Transcript
Page 1: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Long-lead flood forecasting for India: challenges, opportunities, outline

Tom Hopson

Page 2: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

“Science exists to serve human welfare. It’s wonderful to have the opportunity given us by society to do basic research, but in return, we have a very important moral responsibility to apply that research to benefiting humanity.”

Dr. Walter Orr Roberts (NCAR founder)

Page 3: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

NCAR Scientific facilities

2. Supercomputers, data and networks

3. International Collaborative Research Environment

National Science Foundation Research & Development Center- 900 Staff, 500 Scientists/Engineers- Basic Research & Societal Applications- Atmospheric and related sciences

1. Advanced Observational Facilities

Page 4: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

universities

-- NCAR board composed exclusively of US universities

Page 5: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Global Climate Models

Page 6: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson
Page 7: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Overview:I.Challenges

i. Naturalii. Observational limitations

II.Technological OpportunitiesIII.Overview of this week’s course

Primary challenge in forecasting river flow:

I. estimating and forecasting precipitationAndII. measurement of upstream river

conditions

Page 8: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

8

Natural Challenge: Topography• Complete river basin

monitoring difficult in Northern sections of major watersheds:

– Rain gauge installation and monitoring

– River gauging location

– Snow gauging location

Page 9: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

9

Monitoring basin’s available soil moisture not done in “real-time”!=> Data collection problem!

Page 10: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

10

Natural Challenge: Topography

Weather precipitation radar for future monitoring and instrumentation needs (predominantly used in the US):

=> Topography causes radar signal blockage, limiting coverageDoppler radar (e.g. Calcutta) providing adequate coverage in places?

Page 11: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

11

Natural Challenge: Topography

Use of numerical weather prediction forecast output to “fill in” the instrumentation gaps or for advanced lead-time flood forecasting …

but has own set of challenges in mountainous environments …

Page 12: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

=> Use caution with numerical weather prediction outputs

Page 13: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Trans-boundary challenges:

Parts of watersheds in other countries

Q: Data sharing of both rain and river gauge? How reliable and how quickly? Opportunities for further engagement?

Current method: lagged correlation of stage with border Q (8hr forecast?)

Page 14: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

14

Parts of basins snow dominated:

-- complicated variable to model and measure

Page 15: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

“Historical challenges”:

•Low density of-rain gauges-river gauges

•Lack of telemetric reporting=> Basis of (US) traditional flood forecasting approaches

Q: what is the density in your basin?How many develop rating curves?

Page 16: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

… more “Historical challenges”:

•Maintaining updated rating curves--- important for hydrologic (watershed) model calibration and state proper variable for river routing (e.g. not stage)(sediment load issues)

•sufficient radars (basis of US monitoring)

Page 17: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Opportunities:

•Snow covered basins-- latent predictability

Page 18: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

18

-- latent predictability … for snow dominated basins

Page 19: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Opportunities:•Snow covered basins

-- latent predictability•Remotely-sensed (satellite) data

-Discharge-Rain-Snow

Page 20: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

MODIS in the West

-- snow covered area

• Yampa Basin, Colorado

MissingCloudSnowSnow-Free

Snow covered area …

Page 21: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

The Advanced Microwave Scanning Radiometer - Earth Observing System (AMSR-E) is a twelve-channel, six-frequency, passive-microwave radiometer system. It measures horizontally and vertically polarized brightness temperatures at 6.9 GHz, 10.7 GHz, 18.7 GHz, 23.8 GHz, 36.5 GHz, and 89.0 GHz.

Spatial resolution of the individual measurements varies from 5.4 km at 89 GHz to 56 km at 6.9 GHz.AMSR-E was developed by the Japan Aerospace Exploration Agency (JAXA) and launched by the U.S.

aboard Aqua in mid-2002.

Objective Monitoring of River Status:The Microwave Solution

Page 22: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Example: Wabash River near Mount Carmel, Indiana, USA

Black square showsMeasurement pixel(blue line in next plot)

White square iscalibration pixel(green line in next plot)

Dark blue colors:mapped flooding

New: latency of 6-8hr!

Dartmouth Flood Observatory ApproachDischarge …

Page 23: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Satellite Precipitation Products

Monsoon season (Aug 1, 2004)Indian subcontinent

TRMM

Rainfall …

data roughly 6hr-delayed. IR-based data 15min delays

Page 24: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Gravity Recovery And Climate Experiment (GRACE)

Slide from Sean Swenson, NCAR

Page 25: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

GRACE catchment-integrated soil moisture estimates useful for:

1) Hydrologic model calibration and validation

2) Seasonal forecasting

3) Data assimilation for medium-range (1-2 week) forecasts

Slide from Sean Swenson, NCAR

Page 26: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson
Page 27: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Opportunities:•Snow covered basins

-- latent predictability•Remotely-sensed (satellite) data•Large-scale features of the monsoon

-- predictability ENSO, MJO

Page 28: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

slide from Peter Webster

Page 29: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

(Peter Webster)

Page 30: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Opportunities:•Snow covered basins

-- latent predictability•Remotely-sensed (satellite) data•Large-scale features of the monsoon

-- predictability ENSO, MJO•Modeling developments

Page 31: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Numerical Weather Prediction continues to improve …- ECMWF GCM or NCAR’s WRF

Page 32: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

-- Weather forecast skill (RMS error) increases with spatial (and temporal) scale

=> Utility of weather forecasts in flood forecasting increases for larger catchments

-- Logarithmic increase

Rule of Thumb:

Page 33: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Opportunities:•Snow covered basins

-- latent predictability•Remotely-sensed (satellite) data•Large-scale features of the monsoon

-- predictability ENSO, MJO•Modeling developments•Blending models with local and remotely-sensed data sets

Page 34: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Data Assimilation: The Basics

• Improve knowledge of Initial conditions

• Assimilate observations at time t

• Model “relocated” to new position

Page 35: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson
Page 36: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Bangladesh Flood Forecasting

Page 37: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Opportunities:•Snow covered basins

-- latent predictability•Remotely-sensed (satellite) data•Large-scale features of the monsoon

-- predictability ENSO, MJO•Modeling developments•Blending models with local data sets•Institutional commitment to capacity build up Scientific and engineering talent of India

Page 38: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson
Page 39: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Day1

Session 1-- overview of course-- Introductions of participants and questionnaire

Session 2-- CFAB example

Session 3-- introduction to linux: shell commands, cron

Session 4-- introduction to R

Course Outline

Day2

Session 1-- QPE products -- rain and snow gauges -- radar -- satellite precip-- QPF products -- NWP -- GCM and mesoscale atmospheric models -- ensemble forecasting

Session 2 -- preprocessing -- bias removal and types/sources of stochastic behavior/uncertainty -- quantile-to-quantile matching -- deterministic processing and particularities of precip/wind speed -- ensemble products and making statistically-equiv

Session 3-- Introduction to IDL

Session 4 -- wget and download satellite precip and cron-- quantile-to-quantile matching

Page 40: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Day3

Session 1 -- hydrologic models and their plusses/minuses -- lumped model -- time-series analysis -- overcalibration and cross-validation and information criteria

Session 2 -- distributed model -- numerical methods -- calibration and over-calibration

Session 3 -- time-series analysis -- AR, ARMA, ARIMA, and other types of models -- overfitting, information criteria, and cross-validation

Session 4 -- numerical methods and 2-layer models -- multi-modeling

Course Outline (cont)

Day4

Session 1 -- multi-model -- post-processing -- BMA/KNN/QR/LR

Session 2 -- verification -- user needs

Session 3 -- post-processing algorithms via R

Session 4 -- running full CFAB codes -- verification

Page 41: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Goals:

1)Introduction (brief) on advanced techniques beingimplemented for flood forecasting – many are still

evolving in their effectiveness, so be discriminating!

2) Awareness of (new) global data sets available for use

3) Awareness of available and relevant software tools

Stress: stay simple and only add complexity *if* needed. Stay focused on your goals. Do you have what you need already, both in terms of data and tools (have you adequately tested them)? If not, prioritize and build from the simple.

e.g. calibrating rainfall at a point versus for the whole watershed.

Page 42: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Next up:

Linux – why learn new OS for flood forecasting? - powerful, with easily automated processes- most-used scientific and engineering tool development and computational environment- efficient- free (sort of)!

R – why?- powerful cutting-edge statistical tools (e.g. post-processing techniques, parametric and

non-parametric tools and regression analysis, verification, extreme-value analysis

- efficient (not so)- free (sort of)!

Page 43: Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson

Recommended