack and Aux Buildings
Bharat Heavy Electricals ltd (BHEl) 16,690
2009Chhatrapati Shivaji International Airport - South West Pier, India
Connection Design, Engineering, Supply Material, fabrication, Erection and Fire proofing Works
larsen & Toubro 450
2009 Gate District Towers, Abu Dhabi
Connection Design, Engineering, Supply Material, fabrication, Surface Preparation & Painting, Metal Decking and Erection of Steel Structure including special strand jacking lifting techniques and Fire proofing Works
Arabian Construction Company 6,770
92 93
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
2010King Abdullah Petroleum Studies and Research Centre, Saudi Arabia
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Metal Decking, Erection of Steel Strucutre
Saudi Arabian Oil Company 14,000
2010 Doha Convention Center and Tower, Qatar
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Metal Decking, Erection of Steel Strucutre
Six Construct/Midmac Jv 12,094
2010 Trump Tower, India Construction of Substructure and Superstructure Core and Shell Works
Rohan lifescapes 4,275
2010 Marathon futurex, India
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation, Painting, Transportation and Erection of floor Beams and Plate Sections for Composite Slab
Marathon Realty Pvt ltd 1,440
2010 BWE 2x487 TPH Boiler Structure, India
Engineering, Material Supply, fabrication, Surface Preparation and Painting of Boiler Steel Structure and Accessories, Gratings and Handrail Works and Delivery on Ex-works basis.
BWE Energy India Pvt ltd 3,370
2010 2x500 MW NTPl Tuticorn Thermal Power, India
Erection, Testing and Commissioning of Electrostatic Precipitator and Auxiliaries
Bharat Heavy Electricals ltd (BHEl) 17,971
2010 2x300 MW EMCO Thermal Power Plant, India
Erection, Testing and Commissioning of Boiler, Turbine, Generator and Auxiliries including Electrical, Commercial and Industrial Works
GMR Energy limited 41,988
2010 2x660 MW Bhavanapadu Thermal Power , India
Erection, Testing and Commissioning of Boiler, Turbine, Generator and Auxiliries including Commercial and Industrial Works
Abir Infrastructure Pvt ltd 68,761
2010Office Towers for Bank Kerjasama Rakyat Malaysia Berhad, Malaysia
Spply fabrication, Painting, Fireproofing and Erection of Structural Steel
Kasugi Prima Bhd 505
2010
Academy Training Complex & Tactical Training Building, Police Training Center (Pulaupol) Kl, Malaysia
Steel structure, roof covering and box gutter work Bina Puri Construction Sdn Bhd 300
2010New Doha International Airport Retrofitting Work, Doha, Qatar
Installation of strengthen plates SKY ORYX JOINT VENTURE Manpower supply
2010 Khatau Mills, India G+ 2 floors Carrying out Structural Steel wok for Marketing Office at Khatau Mill, Byculla
Swayam Realtors & Traders ltd 199
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
2010yas Island Development - Signage Canopies, Abu Dhabi
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting and Erection of Steel Structure
Thomas Bennett Signs llC 98
2010 Etihad Tower - Roof, Abu Dhabi
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting and Erection of Steel Structure
Arabian Construction Company 115
2010 Capital Gate Building - Helipad, Abu Dhabi
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting, Metal Decking and Erection of Steel Structure
Al Habtoor Engineering Company llC 140
2010 Sowwah Square - Tower Canopies, Abu Dhabi
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting and Erection of Steel Structure
OGER Abu Dhabi llC 120
2010Sowwah Square - North and South Carpark lobbies (Glass Boxes), Abu Dhabi
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting and Erection of Steel Structure
OGER Abu Dhabi llC 625
2010 Emirates Park Tower Hotel - Podium, Dubai
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting, Erection of Steel Structure and Cemetitious Fireproofing Works
Brookfield Multiplex Construction 725
2010New Doha International Airport - Central utility Plants, Qatar
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting, Metal Decking and Erection of Steel Structure
CAT International Qatar Wll 1,526
2010 PKT logistics Warehouse & Office, Malaysia
Design and overall construction of a single storey Warehouse with a 2 storey Office, TNB Sub-Station, Guard House for PKT logistics (35,000 m2)
Shin Eversendai Engineering (M) Sdn Bhd 1,200
2010 Cleveland Clinic, Abu Dhabi
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation, Painting, Metal Decking, Erection of Steel Structure and Cememtitious Fireproofing
Samsung/Sixco Jv 30,150
2010 Capital Market Authority Tower, Saudi Arabia
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation, Painting, Metal Decking, Erection and Fireproofing Works
Saudi Bin laden Group 25,500
2010
New Doha International Airport - North Node, Concourse C & D - Phase 3 CP 51, Qatar
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Metal Decking, Erection of Steel
Midmac - Sixco Jv 35,000
94 95
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
2011
Manjung 4 - 1 x 1,000 MW Coal fired Power Plant - Steam Turbine Hall, Malaysia
Construction and completion of Structural Steel for Steam Turbine Hall including Shop Drawings, Procurement, fabrication, Delivery and Erection
Mudajaya Corporation Bhd 3,150
2011
“Erhama Bin Jaber Al Jalahma Shipyard - Production Support facility Building.Phase-5 .Port of Ras laffan,Qatar
Design, connection design, supply, fabrication, painting, delivery, erection of structural steel works, fire proff, roof/ wall cladding works
Gulf Contracting Company Wll 230
2011 MIAl HangarEngineering, fabrication, Site Assembly and Erection of Structural Steel Work
larsen & Toubro 860
2011 four SeasonsG+3 floors , Structural Steel Works, Concreting Works, Civil finishes Works and Miscellaneous Works
Magus Estates & Hotels Private limited 320
2011MIAl Subcontract #T2/2-G, fixed link Bridge Structural Steel Works
Engineering, fabrication, Site Assembly and Erection of Structural Steel Works for 12 Nos flB’s
larsen & Toubro 2,272
2011 The Regent Emirates Pearl Hotel, Plot 5, Abu Dhabi
Design, Engineering, Material Supply, fabrication, Surface Preparation & Painting, Erection of Misc Steel Structures
Arabian Construction Company 232
2011 Dubai Mixed use Tower, Dubai
Connection Design, Engineering, Material Supply, fabrication, Metal Decking, Surface Preparation & Painting, Fireproofing and Erection of Misc Steel Structure for Podium , Carpark, Pool and link bridges from Carpark to Towers
Arabian Construction Company 495
2011 City of lights, Reem Island, Abu Dhabi
Detailed design, Material Supply, fabrication and installation of Embeds, Base Plate, Anchor Bolt and Shear Studs
Brookfield Multiplex Construction 5
2011 Stand Point Tower, DubaiInstallation of formwork, Reinforcement, Scaffolding and Pouring of Concrete of works
Besix - Arabtec Jv
2012
Tanjung Bin 4- 1 x 1,000 MW Coal fired Power Plant - Engineering, Constrution & Procurement (EPC), Malaysia
fabrication & Erection of Steel Structure and Installation of Boiler Pressure and Non-Pressure Parts including Auxiliary Equipment and Piping and related services as Part of an EPC Consortium Partner
Tanjung Bin Energy Issuer Bhd 54,491
2011
“EPIC for Building Superstructures (Phase 4A) Erhama Bin Jaber Al Jalahma Shipyard - Energy Center, Work Shop/Painting Shop facility and Super yacth Hall.Port of Ras laffan, Qatar
Design, Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Erection of Steel Strucutre including Fire Proofing. Design and Construction of Mega Sliding Door of size 33.92m width and 45m height. Supply and Installation of double skin & Single Skin Roofing System 76,325Sq.mtrs.
Qatar Petroleum 8,000
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
2010 Tamkeen Tower, Riyadh, Saudi Arabia
Supervision of Structural Steel works installation(only)
Al Rajhi Projects & Construction llC
2010upgrading Al Salam Street & Abu Dhabi City Ring Road, Abu Dhabi
Installation of formwork, Reinforcement, Scaffolding and Pouring of Concrete works..
Samsung
2011 Dubai Pearl, Dubai
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Erection of Steel Strucutre
Al habtoor leighton Group 361
2011MASDAR Institute for Science & Technology, Abu Dhabi
Basic Designing including Connections, Engineering, Material Supply, fabrication, Surface Preparation & Painting, Galvanization, Metal Decking, Erection and Intumescent Fireproofing Works
Arabian Construction Company 1,580
2011 Etihad Towers - South façade, Abu Dhabi
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting and Erection of Steel Structure
Arabian Construction Company 87
2011Etihad Towers - Seafood floating Restaurant, Abu Dhabi
Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting and Erection of Steel Strucutre
Arabian Construction Company 255
2011 Etihad Tower - Roof features, Abu Dhabi
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting and Erection of Steel Strucutre
Arabian Construction Company 145
2011 SAMBA Headquarters, Saudi Arabia
Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Metal Decking, Erection and Fireproofing Works
El Seif Engineering Contracting Company ltd 834
2011 New KlIA 2 Airport Terminal, Malaysia
Design, Supply and Installation of Structural Steel Works for Satellite Building, Sky Bridge and Contact Piers
Bina Puri Sdn Bhd 5,000
2011 Sabah Oil & Gas Terminal, Malaysia
Supply, fabrication, Surface Preparation, Painting and Delivery of Steel Structure
Samsung Engineering Malaysia Sdn Bhd 5,000
2011 Maldives Airport Terminal Improvement, Maldives
Supply and Delivery of Pre-fabricated Structural Steel Works
GADl (Isle of Man) ltd (GMR Group) 25
2011Manjung 4 - 1 x 1,000 MW Coal fired Power Plant - Boiler Package, Malaysia
fabrication & Erection of Structural Steel Works of Turbine Building and Installation of Pressure and Non Pressure Parts, Coal Bunker, Mill Bay Structure, Piping and Auxiliaries
Alstom Services Sdn Bhd 32,600
2011Manjung 4 - 1 x 1,000 MW Coal fired Power Plant - Ducting, Malaysia
Supply of Ducts Alstom Services Sdn Bhd 1,370
96 97
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
2012 Al Jalila Children’s Specialty Hospital, Dubai
Connection Design, Engineering, Material Supply, fabrication, Metal Decking, Galvanizing and Erection of Steel Structure
Al futtaim Carillion 4,750
2012 Abu Dhabi International Airport, Abu Dhabi
Connection Design, Engineering, Material Supply, fabrication, Metal Decking, Surface Preparation & Painting, Fireproofing and Erection of Steel Structure
TCA Joint venture 25,916
2012 Crescent City Project, Baku, Azerbaijan
Connection Design, Engineering, Material Supply, fabrication, Metal Decking, Surface Preparation & Painting, Fireproofing and Erection of Steel Structure
Gilan Holding llC 6,000
2012 Al Safooh Transit System (TRAM), Dubai
Installation of formwork, Reinforcement, Scaffolding and Pouring of Concrete works for the stations
Besix
2012 Masdar Head Quarters, Abu Dhabi
fabrication Drawings, fabrication & Delivery to Site, Painting, Erection of Structural Steel
Multiplex 2,623
2013 Petronas lNG Train 9, Malaysia Shop fabrication of Steel Structure JGC (Malaysia) Sdn Bhd 2,245
2013 Doha land, Phase 1C, Qatar
Connection design, supply, fabrication, painting, delivery, erection of structural steel works, metal deck and fire proof
Brookfield Multiplex Construction 650
2013
Doha Convention Center and Tower- Temporary Platform for Piling Works, Qatar
Supply, fabrication, painting, delivery, erection of structural steel works & dismantling
Six Construct/Midmac Jv 772
2013 lusail Multipurpose Hall Package 02, Qatar
Connection design, supply, fabrication, painting, delivery, erection of structural steel works, metal deck and fire proof
Consolidated Contractors Group S.A.l(offshore)(CCC)/Teyseer Contracting company W.l.l
820
2013Qatar foundation Research & Development Complex, Qatar
Design, connection design, supply, fabrication, painting, delivery, erection of structural steel works, metal deck and fire proof
Redco - Construction - Almana 4,050
2013 Duhail Multipurpose Sports Club, Qatar
Design, connection design, supply, fabrication, painting, delivery, erection of structural steel works, metal deck and fire proof
Redco - Construction - Almana 2,200
2013 Mall of Qatar, Qatar Connection design, supply, fabrication, painting, delivery, erection of structural steel works
Al Khayat Trading & Contracting 205
2013 World Crest/ Shree Niwas Mill, India
Engineering, Procurement, Shop fabrication, Transport, Delivery and Erection of Mild Steel Structure Beam
lodha Group, Mumbai 121
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
2012 Qatar faculty of Islamic Studies, Malaysia
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Erection of Steel Strucutre
CCC and Teyseer Contracting Co Wll J.v 3,627
2012 Worli Mixed use Development, India
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Erection of Steel Strucutre
Samsung C&T Pte limited 3,150
2012 Salalah Airport Expansion Project, Oman
Erection of Structural Steel, Alignment, Bolting and Welding Works
larsen & Toubro limited 4,513
2012 yas Mall, Abu Dhabi
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Erection of Steel Strucutre
Six Construct Co. ltd 6,005
2012 ADNOC Headquarters, Abu Dhabi
Connection Design, Engineering, Material Supply, fabrication, Metal Decking, Surface Preparation & Painting, Fireproofing and Erection of Steel Structure
Six Construct Co. ltd 4,520
2012 MASDAR Headquarters, Abu Dhabi
Connection Design, Engineering, Material Supply, fabrication, Metal Decking, Surface Preparation & Painting, Fireproofing and Erection of Steel Structure
Brookfield Multiplex Construction 3,610
2012 ADNOC Headquarters Roof, Abu Dhabi
fabrication Drawings, fabrication & Delivery to Site, Painting, Erection of Structural Steel
Six Construct Co. ltd 1,600
2012 Qatar foundation Headquarters, Qatar
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Erection of Steel Strucutre
Midmac Contracting Company W.l.l. 2,414
2012 National Museum of Qatar (Package 1),Qatar
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Erection of Steel Structure
Hyundai Engineering & Construction Co., ltd 26,500
2012 National Museum of Qatar, Qatar
Connection Design, Engineering, Material Supply, fabrication, Surface Preparation &Painting, Erection of Steel Structure
Hyundai Engineering & Construction Co., ltd
2012King Abdulaziz International Airport Railway Station, Saudi Arabia
Connection Design, Engineering, Material Supply, fabrication, Metal Decking, Surface Preparation & Painting, Fireproofing and Erection of Steel Structure
Saudi Bin laden Group 12,085
2012Tokuyama Malaysia Polycrystalline Silicon Project (TMP2), Malaysia
fabrication Drawings, fabrication & Delivery to Site, Painting, Erection of Structural Steel
Taisei Corporation 4362
2012 Iron Ore Distribution Project, Manjung, Malaysa fabrication & Supply vale Malaysia Minerals Sdn Bhd 5300
2012 MfAR Developers Pvt ltd, India
Structural Steel work - Shop drawing, Material Supply, fabrication.a) Supply of Shear Plates for Piles
- 25 mmb) Supply of Shear Studs - 20 mm
dia X 125 mm length
MfAR Holdings Private limited 52
Thermal Energy Tank, Saudi Arabia
Al f
aisa
liah,
Sau
di A
rabi
a
Marina Heights, Dubai
Grosvenor House, Dubai
Telekom Building, Malaysia
Cargo Terminal, Malaysia
ATM Tower, Thailand
Ritz Carlton, Qatar
21st Century Tower, Dubai
Chelsea Tower, Dubai
Anantara Palm, Dubai
SAMBA financial Group Headquarters, Saudi Arabia
Stacker Reclaimer, Malaysia
Sowwah Square – Tower Canopies, Dubai
98
Airport Control Tower, Dubai
Philip Morris, Philippines
yEAR (awarded) PROjECT NAME sCOPE OF WORK MAIN CONTRACTOR qUANTITy
(tonnage)
2013 World One-King Tower, India
Structural Steel works - Connection Design, Shop Drawings, Material Supply, Shop fabrication, Mill Scaling Removal, Delivery and Erection.
lodha Group, Mumbai 914
2013 TCS Siruseri-Signature Tower, India
fabrication, Supply, Short Blasting (SA 2.5), Paiting, Transportation and Erection and Handing over of structural steel works.
larsen & Toubro 560
2013Pasari-Bio Wonder Project, Kolkata-Supply & Erection, India
Design, Procurement, fabrication, Delivery and Erection of Mild Steel Strutural Beams and Columns for Cantilever structure.
Pasari Multiprojects Pvt.ltd 480
2013Margus Estates & Hotels - Roof top restaurant, four Seasons Hotel, Mumbai
Supply, fabrication and Erection of Structural Steel works AER (Roof Top Restaurant)
Magus Estates & Hotels Private limited 5
2013
GvK-MIAl - Closure of Gable End Opening & providing rolling shutter for HMD Hangar, India
Closure of Gable End Opening and Providing Rolling Shutter for lMD Hangar
Mumbai International Airport Pvt.ltd (GvK) 11
2013
Garraf, Iraq Development facility Operation - fGCu and associated equipment for 15MW Power Plant, Iraq
Supply and Delivery of fuel Gas Conditioning unit (fGCu) and associated equipments
Petronas Carigali Iraq Holding, Bv
2013
Garraf, Iraq Development facility Operation - upgrade for 15MW Power Plant, Iraq
EPC of fuel Gas Conditioning unit (fGCu), compressor skid and fully equipped mini substation
Petronas Carigali Iraq Holding, Bv 270
2013 The Binary, Abu Dhabi Just in-situ, blast cleaning of installed rebars,miscellaneous Binary Development
2013 TJ Pearl Mansion, Qatar
Connection design, shop drawing, supply of materials, fabrication, blasting/priming, hot dip galvanising, site assembly, erection and decking
Midmac Contracting Company W.l.l. 3,800
2013Hub Zero family Entertainment Centre, Dubai
Connection design, fabrication drawing, raw materials supply, fabrication, blasting, primer and application of cementious/intumescent fireproofing, installation of structural steel works, supply and installation of composite metal decking
Samsun C&T 1,854
2013 Atmosphere Sky Bridge, India
Connection design, shop drawing, fabrication, blasting, painting, erection and decking
larsen & Toubro limited 1300
2014 New Jet Propulsion Centre, Saudi Arabia
Design verification, connection design, shop drawing, supply of material, fabrication, blasting and primer, delivery to site and erection of structural steel works
freyysinet Saudi Arabia 5,715
www.eversendai.com
MalaysiaEVERsENDAI CORPORATION BERHADEVERsENDAI OFFsHORE sDN BHDsHIN EVERsENDAI ENGINEERING (M) sDN BHDECB PROPERTIEs sDN BHD
Lot 19956, Jalan Industri 3/6,Rawang Integrated Industrial Park, 48000 Rawang, Selangor Darul Ehsan, Malaysia.
Tel : +603 6091 2575Fax : +603 6091 2577Email : [email protected]
EVERsENDAI OIL & GAs (M) sDN BHDVAHANA CONsTRUCTIONs sDN BHD
level 5, Menara Mudajaya,12A, Jalan PJU 7/3, Mutiara Damansara,47810 Petaling Jaya,Selangor Darul Ehsan, Malaysia.
Tel : +603 7733 3300Fax : +603 7733 3351Email : [email protected] [email protected]
DubaiEVERsENDAI ENGINEERING LLCEVs CONsTRUCTION LLC
29th floor, vision Tower @ Business Bay,Al Khaleej Al Tejari Street 1, Business Bay,PO Box 29537, Dubai, United Arab Emirates.
Tel : +971 4 453 9881Fax : +971 4 453 9940Email : [email protected]
sharjahEVERsENDAI ENGINEERING FzE
Plot No. 2E-04,05,09 & 10,P.O.Box 42531,Hamriyah free Zone Establishment,Sharjah, united Arab Emirates.
Tel : +971 4 267 3738Fax : +971 4 267 3663Email : [email protected]
QaTarEVERsENDAI ENGINEERING qATAR WLL
P.O. Box 35283,Street No.41, New Industrial Area,Doha, Qatar.
Tel : +974 4 411 4378Fax : +974 4 411 4381Email : [email protected]
ras al KhaiMahEVERsENDAI OFFsHORE RMC FzE
RAK Maritime City,P.O. Box 5130,Ras Al Khaimah, united Arab Emirates.
Tel : +971 4 456 4815Fax : +971 4 456 4833Email : [email protected]
45th floor, vision Tower @ Business Bay, P.O Box 116654, Dubai,united Arab Emirates.
Tel : +971 4 456 4815Fax : +971 4 456 4833Email : [email protected]
EVERsENDAIabu DhabiEVERsENDAI ENGINEERING LLC
P.O. Box 107729,Abu Dhabi, united Arab Emirates.
Tel : +971 2 495 0700fax : +971 2 445 4672Email : [email protected]
sauDi arabiaEVERsENDAI ENGINEERING LLC
P.O. Box 30515,Al Iman Saudi Bin Aziz Bin Moh Street,Riyadh, Kingdom of Saudi Arabia.
Tel : +966 1 494 4891 fax : +966 1 494 4892 Email : [email protected]
inDiaEVERsENDAI CONsTRUCTION PVT LTD
Plot No.1 & 2 , The lords Block-1,5th floor, Thiru-vi-ka Industrial Estate,Jawaharlal Nehru Road, Ekkattuthangal,Guindy, Chennai-600 032,Tamil Nadu, India.
Tel : +91 044 4070 1234Fax : +91 044 4070 1230 Email : [email protected]
singaporeEVERsENDAI CONsTRUCTION (s) PTE LTDEVERsENDAI ENGINEERING PTE LTDEVERsENDAI TECHNICs PTE LTD
6001, Beach Road, #18-01A,Singapore 199589.
Tel : +65 6227 0335 fax : +65 6227 0021Email : [email protected]