Mobin (Iran)_SW & Cooling Water System
PROJECT
Mobin (Iran) SW & Cooling Water System
PROJECT TyPE
Detail Engineering
LOCATION
Asaluyeh, Iran
CLIENT
Sadra/Aker Marine Contractors
PERIOD
2002-2004
KEy NUMBERS
Pump basin: 13000 m2, Intake/outlet culverts:
1400 m, Pumping capacity: 106 m3/s
The project comprises a cooling water project with intake and outlet culverts, pumping basin and some infrastructure (buildings etc).
The main parts of the project are a pumping station basin covering an area of 13,000 m2, an intake culvert structure, approx. 1000 m long, and an outlet culvert approx. 400 m long. The cross section of the culverts is 13 x 5 m.
Two 120 m long culvert elements will be constructed in a dry dock in Busher, towed to Asaluyeh and installed on the seabed at 20 - 40 m depth. The remaining part of the culvert was prefabricated in 25 meter long sections, transported by barge to site and lifted into position by a crane barge.
411-
HM
-002
: 03_
038,
rev.
10.
09.2
010
Mobin SW & Cooling Water System - Photo: Multiconsult
03_Oil & Gas
www.multiconsult.no
Mobin (Iran)_SW & Cooling Water System
Engineering services
Multiconsult has a contract for the detailed
design of civil structures with Aker Marine
Contractors. Aker has a contract with Iran
Marine Industrial Company (SADRA), which
is a turnkey contractor for the cooling water
project versus Mobin.
The Aker contract is including detailed design
of civil structures and marine operations.
For parts of the work Multiconsult has
engaged the local consulting company Sazeh
Pardazi Iran (SPI).
Diciplines
• Geology
• Geotechnics
• Landscaping
• Roads
• Water & sewage
• Civil
Scope of work
Construction of site was performed according
to plan.
PROJECT
Mobin
PROJECT TyPE
Detail Engineering
LOCATION
Asaluyeh, Iran
CONTRACT
NOK 9 mill.
Mobin SW & Cooling Water System - Photo: Multiconsult