Transmission System
Reliability Standards
Effective January 1, 2006
Version 2.0Edition 1.0
TENAGA NASIONAL BERHAD, 2006
7/31/2019 Malaysia Transmission
3/93
Transmission System Reliability Standards Contents
1
Contents
TRANSMISSION SYSTEM RELIABILITY STANDARDS ........................................1
CONTENTS........................................................................................................................1
CHAPTER 1: INTRODUCTION.....................................................................................4
1.1 GENERAL ..............................................................................................................41.2 APPLICATIONS AND OBJECTIVES OF THE STANDARDS...........................................51.3 SCOPE ...................................................................................................................6
CHAPTER 2: GENERATION RELIABILITY STANDARD ......................................8
2.1 GENERATION PLANNING SECURITY CRITERIA ......................................................82.2 REQUIREMENTS ASSOCIATED WITH LOSS OF POWER INFEED................................82.3 GENERATION CONNECTION CRITERIA...................................................................9
2.3.1 General Generation Connection Requirements...............................................92.3.2 Planning Criteria for Generation Connections.............................................102.3.3 Operational Criteria for Generation Connections ........................................13
CHAPTER 3: TRANSMISSION RELIABILITY STANDARD.................................14
3.1 GENERAL ............................................................................................................143.2 TRANSMISSION ADEQUACY AND SECURITY CRITERIA ........................................15
3.2.1 Planning Criteria...........................................................................................153.3.2 Operational Criteria......................................................................................183.2.3 Mitigating Unsecured Contingency Events ...................................................21
3.3 DEMAND CONNECTON CRTERA .......................................................................233.3.1 General ..........................................................................................................233.3.2 Planning Criteria...........................................................................................233.3.3 Operational Criteria......................................................................................24
CHAPTER 4: PERFORMANCE CRITERIA AND LIMITS.....................................25
4.1 INTRODUCTION ...................................................................................................254.2 VOLTAGE ............................................................................................................254.3 VOLTAGE PERFORMANCE MARGN .....................................................................28
4.4 FREQUENCY LM
TS ............................................................................................294.5 STABLTY LMTS...............................................................................................29
4.6 FAULT CLEARNG TMES.....................................................................................304.7 SHORT-CIRCUIT LIMITS ......................................................................................304.8 BASC INSULATON LEVEL ..................................................................................314.9 CRTERA FOR EVALUATNG UNSECURED CONTNGENCES ................................324.10 THERMAL LOADNG LMTS OF TRANSMSSON COMPONENTS............................334.11 SUMMARY OF TRANSMISSION SYSTEM REQUIREMENTS NORMAL ANDEMERGENCY CONDITIONS...............................................................................................33
7/31/2019 Malaysia Transmission
4/93
Transmission System Reliability Standards Contents
2
TRANSMISSION SYSTEM POWER QUALITY STANDARDS..............................36
CONTENTS......................................................................................................................37
CHAPTER 1: INTRODUCTION...................................................................................381.1 POWER QUALITY DEFINITION AND REQUIREMENTS............................................381.2 SCOPE .................................................................................................................40
CHAPTER 2: TRANSMISSION POWER QUALITY STANDARDS.......................41
2.1 VOLTAGE SAG OR VOLTAGE DIP ........................................................................412.2 VOLTAGE STEP CHANGE.....................................................................................422.3 VOLTAGE FLUCTUATONS AND FLCKER.............................................................422.4 HARMONICS ........................................................................................................442.5 PHASE UNBALANCE AND TRACTION LOAD .........................................................462.6 STEP CHANGES OF POWER ..................................................................................49
7/31/2019 Malaysia Transmission
5/93
Transmission System Reliability Standards Contents
3
GLOSSARY AND DEFINITIONS FOR TRANSMISSION SYSTEM
RELIABILITY STANDARDS AND TRANSMISSION SYSTEM POWER
QUALITY STANDARDS ...............................................................................................50
APPENDIX A BACKGROUND TO THE STANDARDS........................................66
A1PURPOSE ...................................................................................................................67A2STANDARDS FOR BULK GENERATION,TRANSMISSION AND DELIVERY .....................70A3STANDARDS FOR DISTRIBUTION ................................................................................71A4PROCESSES AND PROCEDURES ..................................................................................72A5SUMMARY .................................................................................................................77
APPENDIX B FOR TRANSMISSION SYSTEM RELIABILITY STANDARDS
GUIDANCE ON ECONOMIC JUSTIFICATION OF GENERATION AND
TRANSMISSION CONNECTIONS..............................................................................79
B1GENERAL PRINCIPLES................................................................................................80B2GUDELNES...............................................................................................................80
APPENDIX C FOR TRANSMISSION SYSTEM RELIABILITY STANDARDS
GUIDANCE ON SUBSTATION CONFIGURATIONS AND SWITCHING
ARRANGEMENTS.........................................................................................................82
C1GENERAL GUDANCE.................................................................................................83C2GENERATON PONT OF CONNECTON SUBSTATONS .................................................84C3MARSHALLNG SUBSTATONS....................................................................................84C4GRD SUPPLY PONT SUBSTATONS ...........................................................................84C5(1)TYPICAL TNBSUBSTATION LAYOUT AND SWITCHING ARRANGEMENTS .............86
C5(2)TYPICAL TNBSUBSTATION LAYOUT AND SWITCHING ARRANGEMENTS CONTD........................................................................................................................................87
APPENDIX D FOR TRANSMISSION SYSTEM RELIABILITY STANDARDS
ADDITIONAL CRITERIA TO LIMIT THE COMPLEXITY OF TRANSMISSION
CIRCUITS........................................................................................................................88
D1GENERAL PRINCIPLES ...............................................................................................89D2REQUREMENTS/RESTRCTONS.................................................................................89
7/31/2019 Malaysia Transmission
6/93
Transmission System Reliability Standards Chapter 1:Introduction
4
Chapter 1: Introduction
1.1 General
1.1.1 In large interconnected Electric Power Systems its Reliability is of utmost
importance as electricity is an essential commodity, which underpins the
economic activity of a country. The Transmission Function of an Electric Power
System is pivotal to the objectives of:
a) Developing and maintaining an efficient, coordinated and economical
Transmission System for bulk delivery of electrical energy;b) Ensuring continuous availability of sufficient electrical energy supply for all
consumers, with an adequate margin between supply and demand.
1.1.2 The distinct processes and their related Standards are paramount in ensuring
Reliability in planning the development of an Electric Power System, and in
ensuring its Secure and Robust operation:
1) The Generation Reliability Standard which relates to provision of sufficient
firm Generation Capacity to meet the Demand with a sufficient margin with
allowance for Plant maintenance, Plant breakdown and Plant Unavailability,i.e., scheduled and unscheduled generating Plant outages, to meet the annual
and daily electric energy demand without the need to disconnect customers at
critical periods or cause interruptions in supply. This is used by Tenaga
Nasional Berhad (TNB) to determine additional generation investment
requirements on an annual basis.
2) Transmission Reliability Standard which relates to provision of sufficient
Transmission Capacity, operational facilities, maintenance activity and co-
ordination with generation and Distribution Functions to enable continued
supply of electric energy to the distribution systems and Directly ConnectedCustomers. This Standard is used by TNB to determine the investment
requirements for the Transmission System and transmission operational
facilities and implement the necessary measures.
The development and maintenance of Transmission System Reliability Standards
is the duty of TNB Transmission Division under the provisions of the TNB
Licence that includes Generation Reliability Standards. These Standards are also
termed as License Standards.
7/31/2019 Malaysia Transmission
7/93
Transmission System Reliability Standards Chapter 1:Introduction
5
1.1.3 This Standard contains technical terms and phrases specific to Transmission
Systems and the Malaysian Electricity Supply Industry. The meanings of some
terms or phrases in this Standard may also differ from those commonly used
elsewhere. For this reason a Glossary and Definitions has been included as aseparate document but attached to these Standards. All defined terms have been
identified in the text by the use of capitalised words.
1.1.4 Appendix A provides a background the Standards as well as general principles of
its applications.
1.2 Applications and Objectives of the Standards
1.2.1 The electric power Transmission System needs to be planned, operated and
maintained according to a set of Transmission System Reliability Standards. The
development of these Standards determines the investment requirements for
capital Plant and operational facilities; operation and maintenance practices; as
well as provision of Supplementary Services. The provision of levels of
Transmission System performance in accordance with these Standards is the duty
of TNB Transmission Division as specified in TNB License Conditions.
1.2.2 The transmission planning process involves the application of the Transmission
System Reliability Standard and the Transmission System Power Quality Standard
(as the second Standard within this combined document), together with strategic,
environmental and economic analysis, to determine the planned development of
the Transmission System to meet the forecast future demand.
1.2.3 The operational processes involve application of these Standards in operational
planning, maintenance and actual operation of the Electric Power System under
the Prevailing System Conditions on the actual operational day. Whilst the System
operational conditions are carefully planned at the operational planning stage, in
the months, weeks and days ahead, the operation of the System on the day isdictated by the actual prevailing climatic conditions, planned outages as well as
the unplanned events that occur on the day, such as unscheduled generation
breakdown, unplanned transmission outages due to faults and exceptional
demand.
1.2.4 The Standards also provide the limits and permissible excursions of key System
parameters enabling secure implementation of operational measures.
7/31/2019 Malaysia Transmission
8/93
Transmission System Reliability Standards Chapter 1:Introduction
6
1.2.5 The above-mentioned transmission Standards therefore determine a defined level
of Reliability for electric power that is delivered at the bulk demand supply points
at the interface between the Main Interconnected Transmission System (MITS)
and the 132kV and 66kV Systems, as well as other parts of the TransmissionSystem and the Distribution Systems at 33kV and below.
1.3 Scope
1.3.1 This document only covers the Transmission System Reliability Standards, which
are the responsibility of TNB Transmission Division. Amendments or changes to
these Standards can only be made with the concurrence of the Energy
Commission (EC) as provided for in the TNB License.
1.3.2 This document is solely concerned with the Standards for the Transmission
System, which includes the Main Interconnected Transmission System (MITS)
and its interface with the Generation Systems as well as the other parts of the
Transmission System which have voltages at 132kV and 66kV. These Standards
are applicable to bulk generation, transmission and delivery of electric power.
These Standards are also reflected in the Malaysian Grid Code which contains all
the technical requirements governing the planning, the development, connection
to, and operation of, the Generation and Transmission System as a whole known
as the Grid System.
1.3.3 Figure 1.1 indicates the contents of the Standards and the subject coverage in
terms of the generation, transmission and distribution Security and Reliability.
7/31/2019 Malaysia Transmission
9/93
Transmission System Reliability Standards Chapter 1:Introduction
7
Figure 1.1: The outline contents of the Transmission System Reliability Standards
and its relationship with the systems and codes
G G
Main InterconnectedTransmission System
Transmission radial networkand demand points
Distribution System
Embedded Distribution
Customers
DG
DG
Generation
Transmission
Distribution
GenerationReliabilityStandards
TransmissionReliabilityStandards
TransmissionPower Quality
Standards
Sufficient generation capacityand connections to deliver fullgeneration output for normal
and Specific contingencies
GRIDC
ODE
Sufficient transmissioncapacity to meet demand
for specified contingenciesMeeting standardsperformance limits
Criteria for planning, designingand operating of transmission
system to meet reliability andpower quality standards
Sufficient transformer
capacity to meet demand
Power quality limits atinterfaces
Criteria for planning, designing
and operating of distributionsystem to meet supply security
and power quality standards
STANDARDS CODESDISTRIBUTIONC
ODE
TOTALPOWERSYSTEMS
TransmissionSystem
ReliabilityStandards
Distribution SupplySecurity and PowerQuality Standards
7/31/2019 Malaysia Transmission
10/93
Transmission System Reliability Standards Chapter 2:Generation Reliability Standard
8
Chapter 2: Generation Reliability Standard
2.1 Generation Planning Security Criteria
2.1.1 The Generation Security Standard for the Peninsular Malaysia Electric Power
System shall be the Reliability Index of Loss of Load Probability (LOLP). LOLP
is defined as the proportion of days per 365 days in a year when insufficient
generating capacity is available to serve the daily peak Loads. Alternatively, the
standard can also be defined in term of Loss of Load Expectation (LOLE) which
is a measure of the time duration in a year when insufficient generating capacity is
available to serve the daily peak Loads. Normally, this is expressed in number of
days per year. For the Peninsular Malaysia Grid System the LOLE is normally set
at one (1) day per year, which translates to a LOLP of 0.0274 (ratio of LOLE to
number of days in a year).
2.2 Requirements Associated with Loss of Power Infeed
2.2.1 The Transmission System shall be designed to be secure for the instantaneous
Loss of Power Infeed represented by the output of a single Generating Unit,CCGT Module, imports of power from External Systems or DC Link Monopole
as a result of a Secured Contingency Event. Following such an event the System
Frequency shall return to its Normal Operational Limits defined in the
Transmission System Power Quality Standard within sixty (60) seconds and the
System shall operate within normal voltage and Frequency limits, in a stable
manner both transiently and in the Steady State. There shall be:
(1) no loss of demand;
(2) no overloading of any transmission equipment;
(3) no operation outside post contingency voltage limits; and(4) no excessive degradation of Voltage Performance Margins.
2.2.2 The Largest Loss of Power Infeed Risk for the Peninsular Malaysian Power
System is defined as the largest single generating unit or a CCGT module or a DC
Link Monopole or power import whichever is the largest. In order to ensure the
System is secure after such an event, TNB facilitates the provisions of sufficient
Spinning Reserve and Reactive Power Reserve to avoid deviation of Frequency
and voltage beyond Normal Operational Limits defined in the Transmission
System Power Quality Standard for more than sixty (60) seconds.
7/31/2019 Malaysia Transmission
11/93
Transmission System Reliability Standards Chapter 2:Generation Reliability Standard
9
2.2.3 The instantaneous Loss of Power Infeed may exceed that of the Largest Loss of
Power Infeed Risk on very rare occasions which may occur for the loss of a
complete Power Station for contingencies outside the planning or operational
Criteria. This is termed an Infrequent Loss of Power Infeed Risk and is defined asthe loss of the largest single power station. For an Infrequent Loss of Power
Infeed Risk, planning and operational limits may be violated but the Transmission
System shall be planned and operated so that while controlled load loss is allowed,
the integrity of the Transmission System is maintained.
2.3 Generation Connection Criteria
2.3.1 General Generation Connection Requirements
2.3.1.1 This Section of Chapter 2 includes the planning and operational Criteria for the
direct connection of one or more Power Stations to the Transmission System. The
connection Criteria will also apply to the connections from a Demand Supply
Point to the Transmission System by which Power Stations embedded within the
Distribution System or within a Users Network that are connected to the
Transmission System.
2.3.1.2 In planning the Generation Connections, this Standard will be considered as met if
the connection design either:(1) satisfies the minimum deterministic Criteria detailed in paragraphs 2.3.2.1 to
2.3.2.13 below; or
(2) varies from the design necessary to meet item (1) so as to meet a higher
Standard than those set out in paragraphs 2.3.2.1 to 2.3.2.13 below if the
higher Standards can be economically justified or if they are specifically
requested by an external party connecting to the Transmission System, to
ensure a higher level of connection Security and Reliability, which will then
be subject to appropriate commercial negotiation and contract. Guidance on
the economic justification of generation connections is given in Appendix B.
2.3.1.3 The overarching principle in this Standard applicable to the generation
connections is that the transfer capacity of the connection facilities for the
following conditions:
(1) normal System operation;
(2) (n-1) contingencies;
shall provide full export capability for the generation facility into the
Transmission System by satisfying the following Criteria:
(a) the continuous transfer capacity shall be at least equal to the Facility
Contractual Available Capacity (in MW), and
7/31/2019 Malaysia Transmission
12/93
Transmission System Reliability Standards Chapter 2:Generation Reliability Standard
10
(b) the connection facilities and the Power Station shall not cause any reduction
in the power quality delivered at the Bulk Supply Points to the Distribution
System and/or to a Users Network.
2.3.2 Planning Criteria for Generation Connections
2.3.2.1 The connection configurations for Generating Units need to be planned to
minimise the effect of coincident Fault Outage(s) of generation and Transmission
Circuits and for the risk of losing multiple Generating Units within a Power
Station.
2.3.2.2 In this respect the Generating Unit connections define the magnitude of the largest
generation loss risk for which dynamic Spinning Reserve will be provided to
contain the Frequency deviation and restore the System Frequency to within limits
defined by the Transmission System Power Quality Standard. Therefore, there is
a requirement to provide sufficient switching facilities and sufficient connection
capability to ensure adequate operational flexibility, and compliance with the
Criteria defined below.
2.3.2.3 Generation connections shall be planned such that starting with an Intact System
the consequences of System contingency events and design of generation
connections to the Transmission System shall be as follows:
(1) following a Fault Outage of any single Transmission Circuit, no Loss of
Power Infeed shall occur;
(2) following the arranged outage of any single section Busbar, the Loss of Power
Infeed shall not exceed the Largest Loss of Power Infeed Risk;
(3) following a Fault Outage of any single Generation Circuit or a single section
of Busbar, the instantaneous Loss of Power Infeed shall not exceed the Largest
Loss of Power Infeed Risk;
(4) following the Fault Outage of any single Transmission Circuit, single section
of Busbar, during the arranged outage of any other single Transmission Circuitor single section of Busbar, the Loss of Power Infeed shall not exceed the
Largest Loss of Power Infeed Risk;
(5) following the Fault Outage of any single Busbar coupler circuit breaker or
Busbar section circuit breaker or mesh circuit breaker, during the arranged
outage of any single section of Busbar or mesh corner, the Loss of Power
Infeed shall not exceed the Largest Loss of Power Infeed Risk.
7/31/2019 Malaysia Transmission
13/93
Transmission System Reliability Standards Chapter 2:Generation Reliability Standard
11
2.3.2.4 The connection of a particular Power Station shall meet the following planning
Criteria set out in paragraphs 2.3.2.5 to 2.3.2.8 under the following background
conditions:
(1) the Active Power output of the Power Station and individual Generating Unitsshall be set equal to their respective rated power output, and to the
corresponding full leading or lagging Reactive Power output; and
(2) conditions on the Transmission System shall be set to those which ought
reasonably to be expected to arise in the course of a year of operation. Such
conditions shall include forecast demand cycles, typical Power Station
operating regimes and typical arranged transmission equipment outage
patterns modified where appropriate by the provisions of paragraph 2.3.2.5.
2.3.2.5 The Transmission Capacity for the connection of a Power Station shall be plannedsuch that, for the background conditions described in paragraph 2.3.2.4, prior to
any fault there shall not be any:
(1) equipment loadings exceeding their continuous rating;
(2) voltages outside the Pre-Disturbance Planning Voltage Limits or Insufficient
Voltage Performance Margins; or
(3) System Instability.
The above performance requirements are summarised in Table 4.12, in section
4.11, under system condition classified as Category A No contingencies.
2.3.2.6 The Transmission Capacity for the connection of a Power Station shall also be
planned such that for the background conditions described in paragraph 2.3.2.4
and for the Secured Event of either an Outage of any of the following:
(1) a single Transmission Circuit or element, a reactive compensator or other
Reactive Power resource;
there shall not be any:
a) Loss of Supply Capacity;
b) Unacceptable Overloading of any Primary Transmission Equipment;
c) Unacceptable Voltage Conditions or Insufficient Voltage Performance
Margins; ord) System Instability.
The above performance requirements, contingencies and impacts are summarised
in Table 4.12, in section 4.11, under system condition classified as Category B
Events resulting in loss of a single element.
2.3.2.7 The Transmission Capacity for the connection of a Power Station shall also be
planned such that for the background conditions described in paragraph 2.3.2.4
and for the Secured Event of a Fault Outage of any of the following:
7/31/2019 Malaysia Transmission
14/93
Transmission System Reliability Standards Chapter 2:Generation Reliability Standard
12
(1) a Double Circuit Overhead Line (with the exception of 500kV and radial
275kV lines), or
(2) a single Transmission Circuit with the prior outage of another Transmission
Circuit (with the exception of 500kV and radial 275kV lines);(3) a section of Busbar; or
(4) a single Transmission Circuit with the prior outage of a Generating Unit, a
reactive compensator or other Reactive Power resource;
there shall not be:
(a) cascade tripping; and
(b) System Instability.
Under the conditions described above, it is however acceptable for
planned/controlled loss of load to occur. The above performance requirements,
contingencies and impacts are summarised in Table 4.12, in section 4.11, undersystem condition classified as Category C Events resulting in loss of two or
more elements.
2.3.2.8 Under maintenance conditions it shall be assumed that the prior circuit outage(s)
specified in paragraphs 2.3.2.7(1) and 2.3.2.7(4) reasonably form part of the
typical outage pattern referred to in paragraph 2.2.2.4(2) rather than in addition to
that typical outage pattern i.e., only a reasonable typical outage pattern will be
assumed without any double counting or excessive and unrealistic outages being
included.
2.3.2.9 In the event of a contingency more severe than those described in 2.3.2.3, 2.3.2.6
and 2.3.2.7 of this chapter which results in a total generation infeed loss up to the
Infrequent Infeed Loss Risk the Frequency shall not fall below 47.5Hz, with all
defence measures inplace and operational. System performance requirements,
contingencies and expected impacts following more severe or extreme
contingencies than those described in 2.3.2.3, 2.3.2.6 and 2.3.2.7 are summarised
in Table 4.12, in section 4.11, under system condition classified as Category D
Extreme events resulting in two or more elements removed or cascading out of
service.
2.3.2.10 Guidance on typical substation configurations and switching arrangements are
described in Appendix C. However, other configurations and switching
arrangements which meet those Criteria are also acceptable.
2.3.2.11 Variations, arising from a generation customers request, to the generation
connection design necessary to meet the requirements of paragraphs 2.2.1 to 2.2.3
shall also satisfy the requirements of this Standard provided that the varied design
satisfies the conditions set out in paragraph 2.3.2.12(1) to (3). For example, such a
7/31/2019 Malaysia Transmission
15/93
Transmission System Reliability Standards Chapter 2:Generation Reliability Standard
13
generation connection design variation may be used to take account of the
particular characteristics of a Power Station.
2.3.2.12 Any generation connection design variation must not, other than in respect ofthe generation customer requesting the variation, either immediately or in the
foreseeable future:
(1) reduce the Security of the Transmission System to below the minimum
planning Criteria specified in Chapter 3; or
(2) result in additional investment or operational costs to any particular customer
or overall, or a reduction in the Security and quality of supply of the affected
customers connections to below the planning Criteria in this chapter or in the
Transmission System Power Quality Standards, unless specific agreements are
reached with affected customers; or(3) compromise TNBs ability to meet other statutory obligations or licence
obligations.
2.3.2.13 Should System conditions subsequently change, for example due to the
proposed connection of a new customer, such that either immediately or in the
foreseeable future, the conditions set out in paragraph 2.3.2.12(1) to (3) are no
longer satisfied, then alternative arrangements and/or agreements must be put in
place such that this Standard continues to be satisfied.
2.3.2.14 The additional operational costs referred to in paragraph 2.3.2.12(2) and/or any
potential Reliability implications shall be calculated by simulating the expected
operation of the Transmission System in accordance with the operational Criteria
set out in Chapters 3 and 4 of this Standard. Guidance on economic justification is
given in Appendix B.
2.3.3 Operational Criteria for Generation Connections
2.3.3.1 The operational Criteria for generation connections are the same as the operationalTransmission System criteria which are set out in Chapter 3 of this Standard.
7/31/2019 Malaysia Transmission
16/93
Transmission System Reliability Standards Chapter 3:Transmission Reliability Standard
14
Chapter 3: Transmission Reliability Standard
3.1 General
3.1.1 The Transmission System is and shall continue to be planned and developed such
that, under both normal System operational conditions or following a Secured
Contingency Event, there will be sufficient Transmission Capacity and capability
available to enable the System to return to normal operation. Normal operation of
the System in this respect means operation of the System within thermal, voltage,
Frequency and stability limits.
3.1.2 In rare circumstances, disturbed System operating conditions involving multiple
outages and/or equipment failures beyond the Secured Contingency conditions
can occur. Usually the occurrence of such events, will result in a controlled or
planned loss of load.
3.1.3 In some rare and extreme cases, Unsecured Contingency Events could also lead to
partial or full disruption of the whole System and affect supplies to consumers.
Under such adverse operating conditions, and as part of the special Protection and
defence measures, some generation and/or demand disconnection is permitted toensure stable operation of the remaining System in the post-contingency period.
3.1.4 This Chapter 3 includes:
(1) the Transmission Adequacy and Security Criteria which ensures adequate
Transmission Capacity so that the Security and integrity of the power System
is maintained for a set of defined Secured Contingency Events;
(2) the planning and operational measures that shall be applied towards mitigating
the impact of rare events with multiple outages and/or equipment failures
beyond the Secured Contingency conditions termed as UnsecuredContingency Events; and
(3) the Demand Connection Criteria which ensures Adequacy of interface
connection capacity to meet demand.
3.1.5 This Chapter 3 also presents the planning and operational Criteria for ensuring
Reliability of the Transmission System. These Criteria apply throughout the
Transmission System and must be met by TNB in planning and operating the
Transmission System. In addition, in those parts of the Transmission System
where the Criteria of Chapter 2 also apply, those Criteria must be met.
7/31/2019 Malaysia Transmission
17/93
Transmission System Reliability Standards Chapter 3:Transmission Reliability Standard
15
3.2 Transmission Adequacy and Security Criteria
3.2.1 Planning Criteria
3.2.1.1 The following System background conditions will be used to set up the base case
for the planning studies to determine the adequate Transmission Capacity
requirements for the Transmission System:
(1) For the Intact System, the base case power flows shall be set to those arising
from the Planned Transfer Condition prior to application of any fault or
outage;
(2) Conditions on the Transmission System shall be set to those which ought
reasonably to be foreseen to arise in the course of a year of operation. Such
conditions shall include forecast demand cycles, typical Power Station
operating regimes and consideration on arranged transmission equipment
outage. Rearrangement of transmission outages and appropriate reselection
of Generating Units, from those expected to be available may be considered
in order to satisfy the adequate Security Criteria provided that maintenance
access for each Transmission Circuit can be achieved and provided that such
measures are economically justified. Guidance on economic justification is
given in Appendix B;
(3) The expected Availability of generation reactive capability shall be set to thatwhich ought reasonably to be expected to arise. This shall take into account
the variation of reactive capability with the Active Power output as defined
in the machine performance chart. Any long term reactive capability
limitations and exemptions or derogations issued by the Energy Commission
will be taken into account. The target reactive output of generators, at this
stage, shall be set as close as possible to 50% of the expected available
reactive capability;
(4) The Planned Transfer Condition is defined as the condition arising from
scaling the Registered Capacities of each directly connected Power Stationand embedded Large Power Station such that the total of the scaled
capacities is equal to the Peak Demand plus dynamic spinning reserve for
Frequency control and minus imports from External Systems. This scaling
shall be achieved by ranking all directly connected Power Stations and
embedded Large Power Stations in order of likelihood of operation at times
of Peak Demand. Those Power Stations considered least likely to operate at
peak are progressively removed and treated as non-contributory until an
Operational Plant Margin of 10% or just fractionally below is achieved. This
is regarded as sufficient to meet the demand on the day with sufficient Plant
to cater for unscheduled outages and Plant breakdown;
7/31/2019 Malaysia Transmission
18/93
Transmission System Reliability Standards Chapter 3:Transmission Reliability Standard
16
(5) The output of contributing Power Stations will include its operating reserve
which is calculated in accordance with their ability to provide dynamic
spinning response based on the characteristics of the Plant at that Power
Station;(a) for thermal units, a typical dynamic response of about 8%, if the actual
response is not available;
(b) for GT units, a typical dynamic response of 10%, if the actual response
is not available;
(c) for hydro units, equally proportionally part loaded to balance the
demand, plus losses, plus interconnection infeed;
(d) power imports from External Systems (e.g., Thailand and/or
Singapore) shall be assumed to be at their typical values as indicated
by reciprocal agreements for the base case Planned Transfer Condition;(e) a Load power factor of 0.9 or better shall be maintained, if the
measured power factor is not avilable, at the 132kV side of the
132/33kV and 132/11kV transformers; and
(f) for the Planned Transfer Conditions on the Transmission System there
shall not be:
(i) equipment loadings exceeding the pre-fault rating;
(ii) voltages outside the Pre-fault Planning Voltage Limits or
Insufficient Voltage Performance Margins; or
(iii) system Instability,
otherwise remedial planning measures to remove any violations will be
considered.
3.2.1.2 The minimum Transmission Capacity of the Main Interconnected Transmission
System shall be planned such that, for the background conditions described in
paragraph 3.2.1.1, prior to any fault there shall not be:
(1) equipment loadings exceeding the continuous current rating;
(2) equipment Three-Phase Short-Circuit currents exceeding 90% of their Short-
Time Current Ratings;
(3) voltages outside the Pre-fault Planning Voltage Limits or InsufficientVoltage Performance Margins; or
(4) System Instability.
The above performance requirements are summarised in Table 4.12, in section
4.11, under system condition classified as Category A No contingencies.
7/31/2019 Malaysia Transmission
19/93
Transmission System Reliability Standards Chapter 3:Transmission Reliability Standard
17
3.2.1.3 The minimum Transmission Capacity of the Main Interconnected Transmission
System shall also be planned such that for the background conditions described in
paragraph 3.2.1.1 and for the Secured Contingency Event of a Fault Outage of a
single Transmission Circuit or Element, a reactive compensator or other ReactivePower resource there shall not be any of the following:
(1) Loss of Supply Capacity (except as permitted by the Demand Connection
Criteria detailed later in this Chapter 3);
(2) Unacceptable Overloading of any Primary Transmission Equipment;
(3) Unacceptable Voltage Conditions or Insufficient Voltage Performance
Margins; or
(4) System Instability.
The above performance requirements, contingencies and impacts are summarised
in Table 4.12, in section 4.11, under system condition classified as Category B Events resulting in loss of a single element.
3.2.1.4 The minimum Transmission Capacity of the Main Interconnected Transmission
System shall also be planned such that for the background conditions described in
paragraph 3.2.1.1 and for the Contingency Event of a Fault Outage of any of the
following:
(1) a Double Circuit Overhead Line (with the exception of 500kV and radial
275kV lines), or
(2) a single Transmission Circuit with the prior outage of another Transmission
Circuit (with the exception of 500kV and radial 275kV lines);
(3) a section of Busbar or mesh corner; or
(4) any single Transmission Circuit with the prior outage of another Transmission
Circuit, Generating Unit, reactive compensator or other Reactive Power
resource,
there shall not be:
(a) cascade tripping; and
(b) System Instability.
Under the conditions described above, it is however acceptable for
planned/controlled loss of load to occur. The above performance requirements,contingencies and impacts are summarised in Table 4.12, in section 4.11, under
system condition classified as Category C Events resulting in loss of two or
more elements.
3.2.1.5 In addition to the requirements set out in paragraphs 3.2.1.3 and 3.2.1.4, for the
background conditions described in paragraph 3.2.1.1, the System shall also be
planned such that operational switching of any component or part of the Main
Interconnected Transmission System shall not cause:
(1) Unacceptable Overloading of any Primary Transmission Equipment;
7/31/2019 Malaysia Transmission
20/93
Transmission System Reliability Standards Chapter 3:Transmission Reliability Standard
18
(2) Unacceptable Voltage Conditions or Insufficient Voltage Performance
Margins;
(3) Any switchgear with duty exceeding 90% of its Short Circuit Break or Make
capacity;or(4) System Instability.
3.2.1.6 Circuits comprising the Main Interconnected Transmission System shall not
exceed the circuit complexity limit defined in Appendix D.
3.2.1.7 Guidance on substation configurations and switching arrangements are described
in Appendix C. These guidelines provide an acceptable way towards meeting the
Criteria of this Chapter 3. However, other configurations and switching
arrangements which meet the Criteria are also acceptable.
3.2.2 Operational Criteria
3.2.2.1 The Main Interconnected Transmission System shall be operated under Prevailing
System Conditions so that for the Secured Contingency Event of a Fault Outage of
a single Transmission Circuit or Element, a reactive compensator or other
Reactive Power provider there shall not be any of the following:
(1) a Loss of Supply Capacity (except that under certain maintenance outage
conditions, should an unplanned outage occur, some loss of Load can be
accepted, and except as permitted in paragraph 3.2.2.3);
(2) Unacceptably High or Low Frequency Conditions;
(3) Unacceptable Overloading of any Primary Transmission Equipment;
(4) Unacceptable Voltage Conditions; or
(5) System Instability.
The above performance requirements, contingencies and impacts are summarised
in Table 4.12, in section 4.11, under system condition classified as Category B
Events resulting in loss of a single element.
3.2.2.2 The Main Interconnected Transmission System shall be operated under Prevailing
System Conditions so that for Contingency Event of any of the following:
(1) a Double Circuit Overhead Line (with the exception of 500kV and radial
275kV lines); or
(2) a single Transmission Circuit with the prior outage of another Transmission
Circuit (with the exception of 500kV and radial 275kV lines); or
(3) a section of Busbar or mesh corner; or
7/31/2019 Malaysia Transmission
21/93
Transmission System Reliability Standards Chapter 3:Transmission Reliability Standard
19
(4) any single Transmission Circuit with the prior outage of another
Transmission Circuit, Generating Unit, reactive compensator or other
Reactive Power resource, or
(5) the most onerous Loss of Power Infeedthere shall not be:
(a) cascade tripping; and
(b) System Instability.
Under the conditions described above, it is however acceptable for
planned/controlled loss of load to occur. The above performance requirements,
contingencies and impacts are summarised in Table 4.12, in section 4.11, under
system condition classified as Category C Events resulting in loss of two or
more elements.
3.2.2.3 The operational Criteria above are subject to the following exceptions:
(1) Provided that it is in accordance with the appropriate requirements of the
demand connections criteria in part 3.3 of this Chapter 3, there may be an
associated Loss of Supply Capacity due to a Secured Contingency Event, for
example by virtue of the design of the generation connections and/or the
designed switching arrangements at the substations concerned. Typical
examples of this could be:
(a) at mesh substations where the loss of a Double Circuit Overhead Line
would result in the consequential loss of mesh corner Demand Supply
Point transformers;
(b) Demand Supply Point transformers which are teed off circuits that form
part of the Main Interconnected Transmission System and which would
become disconnected following the loss of these circuits.
(2) During periods of Severe Weather conditions or other high System risk
periods, TNB Transmission Division may implement measures to mitigate the
consequences of this risk. Such measures may include reducing output at
certain Power Stations.
3.2.2.4 For the purposes of paragraph 3.2.2.2, it is acceptable to utilise short term postfault actions to avoid Unacceptable Overloading of Primary Transmission
Equipment which may include a requirement for demand reduction; however this
will not be used as a method of increasing reserve to cover abnormal post fault
generation reduction. Where possible these post fault actions shall be notified to
the appropriate Users. Normally the provisions of the Grid Code, in respect of
Emergency Manual Demand Disconnection will be applied. Additional post fault
actions beyond the Grid Code provisions may be applied, but only where they
have been agreed in advance with the appropriate Users.
7/31/2019 Malaysia Transmission
22/93
Transmission System Reliability Standards Chapter 3:Transmission Reliability Standard
20
3.2.2.5 Post-fault Restoration of System Security - Following the occurrence of a Secured
Contingency Event measures shall be taken to re-secure the System to the above
operational Criteria as soon as reasonably practicable. To this end it is permissible
to put operational measures in place to facilitate the speedy restoration of SystemSecurity.
3.2.2.6 Authorised Variations From the Operational Criteria - The principles of these
operational Criteria shall be applied at all times except in special circumstances
where TNB, following consultation with the appropriate Network Operator,
Generator or Directly Connected Customer, may need to give instructions to the
contrary to preserve overall System integrity.
7/31/2019 Malaysia Transmission
23/93
Transmission System Reliability Standards Chapter 3:Transmission Reliability Standard
21
3.2.3 Mitigating Unsecured Contingency Events
3.2.3.1 In rare circumstances, disturbed System operating conditions, with multipleoutages and/or equipment failures beyond the Secured Contingency conditions
can occur on the Transmission System. Such events can lead to partial or full
disruption of the whole System and affect the Security and Adequacy of supplies
to consumers. Reasonably predicting the full extent and nature of such events
and hence putting sufficient investment in preventive measures is not fully
possible even when excessively large capital investment is available. These types
of events are therefore termed as Unsecured Contingency Events.
3.2.3.2 In practice however, TNB Transmission Division shall evaluate and install
special protective measures and defence mechanisms such that the impact of the
Unsecured Contingency Events is contained such that only part of the System
may be affected with some generation and demand loss.
3.2.3.3 The Transmission System is and shall continue to be planned and developed
such that special protective measures and defence mechanisms are included not
only to prevent a total System shutdown but also to facilitate rapid recovery to
normal System operation in the case of Unsecured Contingency Events. Under
such adverse operating conditions and as part of the special Protection and
defence measures loss of some generation and/or demand is permitted to ensure
stable operation of the remaining System in the post-contingency period.
3.2.3.4 Planning Requirements - As part of the System planning process, based upon the
System background conditions in paragraph 3.2.1.1 (used to set up the base case
for the planning studies to determine the adequate Transmission Capacity
requirements for the Transmission System), TNB shall study the impact of and
the sensitivity of the System to Unsecured Contingency Events relating to
multiple and very severe but rare System contingency events well beyond the
Secured Contingency Events.
3.2.3.5 For the impact assessment at the System planning stage the following types of
Unsecured Contingency Events will be considered and fully evaluated.
Consideration and full evaluation of events will not be restricted to those events
listed below but an assessment of reported events occurring in other power
Systems and a full consideration of such events as relevant to the Transmission
System. The types of Unsecured Contingency Events include:
(1) Loss of a bus section;
(2) Stuck breaker;
7/31/2019 Malaysia Transmission
24/93
Transmission System Reliability Standards Chapter 3:Transmission Reliability Standard
22
(3) Loss of the transmission towers in a Right of Way (involving loss of two or
more double circuit lines);
(4) Loss of a substation; and
(5) Loss of a complete Power Station.In making the assessment, system performance requirements, contingencies and
expected impacts following Unsecured Contingency Events or extreme
contingencies summarised in Table 4.12, in section 4.11, under system condition
classified as Category D - Extreme events resulting in two or more elements
removed or cascading out of service - shall be considered.
3.2.3.6 Operational Requirements - The Main Interconnected Transmission System shall
be operated with all the special Protection and defence measures in a fully
operational state. If any one or more of these measures are out of service or onmaintenance then specific Operational Planning studies shall be carried out well
in advance to put in place appropriate operating regimes and alternative
measures with a target of reducing the risk.
7/31/2019 Malaysia Transmission
25/93
Transmission System Reliability Standards Chapter 3:Transmission Reliability Standard
23
3.3 Demand Connection Criteria
3.3.1 General
3.3.1.1 The Demand Connection Criteria relate to the planning of demand connections
and provision of sufficient transformer capacity and/or demand transfer facilities
to avoid undue Loss of Supply Capacity for Secured Contingency Outages
included in the Transmission Reliability Standard. These Criteria enable TNB
Transmission Division and the Distributors, Network Operators or Directly
Connected Customers to make necessary investments ensuring the planning,
development and operation of the Transmission and Distribution Systems within
the provisions of Transmission System Reliability and Power Quality Standards,
and the Grid Code both under normal and Secured Contingency Outage
conditions.
3.3.1.2 This section of Chapter 3 presents the planning and operational Criteria for the
connection of demand to the Transmission System. In those parts of the
Transmission System where the Criteria of Chapter 2 of this Standard also apply,
those Criteria must also be met.
3.3.2 Planning Criteria
3.3.2.1 The objective of planning is to ensure there are sufficient connections from the
Transmission System at the Demand Supply Point such that the demand can be
fully met under secured contingency conditions.
3.3.2.2 The supply of demand shall also be planned such that for the background
conditions described in paragraph 3.2.1.1 and for the Secured Contingency Event
of a Fault Outage of a single Transmission Circuit, a reactive compensator or
other Reactive Power resource, or a step down transformer supplying demandwhose high voltage side is connected to the Transmission System, there shall not
be any loss of demand. The performance requirements, contingencies and impacts
for the demand connection are summarised in Table 4.12, in section 4.11, under
system condition classified as Category B Events resulting in loss of a single
element.
3.3.2.3 The above requirements shall not preclude the Customer/demand to be provided
with higher or lower security of supply level as stated in appropriate Agreement.
7/31/2019 Malaysia Transmission
26/93
Transmission System Reliability Standards Chapter 3:Transmission Reliability Standard
24
3.3.2.4 It is permissable to secure demand against the contingencies outlined in section
3.3.2.2 by demand transfer or other methods at distribution voltages levels.
3.3.3 Operational Criteria
3.3.3.1 In the case of a planned outage of a single Transmission Circuit, a reactive
compensator or other Reactive Power resource, or a step down transformer
supplying demand whose high voltage side is connected to the Transmission
System, full demand may not be met for a subsequent forced outage.
7/31/2019 Malaysia Transmission
27/93
Transmission System Reliability Standards Chapter 4:Performance Criteria and Limits
25
Chapter 4: Performance Criteria and Limits
4.1 Introduction
4.1.1 This Chapter 4 presents performance criteria and limits used in this Standard for
planning and operation. performance criteria and limits specified in this Chapter
are:
(1) Voltage;
(2) Voltage Performance Margin;
(3) Frequency Limits;
(4) Stability Limits;
(5) Fault Clearing Times;
(6) Short Circuit Limits;
(7) Basic Insulation Levels;
(8) Criteria for Evaluating Unsecured Contingencies; and
(9) Thermal Loading Limits of Transmission Components.
4.1.2 The specified criteria and limits in this Chapter shall be complied with for
planning and operation of the Grid as outlined in Chapter 2 and Chapter 3.
4.2 Voltage
4.2.1 The Transmission System is planned, maintained and operated in accordance with
the Standards included in Chapters 2 and 3. Pre-Fault Planning Voltage Limits
and Unacceptable Voltage Conditions are defined as follows. The operation of the
System is planned in Operational Planning timescales for operation within the
Pre-Fault Planning Voltage Limits and operated under the Prevailing System
Conditions so that for the Secured Contingency Event of a Fault Outage, any
Unacceptable Voltage Conditions will not be experienced. Under rare Unsecured
Contingency Events some parts of the System may experience Unacceptable
Voltage Conditions and some parts of the voltage may experience total loss of the
supply voltage.
7/31/2019 Malaysia Transmission
28/93
Transmission System Reliability Standards Chapter 4:Performance Criteria and Limits
26
4.2.2 The voltage limits applicable in planning studies for the pre-disturbance/pre-fault
state of the Transmission System are (see table 4.1):
Table 4.1: Pre-disturbance voltage limits for planning studiesNominal Voltages Maximum Minimum (Note 2)
500kV 525kV (+5%) 500kV (-0.0%)
275kV 289kV (+5%) 275kV (-0.0%)
132kV 139kV (+5%) 132kV (-0.0%) (Note 1)
Lower Voltages 1.05 p.u. (+5%) 1.0 p.u. (-0.0%) (Note 1)Note 1 There is no minimum planning voltage provided that, at the Busbar of the same nominal voltage atthe Demand Supply Point from which it is derived, it is possible (for example by tap changing) to achieve atleast 105% of nominal voltage.Note 2 It is assumed that at the planning stage the load power factor at the 132kV bus is no lower than 0.9 .
4.2.3 In both planning and operational timescales the voltage is unacceptable if outsidethe limits set out in table 4.2.
Table 4.2: Unacceptable voltage limits in planning and operation
Planning Timescales
Note 1Operational TimescalesNominal
VoltageMaximum Minimum Maximum Minimum
500kV
525kV (+5.0%)
Note 2
475kV (-5.0%)
Note 3
525kV (+5.0%)
Note 6
450kV (-10.0%)
275kV 289kV (+5.0%) 248kV (-10.0%) 303kV (+10.0%) 248kV (-10.0%)
132kV 139kV (+5.0%) 145kV (+10%) 119kV (-10%)
Less than
132kV(+5.0%) Note 4
Note 5
(+6.0%) (-6.0%)
Note1 These voltages to be achieved without widespread post-fault generation transformer re-tapping or
postfault adjustment of reactive compensation equipment reference voltage set points to increase the
Reactive Power output or to avoid exceeding the available reactive capability of generation or
reactive compensation equipment.
Note 2 It is permissible to relax this to 550kV (+10%) if lasting for no longer than 15 minutes (or longer if
the equipment permits).
Note 3 It is permissible to relax this to 450kV (-10%) if:
the affected substations are on the same radially fed spur post-fault;
there is no lower voltage interconnection from these substations to other Main
Interconnected System Substations; and
no auxiliaries of Large Power Stations are derived from them.
Note 4 It shall be possible to operate the lower voltage Busbar of a Demand Supply Point up to 100% of
nominal voltage unless the Secured Contingency Event includes the simultaneous loss of a
500/275kV transformer.
Note 5 The target operational voltages at Demand Supply Point should be as agreed with relevant
Users.
Note 6 It is permissible to relax this to 550kV (+10%) if lasting for no longer than 15 minutes (or longer if
the equipment permits).
7/31/2019 Malaysia Transmission
29/93
Transmission System Reliability Standards Chapter 4:Performance Criteria and Limits
27
4.2.4 Under System operational conditions elements of the Transmission System need
to be switched to optimise the operation of the System, to facilitate maintenance
and to isolate faulty equipment for repair. Under such operational activities
switching of any element or equipment shall not cause unacceptable Voltage StepChanges. The voltage change is deemed unacceptable if it changes by more than
the limits set out in table 4.3.
Table 4.3: Unacceptable voltage step changes in planning and operation
Planning Timescales
Note 1
Operational Timescales
Note 3
System Condition
Voltage
Rise
Voltage Fall Voltage
Rise
Voltage Fall
Following SecuredContingency Events
+10%
-2.5% for500kV
-5% for
others
Note 2
+10%
-2.5% for500kV
-5% for
others
Note 4
Following operational
switching less frequent
than specified in ER P28
+3% -3% +3% -3%
Otherwise According to ER P28Note 1 These limits apply at all demand conditions and only to the interfaces between the
Transmission System and customers, and must be applied with the Load response tovoltage change taken into account.
Note 2 This is relaxed to -12% if the fault involves the loss of a section of Busbar, or a meshcorner, or a Secured Contingency Event which also includes the simultaneous loss of a500/275kV transformer (Applicable to voltage other than 500kV).
Note 3 Following Voltage Step Change within these limits, it must be possible to restore theSteady State voltage to 95% of nominal at Demand Supply Points following any manualand/or automatic facilities available, including switching in or out of relevant Apparatus.
Note 4 This is relaxed to -12% if the fault involves the loss of a Double Circuit Overhead Line, asection of Busbar, or mesh corner(Applicable to voltage other than 500kV).
7/31/2019 Malaysia Transmission
30/93
Transmission System Reliability Standards Chapter 4:Performance Criteria and Limits
28
4.2.5 Limits of voltage changes due to frequent and infrequent operational switching of
Load both by TNB and the User are defined as follows (see table 4.4), provided
that this does not constitute a risk to the Transmission System.
Table 4.4: Voltage limits on switching of load
Load Switching Limit of Voltage Change
Infrequent single switching ordisconnection of Load (e.g., twice a day)Including capacitor banks and reactors
3%
Frequent switching and/or disconnectionof Load (e.g., Many times in a day)
1%
4.2.6 Immediately following a fault clearance and removal of the faulted item of
equipment from the Transmission System, and, prior to reaching Steady Stateconditions whose limits are described in Sections 4.2.3 and 4.2.4 above, the
voltage at any point on the Main Interconnected Transmission System is
unacceptable if outside the limits set out in the table 4.5.
Table 4.5: Dynamic voltage excursion limits
Low voltage High voltage
0.7 p.u. for not more than 400ms 1.2 p.u. for not more than 30s
4.3 Voltage Performance Margin
4.3.1 At the planning stage power transfer within the System and at each specific
demand point shall be limited such that there is a margin of 15% to the maximum
possible transmitted power, under the base case conditions described in Section
3.2.1.1 of this Standard.
4.3.2 At the planning stage power transfer within the System and at each specific
demand point shall be limited such that there is a margin of 7.5% to the maximum
possible transmitted power, under the contingency conditions described in Section
3.2.1.4of this Standard.
4.3.3 During operation, power transfer within the System and at each specific demand
point shall be limited such that there is a margin of 5% to the maximum possible
transmitted power, under the contingency conditions described in Section 3.2.2.1
of this Standard.
4.3.4 These voltage margin Criteria are in additon to any other voltage Criteria
requirements.
7/31/2019 Malaysia Transmission
31/93
Transmission System Reliability Standards Chapter 4:Performance Criteria and Limits
29
4.4 Frequency Limits
4.4.1 During normal steady-state operational conditions the Frequency is to be
maintained to within 1% of the nominal, that is, between 49.5 and 50.5Hz.
4.4.2 The System Frequency could rise to 52Hz or fall to 47Hz in extremely rare and
exceptional circumstances. Therefore the design of both TNB and User's Plant and
Apparatus must enable operation of that Plant and Apparatus within that range in
accordance with table 4.6.
Table 4.6: Frequency excursion limits
Frequency Range Requirement
47.5Hz - 52Hz*
Continuous operation is required47Hz - 47.5Hz Operation for a period of at least 10 seconds is required
each time the Frequency is below 47.5Hz* This value may be lowered to 51.5Hz if substantive evidence can be provided to show
that the operation of the generating unit beyond 51.5Hz will affect the safety of the plant.
4.5 Stability Limits
4.5.1 The relative rotor angle of any two Generating Units in the System must not
exceed 180 degrees at any time.
4.5.2 Following any disturbance the Damping Ratio of power, angle or voltage
oscillation must not be less than 5%.
7/31/2019 Malaysia Transmission
32/93
Transmission System Reliability Standards Chapter 4:Performance Criteria and Limits
30
4.6 Fault Clearing Times
4.6.1 The following maximum fault clearance times (see table 4.7) are normallyexpected from the Main Protection equipment installed in the Transmission
System.
Table 4.7: Maximum Fault Clearing Times
System Voltage (kV) Fault Location Fault Clearance Time (ms)
Substation 100500 and 275
Overhead Line/Cable 100
Substation 150132
Overhead Line/Cable 150
4.6.2 For planning studies:
(1) a 100ms fault clearance time shall be used for system at nominal voltage of
500kV and 275kV;
(2) a 150ms fault clearance time shall be used for system at nominal voltage of
132kV.
Fault clearance time is defined as the time between fault inception and complete
disconnection of the faulted item of equipment from the Transmission System.
4.6.3 For operational studies the Protection times in 4.6.2 shall also be used. However,
where the used of fault clearing times in 4.6.2 is found to be limited, the actual
fault clearing times may be used.
4.7 Short-Circuit Limits
4.7.1 The Transmission System shall be planned such that the maximum sub-transient
three phase symmetrical short circuit fault levels are not greater than 90% of theswitching equipment short-circuit ratings, the breaking and making capacities of
switching equipment shall not be exceeded under maximum system short circuit
condition.
4.7.2 For three-phase or single-phase-to-earth faults, the planned maximum sub-
transient short circuit fault levels shall not be greater than that indicated in the
table 4.8.
7/31/2019 Malaysia Transmission
33/93
Transmission System Reliability Standards Chapter 4:Performance Criteria and Limits
31
Table 4.8: Short-circuit limits
System Voltage (kV) Circuit Breaker
Short Circuit Rating Break Capacity
500 50kA, 1s
275
x 40kA, 3s for bulk substation
x 50kA, 1s for Power Station and 275kV within 500kV
substation
132 x 31.5kA, 3s
x 40kA, 3s for Power Station and 132kV within a
500/275kV substation
33 25kA, 3s
22, 11, 6.6 20kA, 3s
0.415 and 0.240 31.5kA, 3sNote: Typically closing-and-latching (momentary) capability of a circuit breaker as anrms current is not more than 1.6K times Symmetrical Short Circuit Rating or as aninstantaneous peak current is not more than 2.7K times Symmetrical Short Circuit Rating.For most circuit breakers, K is equal to one.
4.8 Basic Insulation Level
4.8.1 Typical Basic Impulse Insulation Levels (BIL) of the Transmission andDistribution Systems are as given in the following table. The Users Plant and
Apparatus is required to match these insulation levels. These may vary under
specific circumstances.
Table 4.9: Basic insulation level (BIL)
System Voltage (kV) BIL (kV)
500 1550
275 1050
132 65033 170
22 125
11 and 6.6 75
7/31/2019 Malaysia Transmission
34/93
Transmission System Reliability Standards Chapter 4:Performance Criteria and Limits
32
4.9 Criteria for Evaluating Unsecured Contingencies
4.9.1 For the purposes of determining the types of special Protection and defencemeasures the following contingencies which will be considered together with the
appropriate Fault Outage Criteria to be considered are listed in table 4.10 and also
as described under Category D of Table 4.12, in section 4.11,. In all these cases
special Protection and/or defence measures shall be put in place such that whilst
some demand and generation loss may be experienced a total System shutdown
will be avoided.
Table 4.10: Unsecured contingencies to be evaluated
Unsecured
Contingency
Event
Fault Outage CriteriaNote 1
Outage of System
Elements
Bus Section Fault Single-phase-to-ground fault cleared in
250 ms followed by the loss of the
entire bus section through tripping of
all circuit breakers connected to that
section of Busbar
All Transmission Circuits
and any transformers and/or
reactive compensation
equipment connected
Stuck Breaker
Fault Single Phase
Fault Initiation
Single-phase-to-ground fault being
cleared in 250 ms by the tripping of the
circuit breakers of transmissionelements in the immediate proximity to
clear the fault which could not be
normally cleared due to the stuck
breaker
All Transmission Circuits
and any transformers and/or
reactive compensationequipment in the immediate
proximity
Stuck Breaker
Fault Three Phase
Fault Initiation
Three-phase fault cleared in normal
clearing time followed by a single line
to ground fault cleared in delayed time.
Typical delay time is assumed at
250ms.
All Transmission Circuits
and any transformer and/or
reactive compensation
equipment in the immediate
proximity
Loss of one Bipole of
the HVDC
Interconnector
Blocking of one Bipole through its
control equipment reducing the current
flow to zero and the resumption of
current flow
Outage of some elements of
the HVDC link
Loss of Right of Way Three-phase fault cleared in 150ms or
100ms followed by the loss of circuits
on the Right of Way
Loss of all circuits on the
Right of Way
7/31/2019 Malaysia Transmission
35/93
Transmission System Reliability Standards Chapter 4:Performance Criteria and Limits
33
Unsecured
Contingency
Event
Fault Outage CriteriaNote 1
Outage of System
Elements
Loss of substation
(one transmission
voltage level plus
associated
transformers) i.e., loss
of a Busbar
Three-phase fault cleared in 150ms or
100ms followed by the loss of circuits
connected to the busbar
Loss of all circuits
connected to the busbar
Loss of a complete
Power Station
Three-phase fault cleared in 150ms or
100ms followed by the loss of all
Generating Units at the Power Station
Loss of all Generating Units
at the Power Station
Note 1: Normal clearing time - Three-phase fault duration for 500kV and 275kV is 100ms and forand 132kV is 150ms
4.10 Thermal Loading Limits of Transmission Components
4.10.1 The thermal loading limits of equipment in planning and operational timescales
are defined in table 4.11.
Table 4.11: Thermal loading limits on transmission components
Equipment Planning Operation
Lines No thermal overloading
allowed
130% for not more than thirty
(30) minutes or an applicabletime dependent emergency limit
Underground cables Strict observation of
equipment continuous rating
125% for not more than thirty
(30) minutes or an applicable
time dependent emergency limit
Transformers No thermal overloading
allowed
130% for not more than thirty
(30) minutes or an applicable
time dependent emergency limit
Switching and
Isolation Equipment
Strict observation of
equipment continuous rating
Applicable time dependent
emergency limit
4.11 Summary of Transmission System Requirements Normaland Emergency Conditions
4.11.1 Table 4.12 summarises the required and/or expected performance of thetransmission system under four (4) categories of contingencies and for eachcategory:(1) the initiating events and contingency elements; and(2) system performance requirements and expected impactsare specified.
7/31/2019 Malaysia Transmission
36/93
Transmission System Reliability Standards Chapter 4:Performance Criteria and Limits
34
Table 4.12: Summary of System Performance Requirements Following Events
Involving Loss of Single or More Grid System Elements under Both Normal and
Emergency ConditionsContingencies System Limits or Impacts
CategoryInitiating Event(s) and
Contingency Element(s)System Stable
& both Thermal
and Voltage
Limits within
Applicable
RatingNote (a)
Loss ofDemand
or
Curtailed
Firm
Transfers
CascadingOutages
ANoContingencies
All Facilities in Service Yes No No
Single Line Ground (SLG) or 3-Phase (3) Fault with NormalClearing (Note (e)):1. Generator2. Transmission Circuit
3. TransformerLoss of an Element without aFault
YesYes
YesYes
NoNo
NoNo
Note (b)
NoNo
NoNo
BEvent resultingin the loss of asingle element
Single Pole Block, NormalClearing (Note (e)):4. Single Pole (dc) Line Yes No
Note (b)No
SLG Fault, with Normal Clearing(Note (e)):1. Bus Section
2. Breaker (failure or internalfault)
Yes
Yes
Planned/ControlledPlanned/
ControlledNote (c)
No
No
SLG or 3 Fault, with NormalClearing (Note (e)). ManualSystem Adjustment, followed byanother SLG or 3 Fault, withNormal Clearing (Note (e)):3. Category B (B1, B2, B3 or
B4) contingency, manualsystem adjustments, followedby another Category B(B1,B2, B3 or B4) contingency
Yes Planned/ControlledNote (c)
No
Bipolar Block with NormalClearing (Note (e)):4. Bipolar (dc) Line Fault (non
3) with Normal Clearing
(Note (e))5. Any two circuits of a multiple
circuit tower (Note (f)).
Yes
Yes
Planned/Controlled
Planned/ControlledNote (c)
No
No
CEvent(s)resulting in theloss of two ormore (multiple)elements
SLG Fault, with DelayedClearing (stuck breaker orprotection system failure) (Note(e)):6. Generator
7. Transformer
8. Transmission Circuit
9. Bus Section
Yes
Yes
Yes
Yes
Note (c)
Planned/ControlledPlanned/
ControlledPlanned/
Controlled
Planned/Controlled
No
No
No
No
7/31/2019 Malaysia Transmission
37/93
Transmission System Reliability Standards Chapter 4:Performance Criteria and Limits
35
Contingencies System Limits or Impacts
CategoryInitiating Event(s) and
Contingency Element(s)
System Stable
& both Thermal
and Voltage
Limits within
ApplicableRatingNote (a)
Loss of
Demand
or
Curtailed
FirmTransfers
Cascading
Outages
DExtreme eventresulting in twoor more(multiple)elementsremoved orCascading outof service
Note (d)
3 Fault with Delayed Clearing (stuck breaker or protection systemfailure) (Note (e)):
1. Generator2. Transmission (Circuit)3. Transformer4. Bus Section
3 Fault with Normal Clearing (Note (e)) :5. Breaker (failure or internal Fault)6. Loss of tower with three or more circuits
7. Loss of all transmission lines on a common right-of way8. Loss of a substation (one voltage level plus transformers)9. Loss of a switching station (one voltage level plus transformers)10. Loss of all generating units at a station.11. Loss of large Load or major Load center12. Failure of a fully redundant Special Protection System to operate
when required13. Operation, partial operation, or misoperation of a fully redundant
Special Protection System in response to an event or abnormalsystem condition for which it was not intended to operate
14. Impact of severe power swings or oscillation from Disturbancesin another Interconnected Systems
Elevate for risks andconsequences:
x May involvesubstantial loss ofcustomer Demandand generation ina widespread areaor areas
x Portions or all oftheinterconnection
systems may ormay not achieve anew, stableoperating point.
x Evaluation ofthese events mayrequire jointstudies withneighboringsystems.
Notes:(a) Applicable rating refers to the applicable Normal and Emergency facility thermal Rating (see table4.11) or system voltage limit as determined and consistently applied specified in section 4.1 of thisStandard. Applicable Ratings may include Emergency Ratings applicable for short durations asrequired to permit operating steps necessary to maintain system control.
(b) Planned or controlled interruption of electric supply to radial customers or some local Networkcustomers connected to or supplied by the Faulted element or by the affected area, may occur in certainareas without impacting the overall reliability of the interconnected transmission systems. To preparefor the next contingency, system adjustments are permitted, including curtailments of contracted firmpower transfers.
(c) Depending on system design and expected system impacts, the controlled interruption of electricsupply to customers (load shedding), the planned removal from service of certain generation, and/or thecurtailment of contracted firm power transfers maybe necessary to maintain the overall reliability of the
interconnected transmission systems.(d) A number of extreme contingencies that are listed under Category D and judged to be critical will be
selected for evaluation. It is not expected that all possible facility outages under each listed contingencyof Category D will be evaluated.
(e) Normal clearing is when the protection system operates as designed and the Fault is cleared in the timenormally expected with proper functioning of the installed protection systems (see table 4.7). Delayedclearing of a Fault is due to failure of any protection system component such as a relay, circuit breaker,or current transformer, and not because of an intentional design delay. Three phase delayed clearing iswhen a three phase fault is cleared in normal clearing time followed by a SLG fault cleared after adelay time (to represent the single pole of a stuck breaker or protection system failure). Typical delaytimes are 250 milliseconds
(f) System assessment may exclude these events where multiple circuit lowers are used over shortdistances (e.g. substation entrance, river crossings).
7/31/2019 Malaysia Transmission
38/93
7/31/2019 Malaysia Transmission
39/93
Transmission System Power Quality Standards Contents
36
Transmission System Power
Quality Standards
Effective January 1, 2006
Version 2.0Edition 1.0
TENAGA NASIONAL BERHAD, 2006
7/31/2019 Malaysia Transmission
40/93
Transmission System Power Quality Standards Contents
37
Contents
TRANSMISSION SYSTEM POWER QUALITY STANDARDS..............................36
CONTENTS......................................................................................................................37
CHAPTER 1: INTRODUCTION...................................................................................38
1.1 POWER QUALITY DEFINITION AND REQUIREMENTS............................................381.2 SCOPE .................................................................................................................40
CHAPTER 2: TRANSMISSION POWER QUALITY STANDARDS.......................41
2.1 VOLTAGE SAG OR VOLTAGE DIP ........................................................................412.2 VOLTAGE STEP CHANGE.....................................................................................42
2.3 VOLTAGE FLUCTUATONS AND FLCKER.............................................................422.4 HARMONICS ........................................................................................................442.5 PHASE UNBALANCE AND TRACTION LOAD .........................................................462.6 STEP CHANGES OF POWER ..................................................................................49
7/31/2019 Malaysia Transmission
41/93
Transmission System Power Quality Standards Chapter 1: Introducton
38
Chapter 1: Introduction
1.1 Power Quality Definition and Requirements
1.1.1 In this Standard, Power Quality is defined as the degree to which the Voltage at
the point of connection to the User of the Transmission System is maintained to be
Sinusoidal at declared rated Voltage and Frequency within the stipulated limits.
1.1.2 Major Power Quality Problems that are associated with the Transmission System
is Voltage Sag or Voltage Dip. Voltage sag would occur in the System during the
short-circuit fault. The most severe Voltage Sag would occur at the fault location
and the Voltage Sag effects would be propagated throughout the Systems with the
magnitude of the Voltage Dip attenuated.
1.1.3 Voltage Sag could also be caused by short circuit faults in Users System and
propagated to other Users Systems through the Transmission Systems or through
the Distribution System as the case may be. Majority of problems associated with
harmonics are caused by non-linear loads that draw non-sinusoidal current from
the system and thus causing the supply voltage to be distorted. Frequent switching
of large load such as motors is also another source of power quality problems thatresult in voltage flicker to be experienced by other Users.
1.1.4 The approaches to resolving power quality problems depend on the types of the
power quality problems. Both utility and Customers have their individual roles
and responsibilities in resolving power quality problems. Individual Customer
shall ensure that any non-linear load to be connected to the Transmission System
does not produce harmonic currents that would result in voltage at Point of
Common Coupling to be distorted beyond the limits as set out in section 2.4 of
this Standard. Likewise the utility shall continue to monitor and ensure thatHarmonic limits as specified in section 2.4 are complied with.
1.1.5 Voltage sag could affect sensitive loads usually connected at low voltage network
of the Customers installation. Not withstanding the presence of several voltage
transformations from transmission voltage to low voltage, voltage sag caused by
Transmission faults can affect Customers voltage sensitive loads and the effect is
more pronounced during severe three-phase faults on the Transmission System. It
shall be the responsibility of the utility to provide appropriate information on
voltage sag and for the individual customer to ensure sufficient ride-through
capability of the voltage sensitive equipment.
7/31/2019 Malaysia Transmission
42/93
Transmission System Power Quality Standards Chapter 1: Introducton
39
1.1.6 The Standards contained in this document specify the Power Quality requirements
of the bulk supply point that delivers electricity supply to the Distribution System
and other bulk supply Users in terms of stable voltage and frequency within
specific limits so that Generator, TNB Transmission equipment or Consumersequipment directly connected to the Transmission System can operate safely
within its design performance without suffering undue damage or breakdown.
1.1.7 The requirements and limits specified in this Standard shall also be complied with
by all Users connected or intending to be connected to the Transmission System.
1.1.8 Consequently these Standards also determine the investment required in provision
and/or procurement of Supplementary Services such as Reactive Power, Active
Power response, hot standby generation, fast start generation, demand control andblack start by TNB Transmission. They also indicate the investment required both
in the Transmission and Distribution Systems for containing harmonics, voltage
unbalance as well as the permitted types and levels of special Loads adversely
affecting the power quality and requirements for compensation plant to limit their
adverse effects. Compliance with these Standards is the responsibility of TNB
Transmission, Generators, Distributors, Network Operators and Non-Embedded
Customers.
1.1.9 In order to achieve the required Transmission Power Quality these Standards will
be used by TNB Transmission in planning, developing, maintaining and operating
the Transmission System as well as in connecting generation and demand to the
System. In turn the equipment utilised by the Generators, TNB Transmission,
Distributors and Customers also need to comply with the provisions of this
Standard. Compliance with these Standards is therefore not optional and where a
connecting partys plant or equipment is likely to be non-compliant at the
planning stage then such plant and/or equipment will not be energised until
appropriate remedial measures are put in place and are fully functional. In
addition, TNB Transmission shall put in place appropriate monitoring facilities to
ensure compliance with the provisions of this Standard as part of its Licence.
1.1.10 In cases where, the nature and operation of the new types of plant and equipment
to be connected to the Transmission System is perceived to be likely to cause
problems to other customers and users of the System, but not fully covered by
this Standard, appropriate remedial measures shall be put in place based on expert
advice within a mutually agreed time period.
7/31/2019 Malaysia Transmission
43/93
Transmission System Power Quality Standards Chapter 1: Introducton
40
1.2 Scope
1.2.1 This Standard covers most of the power quality related phenomena generated byvarious types of plant and equipment connected to the Transmission System. In
each particular case the Transmission Power Quality that should be maintained is
indicated together with the remedial approach and responsibilities of parties.
7/31/2019 Malaysia Transmission
44/93
Transmission System Power Quality Standards Chapter 2: Transmission Power Quality Standards
41
Chapter 2: Transmission Power Quality Standards
2.1 Voltage Sag or Voltage Dip
2.1.1 Voltage sag, dip or swell is the transient phenomena which can affect the
voltage level and is usually experienced during System faults and the subsequent
recovery period. These phenomena can adversely affect some customer equipment
that are sensitive to such changes. This Standard does not specifically cover
voltage sag, dip or swell.
2.1.2 The voltage sags are caused by faults on the Transmission System due to short
circuits incidents which are cleared by System Protection. The nature and
technical detail of such events is a function of the location of the connection point
on the System, the distance of the short circuit from the connection point and the
short-circuit level at the connection point, the severity (magnitude and duration) of
the short circuit. Voltage Sag may also