Learning & teaching refurbishments 2012 October 2012

Page 2: Learning & teaching refurbishments 2012

Medical School Pool cluster MG130

Before

After

Page 3: Learning & teaching refurbishments 2012

Medical School MG130 Pool Cluster

The corridor was removed to create a larger room and increase the PC’s from 55 to 70. The teaching position was moved to the centre of the room with repeater screens along the wall.

Page 4: Learning & teaching refurbishments 2012

Bedson Chart Cluster 3.30

Before

After

Increased from 35 to 42 PC stations The insulated ceiling improves the heating and lighting.

Page 5: Learning & teaching refurbishments 2012

Bedson Chart Cluster 3.30

The focal teaching wall was moved to improve student sight lines.

Page 6: Learning & teaching refurbishments 2012

Bedson 2.40 creation of new cluster

Close to other teaching spaces in the Bedson enhancing this teaching hub

Page 7: Learning & teaching refurbishments 2012

Bedson 2.40PC Capacity 40

The ‘daisy’ desks were used to ease movement around the room

Page 8: Learning & teaching refurbishments 2012

Ridley 1 Nereid Cluster 4.72

Increased from 24 to 30 PC work stations. Posters to go up on the walls.

Before

After

Page 9: Learning & teaching refurbishments 2012

Daysh 1.31 Brae Cluster A central teaching position was created and access around the room improved with alterations to the layout.

Before

After

Page 10: Learning & teaching refurbishments 2012

Daysh 1.31 Brae Cluster

New glazed entrance with quick access stations to provide additional space at class change over times

Page 11: Learning & teaching refurbishments 2012

Agriculture building student social space ground floor

Former SAgE faculty meeting room

Student social space with 9 PC’s, collaborative working table and soft seating.

Page 12: Learning & teaching refurbishments 2012

KGVI building student social space basement B56 & B57

Existing common room March 2012

Opened up with B57 to provide a larger space.

Page 13: Learning & teaching refurbishments 2012

KGVI building student social space

The additional space provides an area for students to eat and drink.

Page 14: Learning & teaching refurbishments 2012

Ridley 1 ground floor student common room Students requested a number of minor improvements to the space which included a zip hot water boiler and sink ….

…. and the furniture recycling mail base brought in coffee tables, alternative seating and a table football.

Page 15: Learning & teaching refurbishments 2012

Bedson building porters lodge Student touch down space created with quick access stations and soft seating. Notice boards are being installed soon.

Old porters lodge removed

Page 16: Learning & teaching refurbishments 2012

CLT first floor corridor

Before

This project to improve the student corridor and access and egress to the lecture theatre and teaching rooms is still on going and will complete in November.

A student touch down space will be created and notice boards will be added for student information.

After

Page 17: Learning & teaching refurbishments 2012

CLT first floor corridor This area of seminar rooms always looked abandoned, the refurbishment ties them in with the main corridor and ground floor refurbishment

Before

After

Page 18: Learning & teaching refurbishments 2012

Ridley 1 MAST Project Lab 5.76

Before

After

An old research lab in the Ridley building has been refurbished to provide space for student projects.