McMILLAN PAZDAN SMITH WCI GROUP LLC
FIELD REPORT
PROJECT: Leavelle McCampbell Middle
FIELD REPORT NO.: Fifty (50)
CONTRACT: Construction Management @ Risk
HG Reynolds ARCHITECTS
PROJECT NO.:
Page 1 of 7
DISTRIBUTION: Owner:
Dr. Shawn Foster, Aiken County Schools
Mr. Kevin Chipman, Aiken County Schools
Ms. Michelle Padgett, Aiken County Schools
Ms. Beth Clark, Aiken County Schools
Mr. Kip Gunter, Aiken County Schools
Ms. Sandra Waddell, Aiken County Schools
Mr. Jeremiah Jones, Aiken County Schools
Architect: Mr. Donnie Love, McMillan Pazdan Smith
Mr. Bill Williams,WCI
Mr. Robert Wayne, WCI
Consultant: Mr. Mayhar Angooraj, BGA
Mr. William Wafer, BGA
Mr. Dan Reider, BGA
Mr. Tilden Hilderbrand, Hass & Hilderbrand
Contractor: Mr. Jeffrey Reynolds, HG Reynolds
Mr. Robert Lowe, HG Reynolds
Mr. Graham Reynolds, HG Reynolds
DATE: Aug. 16, 2016
WEATHER: Sunny / 99 / Humid
TIME: 1:30 pm SCHEDULE
COMMENTS:
On Schedule
PRESENT AT SITE: HJR General Contractor, HVAC, Plumbing, Electrical, Masonry, Roofing
OBSERVATION:
1) Site conditions are dry as masonry veneer continues progress aggressively. The Contractor (Masonry) is
continues @ approximately (99%) on 3 sides with moisture barrier and brick veneer install is continuous at
front façade. Masonry contractors work is consistent.
2) Interior CMU walls in areas are damp due to previous weeks rain. Point work has slowed.
3) Slabs remain wet in partial areas throughout building both first and second floors.
4) Contractor install of additional temporary lights are inconsistent in several areas both first and second
floors. This work is ongoing.
5) Roofing contractor work is aggressive and is consistent as flash of penetration for roof top curbs, devices
and / or structures is ongoing. Roof install inspections are current.
6) First floor HVAC duct, gas, domestic water lines progress is continuous and consistent, as prime mastic
seal and seismic fastener application are continuous and as specified in corridors, gym and cafeteria.
7) Scheduled HVAC 500lb and 700 lb. Air Handler Units have been delivered and received by contractor.
8) Fire sprinkler riser rooms and progressing as contractors nears (75%) install at riser rooms
9) CCI inspection are coordinated by CI Group as required by jobsite and consistent and documented.
10) The Electrical contractor has progressed to approximately (75%)complete roughed in on first floor as panel
boxes and conduits are place to received required wire pull. Coordination is consistent.
11) Electrical scope of work maintains a critical status on second floor as rough in continues.
12) Temporary lights are required on second floor as coordination by contractor is ongoing.
13) Contractors stud framing work continues with specified details. As partial scheduled inspections have been
provided and documented.
14) Contractor site maintenance and cleanup is continuous with current CMU debris and standing rain water is
required.
McMILLAN PAZDAN SMITH WCI GROUP LLC
FIELD REPORT
PROJECT: Leavelle McCampbell Middle
FIELD REPORT NO.: Fifty (50)
CONTRACT: Construction Management @ Risk
HG Reynolds ARCHITECTS
PROJECT NO.:
Page 2 of 7
SUBMITTALS: 1) Submission is in progress.
COORDINATION: 1) Bi-weekly meeting Tuesday 10:00 am, August 23 ,2016.
INSPECTIONS: 1) Coordination by WCI Group
DEFICEINT WORK:
1) Temporary Light Fixtures
PHOTOS: Attached
View of East and North facades
McMILLAN PAZDAN SMITH WCI GROUP LLC
FIELD REPORT
PROJECT: Leavelle McCampbell Middle
FIELD REPORT NO.: Fifty (50)
CONTRACT: Construction Management @ Risk
HG Reynolds ARCHITECTS
PROJECT NO.:
Page 3 of 7
Masonry façade @ Gymnasium
Interior Framing typical @ Cafeteria
McMILLAN PAZDAN SMITH WCI GROUP LLC
FIELD REPORT
PROJECT: Leavelle McCampbell Middle
FIELD REPORT NO.: Fifty (50)
CONTRACT: Construction Management @ Risk
HG Reynolds ARCHITECTS
PROJECT NO.:
Page 4 of 7
Framing furring, studs for soffitts and headers (Typical) Administration area.
View of Electrical Panel Room as conduits have installed to panels boxes (Typ)
McMILLAN PAZDAN SMITH WCI GROUP LLC
FIELD REPORT
PROJECT: Leavelle McCampbell Middle
FIELD REPORT NO.: Fifty (50)
CONTRACT: Construction Management @ Risk
HG Reynolds ARCHITECTS
PROJECT NO.:
Page 5 of 7
View of indoor AHU placed on pads
View of 500lbs and 700lbs AHU
McMILLAN PAZDAN SMITH WCI GROUP LLC
FIELD REPORT
PROJECT: Leavelle McCampbell Middle
FIELD REPORT NO.: Fifty (50)
CONTRACT: Construction Management @ Risk
HG Reynolds ARCHITECTS
PROJECT NO.:
Page 6 of 7
Fire Sprinkler Riser Rooms nearing 75% complete (Typ)
McMILLAN PAZDAN SMITH WCI GROUP LLC
FIELD REPORT
PROJECT: Leavelle McCampbell Middle
FIELD REPORT NO.: Fifty (50)
CONTRACT: Construction Management @ Risk
HG Reynolds ARCHITECTS
PROJECT NO.:
Page 7 of 7
Gymnasium View as masonry walls continue to dry
Masonry Veneer view has progressed to approximately 80% overall to completions
Reported by: Wayne Jr. -WCI Group