National Mission for Clean Ganga
Annexure-II
Submission of Monthly Progress Report for September, 2020 by Jharkhand State (Hon’ble NGT in the matter of O.A No. 673/2018 dated 06.12.2019)
Sl. No. Activity to be monitored Timeline Submission of Progress by State/UT-Compliance Status
1
Ensure 100% treatment of sewage at least in-situ remediation
31.03.2020 NEERI site visit at drains was done from 03.03.2020 to 07.03.2020. Proposal to go ahead for adoption of in-situ remediation at drains is received from NEERI. Regular consultation with NEERI is in progress. Proposal for DPR Preparation and Support in Implementation is Received on 25.09.2020 Allocation of state fund for this project and Approval on selection of CSIR-NEERI on nomination basis for preparation of DPR to adopt in-situ remediation at drains at identified ULBs viz. Chas, Ranchi, Mango and involvement of CSIR – NEERI for complete implementing including tendering is under process from competent authority from approx. 98 MLD of waste water will be treated. 15 MLD STP Plant at Phusro is under process of Approval at NMGC. 50 MLD STP is under operational at Jamshedpur which is operated by JUSCO. 31.5 MLD Lagoon Based STP is under operation by Bokaro Steel Limited. There are two schemes at Chottagovindpur – 46 MLD and Bagera – 37 MLD for Water Treatment Plant designed with sludge drying pit along the banks of River Subarnarekha.( Annexure -1)
2 Commencement of setting up of
STPs and connecting all the drains and other sources of generation of sewage to the STPs must be ensured
31.03.2020 Detailed status of various ongoing projects related to Sewerage /Septage Treatment at these 8 ULBs are enclosed as Annexure -2
3 Timeline for completing all steps of action plans including completion of setting up STPs and their commissioning
31.03.2021 Detailed status of various ongoing projects related to Sewerage /Septage Treatment at these 8 ULBs are enclosed as Annexure -2
5 Chief Secretaries may set up appropriate monitoring mechanism at State level • Specifying accountability of
nodal authorities not below the Secretary level
• Chief Secretaries may have an accountable person attached in their office for this purpose.
22.01.2020
22.01.2020
• Monitoring at State level must take place
Fortnightly Commencing 21.12.2019
Fortnight monitoring of 7 polluted river stretches will initiated from Sept’2020.
Sr. No.
Activity to be monitored
Timeline
Submission of Progress by State/UT-Compliance Status
6
Progress report may be furnished by the States / UTs to
• Secretary, Ministry of Jal Shakti
• Member Secretary, CPCB
Monthly (preferably before 20th of every
month)
6.1
Progress report may be comprised of details along with completion timelines on:
6.1(i)
Identification of polluting sources including drains contributing to river pollution and action as per NGT order on in-situ treatment
NEERI site visit at drains was done from 03.03.2020 to 07.03.2020. Proposal to go ahead for adoption of in-situ remediation at drains is received from NEERI. Regular consultation with NEERI is in progress. Proposal for DPR Preparation and Support in Implementation is Received on 25.09.2020 Allocation of state fund for this project and Approval on selection of CSIR-NEERI on nomination basis for preparation of DPR to adopt in-situ remediation at drains at identified ULBs viz. Chas, Ranchi, Mango and involvement of CSIR – NEERI for complete implementing including tendering is under process from competent authority from approx. 98 MLD of waste water will be treated. 15 MLD STP Plant at Phusro is under process of Approval at NMGC. 50 MLD STP is under operational at Jamshedpur which is operated by JUSCO. 31.5 MLD Lagoon Based STP is under operation by Bokaro Steel Limited.
6.1(ii)
Status of STPs, I&D and Sewerage networks: Details of existing infrastructure, Gap Analysis, proposed along with completion timeline
Detailed status of various ongoing projects of STP, Sewerage network, gap analysis, timeline etc. at the identified 6 ULBs are enclosed as Annexure -2
6.1(iii)
(iii)Status of CETPs Details of Existing CETP and ETP Infrastructure, Gap Analysis, Proposed along with completion timeline, No. of industries and complying status
Details pertaining to the Status of compliance of ETPs are enclosed as Annexure - 4.
6.1(iv)
Status of Solid waste management & details of processing facilities: Details of Existing Infrastructure, Gap Analysis, Proposed along with completion timeline
Details attached as Annexure - 3(a&b)
6.1(v) Latest water quality of polluted river, its tributaries, drains with flow details and ground water quality in the catchment of polluted river;
Details attached as Annexure - 5
6.1(vi) Preventing dumping of waste and scientific waste management including bio-medical wastes, plastic wastes and decentralizing waste processing, including
District Magistrate has been directed to ensure that illegal dumping of waste and to promote scientific waste management practices including bio-medical wastes, plastic wastes and decentralizing waste processing. Action has been taken against the violators at the district level and Seminars/awareness programs are organized on Waste Management Rules.
6.1(vii) Ground water regulation Drinking water & Sanitation Dept. have identified the contaminated hand pumps and sealed those hand pumps whose water is not fit for drinking (Annexure - 6). Portable water is supplied to the Communities in the identified critical blocks through water tanker owned by local bodies and log book is maintained.
List of polluted blocks in Jharkhand have been identified and details is annexed as Annexure - 7 Periodic assessment of 24 districts and 260 blocks of Jharkhand for ground water resources was conducted by Jharkhand in 2009, 2011, 2013 & 2017 which also covers the area related to 7 polluted stretches and based on which a comparative statement of dynamic ground water resource is prepared which is annexed as Annexure -8. As per report of CGWA, Dhanbad and Bermo are among the overexploited blocks, Patratu, Silli and Bermo are among semi critical blocks along the seven polluted river stretches. CGWA is also preparing a policy for conservation of ground water with a robust institutional mechanism for surveillance and monitoring with a view to enhance the access to ground water for drinking purpose. Water Resource Department, Govt. of Jharkhand is framing Ground Water Development and Management (Control/ Regulation) Act which is under progress which shall be completed by 6monthsandthereafterdepartmentswillcompletetheformalities for enactment of Ground Water Development and Management Control/Regulation) Act within One Year.
6.1(viii) Adopting good irrigation practices Details of the Irrigation Projects taken by Water Resource Department along the polluted river stretches is attached as Annexure-8 Department of Agriculture is promoting and conducting workshops for the use of organic fertilizers. Promoting micro irrigation (drip & mini irrigation) system to save the quantity of water used during agriculture.
6.1(ix) Protection and management of
Flood Plain Zones (FPZ) District Magistrate has been directed to ensure that no encroachments
in the FPZ and necessary actions are taken. Apparently, no area under seven river stretches have issues related to flood plain zone. But, for protection and management of flood plain zone - RFP
Circulated on 17.06.2019 consultant have been appointed by 15.09.2019 and complete assignment along with the action plan (if required) which is to be submitted by them up to 30.06.2020 but the is pending due to COVID-19 Situation and will be submitted by 31.12.2020.
6.1(x) Rain water harvesting 144 nos. of RWH structure has been sanctioned for Rs. 5.89 Cr. which is under progress and targeted to be completed by June,2020. Agreement with consultant PKS Infra Engineer Pvt. Ltd. Ghaziabad, India has been deputed to preparation of DPR regarding Geophysical survey for Ground Water recharging/ Rain Water harvesting along the sevn polluted river stretches. Based on the DPR submitted and an Action Plan has been prepared and to be submitted by 30.04.2020 but due to COVID-19 it is likely to be submitted by 31.12.2020. Jharkhand Rain Water harvesting Regulation, 2017 Notified on 23.01.17. and implementation is ongoing. 54 nos. of RWH/ground water recharging structure have been constructed at Dhanbad by CGWB and 75 nos. of RGH structures have been constructed by the State Ground Water Directorate, Jharkhand. 214 nos. of water bodies has been sanctioned for Rs. 185.08 Cr. for restoration which is under progress and targeted to be completed by March, 2021.
6.1(xi) Maintaining minimum environmental flow of river
A study in this regard is to be done by the consultant PKS Infra under agreement no.- 03F2/19-20. And as per action plan suggested in the DPR flow up action will be taken up in the structures constructed along the polluted stretches. It is be noted that mandatorily min. 10% of Non-monsoon flow is to be maintained as e-flow in the river D/S of the structures like Dam & Barrage during Non-Monsoon period. Study has been carried out for one of the seven different river stretches. The D/S of Kanke Dam upto Kadal Bridge & has found requirement during fair weather to be 1.6 Cumecs for rest 06 stretches studies are being done by the consultant. The details are annexed as Annexure 9
6.1(xii) Plantation on both sides of the river
6.1(xiii) Setting up biodiversity parks on flood plains by removing encroachment
Serial No.
Name of the
River
River Stretch
Approx.
Length of the
Stretch (Kms)
No. of Villages/ Towns/ Cities along the river ( Approx. 10 Kms. from the
center of the identified river stretch length)
Population (as per Census 2011)
Approx Estimated Population
after 15 yrs. (for year
2035)
No. of Municipal
Drains falling into the main stream
Water Quality of
Each Darin
Quantity of
Sewage Discharged form
each drain
No. of Municipal
Drains divereted
or intercepted
before falling into the river
Existing Treatment
FacilityGap Analysis
Details on Current Method
adotped to prevent
discharge of
untreated sewage
prior to the completion
of proposed project
Propsed Treatment
Tentative
Budget Require
d
Funding Agency
Status
Timeline as per the order
of Hon'ble NGT
Curent Status Remarks
Details on Action Taken for Utilization of Treated Sewage
Quantity to minimise the abstraction of Ground
Water
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
NA
31.03.2021NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is received from NEERI. Regular consultantion with NEERI is in progress.Proposal for DPR Prepartion and Support in Implemnetaion is Recived on 25.09.2020Allocation of state fund for this project and Approval on selection of CSIR-NEERI on nomination basis for preparation of DPR to adopt insitu remediation at drains at identified ULBs viz. Chas, Ranchi,Mangao and involvement of CSIR – NEERI for complete
implementing including tendering is under process from competent authority.
At Present, under AMRUT Scheme, Septage Management scheme of Chas, in which septage treatment plant of 89 KLD is under construction and expected to be completed by Dec 2021
Revised timeline of 31.03.2022 is proposed for adoption of insitu remediation at drains
UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.
1568881 GARGA
ALONG
TALMUCHU
8Chas Municipal
Corporation
Details on Municipal Drains which are dischaging into the identified river stretches
TABLE -2
NA NA 28.2 MLD243675
Please refer Annexure -1
NA
Please refer Annexure -1
Approx 41.50 Cr. of budget is proposed from State Fund for adoption of insitu remediation at
drains for treatment of 29 MLD waste water as per NEERI Site visit report.
(Budget include capex + 5 years of O&M)
41.50 Cr
State Fund
Serial No.
Name of the
River
River Stretch
Approx.
Length of the
Stretch (Kms)
No. of Villages/ Towns/ Cities along the river ( Approx. 10 Kms. from the
center of the identified river stretch length)
Population (as per Census 2011)
Approx Estimated Population
after 15 yrs. (for year
2035)
No. of Municipal
Drains falling into the main stream
Water Quality of
Each Darin
Quantity of
Sewage Discharged form
each drain
No. of Municipal
Drains divereted
or intercepted
before falling into the river
Existing Treatment
FacilityGap Analysis
Details on Current Method
adotped to prevent
discharge of
untreated sewage
prior to the completion
of proposed project
Propsed Treatment
Tentative
Budget Require
d
Funding Agency
Status
Timeline as per the order
of Hon'ble NGT
Curent Status Remarks
Details on Action Taken for Utilization of Treated Sewage
Quantity to minimise the abstraction of Ground
Water
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Details on Municipal Drains which are dischaging into the identified river stretches
TABLE -2
2 SANKH
KONGSERABASAR
TO BOLB
A
10No ULB falls under
the identified stretch of River
- -
UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.
State Fund
NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is received from NEERI. Regular consultantion with NEERI is in progress.Proposal for DPR Prepartion and Support in Implemnetaion is Recived on 25.09.2020Allocation of state fund for this project and Approval on selection of CSIR-NEERI on nomination basis for preparation of DPR to adopt insitu remediation at drains at identified ULBs viz. Chas, Ranchi,Mangao and involvement of CSIR – NEERI for complete
implementing including tendering is under process from competent authority.
31.03.2021
16 MLD of STP of SBR Technology is under construction under Ranchi Smart City Mission. Tentative timline of completion of project is December 2021.
Revised timeline of 31.03.2022 is proposed for adoption of insitu remediation at drains
10 MLD of nature based STP is operational at Harmu River i.e. one of the Tributary of Subarnarekha River at Ranchi.
26 MLDPhytorid
Technology based STP
Approx 20 Cr. of budget is proposed from State Fund
for adoption of insitu remediation at drains for
treatment of 36 MLD waste water as per NEERI Site
visit report. (Budget include capex + 5 years of
O&M).16 MLD of STP of SBR
Technology STP work is in progress under Ranchi
Smart City Mission
20 Cr.3348023
Please refer Annexure -1
NA
Please refer Annexure -1
NARanchi Municipal
Corporation1073427
3
SUBARNAREKHA
HATIA DAM TO
JAMSHEDP
UR
120
Serial No.
Name of the
River
River Stretch
Approx.
Length of the
Stretch (Kms)
No. of Villages/ Towns/ Cities along the river ( Approx. 10 Kms. from the
center of the identified river stretch length)
Population (as per Census 2011)
Approx Estimated Population
after 15 yrs. (for year
2035)
No. of Municipal
Drains falling into the main stream
Water Quality of
Each Darin
Quantity of
Sewage Discharged form
each drain
No. of Municipal
Drains divereted
or intercepted
before falling into the river
Existing Treatment
FacilityGap Analysis
Details on Current Method
adotped to prevent
discharge of
untreated sewage
prior to the completion
of proposed project
Propsed Treatment
Tentative
Budget Require
d
Funding Agency
Status
Timeline as per the order
of Hon'ble NGT
Curent Status Remarks
Details on Action Taken for Utilization of Treated Sewage
Quantity to minimise the abstraction of Ground
Water
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Details on Municipal Drains which are dischaging into the identified river stretches
TABLE -2
Adityapur Municipal Corporation
174355 326578
Please refer Annexure -1
NA
Please refer Annexure -1
NA NA 36 MLD NA
Total STP of 36 MLD capacity is under
construction with SBR Technology
255.15 Cr
AMRUTWork under progress. Till date 55 % of work completed at site.
31.03.2021
Work under progress. Till date 55 % of work completed at site.
Tentative timeline for completion of projct is December 2021
UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.
Mango Municipal Corporation
223805 388730
Please refer Annexure -1
Please refer Annexure -1
Please refer Annexure -1
NA NA 33 MLD NA
Approx 30 Cr. of budget is proposed from State Fund
for adoption of insitu remediation at drains for
treatment of 33 MLD waste water as per NEERI Site
visit report. (Budget include capex + 5 years of
O&M)30 Cr.
State Fund
31.03.2021
-
Revised timeline of 31.03.2022 is proposed for adoption of insitu remediation at drains
UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.
Please refer Annexure -1
1317852677350Jamshedpur NAC 35.20 Cr32 MLD
Around 50 MLD of STP is operational under JUSCO, STP for rest 32 MLD treatment required.
NA
Please refer Annexure -1
Please refer Annexure -1
NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is received from NEERI.
Regular consultantion with NEERI is in progress.
Approval for taking funds from TATA group under CSR fund for treatmaent of remaining 32 MLD is under progress.CSR
Fund
Approx 35.20 Cr. of budget is required for adoption of
insitu remediation at drains for treatment of 32 MLD as
per NEERI Site visit report. (Budget include
capex + 5 years of O&M)
Physiochemical
treatment and
Biological treatment
31.03.2021 -
Revised timeline of 31.03.2022 is proposed for adoption of insitu remediation at drains
UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.
3
SUBARNAREKHA
HATIA DAM TO
JAMSHEDP
UR
120
Serial No.
Name of the
River
River Stretch
Approx.
Length of the
Stretch (Kms)
No. of Villages/ Towns/ Cities along the river ( Approx. 10 Kms. from the
center of the identified river stretch length)
Population (as per Census 2011)
Approx Estimated Population
after 15 yrs. (for year
2035)
No. of Municipal
Drains falling into the main stream
Water Quality of
Each Darin
Quantity of
Sewage Discharged form
each drain
No. of Municipal
Drains divereted
or intercepted
before falling into the river
Existing Treatment
FacilityGap Analysis
Details on Current Method
adotped to prevent
discharge of
untreated sewage
prior to the completion
of proposed project
Propsed Treatment
Tentative
Budget Require
d
Funding Agency
Status
Timeline as per the order
of Hon'ble NGT
Curent Status Remarks
Details on Action Taken for Utilization of Treated Sewage
Quantity to minimise the abstraction of Ground
Water
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Details on Municipal Drains which are dischaging into the identified river stretches
TABLE -2
Phusro Nagar Parisahd
89178 118350
Please refer Annexure -1
Please refer Annexure -1
Please refer Annexure -1
NA NA 15 MLD NA
STP of 15 MLD capacity proposed with SBR (14
MLD) and Phytorid Technology (1 MLD)
64 Cr. NMCG DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on may 2019. NMCG send the DPR To IIT Roorkee for Third Party Appraisal on Jan 2020. DPR appraised by the IIT Roorkee on April 2020.
31.03.2021 29 Exective Committee (EC) of NMCG held on 28.08.2020 through Video Conferncing Executive Committee (EC) resolved to defer the Proposal and take up the same in the next EC meeting due to paucity of time.
18 months timeline is proposed for Tendering , construction of STP and I&D Scheme after aporoval from NMCG
UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.
Dhanbad Municipal Corporation
1162472 1484520
Please refer Annexure -1
NA
Please refer Annexure -1
NA
50 KLD of treatment facility existing
143 MLD NASTP of 144 MLD capacity
required 381 Cr NMCG
DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on July 2019. NMCG send the DPR To IIT Roorkee for Third Party Appraisal on Jan 2020. DPR appraised by the IIT Roorkee is under progress.
31.03.2021 Approval awaided from NMCG
26 months timeline is proposed for Tendering , construction of STP and I&D Scheme after aporoval from NMCG
UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.
Ramgarh Nagar Parishad
123875 141886
Please refer Annexure -1
NA
Please refer Annexure -1
NA NA 40 MLD NASTP of 40 MLD capacity
required252 Cr NMCG
DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on August 2020.
31.03.2020
Approval awaided from NMCG
26 months timeline is proposed for Tendering , construction of STP and I&D Scheme after aporoval from NMCG
UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.
5 JUMAR
KANKE DAM
TO KADA
L
10Ranchi Municipal
Corporation1073427 3348023
1 no. of drains having negiligible discharge
NA NA NA NA
37 MLD capacity STP construction
work was under progress for Zone-1 (in which River Jumar falls)
and 42% of the work
completed
NA
37 MLD capacity STP construction work was
under progress for Zone-1 (in which River Juamr
falls) with SBR Technology
209.05 Cr.
State Fund
Sewerage Scheme for Zone-1 Ranchi, under Ranchi Municipal Corporation (in which river Jumar falls) was started but due to the poor performance of the executing agency the agreement has been terminated on dated 14.10.2019,
31.03.2021 Tender for the construction of remaining work has been floated by the RMC. Date of opening of Tender is 01.10.2020
24 months timeline is proposed for construction of STP and laying of sewer network under Zone-I
UD&HD, GoJ has already issued a policy for utilization of treated waste water from STPs called as Jharkhand Waste Water Policy 2017.The utilizaiton will be done as per the policy document.
4DAMODAR
PHUSRO
ROAD BDG TO
TURIO
12
Serial No.
Name of the
River
River Stretch
Approx.
Length of the
Stretch (Kms)
No. of Villages/ Towns/ Cities along the river ( Approx. 10 Kms. from the
center of the identified river stretch length)
Population (as per Census 2011)
Approx Estimated Population
after 15 yrs. (for year
2035)
No. of Municipal
Drains falling into the main stream
Water Quality of
Each Darin
Quantity of
Sewage Discharged form
each drain
No. of Municipal
Drains divereted
or intercepted
before falling into the river
Existing Treatment
FacilityGap Analysis
Details on Current Method
adotped to prevent
discharge of
untreated sewage
prior to the completion
of proposed project
Propsed Treatment
Tentative
Budget Require
d
Funding Agency
Status
Timeline as per the order
of Hon'ble NGT
Curent Status Remarks
Details on Action Taken for Utilization of Treated Sewage
Quantity to minimise the abstraction of Ground
Water
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Details on Municipal Drains which are dischaging into the identified river stretches
TABLE -2
6 KONAR
ALONG
TILAYA AND KONA
R
-No ULB falls under
the identified stretch of River
-
7NALKAR
I
ALONG
PATRATU
-No ULB falls under
the identified stretch of River
-
Serial No.
Name of the River
River Stretc
h
Approx.
Length of the
Stretch
(Kms)
No. of Villages/
Towns/ Cities along the
river ( Approx. 10 Kms. from
the center of the identified river stretch
length)
Population (as per Census 2011)
Estimated Population
after 15 yrs. (for
year 2035)
Approximate Quantity of
Sewage Generated
(City/Town/Village wise)
Propsed Treatment Facility based on
estimation of population after 15 yrs.
(Numbers and Capacity)
Tentative Budget Required
Funding Agency
Status
Timeline as per the order of Hon'ble
NGT
Curent Status
Current Status on
Networking/ Channelizatio
n including diversion of
sewage generated
from household/town ships/villages to sewer lines
Proposal for Networking/ Channelization including diversion of
sewage generated from household/town ships/villages to
sewer lines
Timeline required
1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23
1
2
Ranchi Municipal
Corporation1073427 3348023 36 MLD
26 MLD :- Phytorid Technology and
RENEU Technology of NEERI.
16 MLD:- 1 unit SBR technology '
20 Cr. for Phytorid Technology and RENEU Technology of NEERI.
16 MLD plant under construction under Ranchi Smart City
Mission
State Fund
Ranchi Smart city
Mission (State + Central)
NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is received from NEERI. Regular consultantion with NEERI is in progress.Allocation of state fund for this project and Approval on selection of CSIR-NEERI on nomination basis for preparation of DPR to adopt insitu remediation at drains at identified ULBs viz. Chas, Ranchi, Jamshedpur and involvement of CSIR – NEERI for complete
implementing including tendering is under process from competent authority.16 MLD plant is under construction, and to be completed by Dec 2021
31.03.2021
16 MLD of STP of SBR Technology is under construction under Ranchi Smart City Mission. Tentative timline of completion of project is December 2021.
Sewerage scheme under construction
Approx 20 Cr. of budget is proposed from State Fund for adoption of insitu remediation at drains for treatment of 36 MLD waste water as per NEERI Site visit report. (Budget include capex + 5 years of O&M).16 MLD of STP of SBR Technology STP work is in progress under Ranchi Smart City Mission NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is awaited from NEERI.
Regular consultantion with NEERI is in progress.
Revised timeline of 31.03.2022 is proposed for adoption of insitu remediation at drains
NA
Approx 41.50 Cr. of budget is proposed from State Fund for adoption of insitu remediation at drains for treatment of 29 MLD waste water as per NEERI Site visit report. (Budget include capex + 5 years of O&M)NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is awaited from NEERI.
Regular consultantion with NEERI is in progress.
Allocation of state fund for this project is in progress.
Revised timeline of 31.03.2022 is proposed for adoption of insitu remediation at drains
Chas Municipal Corporation
8 31.03.2021
At Present, under AMRUT Scheme, Septage Management scheme of Chas, in which septage treatment plant of 89 KLD is under construction and expected to be completed by Dec 2021
29 MLD243675156888
Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019TABLE -3
Deatials on Municipal Drains which are dischaging into the identified river stretches
3
SUBARNAREKHA
HATIA
DAM TO
JAMSHEDPU
R
120
NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is received from NEERI.
Regular consultantion with NEERI is in progress.
Allocation of state fund for this project and Approval on selection of CSIR-NEERI on nomination basis for preparation of DPR to adopt insitu remediation at drains at identified ULBs viz. Chas, Ranchi, Mango and involvement of CSIR – NEERI for
complete implementing including tendering is under process from competent authority.
State Fund
State+ Central
29 MLD
ALONG TALMUCHU
GARGA
41.50 Cr. for Phytorid Technology and RENEU Technology of NEERI.
89 KLD Septage treatment plant under
construction under AMRUT Scheme
Serial No.
Name of the River
River Stretc
h
Approx.
Length of the
Stretch
(Kms)
No. of Villages/
Towns/ Cities along the
river ( Approx. 10 Kms. from
the center of the identified river stretch
length)
Population (as per Census 2011)
Estimated Population
after 15 yrs. (for
year 2035)
Approximate Quantity of
Sewage Generated
(City/Town/Village wise)
Propsed Treatment Facility based on
estimation of population after 15 yrs.
(Numbers and Capacity)
Tentative Budget Required
Funding Agency
Status
Timeline as per the order of Hon'ble
NGT
Curent Status
Current Status on
Networking/ Channelizatio
n including diversion of
sewage generated
from household/town ships/villages to sewer lines
Proposal for Networking/ Channelization including diversion of
sewage generated from household/town ships/villages to
sewer lines
Timeline required
1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23
Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019TABLE -3
Deatials on Municipal Drains which are dischaging into the identified river stretches
Adityapur Municipal
Corporation174355 326578 36 MLD 4 units of 36 MLD
36 MLD STP under construction under AMRUT scheme
State + Central
Work under progress. Till date 55 % of work completed at site.
31.03.2021
Work under progress. Till date 55 % of work completed at site.
Sewerage scheme under construction
Sewerage scheme under construction
Tentative timeline for completion of projct is December 2021
Jamshedpur NAC
677350 1317852 82 MLD 32 MLD 35.20 CrCSR
FUND
NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is recived from NEERI.
Regular consultantion with NEERI is in progress.
Approval for taking funds from TATA group under CSR fund for treatmaent of remaining 32 MLD is under progress.
31.03.2021
50 MLD of waste water is currently treated.
Approx 35.20 Cr. of budget is required for adoption of insitu remediation at drains for treatment of 32 MLD as per NEERI Site visit report. (Budget include capex + 5 years of O&M)NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is awaited from NEERI.
Regular consultantion with NEERI is in progress.
Revised timeline of 31.03.2022 is proposed for adoption of insitu remediation at drains
Mango Municipal
Corporation223805 388730 33 MLD 33 MLD 30 Cr. State Fund
NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is received from NEERI.
Regular consultantion with NEERI is in progress.
Allocation of state fund for this project is in progress.
31.03.2021 NA
Approx 30 Cr. of budget is proposed from State Fund for adoption of insitu remediation at drains for treatment of 33 MLD waste water as per NEERI Site visit report. (Budget include capex + 5 years of O&M)NEERI site visit at drains was done from 03.03.2020 to 07.03.2020.Proposal to goahead for adoption of insitu remediation at drains is awaited from NEERI.
Regular consultantion with NEERI is in progress.
Revised timeline of 31.03.2022 is proposed for adoption of insitu remediation at drains
3
SUBARNAREKHA
HATIA
DAM TO
JAMSHEDPU
R
120
Serial No.
Name of the River
River Stretc
h
Approx.
Length of the
Stretch
(Kms)
No. of Villages/
Towns/ Cities along the
river ( Approx. 10 Kms. from
the center of the identified river stretch
length)
Population (as per Census 2011)
Estimated Population
after 15 yrs. (for
year 2035)
Approximate Quantity of
Sewage Generated
(City/Town/Village wise)
Propsed Treatment Facility based on
estimation of population after 15 yrs.
(Numbers and Capacity)
Tentative Budget Required
Funding Agency
Status
Timeline as per the order of Hon'ble
NGT
Curent Status
Current Status on
Networking/ Channelizatio
n including diversion of
sewage generated
from household/town ships/villages to sewer lines
Proposal for Networking/ Channelization including diversion of
sewage generated from household/town ships/villages to
sewer lines
Timeline required
1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23
Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019TABLE -3
Deatials on Municipal Drains which are dischaging into the identified river stretches
DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on July 2019. NMCG send the DPR To IIT Roorkee for Third Party Appraisal on Jan 2020. DPR appraised by the IIT Roorkee is under progress.
26 months timeline is proposed for Tendering , construction of STP and I&D Scheme after aporoval from NMCG
Namami Gange
(Central fund)
DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on July 2019. NMCG send the DPR To IIT Roorkee for Third Party Appraisal on Jan 2020. DPR appraised by the IIT Roorkee is under progress.
31.03.2021Approval awaided from NMCG
NA3 units of total 144
MLD 381 Cr for Dhanbad
I&D Scheme1484520 144 MLD
12
PHUSRO ROA
D BDG TO
TURIO
DAMODA
R
Dhanbad Municipal
Corporation1162472
29 Exective Committee (EC) of NMCG held on 28.08.2020 through Video Conferncing Executive Committee (EC) resolved to defer the Proposal and take up the same in the next EC meeting due to paucity of time.
NA
DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on may 2019. NMCG send the DPR To IIT Roorkee for Third Party Appraisal on Jan 2020. DPR appraised by the IIT Roorkee on April 2020.
18 months timeline is proposed for Tendering , construction of STP and I&D Scheme after aporoval from NMCG
15 MLD11835089178Phusro Nagar
Parisahd 31.03.2021
DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on may 2019. NMCG send the DPR To IIT Roorkee for Third Party Appraisal on Jan 2020. DPR appraised by the IIT Roorkee on April 2020.
Namami Gange
(Central fund)
64 Cr for Phusro I&D Scheme
2 Unit: SBR Technology 14 MLD
1 unit: Phytorid Technology 1 MLD
4
Serial No.
Name of the River
River Stretc
h
Approx.
Length of the
Stretch
(Kms)
No. of Villages/
Towns/ Cities along the
river ( Approx. 10 Kms. from
the center of the identified river stretch
length)
Population (as per Census 2011)
Estimated Population
after 15 yrs. (for
year 2035)
Approximate Quantity of
Sewage Generated
(City/Town/Village wise)
Propsed Treatment Facility based on
estimation of population after 15 yrs.
(Numbers and Capacity)
Tentative Budget Required
Funding Agency
Status
Timeline as per the order of Hon'ble
NGT
Curent Status
Current Status on
Networking/ Channelizatio
n including diversion of
sewage generated
from household/town ships/villages to sewer lines
Proposal for Networking/ Channelization including diversion of
sewage generated from household/town ships/villages to
sewer lines
Timeline required
1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23
Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019TABLE -3
Deatials on Municipal Drains which are dischaging into the identified river stretches
Approval awaided from NMCG
NA
DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on August 2020.
26 months timeline is proposed for Tendering , construction of STP and I&D Scheme after aporoval from NMCG
2 units of total 40 MLD
252 Cr. for Ramgarh I&D Scheme
Namami Gange
(Central fund)
DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on August 2020.
31.03.2021
DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on July 2019. NMCG send the DPR To IIT Roorkee for Third Party Appraisal on Jan 2020. DPR appraised by the IIT Roorkee is under progress.
26 months timeline is proposed for Tendering , construction of STP and I&D Scheme after aporoval from NMCG
Ramgarh Nagar
Parishad123875 141886 40 MLD
Namami Gange
(Central fund)
DPR to provide I&D structure and STP for drains is prepared and sent to National Mission for Clean Ganga (NMCG) New Delhi for approval on July 2019. NMCG send the DPR To IIT Roorkee for Third Party Appraisal on Jan 2020. DPR appraised by the IIT Roorkee is under progress.
31.03.2021Approval awaided from NMCG
NA3 units of total 144
MLD 381 Cr for Dhanbad
I&D Scheme1484520 144 MLD
12
PHUSRO ROA
D BDG TO
TURIO
DAMODA
R
Dhanbad Municipal
Corporation1162472
Serial No.
Name of the River
River Stretc
h
Approx.
Length of the
Stretch
(Kms)
No. of Villages/
Towns/ Cities along the
river ( Approx. 10 Kms. from
the center of the identified river stretch
length)
Population (as per Census 2011)
Estimated Population
after 15 yrs. (for
year 2035)
Approximate Quantity of
Sewage Generated
(City/Town/Village wise)
Propsed Treatment Facility based on
estimation of population after 15 yrs.
(Numbers and Capacity)
Tentative Budget Required
Funding Agency
Status
Timeline as per the order of Hon'ble
NGT
Curent Status
Current Status on
Networking/ Channelizatio
n including diversion of
sewage generated
from household/town ships/villages to sewer lines
Proposal for Networking/ Channelization including diversion of
sewage generated from household/town ships/villages to
sewer lines
Timeline required
1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23
Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019TABLE -3
Deatials on Municipal Drains which are dischaging into the identified river stretches
5 JUMAR
KANKE
DAM TO
KADAL
10Ranchi
Municipal Corporation
1073427 3348023 37 MLD 1 unit of 37 MLD
209.05 Cr project cost for the Ranchi sewage
scheme under Zone -1 , Tender has been
floated. Date of opening of Tender is 01.10.2020
State Fund
Sewerage Scheme for Zone-1 Ranchi, under Ranchi Municipal Corporation (in which
river Jumar falls) was started but due to the poor performance of the executing agency
the agreement has been terminated on dated 14.10.2019.
209.05 Cr project cost for the Ranchi sewage scheme under Zone -1.
Tender has been floated. Date of opening of Tender is 01.10.2020
31.03.2021
Tender for the construction of remaining work
has been floated by the RMC. Date of opening of Tender
is 01.10.2020
NA
Sewerage Scheme for Zone-1 Ranchi, under Ranchi Municipal
Corporation (in which river Jumar falls) was started but due to
the poor performance of the executing agency the agreement
has been terminated on dated 14.10.2019.
209.05 Cr project cost for the Ranchi sewage scheme under Zone
-1.
Tender has been floated. Date of opening of Tender is 01.10.2020
24 months timeline is proposed for construction of STP and laying of sewer network under Zone-I from the date of agreement.
6 KONAR
ALONG
TILAYA
AND KONAR
-
No ULB falls under the identified stretch of
River
-
Serial No.
Name of the River
River Stretc
h
Approx.
Length of the
Stretch
(Kms)
No. of Villages/
Towns/ Cities along the
river ( Approx. 10 Kms. from
the center of the identified river stretch
length)
Population (as per Census 2011)
Estimated Population
after 15 yrs. (for
year 2035)
Approximate Quantity of
Sewage Generated
(City/Town/Village wise)
Propsed Treatment Facility based on
estimation of population after 15 yrs.
(Numbers and Capacity)
Tentative Budget Required
Funding Agency
Status
Timeline as per the order of Hon'ble
NGT
Curent Status
Current Status on
Networking/ Channelizatio
n including diversion of
sewage generated
from household/town ships/villages to sewer lines
Proposal for Networking/ Channelization including diversion of
sewage generated from household/town ships/villages to
sewer lines
Timeline required
1 2 3 4 5 6 7 8 15 16 17 18 19 20 21 22 23
Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019TABLE -3
Deatials on Municipal Drains which are dischaging into the identified river stretches
7NALKAR
I
ALONG
PATRAT
U
-
No ULB falls under the identified stretch of
River
-
Serial No.
Name of the River
River Stretch
Approx.
Length of the
Stretch (Kms)
No. of Villages/ Towns/ Cities
along the river ( Approx. 10 Kms. from the center of the identified river
stretch length)
Population (as per
Census 2011)
Estimated Population
after 15 yrs.
Total Quantity of MSW Waste
Generated in the town
/city/village(in TPD)
Total Quantity of MSW Waste
Treated (In TPD)(
City/Town/Village Wise)
Gap Analysi
s
Details on Current Method adotped to prevent improper
disposal of untreated waste prior to the
completion of proposed project
Approx. Budget
Funding Agency Current Status
door to door collection
Segerated OthersRecyled/ Rused/
RDF Quantity and Numbers
Composting/Biomining Quantity and Numbers
Landfilable Quantity and
NumbersOthers Number Capacity Technology Other
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 26
1 GARGA
ALONG
TALMUCHU
8Chas
Municipal Corporation
156888 243675 47 p100% D2D collection at all 35 wards
91.4% - 18.8 TPD
Material recovery facility (MRF) for
segregation of waste 1 nos.Wet Waste:
Windrow composting : 2 nos.
Dry waste: recycled through
recycler
28.2 28.2
Material recovery facility (MRF) for
segregation of waste 1 nos.Wet Waste:
Windrow composting : 2
nos.Dry waste:
recycled through recycler
1 no waste to compost
50 MT
With intrgrated MSW solutions (Processing technology - waste to compost)
Further processing facility of the waste will be increased through concessionaire.
Capex: 21.26 Crore
PPP+State+Central + ULB Share
Concessionaire has been selected. Agreement has been done.
2 SANKH
KONGSERABASAR TO BOLBA
10
No ULB falls under the identified stretch of
River
- -
Ranchi Municipal
Corporation1073427 3348023 536 270
100% D2D collection at all 53 wards
100% - 110 TPD
Material recovery facility (MRF) for
segregation of waste: 9 nos.
Wet Waste: Pit Compost: 40 nos.
Dry waste: recycled through
recyclerC&D Recycle : 1
nos.
266 266
Material recovery facility (MRF) for
segregation of waste: 9 nos.
Wet Waste: Pit Compost: 40 nos.
Dry waste: recycled through
recyclerC&D Recycle : 1
nos.
Biomethanation Plant is under approval.
-
Separate Collection, Transportation & Processing (Waste to Biomethanation Technology) solution
Further processing facility of the waste will be increased through PSU/CSR
Capex: 64 Crore
State+Central +ULB+PSU Share
Under approval Stage
Action Plan for 7 Polluted River Stretches of Jharkhand under Hon'ble NGT order dated, 08.04.2019 in O.A. No. 673/2019TABLE - 4
Deatials on Municipal Solid Waste Dumped along the identified river stretches
Type of the treatment facility Present Quantity of MSW Treated Proposed Project for remaining untreated waste
3
SUBARNAREKHA
HATIA
DAM TO
JAMSHEDPU
R
Serial No.
Name of the River
River Stretch
Approx.
Length of the
Stretch (Kms)
No. of Villages/ Towns/ Cities
along the river ( Approx. 10 Kms. from the center of the identified river
stretch length)
Population (as per
Census 2011)
Estimated Population
after 15 yrs.
Total Quantity of MSW Waste
Generated in the town
/city/village(in TPD)
Total Quantity of MSW Waste
Treated (In TPD)(
City/Town/Village Wise)
Gap Analysi
s
Details on Current Method adotped to prevent improper
disposal of untreated waste prior to the
completion of proposed project
Approx. Budget
Funding Agency Current Status
door to door collection
Segerated OthersRecyled/ Rused/
RDF Quantity and Numbers
Composting/Biomining Quantity and Numbers
Landfilable Quantity and
NumbersOthers Number Capacity Technology Other
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 26
TABLE - 4Deatials on Municipal Solid Waste Dumped along the identified river stretches
Type of the treatment facility Present Quantity of MSW Treated Proposed Project for remaining untreated waste
Adityapur Municipal
Corporation174355 326578 59.95 34
100% D2D collection at all 35 wards
100% - 6
Material recovery facility (MRF) for segregation of waste: 1 nosWet Waste: Pit composting - 11 nos.Dry waste: recycled through recycler
25.95 25.95
Material recovery facility (MRF) for segregation of waste: 1 nosWet Waste: Pit composting - 11 nos.Dry waste: recycled through recycler
Jamshedpur NAC
677350 1317852 214 48100% D2D collection at all 4 zones
100% - 6
Material recovery facility (MRF) for segregation of waste: 4 nosWet Waste: Pit composting - 8 nos.Dry waste: recycled through recycler Biomethaneation Plant - 9 nos.
166 166
Material recovery facility (MRF) for segregation of waste: 4 nosWet Waste: Pit composting - 8 nos.Dry waste: recycled through recycler Biomethaneation Plant - 9 nos.
120Mango
Municipal Corporation
223805 388730 77.81 33.1100% D2D collection at all 3 wards
100% - 22.5
Material recovery facility (MRF) for segregation of waste: 1 nosWet Waste: Pit composting - 20 nos.Dry waste: recycled through recycler C&D Recycling unit -1 nos.
44.71 44.71
Material recovery facility (MRF) for segregation of waste: 1 nosWet Waste: Pit composting - 20 nos.Dry waste: recycled through recycler C&D Recycling unit -1 nos.
Further processing
facility of the waste will be
increased through
concessionaire
Capex: 78.63
Crore In cluster
(Adityapur+Jamshedpur+Mango+jugsalai+kapali)
PPP+State+Central + ULB
Share
DPR under
Revision
1 no waste to compost
300 MT
With intrgrated MSW solutions
(Processing technology -
waste to compost)
3
SUBARNAREKHA
HATIA
DAM TO
JAMSHEDPU
R
Serial No.
Name of the River
River Stretch
Approx.
Length of the
Stretch (Kms)
No. of Villages/ Towns/ Cities
along the river ( Approx. 10 Kms. from the center of the identified river
stretch length)
Population (as per
Census 2011)
Estimated Population
after 15 yrs.
Total Quantity of MSW Waste
Generated in the town
/city/village(in TPD)
Total Quantity of MSW Waste
Treated (In TPD)(
City/Town/Village Wise)
Gap Analysi
s
Details on Current Method adotped to prevent improper
disposal of untreated waste prior to the
completion of proposed project
Approx. Budget
Funding Agency Current Status
door to door collection
Segerated OthersRecyled/ Rused/
RDF Quantity and Numbers
Composting/Biomining Quantity and Numbers
Landfilable Quantity and
NumbersOthers Number Capacity Technology Other
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 26
TABLE - 4Deatials on Municipal Solid Waste Dumped along the identified river stretches
Type of the treatment facility Present Quantity of MSW Treated Proposed Project for remaining untreated waste
Phusro Nagar Parisahd
89178 118350 41.89 17.5 (16.5+1)100% D2D collection at all 28 wards
100% - 0
Wet Waste: Pit composting - 2 nos.
24.39 24.39
Wet Waste: Pit composting - 2 nos.
1 no waste to compost
50 MT
With intrgrated MSW solutions (Processing technology - waste to compost)
Further processing facility of the waste will be increased through concessionaire
Capex: 13.45 Crore
PPP+State+Central+ULB Share
Concessionaire has been selected. Agreement has been done.
Dhanbad Municipal
Corporation1162472 1484520 540 290
100% D2D collection at all 55 wards
100% 110
Material recovery facility (MRF) for segregation of waste: 55 nosWet Waste: Pit composting - 143 nos.Dry waste: recycled through recycler C&D Recycling unit -5 nos.
250 250
Material recovery facility (MRF) for segregation of waste: 55 nosWet Waste: Pit composting - 143 nos.Dry waste: recycled through recycler C&D Recycling unit -5 nos.
1 no waste to compost
500 MT
With intrgrated MSW solutions (Processing technology - waste to compost)
Further processing facility of the waste will be increased through concessionaire
Capex: 84 Crore
PPP+State+Central+ULB Share
Concessionaire has been selected. Agreement has been done.
Ramgarh Nagar
Parishad123875 141886 30 24
100% D2D collection at all 32 wards
100% 0
Wet Waste: Pit composting - 32 nos.Dry waste: recycled through recycler C&D collection unit -1 nos.
6 6
Wet Waste: Pit composting - 32 nos.Dry waste: recycled through recycler C&D unit -1 nos.
Tentative Capex: 31 Crore
PPP+State+Central+ULB+ Cantonment Board Share
DPR under
preparation
5 JUMAR
KANKE
DAM TO
KADAL
10Ranchi
Municipal Corporation
1073427 3348023 536 270100% D2D collection at all 53 wards
100% 110 TPD
Material recovery facility (MRF) for
segregation of waste: 9 nos.
Wet Waste: Pit Compost: 40 nos.
Dry waste: recycled through
recyclerC&D Recycle : 1
nos.
266 266
Material recovery facility (MRF) for
segregation of waste: 9 nos.
Wet Waste: Pit Compost: 40 nos.
Dry waste: recycled through
recyclerC&D Recycle : 1
nos.
Biomethanation Plant is under approval.
-
Separate Collection, Transportation & Processing (Waste to Biomethanation Technology) solution
Further processing facility of the waste will be increased through PSU/CSR
Capex: 64 Crore
State+Central +ULB+PSU Share
Under approval Stage
4DAMODA
R
PHUSRO ROA
D BDG TO
TURIO
12
Serial No.
Name of the River
River Stretch
Approx.
Length of the
Stretch (Kms)
No. of Villages/ Towns/ Cities
along the river ( Approx. 10 Kms. from the center of the identified river
stretch length)
Population (as per
Census 2011)
Estimated Population
after 15 yrs.
Total Quantity of MSW Waste
Generated in the town
/city/village(in TPD)
Total Quantity of MSW Waste
Treated (In TPD)(
City/Town/Village Wise)
Gap Analysi
s
Details on Current Method adotped to prevent improper
disposal of untreated waste prior to the
completion of proposed project
Approx. Budget
Funding Agency Current Status
door to door collection
Segerated OthersRecyled/ Rused/
RDF Quantity and Numbers
Composting/Biomining Quantity and Numbers
Landfilable Quantity and
NumbersOthers Number Capacity Technology Other
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 26
TABLE - 4Deatials on Municipal Solid Waste Dumped along the identified river stretches
Type of the treatment facility Present Quantity of MSW Treated Proposed Project for remaining untreated waste
6 KONAR
ALONG
TILAYA
AND KONAR
-
No ULB falls under the identified stretch of
River
-
7 NALKARI
ALONG
PATRAT
U
-
No ULB falls under the identified stretch of
River
-
Serial No.
Name of the
River
River Stretch
Approx.
Length of the
Stretch
(Kms)
No. of Villages/ Towns/ Cities
along the river ( Approx. 10
Kms. from the center of the
identified river stretch length)
Population (as per Census 2011)
Estimated Population after 15 yrs.
Total Quantity of
Plastic Waste Generated in
the town/cily/village (in TPD)
Total Quantity of
Plastic Waste Treated (In
TPD)( City/Town/Vil
lage Wise)
Gap Analy
sis
Details on Current Method adotped to prevent improper
disposal of untreated waste prior to the
completion of proposed project
Recyled/ Rused Quantity and
Numbers
RDF Quantity and Numbers
Landfilable Quantity and Numbers
Others Number Capacity Technology Other
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
1 GARGA
ALONG
TALMUCHU
8 Chas Municipal
Corporation
156888 243675 3.46 0 3.46 0 0 Through local Scrap vendors it is send to recycler
0 All the Plastic waste is recycled through local scrap dealer
- - - Further, Treatment Plant for plastic waste will be installed
through concessionaire
2 SANKH
KONGSERABAS
AR TO
BOLB
10 No ULB falls under the identified stretch of
River
- -
Ranchi Municipal
Corporation
1073427 3348023 70 0 70 0 0 Through local Scrap vendors it
is send to recycler
0 All the Plastic waste is recycled through local scrap dealer
- - - -
Adityapur Municipal
Corporation
174355 326578 5 0 4 0 1 Through local Scrap vendors it
is send to recycler
1 All the Plastic waste is recycled through local scrap dealer
- - - -
Deatials on Plastic Waste Dumped along the identified river stretches
Type of the treatment facility Present Proposed Project for remaining untreated waste
TABLE - 4
3 SUBARNAREKHA
HATIA
DAM TO
JAMSHEDP
UR
120
Serial No.
Name of the
River
River Stretch
Approx.
Length of the
Stretch
(Kms)
No. of Villages/ Towns/ Cities
along the river ( Approx. 10
Kms. from the center of the
identified river stretch length)
Population (as per Census 2011)
Estimated Population after 15 yrs.
Total Quantity of
Plastic Waste Generated in
the town/cily/village (in TPD)
Total Quantity of
Plastic Waste Treated (In
TPD)( City/Town/Vil
lage Wise)
Gap Analy
sis
Details on Current Method adotped to prevent improper
disposal of untreated waste prior to the
completion of proposed project
Recyled/ Rused Quantity and
Numbers
RDF Quantity and Numbers
Landfilable Quantity and Numbers
Others Number Capacity Technology Other
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Deatials on Plastic Waste Dumped along the identified river stretches
Type of the treatment facility Present Proposed Project for remaining untreated waste
TABLE - 4
Jamshedpur NAC
677350 1317852 17.12 0 6 0 11.12 ( Through the local Scrap vendors it is
send to recycler and also used for
road construction)
11.12 All the Plastic waste is recycled through local scrap dealer
- - - -
Mango Municipal
Corporation
223805 388730 2 0 2 0 0 Through local Scrap vendors it
is send to recycler
0 All the Plastic waste is recycled through local scrap dealer
- - - -
Phusro Nagar Parisahd
89178 118350 4.6 0 1.2 0 4.6 Through local Scrap vendors it
is send to recycler
3.4 All the Plastic waste is recycled through local scrap dealer
- - - -
Dhanbad Municipal
Corporation
1162472 1484520 43.2 0 43.2 0 0 Through local Scrap vendors it
is send to recycler
0 All the Plastic waste is recycled through local scrap dealer
- - - -
Ramgarh Nagar
Parishad
123875 141886 0.8 0 0.8 0 0 Through local Scrap vendors it
is send to recycler
0 All the Plastic waste is recycled through local scrap dealer
- - - -
4 DAMODAR
PHUSRO
ROAD
BDG TO
TURIO
12
3 SUBARNAREKHA
HATIA
DAM TO
JAMSHEDP
UR
120
Serial No.
Name of the
River
River Stretch
Approx.
Length of the
Stretch
(Kms)
No. of Villages/ Towns/ Cities
along the river ( Approx. 10
Kms. from the center of the
identified river stretch length)
Population (as per Census 2011)
Estimated Population after 15 yrs.
Total Quantity of
Plastic Waste Generated in
the town/cily/village (in TPD)
Total Quantity of
Plastic Waste Treated (In
TPD)( City/Town/Vil
lage Wise)
Gap Analy
sis
Details on Current Method adotped to prevent improper
disposal of untreated waste prior to the
completion of proposed project
Recyled/ Rused Quantity and
Numbers
RDF Quantity and Numbers
Landfilable Quantity and Numbers
Others Number Capacity Technology Other
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Deatials on Plastic Waste Dumped along the identified river stretches
Type of the treatment facility Present Proposed Project for remaining untreated waste
TABLE - 4
5 JUMAR
KANKE
DAM TO
KAD
10 Ranchi Municipal
Corporation
1073427 3348023 70 0 70 0 0 Through local Scrap vendors it
is send to recycler
0 All the Plastic waste is recycled through local scrap dealer
-
6 KONAR
ALONG
TILAYA
AND KONAR
- No ULB falls under the identified stretch of
River
-
7 NALKARI
ALONG
PATRATU
- No ULB falls under the identified stretch of
River
-
Serial No.
Name of the River
River Stretch
Approx. Length of the
Stretch (Kms)
No. of Villages/ Towns/ Cities
along the river ( Approx. 10
Kms. from the center of the
identified river stretch length)
Population (as per Census 2011)
Estimated Population
after 15 yrs.
Total Quantity of C&DWaste Generated in
the town/cily/village (in TPD)
Total Quantity of C&D Waste Treated (In
TPD)( City/Town/Vil
lage Wise)
Gap Analysis
Details on Current Method adotped to prevent improper
disposal of untreated waste prior to the
completion of proposed project
Recyled/ Rused Quantity and
NumbersLandfilable Quantity and NumbersOthers Number Capacity Technology Other
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 181 GARGA ALONG
TALMUCHU
8 Chas Municipal Corporation
156888 243675 5 - 5 0 - 0 Land filling of low lying area
Construction sitefor Construction of
PCC road
- ` - -
2 SANKH KONGSERABASA
R TO
10 No ULB falls under the
identified stretch
- -
Ranchi Municipal
Corporation
1073427 3348023 20 - 20 0 For treatment of C&D waste, Tender was floated but due
to single bidder found responsive in 1st call, tender was
cancelled and retendering is under
0 Land filling of low lying area
Construction sitefor Construction of
PCC road
1 50 TPD (Projected as per next 15 years)
C&D waste Recycling Plant
For treatment of C&D waste, Tender was
floated but due to single bidder
found responsive in 1st call, tender was cancelled and Adityapur
Municipal Corporation
174355 326578 1.75 1.75 0 - Land filling of low lying area
Construction sitefor Construction of
PCC road
- ` - -
Jamshedpur NAC
677350 1317852 17.5 - 17.5 0 - Land filling of low lying area
Construction site
- ` - -
Mango Municipal
Corporation
223805 388730 2 - 2 0 - Land filling of low lying area
- ` - -
Phusro Nagar Parisahd
89178 118350 7 - 7 0 - Land filling of low lying area
- ` - -
Dhanbad Municipal
Corporation
1162472 1484520 24 - 24 0 - Land filling of low lying area
Construction sitefor Construction of
- ` - -
Ramgarh Nagar Parishad
123875 141886 0.5 - 0.5 0 - Land filling of low lying area
Construction sitefor Construction of
PCC road
- ` - -
5 JUMAR KANKE DAM TO KADAL
10 Ranchi Municipal
Corporation
1073427 3348023 20 - 20 0 For treatment of C&D waste, Tender was floated but due
to single bidder found responsive in 1st call, tender was
cancelled and retendering is under
process.
0 Land filling of low lying area
Construction sitefor Construction of
PCC road
1 50 TPD (Projected as per next 15 years)
C&D waste Recycling Plant
For treatment of C&D waste, Tender was
floated but due to single bidder
found responsive in 1st call, tender was cancelled and
retendering is under process.
6 KONAR ALONG TILAYA
AND KONAR
-
7 NALKARI
ALONG PATRAT
U
-
4 DAMODAR
PHUSRO ROAD
BDG TO TURIO
12
TABLE - 4Deatials on Construction & Demoliation (C&D) Waste Dumped along the identified river stretches
Type of the treatment facility Present Proposed Project for remaining untreated waste
3 SUBARNAREKHA
HATIA DAM TO JAMSHE
DPUR
120
List of Industries present along Subarnarekha river stretch with their Name, Type/Category and Status of E.T.P. installed.
Sl. no.
Name of Industries present along the
catchment basin of the defined stretches
Type/Category of Industries
Status of E.T.P. with respect to the industries present
along the river stretches
Treatment Capacity of ETP
01 M/s. Heavy Engineering Corporation Ltd., Foundry Forge Plant, Dhurwa, Ranchi.
Red/ Foundry Forge Plant
E.T.P. Installed Adequate
02 M/s. Hindalco Industries Ltd, Muri works. Po-Chhotamuri, Dist.-Ranchi.
Red/Alumina Plant without
smelter
E.T.P. Installed Adequate
03 M/s. Usha Martin Ltd., Wire rope and specialty Division, Captive Power Plant, At.-Tatisilway, Dist.-Ranchi.
Red/Wire & Wire Rope
E.T.P. Installed Adequate
04 M/s Samridhi Rice Mill Pvt. LTD. At.- Malar, Bero, Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
05 M/s Hemraj Rice Products Pvt. Ltd., At.- At-Saher, Po-Nagari, Dist.-Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
06 M/s Sri Krishna Metcom, At. -Nagari, Dist.-Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
07 M/s Prateek Agro Experts (P) Ltd., Futkaltoli Simalia Ratu, Kanke Ranchi
Orange/ Rice Mill
E.T.P. Installed Unit is not operational
08 M/s Narmada Agro Foods (P) Ltd. At.-Bandhtoli, Piska Nagari, Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
09 M/s Bihariji Rice Mill, At.-Tikratoli, Nagari, Ranchi.
Orange/ Rice Mill
E.T.P. Installed Adequate
10 M/s Sri Krishna Rice Mill, At. Bandhtoli, Piska Nagari, Dist.-Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
11 M/s Baba rice mill, At.-Bandhtoli, Piska Nagari, Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
12 M/s Sharvi Rice Mill (P) Ltd., At.-Nagri, Po-Piska Nagri, Dist.-Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
13 M/s Satnarayan Agro Pvt. Ltd. At-Agrawal, At-Bandhtoli, Nagri, Ranchi
Orange/ Rice Mill
E.T.P. Installed Unit is not operational
14 M/s Balajee Agrotech Industries, At-Tikratoli, Po-Piska, Nagari, Dist.-Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
15 M/S Chorus Agro Pvt. Ltd., At.-Tupudana Industrial Area, Dist.-Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
16 M/S Shree Shakambari Rice Mill Pvt. Ltd., At.-Industrial Area Tupudana, Dist.-Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
17 M/s Bihar State Milk Co-Operative Federation Ltd., (Ranchi Dairy) At+Mauza-Sector-2, HEC, Po-Dhurwa, Ranchi
Red/ Dairy E.T.P. Installed Adequate
18 M/s Hotel Raddison Blu, Kadru, Bypass Road, Ranchi
Red/ Hotel E.T.P. Installed Adequate
19 M/s Hotel BNR Chanakya, Railway Station Road, Ranchi
Red/ Hotel E.T.P. Installed Adequate
20 M/s S.M.V. Agro Products Pvt. Ltd., At.- Ara Gate, Mahilong, Angara, Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
21 M/s Tulsyan Rice Mill Pvt.Ltd., Tatisilway, I/A, Phase-II, Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
22 M/s KGVK Agro Limited (Dairy Unit), At+ Mauza- Hutup & Rukka, Dist.-Ranchi
Red/ Dairy E.T.P. Installed Adequate
23 M/s. Balaji food & Grains (P) Ltd. At.- Lotwa, Po- Sandi, Dist- Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
24 M/s Rani Sati Food Grains, Rukka,Ormanjhi, Dist- Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
(R.N. Kashyap) Regional Officer
Ranchi
List of Industries present along Jumar river stretch with their Name, Type/Category and Status of E.T.P. installed.
Sl. no.
Name of Industries present along the
catchment basin of the defined stretches
Type/Category of Industries
Status of E.T.P. with respect to the industries present
along the river stretches
Treatment Capacity of ETP
01 M/s KGVK Agro Limited (Dairy Unit), At+ Mauza- Hutup & Rukka, Dist.-Ranchi
Red/ Dairy E.T.P. Installed Adequate
02 M/s. Balaji food & Grains (P) Ltd. At.- Lotwa, Po- Sandi, Dist- Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
03 M/s Rani Sati Food Grains, Rukka,Ormanjhi, Dist- Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
(R.N. Kashyap) Regional Officer Ranchi
List of Industries present along Jumar river stretch with their Name, Type/Category and Status of E.T.P. installed.
Sl. no.
Name of Industries present along the
catchment basin of the defined stretches
Type/Category of Industries
Status of E.T.P. with respect to the industries present
along the river stretches
Treatment Capacity of ETP
01 M/s KGVK Agro Limited (Dairy Unit), At+ Mauza- Hutup & Rukka, Dist.-Ranchi
Red/ Dairy E.T.P. Installed Adequate
02 M/s. Balaji food & Grains (P) Ltd. At.- Lotwa, Po- Sandi, Dist- Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
03 M/s Rani Sati Food Grains, Rukka,Ormanjhi, Dist- Ranchi
Orange/ Rice Mill
E.T.P. Installed Adequate
(R.N. Kashyap) Regional Officer Ranchi
$11'<~O\S ~I\iiI >t~ol Pt li?t 01 m,~ ¢1<:jlC'1<:j-W-q<T'PI~lTcqT. -Qloilo'<:no ::ctfcp, TJGClI~ m, ~~~\Ji.......JI~'-+-IGl~I~JII
Ref . Datc .
Details of the drain meeting in the river in R.O. Hazaribag area in the respect of writpetition(s)(Civil) no(s) 13029/1985, in the matter of M.C. Mehta Vrs. Union of India&Ors.
SL. No.
1
Name of Unit & AddressMis Urimari Project, CCL,At+PO- Urimari, Hazaribag
_\J~jv~!__\ Damodar
Damodar River
River
I
j~~~TOvaliditY __ 1 Treated/UntreatedI Till 15.02.2021 I Treated through1 i. settling tank &
, discharge.TiI130.06.2023 : Treated through
! settling tank &I discharge.
Tilj-jT:Oi20io-~j l~~~ated Ih~;~gI~i settling tank &! discharge.-~--------------- --1 ---- ----~~: Treated through, settling tank &
discharue.---.- -_'-' .
Zero liquid discharge
2 Mis Birsa Project, CCL,.At+PO- Urimari, Hazaribag
11
,
i -! :Viis Central Coal field Ltd.
Kedla Washery, CCL,At- Basantpur, PO-kedla, Dist- Ramgarh
Damodar River1-- ------~--- --------~-- - -----~----- -- ------ ---II 3 Mis Giddi A, Colliery. CCL,
At+PO- Giddi. Hazaribag
'1-- ---~---------~~------------ ----~~-~-----~---------4 ! Mis New Giddi C, Colliery, CCL,
I AtWO- Giddi, HazaribagI
Damodar
r- ---5~---1-M/s Giddi Co~I\Vashery, CCL,
~. ._~ __l_I~_t2f(~_C_Jiddi,!?~t::~<I;>:<lrib<l_gI 6 i Mis Rajrappa OCP, CCL,I I At+-PO- Rajrappa, Dist-Ramgarh
\--------7--f MI, I{,j"PP'W"hory;-CC'J .:- ----
i- 8 ---1 ~t/~~i~~~:~~~P~:~{:~~~~~~I?;rh, I At-Bongabar, 1'0- Bharechnagar,
! Dist- Rarngarh
Treated throughsettling rank &
___ ~ discharge.Till 31.03.2020 Zero liquid discharge
-Till 30.06.2020 J TP Installed.
j rca ted effluent Keptin katchha pond ()WI~
land.
-- -9-----1' M/s-kun] Bihari Food Processing (p) Ltd .•At- Sukrigarha, PO-Lari, Ramgarh
I I
I !
I·----\-~---------------------~-~---1 10 Mis Karma Open Cast Project,: ! At;-PO- Karma, Dist-Rarngarh
Till 31.12.2020- -
[TP Installed.lrcatcd effluent keptin katchha pond ownland.
Till 31.12.2022 Treated throughsettling tank &discharge.
Chutuwa "allah-
rill 30.06.202 J . Zero liquid discharge
------~-- ._ .._-- _._- - __ .-_---_- ..--_"
Till 31. J 2.2006 Treated throughsettling tank &discharge .
12 Mis Argadda Colliery, CCL,At+PO- Argadda, Ramgarh
Mis Sirka Colliery(Sirka U/G & SirkaOep) CCLAt-Sirka. PO- Argadda, Distk.amgarh
14 Mis Religarha Colliery. CCLAt- Rei igarha, Dis- I!azari bag
..._.---__ ..- -
rill 3 J .03.20 19 Treated throughsettling lank &discharge.
Damodar River I rill 31.03.2022 Treated throughsettling tank &discharge., ,
I--~- I__- ~ - _
r 15 1 Mis Purnadih Open Cast Project, CCLI I At-Purnadih, Dist- Chatrai :~ I
-Damodar River Till 3 J .12.2020 lrcatcd through
settling tank &discharge.
OmlOffice Worklpage no. - 1266
I 1~~~M/S Ashoka Project, CCL, III Damodar RiverPO-Bachra, Dist- Chatra
--17 Mi,Pip,';';"-O';;;; C,;; Project, CCL, I Damcdar River
118----j-:;:::;;~;;;~~h'"'D'''-Chatra -1-f:5am;;-d-arRiver
i I At-Piparwar, PO-Bachra, Dist- Chatra
! I I
II 19 I Mis Pali Hills Breweries(p) I:td,~--~- -1-Nafk:;i River! At- Industrial Area, PO-Patratu, Ramgarh I
i- 20 - -\ Mis i-i.R. r:·ood-Proeessi·l~g(p) Ltd., \1\lalkari Ri~~~i At- Industrial Area, PO-Patratu, Ramgarh
1---21- MTsS~u-n-daDCOlii~~y,(:(=1., -hNalkari River
I At-Sounda, Dist-Ramgarh
1--22 ~/~tS:y:~a~i~e~lliery, C-C-L~---··~----·-· --i-)-a-m-o-d~~I{i~;-~1-·-I'-ill-jJ:03-.-20-04--1-N(rtope;a-tl-·v-e--.
At-+ po- Sayal, Dist-Ramgarh I!
; 23 T~:;~:~:'~~~~::~~;:::'i;~~~;;hNalkari Ri~;;--I,ITJj U22004 -i-:~oi;;p,~~tiv<--. __._.I(~.~~~)?_el:atiVe) .
, 24 i Mis Bhurkunda Colliery, CCL,I I At·, PO- Bhurkunda, RamgarhL- "-- ---
Nalkari Rivcr
}
OmlOffice Worklpage no. - 1267
Till 31.03.2020 Treated throughsettling tank &disc_~,!rge. _
Till 31.03.2020 Treated throughsettling tank &
. _. ~_!. _~~0arg':.: ...Till 31. I2.2007 1 Zero liquid discharge
t,··;· ~-. -" --)' .._-_.._--\ -~;;-;-- ..---- lL, --., nu _,1.03._017 ,L I P Installed,i ' Treated effluent goesI out side thc....E!_cmises.
--1 .. ---- E·Tp-II~stalled,- .-
Treated effluent goes_________ I OL~l~idethy premises.
Till 31.12.2006 I Not operative
Till 31.12.2019 Treated throughsettiing tank &discharge ...
(A.K. Yadav)
Regional Officer
List of Industries present along GARGA river stretch with their Name, Type/Category and Status of E.T.P. installed.
Sl. no.
Name of Industries present along the
catchment basin of the defined stretches
Type/Category of Industries
Status of E.T.P. with respect to the industries present
along the river stretches
Treatment Capacity of ETP
1 M/s. Bokaro Steel Ltd., Bokaro
Red/Integrated Steel
E.T.P. Installed Adequate
2 M/s. Bokaro Dairy, BIHAR STATE MILK COOPERATIVE FEDERATION LTD,At- SECTOR12F BOKARO STEEL CITY, PO-Chas, Dist- Bokaro
Red/ Dairy Product
E.T.P. Installed ( Not functioning)
Adequate
3 M/s. Bokaro Power Supply Co. Ltd.At- B.S. City. Bokaro
Red/Thermal Power Plant
E.T.P. Installed Adequate
STN CodeSampling
DateSampling
Time
Name Of Monitoring
Location
Name Of WaterBody
Sub Basin DistrictTemperature
©
Dissolved O2 (mg/l)
pHBOD
(mg/l)Turbidity
(mg/l)
Total Alkalinity
(mg/l)
Chlorides (mg/l)
COD (mg/l)
Total Hardness
(mg/l)
Calcium (mg/l)
Magnesium (mg/l)
Sulphate (mg/l)
Total Dissolved
Solids (mg/l)
Total Fixed Solids (mg/l)
Total Suspended
Solids (mg/l)
2382 10/08/20 11:30 AM DAMODAR AT PHUSRO ROAD BRIDGE
DAMODAR DAMODAR BOKARO 34 7.6 7.5 1.6 Not Analysed
98 48 92 70 13.6 8.78 Not Analysed
536 Not Analysed
102
3557 10/08/20 12:05 PM DAMODAR RIVER NEAR BERMO RAILWAY STATION, BOKARO
DAMODAR DAMODAR BOKARO 35.5 7.7 7.5 1.4 Not Analysed
112 54 88 66 12 8.74 Not Analysed
534 Not Analysed
88
3555 10/08/20 1:20 AM DAMODAR RIVER NEAR ZARANGDIH BRIDGE, BOKARO
DAMODAR DAMODAR BOKARO 36 7.9 7.6 1.3 Not Analysed
100 54 80 86 13.6 11.95 Not Analysed
532 Not Analysed
84
3556 10/08/20 2:00 AM CONFLUENCE OF BOKARO & DAMODAR RIVER NEAR ZARANGDIH BRIDGE, BOKARO
DAMODAR DAMODAR BOKARO 35.5 7.8 7.5 1.8 Not Analysed
112 64 96 90 15.2 12.68 Not Analysed
514 Not Analysed
112
3554 10/08/20 2:50 AM KONAR RIVER NEAR SWANG COAL WASHERY, BOKARO
KONAR DAMODAR BOKARO 35 7.6 7.5 1.5 Not Analysed
122 66 100 88 14.4 12.68 Not Analysed
544 Not Analysed
104
2390 10/08/20 5:15 AM KONAR AT TENUGHAT DAM
KONAR DAMODAR BOKARO 25 7.4 7.6 1.1 Not Analysed
94 38 76 70 14.4 8.29 Not Analysed
454 Not Analysed
74
23 18/08/20 2:30 AM SUBARNAREKHA AT RANCHI, (TATISILWAI)
SUBARNAREKHA
SUBARNAREKHA
RANCHI 21 6.8 7.5 2.6 Not Analysed
86 16 44 110 28.8 9.27 Not Analysed
388 430 42
2385 18/08/20 12:40 PM SUBARNAREKHA AT NAMKUM ROAD BRIDGE
SUBARNAREKHA
SUBARNAREKHA
RANCHI 22 6.4 6.5 2.4 Not Analysed
82 16 32 122 33.6 9.27 Not Analysed
Not Analysed
398 472
2386 19/08/20 11:30 AM SUBARNAREKHA AT MURI ROAD BRIDGE
SUBARNAREKHA
SUBARNAREKHA
RANCHI 22 7.8 7.5 2.4 Not Analysed
86 22 28 124 36.8 7.8 Not Analysed
388 428 40
2395 18/08/20 8:40 AM SUBARNAREKHA AT HATIA DAM
SUBARNAREKHA
SUBARNAREKHA
RANCHI 18 8.5 7.3 1.1 Not Analysed
84 18 24 118 32.4 9.03 Not Analysed
404 456 52
2396 18/08/20 10:35 AM JUMAR AT KANKE DAM
JUMAR DAMODAR RANCHI 20 6.9 7.5 2.1 Not Analysed
74 16 28 122 33.6 9.27 Not Analysed
384 424 40
2397 18/08/20 4:30 AM SUBARNAREKHA AT GATALSUD DAM
SUBARNAREKHA
SUBARNAREKHA
RANCHI 20 8.4 7.4 2 Not Analysed
82 22 32 120 30.4 10.74 Not Analysed
334 384 50
48 29/08/20 10:15 AM SUBARNAREKHA AT CHANDIL BRIDGE
SUBARNAREKHA
SUBARNAREKHA
EAST SINGHBHUM
25.5 7.8 7.4 0.7 5 16 12 4 18 4.8 1.46 4.64 111 Not Analysed
18
4744 29/08/20 7:30 AM ON SWARNREKHA BEFORE MEETING KHARKAI RIVER
SWARNREKHA
SUBARNAREKHA
EAST SINGHBHUM
24 7.5 7.4 1 5 18 14 4 20 4.8 1.95 6.3 112 Not Analysed
24
4746 29/08/20 7:45 AM ON SWARNREKHA RIVER AFTER CONFLUENCE OF KHARKAI RIVER
SWARNREKHA
SUBARNAREKHA
EAST SINGHBHUM
24 6.8 7.4 2.3 7 28 18 8 38 9.6 3.41 8.63 114 Not Analysed
34
49 29/08/20 8:30 AM SUBARNAREKHA AT D/S JAMSHEDPUR, (TATA NAGAR)
SUBARNAREKHA
SUBARNAREKHA
EAST SINGHBHUM
24.5 5.8 7.6 4 17 52 42 16 76 18.4 7.32 15.05 143 Not Analysed
76
4743 29/08/20 1:20 AM SWARNREKHA U/S HCL GHATSHILA, E.S
SWARNREKHA
SUBARNAREKHA
EAST SINGHBHUM
28.2 7.2 7.4 1.1 6 20 14 4 30 7.2 2.92 5.64 110 Not Analysed
24
24 29/08/20 3:40 AM SUBARNAREKHA AT JAMSHEDPUR
SUBARNAREKHA
SUBARNAREKHA
EAST SINGHBHUM
27.3 6 7.4 3.2 13 38 32 12 56 13.6 5.36 11.73 128 Not Analysed
64
4748 29/08/20 5:30 AM SWARNKEKHA RIVER AT BAHARAGORA ROAD BRIDGE, P.O- BAHARAGORA, E.S
SWARNREKHA
SUBARNAREKHA
EAST SINGHBHUM
26.2 7 7.4 1.2 6 28 18 8 36 8.8 3.41 5.86 116 Not Analysed
36
2399 29/08/20 9:45 AM SUBARNAREKHA AT CHANDIL DAM
SUBARNAREKHA
SUBARNAREKHA
SERAIKELA KHARSAWAN
25 7.6 7.5 0.8 5 14 10 4 16 4 1.46 3.98 107 Not Analysed
19
2387 29/08/20 1:40 AM SUBAREKHA AT GHATISLA ROAD BRIDGE
SUBARNAREKHA
SUBARNAREKHA
RANCHI 28 7.3 7.4 1 6 20 12 4 28 7.2 2.44 5.42 106 Not Analysed
24
4749 13/08/20 2:00 AM ON SWARNREKHA RIVER , NEAR RING ROAD BRIDGE SEMBO, NAGRI, RANCHI
SWARNREKHA
SUBARNAREKHA
RANCHI 23 8 7.5 2.8 Not Analysed
80 16 44 110 28.8 9.27 Not Analysed
424 506 82
4750 13/08/20 11:00 AM ON SWARNREKHA RIVER NEAR INTAKE WELL HATIA RAILWAY
SWARNREKHA
SUBARNAREKHA
RANCHI 23 7.8 7.4 2.2 Not Analysed
84 18 40 112 24.8 12.2 Not Analysed
30.2 362 60
4752 13/08/20 10:05 AM SWARNREKHA RIVER, NEAR OBERIA ROAD BRIDGE, HATIA RANCH
SWARNREKHA
SUBARNAREKHA
RANCHI 22 6 6.6 2.8 Not Analysed
88 24 44 124 36.8 7.8 Not Analysed
318 370 52
4084 18/08/20 8:00 AM SURBARNREKHA RIVER AT HATIA ROAD BRIDGE, RANCHI
DAMODAR DAMODAR RANCHI 17 5.8 6.5 2.5 Not Analysed
72 22 48 116 32.4 9.03 Not Analysed
342 382 40
4085 18/08/20 3:20 AM JUMAR RIVER AT BIT MESRA, RANCHI
DAMODAR DAMODAR RANCHI 20 5.6 6.6 2.6 Not Analysed
Not Analysed
Not Analysed
44 120 30.4 10.74 Not Analysed
400 452 52
2391 08/08/20 1:55 AM DAMODAR AT PANCHET DAM
DAMODAR DAMODAR DHANBAD 36 7.5 7.7 1.1 Not Analysed
102 48 76 82 14.4 11.22 Not Analysed
538 Not Analysed
90
4086 19/08/20 12:40 PM SWARNREKHA RIVER U/S HINDALCO IND LTD, MURLI WORKS, CHHOTAMURI, RANCHI
DAMODAR DAMODAR RANCHI 23 8.4 7.4 2.2 Not Analysed
70 24 28 122 33.6 9.27 Not Analysed
328 378 50
2384 08/08/20 1:30 AM DAMODAR AT DOMGARH WATER WORKS D/S SINDRI
DAMODAR DAMODAR DHANBAD 32 7.6 7.4 1.3 Not Analysed
106 48 80 92 15.2 13.17 Not Analysed
530 Not Analysed
88
2383 08/08/20 3:00 AM DAMODAR U/S JAMADOBA WATER WORKS
DAMODAR DAMODAR DHANBAD 30 7.5 7.6 1.4 Not Analysed
106 46 84 80 12.6 11.83 Not Analysed
530 Not Analysed
94
4000 08/08/20 5:05 AM GARGA RIVER NEAR TELMUCHO BRIDGE
GARGA DAMODAR DHANBAD 24 6.8 6.7 4.6 Not Analysed
136 86 92 120 20.8 16.59 Not Analysed
526 Not Analysed
98
3553 08/08/20 5:35 AM DAMODAR RIVER NEAR TELMUCHO BRIDGE
DAMODAR DAMODAR DHANBAD 23 7.5 7.4 1.7 Not Analysed
116 52 88 118 18.4 17.56 Not Analysed
536 Not Analysed
104