FIRM PROFILE

ARCHITECTS ENGINEERS PLANNERS CONSTRUCTION MANAGERS WWW.MAGUIREGROUP.COM

MAGUIRE GROUP INC.  Maguire  Group  is  a  large,  full‐service  multi‐disciplinary  Architectural, Engineering,  Planning  and  Construction  Management  firm  headquartered  in Massachusetts,  with  offices  in  Connecticut,  Florida,  New  Hampshire, Pennsylvania, Rhode Island, and the U.S. Virgin Islands.  Throughout  its history, Maguire has played an  important  role  in  the planning, design,  and  construction  of  the  infrastructure  used  daily  by  millions  of Americans. That role continues today as part of the Metric Engineering Group, a leading U.S. architectural and engineering company.  Maguire Group  offers  professional  architectural  design  and  engineering  (A&E) services including structural, electrical, and mechanical engineering; civil, marine and  environmental  engineering;  transportation  systems  engineering;  water resources engineering; and emergency management services. These services are complemented  by  in‐house  services  which  include  planning  (site,  community and  regional);  geotechnical  engineering;  permit  preparation;  and  construction and project management.   Maguire Group  is ranked among the top firms of  its type  in  the  United  States  and  is  equipped  to  undertake  complex  projects requiring the orchestration of multiple disciplines.  Maguire Group has provided over 70 years of services  to  its clients and  in  the last five years has planned and designed over 1,800 projects.  The advantage of the  firm's  size  is  that  from  initial concept development  through project design and  construction, Maguire  Group  is  able  to  assemble  and  deploy  a  team  of permanent staff members with the capabilities to meet the specific needs of the most complex projects.    Success  in  the  highly  competitive  field  of  design  consulting  is  best  achieved through  consistent excellence, professional dedication, and  services  that merit client trust.   The firm's most precious assets are the capabilities of  its staff and the confidence of  its clients.   Maguire Group  is continually striving  to enhance and preserve these assets. 

Page 3: Maguire Group Parking Facilities Quals

FIRM PROFILE

ARCHITECTS ENGINEERS PLANNERS CONSTRUCTION MANAGERS WWW.MAGUIREGROUP.COM

OUR APPROACH  Great facilities begin with the end in mind. To fit their environment and perform well, the best facilities evolve out of close collaboration. They emerge when the project team works together every step of the way. Maguire’s approach begins with listening closely to the needs of our clients, both technically and financially. The lines of communication that we develop during the course of the assignment provide a forum to exchange ideas and to pose alternative solutions.  Maguire meets  our  clients’  needs  through  an  efficient  and  effective  delivery system providing clients a single point of contact. We respond quickly to project challenges  such  as  tight  schedules,  new  information,  and  revised  project objectives.    Our  multi‐faceted  approach—combined  with  our  expertise  and services—allows us to meet the needs of our customers within one company.   Our  network  of  technical  experts  works  under  a  boundary‐less,  seamless structure  so  that  our  clients  receive  the  best,  most  economical  project  or program solution.  And as technology advances and regulatory processes evolve, Maguire’s  staff  has  remained  flexible  and  adaptive  with  a  keen  focus  on customer  service.     After  all, building  strong,  long‐term  relationships with our clients is the key to our success as a company     

Our team-based approach to services provides each client with the expertise and input of multiple disciplines. Whether using an architect, engineer, planner or environmental scientist, each project benefits from the perspective and skills of varied professionals. The combined experience and knowledge, under one roof, benefits each project and customer for a better result.

Page 4: Maguire Group Parking Facilities Quals

FIRM PROFILE

ARCHITECTS ENGINEERS PLANNERS CONSTRUCTION MANAGERS WWW.MAGUIREGROUP.COM

 

 

MARKET SECTOR FOCUS: PARKING FACILITIES / GARAGES

Maguire’s  parking  consultants,  engineers  and  designers  assist  our  clients  to realize  their  parking  system's  potential. We  start  by  working  with  clients  to identify  the  most  cost‐effective  and  efficient  options  for  achieving  their objectives. We design durable,  low maintenance parking structures or  lots that optimize the site for vehicle circulation and pedestrian movement, and we make them look good.  Parking structures are a big part of their surrounding landscape, whether urban, suburban  or  rural. Maguire’s  designs  blend with  the  surrounding  buildings  or landscape  and offer users  efficient,  visible  entry  and  exit points,  safe  lighting, clear  sight  lines,  and  low‐impact  ventilation  and  noise  emissions. Whenever possible, we specify money‐saving items such as high output lighting and simple operating equipment that facilitates self‐parking. We strive to minimize the need for mechanical ventilation as well to maximize the structure’s durability.  Parking  facilities  are  also  exposed  to  the  elements,  so  our  designs  take  into consideration the structure’s ability to withstand environmental changes due to temperature,  seismic  forces,  salt  penetration,  and  concrete  shrinkage  and volume change.  Once design  is complete, Maguire  is able to assist the owner/operator through the entire construction process from selecting and negotiating with a contractor, to administering and overseeing construction.  

Parking Facilities Services  Budget estimates / financial analysis  Construction review  Contact document preparation / administration  Corrosion protection system design  Design:  functional / structural / architectural  Feasibility studies   Functional planning of parking concepts  Operations analysis  Parking lot surface analysis / upgrades  Prime consulting  Security  Structural design  Surface parking layouts  System design / consulting  Traffic analysis (vehicle / pedestrian) 

 

Page 5: Maguire Group Parking Facilities Quals

FIRM PROFILE

ARCHITECTS ENGINEERS PLANNERS CONSTRUCTION MANAGERS WWW.MAGUIREGROUP.COM

 

 

 

 

 

MARKET SECTOR FOCUS: DESIGN-BUILD

Maguire  Group  has  participated  in  a  number  of  design‐build  ventures.    The success of  these partnerships  stems directly  from  the  fact  that we at Maguire understand  the  design‐build  process.   We  understand  our  role  and work  in  a collaborative relationship with the builder and the owner.   These three entities become  a  team with  a  common  goal.    It  is  the  commitment  to  the  goal  that results  in  the ultimate  success of  the project. For  them, Maguire  represents a single  source  of  comprehensive  architectural,  engineering  and  planning expertise that dramatically simplifies procurement, coordination and control – a benefit that is particularly important in developing complex fast‐track projects.  Design‐Build, Fast‐Track, and Construction Management Projects  Arcade Garage, Providence, RI:  $5.5M, 9‐story, 650‐car parking garage, CM ‐ 

Gilbane   Harvard Sq. Garage, Cambridge, MA:   $4M, 6‐level, 210‐car parking garage 

and retail facility, CM ‐ Gilbane   Bradley Airport Garage, Windsor Locks, CT:  $35M, 3,500‐car, 4‐level garage, 

CM ‐ Downes Construction  High  Hanover  Garage,  Portsmouth,  NH:  $4M  expansion  of  an  existing 

downtown garage to accommodate additional 250 cars, CM ‐ Reed & Reed  Providence Place, Providence, RI:  $460M, 3.2 million SF shopping mall with 

4,000‐car parking garage, CM ‐ Morse Diesel  Newport Gateway  Transportation  and  Visitors  Center, Newport  RI:  $7M, 

18,000‐SF  visitor  center,  parking  garage  and  bus  docking  facility,  CM  – Gilbane 

CVS  Corporate Headquarters:   Design  of  site/civil  for  a  $40M,  400,000‐SF office building / parking lot, CM ‐ Gilbane  

Otis AFB Fire/Crash Rescue Facility, Bourne, MA: $13M, 48,000‐SF 2‐story Fire/Crash Rescue Facility, CM ‐ Cutler Associates 

Roger Williams Park Botanical Gardens, Providence, RI:  $12.9M, 10,000‐SF Welcome  Center,  15,000‐SF  Conservatory,  and  5,000‐SF  Formal  House  for the City of Providence, Parks Department, CM ‐ Gilbane  

B.  J.  Clanton  Elementary  School,  Providence,  RI:    $10M,  80,000‐SF elementary school in the City’s South End, ‐ CM ‐ Dimeo Construction  

Leviton  School,  Providence,  RI:  $3.2M,  135,000‐SF  kindergarten  and  first grade school for the Providence School Department, CM – Dimeo 

New  Britain  Parking  Garage,  New  Britain,  CT:  $13M,  1,500‐car,  pre‐cast garage  with  1/3  set  aside  for  secure  judicial  parking,  CM  ‐  Downes Construction Co. 

DPW  Facility, Portsmouth, NH:   $1.5M, 20,000‐SF new 2‐story  facility  and 20,000 ‐SF renovated space, CM ‐ Jewett Construction 

Page 6: Maguire Group Parking Facilities Quals

FIRM PROFILE

ARCHITECTS ENGINEERS PLANNERS CONSTRUCTION MANAGERS WWW.MAGUIREGROUP.COM

    

Design‐Build, Fast‐Track, and Construction Management Projects (Continued)  

Middlesex  Community  College,  Bedford, MA:  $21.5M,  200‐acre  suburban college campus including 6 buildings, CM ‐ Sciaba Building Co. 

Leander  Jurgen  Command  Police  Station,  St.  John, USVI:  $1.2M,  7,000‐SF police station on three floors in Cruz Bay, Contractor ‐ R&R Caribbean, Inc. 

Virgin  Islands  Modular  Schools,  St.  Thomas/St.  Croix:    $15M  site improvements,  foundations  and  structural  design  of  300  modular  school units following Hurricane Marilyn, Contractor ‐ Ramtech 

Somerville Lumber Distribution Center, Bellingham, MA: $19.5M, 500,000‐SF distribution center on 70 acres, CM ‐ Gilbane  

Mid‐Connecticut  Resource  Recovery  Facility,  Hartford,  CT:  $225M,  2,000‐TPD waste‐to‐energy facility, CM (Phase I) ‐ Fusco Construction, CM (Phase II) ‐ Combustion Engineering (Maguire parent) 

H‐Power  Resource  Recovery  Facility,  Honolulu,  HI:  $200M,  1,800‐TPD waste‐to‐energy facility, CM ‐ Hawaiian Dredge Co. 

Lisbon  Resource  Recovery  Facility,  Lisbon,  CT:  $85M,  500‐TPD  waste‐to energy facility, CM ‐ Rust Engineering 

Detroit Resource Recovery Facility, Detroit, MI: $300M, 3,000‐TPD waste‐to‐energy facility, CM ‐ Barton Marlow 

Materials  Recycling  Facility,  Johnston,  RI:  $7.8M,  5,000‐SF  materials recycling facility addition, CM ‐ Streeter Associates 

Materials Recycling Facility, Prince George’s County, MD: $11.5M, 62,000‐SF materials recycling facility, CM ‐ Marshall Contractors 

Materials Recycling  Facility,  Prince George’s  County, MD:  $8M,  35,000‐SF materials recycling facility, CM ‐ Landmark Building Corp. 

Materials  Recycling  Facility,  Montgomery  County,  MD:  $10M,  55,000‐SF materials recycling facility, CM ‐ Marshall Contractors 

Materials  Recycling  Facility,  Brookhaven,  NY:  $9.6M,  44,000‐SF materials recycling facility, CM ‐ Marshall Contractors 

Materials Recycling Facility, Rockland County, NY: $8M, 38,000‐SF materials recycling facility, CM ‐ Helmer‐Cronin Construction 

Co‐Composting  Facility,  Rockland  County,  NY:  $14M,  82,100‐SF  co‐composting facility, CM ‐ Helmer‐Cronin Construction 

Select Catalystic Reduction  (SCR)  System, Merrimack, NH: $10M  SCR‐NOx air pollution control system, CM ‐ Williams Group International 

Woonsocket  Wastewater  Treatment  Plant,  Woonsocket,  RI:  $17M treatment plant upgrade, CM ‐ Gilbane  

Ocean State Power, Burrillville, RI: $350M, 500‐MW combined cycle power plant, CM ‐ EBASCO 

Rehabilitation of Gainer Dam and Regulating Reservoir, Scituate, RI: $1.6M dam/reservoir rehabilitation, CM ‐ Harbor Marine Corp. 

Page 7: Maguire Group Parking Facilities Quals

Comprehension… Imagination… Solutions 

M aguire Group  was founded over 70 years ago as a small civil engineering firm.  Today, Maguire is a full‐service, internationally recognized 

architectural, engineering, planning and construction management organization.  Throughout its history, Maguire has played an important role in the planning, design and construction administration of the infrastructure used in our daily life for thousands of clients. That role continues today as part of the Metric Engineering Group.   

Maguire’s Buildings / A&E Services Group is a full‐service architecture/engineering 

division that provides services to a range of public and private clients. Projects 

include academic and higher education, commercial, design‐build, hospitality, 

healthcare, military, mixed‐use, owner’s project management, public safety, 

parking garages, and post offices.  

The common denominator throughout the professional services we provide is that 

our designs respond directly to our clients' needs in a creative, cost‐effective and 

environmentally responsible way. We seek to work with our clients to first 

understand their design challenges and then offer them options and, ultimately, 

solutions. We view this as an interactive process in which we interpret our clients’ 

needs and apply the knowledge and skills of our staff to the problem‐solving 

process.  

Our approach combines innovative architectural design, sophisticated computing 

technology, sustainable concepts, and a complete understanding of the 

importance that cost control plays in the success of a building project. Whether 

your project is a public or private endeavor, we welcome the opportunity to 

demonstrate why Maguire has been so successful for our clients for over 70 years. 

BUILDINGS / A&E SERVICES 

 

M a g u i r e G r o u p I n c . Architects Engineers Planners

i n f r a s t r u c t u r e f o r t h e r e a l w o r l d

A Metric Engineering Group Company www.MaguireGroup.com 

FO

XB

OR

OU

GH

, M

A

MIA

MI,

FL

N

EW

BR

ITA

IN,

CT

O

RL

AN

DO

, F

L

PIT

TS

BU

RG

H,

PA

P

OR

TS

MO

UT

H,

NH

P

RO

VID

EN

CE,

RI

S

T.

CR

OIX

, U

SV

I

Page 8: Maguire Group Parking Facilities Quals

MAGUIRE BUILDINGS AND A&E SERVICES Services Segments

Services Architectural Planning / Programming / Design

Building Assessments Comprehensive Facilities Analysis & Design

Conceptual Layout / Renderings Design-Build Services Electrical Engineering

Feasibility Studies Fire Protection Engineering

Geotechnical Engineering Mechanical Engineering

New Facilities / Additions Plumbing Engineering

Renovations / Adaptive Reuse Structural Engineering

Sustainable Design

Market Segments Academic: K-12, Higher Ed, Training Facilities Commercial Facilities Healthcare Facilities / Hospitals Housing / Dormitories Industrial Facilities Intermodal Facilities Manufacturing Facilities Military Facilities Parking Garages / Structures Post Offices Public Safety / Fire & Police Facilities Retail / Mall / Hotel / Hospitality Facilities Vehicle Maintenance Facilities Warehouse Facilities

Retail / Mixed Use 

 

M aguire  Group’s  professional  and  technical  staff  can  provide  BIM,  Owner’s  Services,  and  other  design  / 

engineering services for new construction as well as for renovation projects from a central  location or from 

any number of offices  located  throughout  the Eastern Seaboard and  the U.S. Virgin  Islands. For clients,  this means 

ready access to a full‐range of resources virtually at a moment’s notice. Our repeat business tells us we’re doing many 

things right, and we invite you to visit our website to learn how Maguire Group can help you achieve success. 

Public Safety  Complexes 

Parking Facilities Military Bases 

Award‐Winning Fire Stations Hotels / Resorts / Casinos 

Healthcare Post Offices  Academic / Higher Ed 

www.MaguireGroup.com

Page 9: Maguire Group Parking Facilities Quals

MAGUIRE GROUP BUILDINGS DIVISION Building Information Modeling BIM

M aguire  Group  is  committed  to  providing  our  

clients with  the high  level of  service  they expect 

and deserve  from a professional services  firm. Part of  this 

commitment  extends  to  the  technology  used  to  develop 

our  projects.  For  years, Maguire  has  utilized  the  latest  in 

2D‐CAD  technologies.   Now, Maguire has  the capability  to 

provide  our  clients  with  Building  Information  Modeling 

(BIM) services through Autodesk’s Revit software. 

 

BIM  utilizes  the  latest  generation  of  CAD  software.    This 

software allows the design team to actually "construct" the 

building via a 3D computer model which permits the design 

team to understand potential conflicts and  issues  long be‐

fore  they  are  realized on  a  construction  site.    This  ability 

provides  our  client  with much  improved  coordination  as 

well  as  the  ability  to  visualize  the  building  and  make 

changes during the design rather than during construction. 

 

There are many advantages to using BIM for project design 

instead of traditional 2D‐CAD.   Some of these advantages, 

which ultimately  translate  into potential  costs  savings  for 

the building owner, include: 

A more closely  and accurately coordinated design 

Reduced costs during bidding and construction  

with fewer RFIs and Change Orders 

In‐house and under one roof, Maguire Group’s professional 

and  technical  staff  can  provide  BIM  services  for  new  

construction  as  well  as  renovation  projects.    All  of  the  

disciplines within Maguire’s Building Unit now utilize BIM, 

with several projects under way.    www.MaguireGroup.com

Page 10: Maguire Group Parking Facilities Quals

Energy/Industrial Facilities Management Central Chilling/Heating Plants Coal-Electric Generation Units Cogeneration Communications/Control/SCADA Systems Distribution Automation Fluidized Bed Combustion Systems Gas, Oil, and Diesel-Driven Generators Heating, Venting and Air Conditioning Industrial and Institutional Utilities Instrumentation and Controls Plant Inspection and Evaluations Steam-Electric Generation Plants/ Substations Utility Distribution/Mapping Systems Utility Master Planning Studies

Environmental Asbestos and Lead Paint Surveys Air Quality Permitting and Modeling Biological Resources Studies Brownfield Investigation and Development Chemical and Ecological Risk Assessments Environmental Site Assessment/Impact Statements, Audits and Permitting Hazardous and Solid Waste Management Land Reclamation Landfill Design/Closing/Compliance Municipal and Industrial Waste Treatment Noise Control/Reduction Noise Modeling and Monitoring Odor Control Pollution Prevention/Abatement/Control Regulatory Strategies and Compliance Remedial Action Management Siting Studies Solid Waste Management Spill Prevention/Control/Countermeasure Plans (SPCC) Storage Tank Site Investigations/ Corrective Action Stormwater Measurement/Management Stream/Watershed Modeling Training on Regulatory Requirements Transactional Assessments Water Pollution Control/Treatment Wetland Delineation, Studies, and Mitigation Zoning Updates

Facilities Architectural Buildings Design/Engineering Building Inspections and Evaluations Building Specialty Systems • Security Access Control • Fire Detection and Alarm • Network and Communication Clean Rooms

Facilities (Continued) Facility Master Planning Historic Preservation HVAC System Studies and Upgrades Industrial/Commercial Buildings Design Industrial Process Facilities MEP Systems: Mechanical/Electrical/Plumbing Plant Inspection and Evaluations Structural Design and Engineering

Infrastructure Building Expansion and Renovation Combined Sewer Overflow (CSO) Services Commercial/Manufacturing/Warehouse/ Distribution Facilities Community Centers Correctional Facilities Dams and Reservoirs Educational Facilities Ferry Terminals Geotechnical Engineering Intermodal Transportation Facilities Land Development Mass Transit/Subway/Airport Systems Military Facilities and Airports Municipal Office Buildings—Town Halls Navigation Lock and Dam Rehabilitation Parks and Recreation Parking Garages and Structures Piers and Jetties Ports, Harbors and Marinas Public Safety Facilities Renovation and Adaptive Reuse Sites/Facilities Runway Extensions Schools/Universities/Housing Site Utilities/Development Sports/Entertainment Venues Surveying and Mapping Vehicle Maintenance/Service Facilities Water and Wastewater Engineering Waterfront Development Wellhead/Watershed Management/Security

Land Development/ Resource Management Casino and Resort Development Commercial/Residential Site Development Community Planning/Development Design Build Services Downtown Beautification/Reuse Programs Flood Protection and Control Hotels and Resorts Industrial/Business Park Complexes Irrigation and Drainage Natural Resource Management Parks, Open Space and Recreation Retail/Mall Development Urban and Regional Planning Waterfront/Marinas Wetlands Strategies

Management Constructability and Bidability Reviews Construction Management Contract Administration/Inspections Contractor Procurement Cost Estimating and Control Design-Build Oversight Funding Application Support Expert Witness MCPPO-Certified Professional Services Operations & Maintenance (O&M) Services Owner’s Project Mgmt. (OPM) Services Program/Project Management & Oversight Public Involvement and Education Start-up and Operator Training Technical Management Value Engineering

Planning, Design and Studies Architectural Design Comprehensive/Master/Land-use Planning Computer-Aided Design/Drafting (CADD) Design-Build Engineering Electrical Design Engineering Design Engineering Feasibility Studies Environmental Studies GIS Planning Landscape Architecture Mechanical Design Site Selection Evaluations & Site Planning Structural Design Surveying and Mapping Transportation Engineering & Planning Urban and Regional Planning Programs Utility Planning

Transportation Expressways/Interchanges/Interstates Highways, Roads, Streets and Bridges Traffic Control and Signalization Transit Systems Transportation Engineering and Planning

Water Resources CSO Services Dams and Reservoirs Enhanced Nutrient Removal (ENR) Systems Hydraulics and Drainage Design & Modeling Hydrogeologic Investigations Groundwater Development Infiltration/Inflow Modeling (I/I) Pilot Plant Design/Studies Pumping Stations Wastewater Collection/Treatment/Reuse WWTP Design and Engineering Water Quality/Supply/Treatment/Storage/ Distribution and Piping Wellhead/Watershed Management and Security

PORTFOLIO: Professional Services and Project Types www.maguiregroup.com

i n f r a s t r u c t u r e for the real world

Page 11: Maguire Group Parking Facilities Quals

MAG

UIR

E G

RO

UP, IN

PAR

KIN

G G

AR

AG

ES

C

.

                Union Station Parking Garage Worcester, Massachusetts Cost:  $16 million  Maguire provided architectural and engineering services for the design of a 500‐car parking garage for the City of Worcester.  The project site is located at the corner of Harding and Franklin Streets on the site of the former Parcel Post Building south of Union Station and adjacent to AMTRAK and MBTA rail connections.  The project includes  approximately  5,000  SF  of  retail  space  along  Franklin  Street  that  will  encourage  pedestrian interchange and serve to enliven the streetscape south of Union Station. The architectural context and details of  Union  Station  were  studied  and  incorporated  into  the  design.    The  parking  garage  will  have  a  direct connection to Union Station through a tunnel under the railroad tracks.  The parking garage  is one piece  in the development of a major transportation center at Washington Square.  Union Station, which was built  in 1911 at a cost of $750,000, has been beautifully restored and construction was completed on a bus terminal to its west.  Plans are also proceeding on reconstruction of the Washington Square "roundabout" to the north to  improve pedestrian activity, enhance traffic flow and provide optimum accessibility to Union Station.  The construction of the parking garage was an important consideration in the preparation of a feasibility study associated with the Blackstone Valley National Heritage Corridor.  In fact, the city has recently received funding to develop a comprehensive plan for restoration and replication of the canal immediately south of the parking garage, development of historical markings along  the  canal’s  route and development of a Blackstone Canal Park along the canal bed. 

Page 12: Maguire Group Parking Facilities Quals

MAG

UIR

E G

RO

UP, IN

PAR

KIN

G G

AR

AG

ES

C

.

Allmerica Financial  Parking Garage Worcester, Massachusetts Cost: $15,000,000 

Maguire Group provided complete architectural and engineering services associated with the planning, design, and construction of a 1,368‐car parking garage at their Worcester, MA campus.   The  initial planning  included survey, subsurface and environmental explorations, and the development of a number of site plan options for consideration.  The intent of the design was to create 1000 net parking spaces on the campus while preserving the campus‐like atmospheres of the site.  The design consists of a five  level open parking structure, within a footprint of 240 feet x 380 feet.   The first level  is partially below grade and the  facility will  include a covered pedestrian  link to the North Wing to the South and the Hanover Building to the North.  The facility was built on a fast‐track schedule.  Project Features 

• Site Remediation 

• Full Design Services 

• Construction Phase Services 

• Fast Track  

Page 13: Maguire Group Parking Facilities Quals

MAG

UIR

E G

RO

UP, IN

PAR

KIN

G G

AR

AG

ES

C

.

      Arcade Parking Garage Providence, Rhode Island  Cost:  $5.5 million  The Arcade Garage  is  a 600‐car open parking  structure  located  in  an historic district of Providence, with  a National Register property located directly across the street.  It was obvious from the outset that the project had to be developed with an acute awareness of the surrounding structures.  These buildings, in general, are constructed of cut stone and/or brick masonry and typically have a second‐level cornice line. Maguire worked closely  with  community  groups  and  the  local  Historic  Preservation  Commission.  It  was  the  consensus  of opinion within  these  groups  that  a  solution  incorporating  both  precast  concrete  and  brick masonry would complement and relate most appropriately to the architecture of the area.  The  lower  levels of  the  front  façade were  treated as architectural precast and  incorporate  the  second‐level cornice line that is common along the streetscape.  The articulated arches and columns are reminiscent of the cut stone used in a number of neighboring buildings, and the brick spandrels and stair towers relate nicely with the surrounding brick buildings. To  further complement the adjacent buildings and to blend the precast and brick,  all  exterior  precast members were manufactured with  a  special  "Manchester"  sand  and  then  lightly sandblasted,  resulting  in  a  warm  buff  color  consistent  with  the  soft  off‐white  tones  of  the  marble  and limestone  of  the  adjacent  buildings.    As  a  final  touch,  the  brick  was  laid  in  a  mortar  mix  of  this  same "Manchester" sand.  The structural system consists of untopped precast double tees supported on precast spandrels and columns.  Because of the height of the structure, the requirement for angled parking, and a desire to keep the garage as open as possible, a unique structural solution was developed consisting of a combination of shear walls and full‐bay moment frames which resist wind and seismic forces.  In order to complete construction by the holiday season,  this  project  was  designed  in  a  fast‐track  method  with  the  deep  piles  and  foundations  being constructed when the superstructure was in design. 

AIA Rhode Island Design Award

Page 14: Maguire Group Parking Facilities Quals

MAG

UIR

E G

RO

UP, IN

PAR

KIN

G G

AR

AG

ES

C

.

  Bradley Airport Garage Windsor Locks, Connecticut Cost:  $35 million      The main parking garage at Bradley  International Airport  is a 1,111,400 SF  structure.    It  is  five  levels and  is approximately 304  feet wide and 722  feet  long and accommodates 3,500  cars.   The  structure  is entirely of precast concrete composed of columns,  interior beams/girders, exterior spandrels,  interior k‐wall  frames  for lateral bracing,  light walls  for  ramp  supports  and  structural  flooring  tees.    There  are  three  two‐way  ramps within the garage accessing all levels of the garage.  The garage is divided into two areas with flexible borders to separate short‐term and long‐term parking and to accommodate changing space needs.  The parking garage has seven vertical cores.  The three cores facing the terminals have stairs and elevators and serve to circulate the  majority  of  pedestrian  traffic  between  the  garage  and  either  the  lower  arrivals  or  the  upper departure/viaduct level.  Access between  the garage and  the  viaduct was accomplished with an enclosed pedestrian  skywalk, which collects pedestrians at  the  three main cores and  leads  to  two skywalks crossing  to  the viaduct at midpoints between  the  three main cores.   Access at  the  lower arrivals  level  is at grade and  is open although covered overhead by  the  skywalk.   There are  separate entry plazas  for  short‐term and  long‐term parking; however, both culminate into one large exit plaza. All entry and exit plazas are covered by canopies.  Adjacent to the exit plaza  is a 2,500 SF administration directional signage utilized  for convenience and efficiency  throughout  the structure and adjacent facilities. 

Page 15: Maguire Group Parking Facilities Quals

MAG

UIR

E G

RO

UP, IN

PAR

KIN

G G

AR

AG

ES

C

.

      College of the Holy Cross Worcester, Massachusetts   The purpose of  the Needs Analysis was  to determine  the approximate number of spaces  required  to satisfy proposed development and/or parking policy changes at Holy Cross.   Maguire completed and assessment of the on‐ and off‐campus parking. It was determined that there were ~1,366 parking spaces available on campus and 105 spaces available off‐campus, totaling 1,471 available spaces.  Once the Needs Analysis was completed, Maguire visited the campus, reviewed available maps, and met with college  staff  to  identify areas  for potential  surface and/or  structured parking.   An area  in excess of 3 acres (140,000  SF) was determined  as what would  be  required  to  accommodate  400 parking  spaces.   Given  the competing  interests for open space for athletics and future building sites on campus,  it became  immediately apparent that surface parking for the number of spaces identified in the Needs Analysis could not be achieved without significantly impacting future campus development. 

Page 16: Maguire Group Parking Facilities Quals

MAG

UIR

E G

RO

UP, IN

PAR

KIN

G G

AR

AG

ES

C

.

       Gateway Parking Garage Worcester, Massachusetts  Cost:  $10 million  Maguire designed a six‐level, 650‐car parking garage as part of a Brownfield urban renewal project at Gateway Park  in Worcester, MA.   The project was a partnership of the Worcester Business Development Corporation (WBDC) and Worcester Polytechnic Institute (WPI).    The parking garage  is  the  second  structure  to be built  in  the park and  is  intended  to address  its  long  term parking needs.  It was constructed of precast concrete beams, girders, columns and spandrel panels with thin brick  veneer on  three  sides  to  compliment other buildings  (new  and proposed) within Gateway Park.    The spandrel panels are articulated arches reminiscent of other buildings in the area.    Staircases are  located at each end of the building with two elevators at the main staircase at the south end.  Security systems  include call‐for‐aid stations and surveillance cameras.   The garage has entry and exit gates with card reader access.      The foundation design was complicated by the fact that a portion of the garage was constructed over the Mill Brook Sewer, which is a major sewer in the City of Worcester.       

Page 17: Maguire Group Parking Facilities Quals

MAG

UIR

E G

RO

UP, IN

PAR

KIN

G G

AR

AG

ES

C

.

         Harvard Square Garage Cambridge, Massachusetts  Cost:  $4.8 million  The Harvard  Square Garage  is  a 6‐level parking  and  retail  facility  located  at  the  comer of  John  F. Kennedy Boulevard and Elliot Street in Cambridge, Massachusetts, and two blocks from the heart of Harvard Square.  It consists of approximately 8,000 SF of ground level retail space and five levels of parking for 210 cars.  One of the main challenges of the project was to design a parking facility with ground level retail space on an extremely  tight  15,000  SF  site.    This  was  accomplished  by  dedicating  a  portion  of  the  first  level  to  an access/egress ramp for the parking levels above.  A continually sloping ramp system with a central core serving the retail space below was developed for the superstructure.  The  second  major  challenge  was  to  design  a  facility  compatible  with  the  architecture  of  the  area  and responsive  to  the wishes  of  the  community.    In  order  to  accomplish  this;  the  owner  arranged  a  series  of meetings with the community groups.  The brick facade treatment with arched openings at the lower levels is a result of these meetings.  The exposed portions of the party walls were also treated with brick for uniformity.  In order to help address a concern with the overall mass of the structure, the top parking  level was stepped back from the main structure. 

Massachusetts Governor’s Design Award

Page 18: Maguire Group Parking Facilities Quals

MAG

UIR

E G

RO

UP, IN

PAR

KIN

G G

AR

AG

ES

C

.

      High‐Hanover Garage  Portsmouth, New Hampshire Cost:  $4 million  As  the  architectural/engineering  component  in  a  design/build  arrangement, Maguire  was  responsible  for planning  and  helping  to  implement  a  250‐car  addition  to  an  existing  parking  facility.    The  original  garage, located within a highly sensitive historic district, was built in the mid 1980's.  With a capacity of 680 cars, it is now at capacity as a result of the burgeoning redevelopment of the downtown core.  The garage serves a mix of shoppers, businesses, and tourists.  Built on a hill, it consists of four parking decks with  access  at  the  two  lowest  levels.    The  decks  are  predominately  level  plates with  ramps  that  occupy approximately half the length of one of two parallel double‐loaded bays.   Maguire  developed  an  innovative  solution  that  solved  a number of  critical  functional  and  aesthetic  issues.  These include:  

• Established  level  deck  geometry  for  the  addition  that  simplifies  search  patterns  and  permits  the exterior facade to be composed on a manner consistent with neighboring buildings. 

• Maintained a number of metered surface parking spaces at grade to facilitate access to local shops. • Provided  a  covered  truck  service  drive within  the  building  for  deliverables  to  an  adjoining  office 

building. • Improved  circulation  and minimizing  traffic bottlenecks at  the entry  and exit points  in  the original 

structure.  The project met with the approval to be built of brick with sensitivity‐scaled arcades and “punched” masonry openings, of Portsmouth's Historic District Commission and downtown merchants.   

Page 19: Maguire Group Parking Facilities Quals

MAG

UIR

E G

RO

UP, IN

PAR

KIN

G G

AR

AG

ES

C

.

     Roger Williams University North Parking Garage Bristol, Rhode Island Cost:  $4.8 million  Maguire Group was retained by Roger Williams University to design and provide construction administration services  for  the  construction  of  a  third  parking  level  onto  an  existing  two  level  parking  structure  at  the University's Bristol, RI facility. The new parking level provides an additional 300 parking spaces.  The design was  complicated by  the  fact  that  there was a  code  change  in  the  seismic  requirements  for  the structure resulting in a different approach to transferring seismic loads to the foundations.  The  project was  completed  in  association with  Bond  Brothers  Inc.  as  construction manager  and  Blakeslee Prestress Inc. as the precast concrete supplier.  The total design build time frame was 10 months.  

Page 20: Maguire Group Parking Facilities Quals

MAG

UIR

E G

RO

UP, IN

PAR

KIN

G G

AR

AG

ES

C

.

       New Britain Courthouse Garage New Britain, Connecticut Cost:  $12 million  Maguire Group was  part  of  a  design‐build  team  to  design  a  1,400‐car  parking  garage  for  the  City  of New Britain.   The garage  is connected  to a  then‐new  judicial complex by an overhead walk.   The garage  itself  is divided  into  two  separate  sections: one  for  the  judges  and  employees of  the  courthouse,  and one  for  the public.  The judicial section of the garage contains 280 parking spaces.  It is controlled by a card‐access system both for access by vehicles and for access to the stair towers.  It is separated from the public portion by a security wall and is linked to the courthouse by a glass‐enclosed overhead walk at the third level. The facility is also directly connected to the courthouse with its security systems, and was designed to be fully handicapped accessible.  The public portion of the garage accommodates 1,120 cars.  Access can be gained at one location and egress is achieved at two points.  The parking facility was designed with the security and safety of patrons in mind.  The building is a precast structure with concrete beams columns, spandrels and double tees.  Stair towers are designed to serve as focal points and add interest to the façade. 

Page 21: Maguire Group Parking Facilities Quals

MAG

UIR

E G

RO

UP, IN

PAR

KIN

G G

AR

AG

ES

C

.

     Department of Administration Facility/Garage Rhode Island Public Buildings Authority Providence, Rhode Island Cost:  $34 million   This facility houses the entire Rhode  Island Department of Administration  in 280,000 SF of office space.   The building  includes a  full‐service  restaurant, day care center,  training center,  fitness  facility, and a conference center.  A full‐height atrium enlivens the interior and brings daylight into the building's core.  Located directly beneath the building and connected by elevators is a 600‐car underground garage.  The garage is three levels and is fully ventilated, with a state‐of‐the‐art smoke evacuation system.  The  building  is  steel  frame with  a  granite  exterior.    It  has  a  cellular  floor  deck  to  accommodate  changing communications and data technology.  As part of the mechanical system, the building has a co‐generation unit to provide for a portion of the building's electrical demand through the capture and reuse of waste heat.  Services  provided  included  programming,  schematic  design,  construction  documents,  and  construction administration.  The project was designed on a T‐track basis with multiple bid packages for major components of work. 

Page 22: Maguire Group Parking Facilities Quals

MAG

UIR

E G

RO

UP, IN

PAR

KIN

G G

AR

AG

ES

C

.

Adriaen’s Landing Parking Garage Hartford, Connecticut   Maguire  Group  Inc.  development  design‐build  proposals  for  two  garages which  are  part  of  the  Adriaen’s Landing development in Hartford, Connecticut.  Adriaen’s Landing  is a parcel of  land owned by the City of Hartford that  is being developed  into a retail and residential complex.  Associated and attached to this development are two parking garages.    One  is  nestled  between  an  existing  office  building  beside  Constitutional  Plaza  and  the  retail/residential complex.  This garage has segregated levels for residential, office and retail customer parking.  Also, a portion of the garage structure serves as an extension of Constitutional Plaza and provides space for an ice skating rink and amphitheater.    The second garage attaches to the complex on the opposite side and is exposed to the surrounding streets.  At grade level, retail spaces are provided in this garage.  The segregation of parking levels is similar to the other garage.   The design of the garages camouflages function and resembles the retail residential buildings and  in the area.    There have been numerous complexities associated with this development which have required the expertise of our multi‐disciplined firm to reach economical resolutions.  Soil‐bearing  issues, contaminated soils, existing site utilities  location, connections to the many buildings both new  and  existing  various  levels  of  each,  the  structural  complexities  of  being  sandwiched  between  other structures and  the  required  load‐capacity of  the plaza area are a  few of  the many  issues  that needed  to be resolved taking into consideration the needs of the complex and the overall design compatibility.  Project Features 

• Design/Build (Design Developed) 

• Retail and Residential complex 

Page 23: Maguire Group Parking Facilities Quals

ARCHITECTS ENGINEERS PLANNERS CONSTRUCTION MANAGERS

WWW.MAGUIREGROUP.COM

OFFICE LOCATIONS    The Maguire Corporation Corporate Headquarters & International Operations 33 Commercial Street, Suite 1 Foxborough, MA 02035 P: 508.543.1700 F: 508.543.7757 www.maguiregroup.com    Maguire Group Inc. 225 Chapman Street 4th Floor Providence, RI 02905 P: 401.272.6000 F: 401.272.9185  Maguire Group Inc. One Court Street New Britain, CT 06051 P: 860.224.9141 F: 860.224.9147  Maguire Group Inc. D.L Clark Building/6th Fl. 503 Martindale Street Pittsburgh, PA 15212 P: 412.322.8340 F: 412.322.2138  Maguire Group Inc.  110 Corporate Drive Suite 6  Portsmouth, NH 03801  P. 603.433.0004  F: 603.433.0006 

  

Maguire Group Inc. 1142 King Street Christiansted, St. Croix  USVI 00822 P: 340.713.9331 F: 340.773.5361  Maguire Group Inc. 13940 S.W. 136th Street Miami, FL  33186 P: 305.235.5098 F: 305.251.5894  Maguire Group Inc. 615 Crescent Executive Court,  Suite 524 Lake Mary, FL 32746 407.644.1898 407.644.1921  

Page 24: Maguire Group Parking Facilities Quals

B u i l d i n g s • A & E s E r v i c E s

Park

ing F

acil

itie

s

Maguire is more than you know.For more information on Maguire Group locations and our wide range of services, visit our website: www.MaguireGroup.com