Wilton Park House, Wilton Place, Dublin 2, IrelandTel +353 1 607 3003 Fax +353 1 607 3109 E-mail [email protected] Web www.inab.ie
Notification of intent to perform EMAS verification/validation activity
AF-3E
Please complete the following details at least four weeks prior to performing EMAS verification/validation activities:Verification body name/Name of licenced verifier:
Accreditation or licence details:If possible, please provide hyperlink to schedule on accreditation/licensing body’s website, which will provide evidence that accreditation/licensing is still valid and not affected by suspension or withdrawal and that the scope of accreditation/licensing covers the specific activities of the organization under verification.
Verification team composition: Competence of team:In particular, related to legal requirements specific to the environment in the industrial sector being verified
Time and place of the verification/validation:
Address and contact details of the organisation whose system is being verified:
INAB use only:Date notification received
AF-3-E Notification of intent to perform EMAS verification/validation activityIssue 1 February 2016 Page 1 of 2
Wilton Park House, Wilton Place, Dublin 2, IrelandTel +353 1 607 3003 Fax +353 1 607 3109 E-mail [email protected] Web www.inab.ie
Notification satisfactory:If notification is unsatisfactory, give details.
AF-3-E Notification of intent to perform EMAS verification/validation activityIssue 1 February 2016 Page 2 of 2