Cooling towers are the outside
heat sinks that exhaust the heat
carried by the air conditioning
cooling water circuit used inbuildings HVAC systems.
www.h2obiotech.com
What is a cooling tower?
Pump
HVAC
Air
conditioning
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
3/56
www.h2obiotech.com
What is a cooling tower?
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
4/56
Step 1:
www.h2obiotech.com
How it works
Step 2:
Magic of evaporation
Liquid water + energy Water vapor (with less energy remaining in the liquid)
Evaporative cooling
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
5/56
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
6/56
www.h2obiotech.com
In the real dirty world
Dry air Dry air
WindBuilding fresh
air intake louvers
Building fresh
air intake louvers
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
7/56
Simple definition:
An ubiquitous aquatic organism that causes Pontiac Fever
and Legionnaires disease (lung infection) if inhaled.
Thrives in temperatures between 77 and 122 F.
Travels from infected water source through aerosolized water
droplets.
www.h2obiotech.com
Legionella pneumophila
In the United States
10,000 to 20,000 people get infected by legionella every year.
Various studies have shown that some 40 to 60% of tested cooling towers contained Legionella.
Legionnaires disease mortality rate: 10 to 15% of those infected.
Cooling tower drift
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
8/56
www.h2obiotech.com
Biofilms
Form on surfaces in aquatic systems.
Often resistant to biocides.
Monitoring is difficult.
Release organisms into bulk fluid.
Cost the US nation billions of dollars yearly in equipment damage, product
contamination, energy losses and medical infections.
Bacteria
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
9/56
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
10/56
Qubec 2012: Source?
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
11/56
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
12/56
www.h2obiotech.com
24% had Lp sp1!
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
13/56
www.h2obiotech.com
Before: ASHRAE 62.1-2010
Specifies minimum distances between CTs vs
Air Intakes & Kitchen exhausts.
Not frequently applied especially by architect.
Mitigation : UVGI of fresh Air: always when high risk
occupants
Project the CT plume higher
Prevent food particles from reaching the CT.
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
14/56
www.h2obiotech.com
Before: Pesticide Regulatory System
Pesticides need to be approved by HC for each
use with application guidelines.
Sellers & applicators need certification.
Reality : Provincial application.
No processes for CT biocides!
>75% non compliance in commercial blds for
concentration, contact time or hydraulics.
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
15/56
www.h2obiotech.com
Before: Guidelines not Standards
ASHRAE 12-2000
AWT 2003 (2008)
CTI WTB-148 (2008)
CDC
Reality : Contradict each other.
Incomplete.
Control is left to water treatment as a last step
in general. Voluntary: doesnt work.
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
16/56
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
17/56
www.h2obiotech.com
During
Hopes of official that situation would go away
by itself
High dose oxidizing biocide only.
CDC protocol ASSumes surfaces are clean &
circulation in whole system. Plan created during crisis.
Localisation & owners unknown.
No early public communication.
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
18/56
www.h2obiotech.com
Lessons : Emergency planning
Have a plan of action: If this then that, etc.
What, Where, How, When, Who.
Work upstream of Legionella. Do not ASSume or Hope-away.
Legislate.
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
19/56
www.h2obiotech.com
Lessons : Immediate steps
Stop the fans!
Ultra High Efficiency drift eliminators
Decontamination: Clean first to remove deposits. Circulate in whole system.
Fast acting biocide that keeps its efficiency
throughout the system.
Know system volume.
Analyze biocide concentration
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
20/56
www.h2obiotech.com
Lessons : Involve outside experts
Interview with an official from the health agencyDSP followed by one with the building code
agency, RBQ
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
21/56
www.h2obiotech.com
Lessons : Involve outside experts
Interview with an official the RBQBuilding CodeAgency
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
22/56
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
23/56
www.h2obiotech.com
2013 Law: Form signed by Owner!
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
24/56
www.h2obiotech.com
4 Dimensions of Risk Management
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
25/56
www.h2obiotech.com
Interrelation of the 4 dimensions
Law Description WaterTreatment
Hydraulic Solids Drift
402.1 Overwintering X X X X
402.2 Operational stops X X
402.3 Decontamination X X X X
402.4Corrosion, Scale,
OrganicsX X X
402.5 Schematics X X X
402.6 Water treatment quality X X X
402.7 Chemicals X
402.8 Mechanical Verification X X
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
26/56
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
27/56
www.h2obiotech.com
Law 2013, phase I: the Good
LevelResult
(logs/L)Action
Normal < 4
Intervene 4 - 6Identify causes. Validate efficiency of new
measures.
Sanitary Risk > 6
Apply Decontamination. Identify root
causes & correct maintenance plan.Validate efficiency of new measures.
Test for Legionella pneumophila.
Legionella pneumophila Test concentration & Action Levels
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
28/56
www.h2obiotech.com
2013 Phase I: Lessons
Plans : copy-paste
Schematics have or are:
Not up-to-date No flow speed or materials of
construction
No zones of stand-by operation Inspectors have no powers.
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
29/56
www.h2obiotech.com
After: Coroners report, 2013-09
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
30/56
www.h2obiotech.com
After: Public Health Report
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
31/56
www.h2obiotech.com
After: Media reports
Radio-Canada (CBC) had a 30
minutes piece that showed
delayed actions by officials.
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
32/56
www.h2obiotech.com
After: Workers Health & Safety
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
33/56
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
34/56
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
35/56
www.h2obiotech.com
After: Very Good CT Guide
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
36/56
www.h2obiotech.com
After: Excellent Full Day Training
Michelle Merchat, Climespace
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
37/56
www.h2obiotech.com
Law 2014, phase II: the Excellent
Specific cleaning step
independant from
decontamination Stop the fans if log 6 or more
Identification of sampling points
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
38/56
www.h2obiotech.com
Law 2014, phase II: the Good
Mandatory testing for Legionella
p. every 30 days at most.
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
39/56
www.h2obiotech.com
Interrelation of the 4 dimensions
Law Description WaterTreatment Hydraulic Solids Drift
402.7a Sampling Points X
402.8 Chemicals X
402.9 Mechanical Verification X X
406 Log book X X X
407+
408Sampling procedures X X
417 4-6 logs Action Plan X X X X
418 Interfering flora X x
419 >6 logs, Action Plan X X X X
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
40/56
www.h2obiotech.com
Interrelation of the 4 dimensions
Law Description WaterTreatment Hydraulic Solids Drift
402.1 Overwintering X X X X
402.2 Operational stops X X
402.3 Decontamination X X X X
402.4+
402.9Preventive Cleaning X X X X
402.5Corrosion, Scale,
OrganicsX X X
402.6 Schematics X X X
402.7 Water treatment quality X X X
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
41/56
www.h2obiotech.com
Beyond: What we do
Guidelines, Standards & Regulationsare a minimum
ASHRAE 188 methodology
Zero risk does not exist.Risk = Probability x Consequences
Multiple barriers: if one fails we avoid
an outbreak
Non-oxydising biocide measurement
On-site one hour Legionella
measurement!
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
42/56
www.h2obiotech.com
Risk Assessment: beyond 62.1
Risk = concentration x duration. Occupants: long exposition.
High riks by Common Sense :
Close to ground, next to parking, bld entrance. Next to roof terrasse, balconies.
Adjacent to open windows.
Mitigation: UHE eliminator, lower C, continuous
or low tox or permanent biocide. Ex: Cu/Agionisation
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
43/56
www.h2obiotech.com
Beyond: Flow Speed
Higher flow speed = less biofilm5+ fps up to 10 fps especially for
horizontal lines.
No dead legs: mitigation approach
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
44/56
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
45/56
www.h2obiotech.com
Beyond: Deposits & Corrosion
Variable speed motors to avoid: Total evaporation deposits
Stray current corrosion.
Mechanical action to remove deposits. Zinc coatings are subject to white rust
corrosion.
Copper to steel surface ratio.
Is it clean?
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
46/56
www.h2obiotech.com
Back-Flow Preventer
Biocide means kill the biological
Some are banned from hospitals!
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
47/56
www.h2obiotech.com
Water Meter & Level Control
Towers purge water but take no make-
up?!?
No moving parts Water meter.
Convert from continuous water MU to
ON-OFF.
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
48/56
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
49/56
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
50/56
www.h2obiotech.com
Local Control: Average
Most common currentlyT compensated conductivity by dual
carbon probes
Flow switch, Pre-bleed, Bleed block,
Water meter input, permanent program.
Toroidal Conductivity :
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
51/56
www.h2obiotech.com
Probe
Toroidal Conductivity :deposits & chem.
Valve
Ball valve, not solenoid :
plugging.
Meter
No moving parts & lowflow range.
Level
Chem inventory, water MU
control.
Wireless Meter, valve, level, etc.
pH+ORP Oxydizing biocides dosing.
Record
Conductivity, T,Meter, etc.
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
52/56
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
53/56
www.h2obiotech.com
Beyond: Internal Tank
Last in, last out: hydraulic factor closer to
1
PE instead of steel
Easy to access
Bottom does not favor accumulation
Affects biocide selection & risk strategy
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
54/56
8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show
55/56
Thank you!
Alain Trahan, [email protected]
(514) 943-9044Prepared [email protected]
mailto:[email protected]:[email protected]8/10/2019 Legionella risk management vs Qubec 2012 : Past, present & future CPMX show