D
D
D
D
D
D
D
D
SW F04 (Sc reta n Burn)
SW F03 (Beec hwo o d Burn) SW F05
SW F04 (Sc reta n Burn)
SW F02 (Inshes Burn)
SW F10 (T o wer Burn)
SW F09
SW F08 (Ca irnla w Burn)
SW F02 (Inshes Burn)
SW F04 (Sc reta n Burn)
C08
SW F07
SW F06
SW F01 (Mill Burn)
SW F08 (Ca irnla w Burn)
SW F11
SW F12
C09
C04
C07
C03
C02
C05
C06
C01C10
SW F02 (Inshes Burn)
Cra dleha ll Business Pa rk
SW F05
SW F03 (Beec hwo o d Burn)
A9
INVERNESS
HIGHLAND MAIN
LINE RAILW AY
SMIT HT ON
CU LLODEN
A96
INSHES
INVERNESS CAMPU S
ABERDEEN T O INVERNESSRAILW AY LINE
MORAY FIRT H
CRADLEHALL
RESAU RIE
ST RAT T ON
C1032 BARN CHU RCH ROAD
B9006 CU LLODENROAD
RAIGMOREINT ERCHANGE
U 1124 CAU LFIELDROAD
INVERNESS RET AILAND BU SINESS PARK
U 1058 CAU LFIELDROAD NORT H
A
?
N
© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.5 10.25 Kilometres
Figure A13.1.4a
Legend
A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals500m Study AreaWatercoursesCulvert Crossing
D SuDS Outfall Locations0.5 % AEP 200yr +CC Mo delled Flo o dDepth (m )
0 - 0.250.25 - 0.50.5 - 0.750.75 - 11 - 2
Client
ProjectA9/A96 Inshes to Sm ithto n
95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000
www.jacobs.com
Rev
Drawing title
Scale
Drawing number
Jacobs No.DO NOT SCALE@ A3
© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
B2103501BIM No.
Figure A13.1.4a
DMRB Sta ge 3 EIARMo delled Fluvia l Flo o d Depth
with Pro po sed Sc hem e (No Mitiga tio n)
C00
Drawing Status A – APPROVED AS STAGE COMPLET ESheet 1 o f 5
1:12,500
Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/Dwn
A9-A96IS-JAC-EGN-X X X -FG-EN-1322
Proposed Scheme(DMRB Stage 3 design)
CSSEPT 2019C00 MUEIAR Publication K L DGC
Note:Refer to Section 3.1.74 of Appendix A13.1 (Flood Risk Assessment) and Section 7.1 of Appendix A13.7 (Hydraulic Modelling Report) for modelling interpretation.
D
D
D
D
D
D
D
D
A9
INV ERNESS
HIGHL AND MAIN
L INE RAIL WAY
SMITHTON
CU L L ODEN
A96
INSHES
INV ERNESS CAMPU S
ABERDEEN TO INV ERNESSRAIL WAY L INE
MORAY FIRTH
CRADL EHAL L
RESAU RIE
STRATTON
C1032 BARN CHU RCH ROAD
B9006 CU L L ODENROAD
RAIGMOREINTERCHANGE
U 1124 CAU L FIEL DROAD
INV ERNESS RETAILAND BU SINESS PARK
U 1058 CAU L FIEL DROAD NORTH
SWF04 (Sc reta n Burn)
SWF03 (Beec hwo o d Burn) SWF05
SWF04 (Sc reta n Burn)
SWF02 (Inshes Burn)
SWF10 (To wer Burn)
SWF09
SWF08 (Ca irnla w Burn)
SWF02 (Inshes Burn)
SWF04 (Sc reta n Burn)
C08
SWF07
SWF06
SWF01 (Mill Burn)
SWF08 (Ca irnla w Burn)
SWF11
SWF12
C09
C04
C07
C03
C02
C05
C06
C01C10
SWF02 (Inshes Burn)
Cra dleha ll Business Park
SWF05
SWF03 (Beec hwo o d Burn)
B
?
N
© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.5 10.25 Kilometres
Figure A13.1.4b
L egend
A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals500m Study AreaWatercoursesCulvert Crossing
D SuDS Outfall Locations3.33% AEP 30yr Mo delled Flo o d Depth(m )
0 - 0.250.25 - 0.50.5 - 0.750.75 - 11 - 2
Client
ProjectA9/A96 Inshes to Sm ithto n
95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000
www.jacobs.com
Rev
Drawing title
Scale
Drawing number
Jacobs No.DO NOT SCAL E@ A3
© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
B2103501BIM No.
Figure A13.1.4b
DMRB Sta ge 3 EIARMo delled Fluvia l Flo o d Depth
with Pro po sed Sc hem e (No Mitigatio n)
C00
Drawing Status A – APPROV ED AS STAGE COMPL ETESheet 2 o f 5
1:12,500
Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/Dwn
A9-A96IS-JAC-EGN-XXX-FG-EN-1323
Proposed Scheme(DMRB Stage 3 design)
CSSEPT 2019C00 MUEIAR Publication DGCKL
Note:Refer to Section 3.1.74 of Appendix A13.1 (Flood Risk Assessment) and Section 7.1 of Appendix A13.7 (Hydraulic Modelling Report) for modelling interpretation.
D
D
D
D
D
SW F03 (Be e c hwood Burn) SW F05
SW F04 (Sc re tan Burn)
SW F09
SW F08 (Cairnlaw Burn)
SW F04 (Sc re tan Burn)
SW F06
C08
C09
C04C03
C02
C05
C06
C01
Crad le hall Bus ine s sPark
SW F05
SW F03 (Be e c hwood Burn)
C
?
N
© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.25 0.50.125 Kilometres
Figure A13.1.4c
Le ge nd
A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals500m Study AreaWatercoursesCulvert Crossing
D SuDS Outfall Locations0.5 % AEP 200yr +CC M od e lle d FloodDe pth (m )
0 - 0.250.25 - 0.50.5 - 0.750.75 - 11 - 2
Client
ProjectA9/A96 Ins he s to Sm ithton
95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000
www.jacobs.com
Rev
Drawing title
Scale
Drawing number
Jacobs No.DO NOT SCALE@ A3
© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
B2103501BIM No.
Figure A13.1.4c
DM RB Stage 3 EIARM od e lle d Fluvial Flood De pth
with Propos e d Sc he m e (No M itigation)
C00
Drawing Status A – APPROV ED AS STAGE COM PLETEShe e t 3 of 5
1:5,000
Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/Dwn
A9-A96IS-JAC-EGN-XXX-FG-EN-1324
Proposed Scheme(DMRB Stage 3 design)
CSSEPT 2019C00 M UEIAR Publication KL DGC
Note:Refer to Section 3.1.74 of Appendix A13.1 (Flood Risk Assessment) and Section 7.1 of Appendix A13.7 (Hydraulic Modelling Report) for modelling interpretation.
D
D
D
SWF04 (Sc re ta n Burn)
SWF03 (Be e c hwood Burn) SWF05
SWF04 (Sc re ta n Burn)
SWF10 (Towe r Burn)
SWF09
SWF08 (Ca irnla w Burn)
SWF07
SWF06
C08
C04
C07
C03
C02
C06
SWF05
SWF08 (Ca irnla w Burn)
SWF10(Towe r Burn)
D
?
N
© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.25 0.50.125 Kilometres
Figure A13.1.4d
L e ge nd
A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals500m Study AreaWatercoursesCulvert Crossing
D SuDS Outfall Locations0.5 % AEP 200yr +CC Mod e lle d FloodDe pth (m )
0 - 0.250.25 - 0.50.5 - 0.750.75 - 11 - 2
Client
ProjectA9/A96 Ins he s to Sm ithton
95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000
www.jacobs.com
Rev
Drawing title
Scale
Drawing number
Jacobs No.DO NOT SCAL E@ A3
© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
B2103501BIM No.
Figure A13.1.4d
DMRB Sta ge 3 EIARMod e lle d Fluvia l Flood De pth
with Propos e d Sc he m e (No Mitiga tion)
C00
Drawing Status A – APPROV ED AS STAGE COMPL ETEShe e t 4 of 5
1:5,000
Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/Dwn
A9-A96IS-JAC-EGN-XXX-FG-EN-1325
Proposed Scheme(DMRB Stage 3 design)
CSSEPT 2019C00 MUEIAR Publication KL DGC
Note:Refer to Section 3.1.74 of Appendix A13.1 (Flood Risk Assessment) and Section 7.1 of Appendix A13.7 (Hydraulic Modelling Report) for modelling interpretation.
D
D
D
SWF04 (Sc re ta n Burn)
SWF03 (Be e c hwood Burn) SWF05
SWF04 (Sc re ta n Burn)
SWF02 (Ins he s Burn)
SWF07
SWF06
C08
C04
C07
C03
C05
C06
SWF08 (Ca irnla w Burn)
SWF10(Towe r Burn)
E
?
N
© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.25 0.50.125 Kilometres
Figure A13.1.4e
L e ge nd
A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals500m Study AreaWatercoursesCulvert Crossing
D SuDS Outfall Locations0.5 % AEP 200yr +CC Mod e lle d FloodDe pth (m )
0 - 0.250.25 - 0.50.5 - 0.750.75 - 11 - 2
Client
ProjectA9/A96 Ins he s to Sm ithton
95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000
www.jacobs.com
Rev
Drawing title
Scale
Drawing number
Jacobs No.DO NOT SCAL E@ A3
© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
B2103501BIM No.
Figure A13.1.4e
DMRB Sta ge 3 EIARMod e lle d Fluvia l Flood De pth
with Propos e d Sc he m e (No Mitiga tion)
C00
Drawing Status A – APPROV ED AS STAGE COMPL ETEShe e t 5 of 5
1:5,000
Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/Dwn
A9-A96IS-JAC-EGN-XXX-FG-EN-1326
Proposed Scheme(DMRB Stage 3 design)
CSSEPT 2019C00 MUEIAR Publication KL DGC
Note:Refer to Section 3.1.74 of Appendix A13.1 (Flood Risk Assessment) and Section 7.1 of Appendix A13.7 (Hydraulic Modelling Report) for modelling interpretation.