Page 1: I-95 Widening & 92 (International Speedway Boulevard ...92 (International Speedway Boulevard). • Construction is scheduled to begin in the Spring 2015. • The anticipated completion

• Projectlengthis13.856milesalongI-95,NorthofStateRoad(SR)44toNorthofUS 92(InternationalSpeedwayBoulevard).

• ConstructionisscheduledtobeginintheSpring2015.

• TheanticipatedcompletiondateisSummer2018.

• Thetotalcontractamountis$205,000,000.

• 18bridgesalongthelengthoftheprojectwilleitherbewidenedorreplaced.

Ghyabi & Associates currently serves as the main public involvement contact, coordinator, and facilitator for FDOT’s I-95 Widening and Systems Interchange Reconstruction Design-Build project, which involves widening I-95 from four-lanes to six-lanes from north of State Road 44 to north of US 92. The project scope also includes the reconstruction of the systems interchange with I-4, I-95 and US 92. An Aesthetics Master Plan for the gateway to Daytona Beach is also being developed for this project and Ghyabi & Associates is responsible for coordinating all stakeholder meetings and organizing the final design. Ghyabi & Associates is the liaison for the Department in matters dealing with the public and local government agencies.

I-95 Widening & Systems Interchange Design-Build FDOT District 5