The Project for Expansion of Water Supply System in Kampot (GA: ¥2,985mil. ’15)

The Project for Improvement of Water Supply System in Siem Reap Town (GA: ¥1,537mil. ’04)

The Project for Replacement and Expansion of Water Distri-bution Systems in Provincial Capitals (GA: ¥2,760mil. ’11)

Siem Reap Water Supply Expansion Project(YL: ¥7,161mil. ’12)

Battambang

Pursat

Preah Sihanouk Kampot Svay Rieng

Kampong ThomSiem Reap

in 8 ProvincesSiem Reap, Kampong Thom, Kampong Cham,

Battambang, Pursat, Kampot, Svay Rieng

The Project on Capacity Buildingfor Urban Water Supply Systems

in Cambodia (Ⅲ) (TC: ’12-)

Kampong Cham

The Project for Expansion of Water Supply System in Kampong Cham and Battambang(GA: ¥3,355mil. ’13)

The Niroth Water Supply Project (YL: ¥3,513mil. ’09)

Project for Improvement of the Water Supply Facilities in Phnom Penh (Ⅰ-Ⅱ) (GA: ¥5,283mil. ’94,’97)The Project for Expansion of Phum Prek Water Treatment Plant (GA: ¥2,580mil. ’01)The Project for Introduction of Clean Energy by Solar Electricity Generation System (GA: ¥720mil. ’10)

in Water Supply SectorJapan’s ODA Projects