INVITATION FOR BIDS (RPF) NO. : CUN-17-18 , OFFICE/COMMUNITY CENTER AC REPLACEMENT
SOLICITATION AMENDMENT
Monday, September 25, 2017
4. The above-numbered solicitation is amended as set forth below. Bidders/offerors must acknowledge receipt of this amendment prior to the hour and
date specified for receipt of bids/proposals, by signing this form below or by completing the acknowledgement on the form titled “Solicitation, Bid/Proposal
and Award.”
Submit this document to [email protected]; or submit this document in your submission.
Amendment - 02
5. Description of Amendment
David Cortez
CUN-17-18
See attached amended Specifications Pages updated on 09/25/2017
Except as provided herein, all terms and conditions of the solicitation remain unchanged and in full force and effect. Please acknowledge receipt of this
amendment by signing and returning to Mr. David Cortez via Email at [email protected] or by fax (713) 622-4762.
Allied Orion Group - Solicitation Amendment Page 1
Allied Orion Group, LLC.
SCOPE OF WORK Amendment # 2 dated 09/25/2017
A
SPECIFICATIONS: AC REPLACEMENT FOR LEASING OFFICE AND THE COMMUNITY CENTER
PROPERTY: Cuney Homes Apartments 3260 Truxillo Houston, Texas 7704
PART I – A/C REPLACEMENT FOR COMMUNITY CENTER
1.1 Remove and dispose and replace all existing equipment to be hauled off site. Existing equipment includes:
1.1.1 (1) 15 Ton Cooling System, Including, condenser, coil,furnace.
1.1.2 (1) 10 Ton Cooling System, including, condenser, coil,furnace.
1.1.3 (1) 4 ton Cooling System, including, condenser, coil, furnace.
1.2 Re-Charge System with Freon 1.3 Check System for Proper Operation 1.4 Price to include startup of all equipment 1.5 Labor listed separately 1.6 12- month Warranty on parts and labor1.7 Materials, equipment, fittings, pans, material hoisting, welding, fees, and
permits included, tax exempt
PART 2 – A/C REPLACEMENT FOR THE OFFICE
2.1 Remove and dispose and replace all existing equipment to be hauled off site.
Existing equipment includes:
2.1.1 Remove (1) Ten Ton Condensing Unit
Page 2
Allied Orion Group, LLC.
SCOPE OF WORK Amendment # 2 dated 09/25/2017
A
2.1.2 Install New (1) Ten Ton Condenser 2.1.3 Remove 10 Ton coil (twin application) 2.1.4 Install new 10 ton coil including, condenser, coil, furnace 2.1.5 Pull Vacuum. 2.1.6 Re-Charge system with Freon 2.1.7 Check system for proper operation
Maintenance Shop
3.1.1 Remove & Replace (1) two-ton condensing unit 3.1.2 Remove & Replace (1) two-ton evaporator coil leaking
refrigerant 3.1.3 Re-charge system with Freon 3.1.4 Check system for proper operation 3.1.5 Labor listed separately 3.1.6 12 – month Warranty on parts and labor 3.1.7 Materials, equipment, fittings, pans, material crane/hoisting,
welding, fees, and permits included. 3.1.8 Tax exempt property.
General Information
4.1.1 Humidistat – Energy Star Rated Bacnet System 4.1.2 Install Dryers on every unit 4.1.3 Sight Glass on every unit 4.1.4 All units must be 4 inches off the lowest point 4.1.5 All units are gas furnaces 4.1.6 Vendor must Stage One building at a time with a 72 hour to
complete each unit 4.1.7 Label each thermostat and Unit with permanent labels 4.1.8 City of Houston Permits Required 4.1.9 City of Houston Inspections Required 4.1.10 Material and Labor cost must be separated in estimate.