KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP
Human Factors Verification and
Validation Scenarios
Technical Report
Non-Proprietary
September 2013
Copyright ⓒ 2013
Korea Electric Power Corporation & Korea Hydro & Nuclear Power Co., Ltd
All Rights Reserved
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP . i
Revision History
Revision Page
(Section) Description
0 All Issue for Standard
This document was prepared for the design certification application to the U.S. Nuclear Regulatory Commission and contains technological information that constitutes intellectual property. Copying, using, or distributing the information in this document in whole or in part is permitted only by the U.S. Nuclear Regulatory Commission and its contractors for the purpose of reviewing design certification application materials. Other uses are strictly prohibited without the written permission of Korea Electric Power Corporation and Korea Hydro & Nuclear Power Co., Ltd.
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP . ii
ABSTRACT
The purpose of Human Factors Verification and Validation (HF V&V) Scenarios is to identify operational
conditions and scenarios to be used for HSI task support verification, design verification and integrated
system validation. HF V&V Scenarios provide detailed scenarios suitable for use on a full-scope simulator
HF V&V Scenarios in this Technical Report contain sampling of operational conditions, summary of
APR1400 probabilistic safety assessment, and HF V&V scenarios.
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP . iii
TABLE OF CONTENTS
1.0 OVERVIEW 1
1.1 Purpose 1
1.2 Scope 1
2.0 APPLICABLE DOCUMENTS 2
3.0 SAMPLING OF OPERATIONAL CONDITIONS FOR ISV 3
3.1 Plant Conditions 3
3.2 Types of Personnel Tasks 4
3.3 Situational Factors or Error-forcing Contexts 6
4.0 SUMMARY OF APR1400 PRA 7
4.1 Major Operators Errors 7
4.2 Total CDF of Initial Events : 89.1% 7
4.3 Analysis of Significances 7
5.0 APR1400 HUMAN FACTORS V&V SCENARIOS 8
5.1 SBLOCA with CBP/Displays Failures 8
5.2 ATWT with Ovation DCS Failure 9
5.3 ESDE with Alarm Sever Failure 10
5.4 LOAF 11
5.5 SBO 12
5.6 SGTR 13
5.7 MCR FIRE 14
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP . iv
LIST OF APPENDICES APPENDIX 1 Small break loss of coolant accident with computer based procedure /displays failures APPENDIX 2 Anticipated transient without trip with ovation distributed control system failures APPENDIX 3 Excessive steam demand event with alarm server failures APPENDIX 4 Loss of all feedwater APPENDIX 5 Station black out APPENDIX 6 steam generator tube rupture APPENDIX 7 Main control room fire
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP . v
List of Acronyms AAC alternate alternating current
AFWP auxiliary feedwater pump
AOP abnormal operating procedure
ATWT anticipated transient without trip
CBP computer-based procedure
CCW component cooling water
CCWP component cooling water pump
CSF critical safety function
CVCS chemical and volume control system
DG diesel generator
EDG emergency diesel generator
EO electrical operator
EOF emergency operating facility
EOP emergency operating procedure
ESDE excessive steam demand event
ESWP essential service water pump
HA human action
HSI human system interface
ISV integrated system validation
LCO limiting conditions of operation
LOAF loss of all feedwater
LOCA loss of coolant accident
LDP large display panel
LOOP loss of offsite power
LPMS loose part monitoring system
MCR main control room
MFWP main feedwater pump
NRC U.S. Nuclear Regulatory Commission
OER operating experience review
RCP reactor coolant pump
RCS reactor coolant system
RO reactor operator
RSR remote shutdown room
SBO station black out
SBLOCA small break loss of coolant accident
SCS shutdown cooling system
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP . vi
SG steam generator
SGTR steam generator tube rupture
SIAS safety injection actuation signal
SS shift supervisor
STA shift technical advisor
TO turbine operator
TSC technical support center
VCT volume control tank
V&V verification and validation
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP 1
1.0 OVERVIEW
1.1 Purpose
The purpose of Human Factors Verification and Validation (HF V&V) Scenarios is to identify operational
conditions and scenarios to be used for HSI Task Support Verification, Design Verification and Integrated
System Validation (ISV). V&V Scenarios provide detailed scenarios suitable for use on a full-scope
simulator.
1.2 Scope
The following information is defined to reasonably assure that important dimensions of performance are
addressed, and to allow the scenarios to be accurately and consistently presented for repeated trials:
• a description of the scenario and any pertinent prior history necessary for personnel to
understand the state of the plant at the start-up of the scenario
• specific initial conditions (a precise definition of the plant’s functions, processes, systems,
component conditions, and performance parameters, e.g., similar to that at shift turnover)
• events (e.g., failures) that will occur during the scenario and their initiating conditions, e.g., based
on time, or a value of a specific parameter
• precise definition of workplace factors, (e.g., environmental conditions, such as low levels of
illumination)
• needs for task support (e.g., procedures and technical specifications)
• staffing level
• details of communication content between control room personnel and remote personnel (e.g.,
load dispatcher via telephone)
• scripted responses for test personnel who will act as plant personnel in the test scenarios
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP 2
2.0 APPLICABLE DOCUMENTS
1. U.S. NRC, “Human Factors Engineering Program Review Model," NUREG-0711, Rev. 3, 2012.
2. U.S. NRC, "Standard Review Plan," NUREG-0800, Rev. 2, 2007.
3. U.S NRC, “Human-System Interface Design Review Guidelines,” NUREG-0700, Rev.2. 2002.
4. U.S. NRC, “Integrated System Validation: Methodology and Review Criteria,” NUREG/CR-6393,
1997.
5. KHNP, APR1400-E-J-NR-12010-P, “ HF V&V Implementation Plan,” September 2013.
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP 3
3.0 Sampling of Operational Conditions for ISV
3.1 Plant Conditions
TS
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP 4
3.2 Types of Personnel Tasks
TS
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP 5
TS
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP 6
3.3 Situational Factors or Error-forcing Contexts
TS
TS
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP 7
4.0 Summary of APR1400 PRA
4.1 Major Operators Errors
4.2 Total CDF of Initial Events : 89.1%
4.3 Analysis of Significances
TS
TS
TS
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP 8
5.0 APR1400 HUMAN FACTORs V&V SCENARIOs
5.1 SBLOCA with CBP/Displays Failures
TS
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP 9
5.2 ATWT with Ovation DCS Failure
TS
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP 10
5.3 ESDE with Alarm Sever Failure
TS
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP 11
5.4 LOAF
TS
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP 12
5.5 SBO
TS
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP 13
5.6 SGTR
TS
KEPCO & KHNP HF V&V Scenarios APR1400-E-J-NR-13002-NP Rev. 0
KEPCO & KHNP 14(Final)
5.7 MCR FIRE
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
1
AAPP
PPEE
NNDD
II XX 11
SS
mmaall ll
BBrr ee
aakk LL
oossss oo
ff CC
oooo
ll aann
tt AA
ccccii dd
eenn
tt (( SS
BBLL
OOCC
AA))
wwii tt
hh CC
oomm
ppuu
tt eerr
BBaassee
dd PP
rr ooccee
dduu
rr ee ((
CCBB
PP)) //
DDii ss
ppll aa
yyss FF
aaii ll
uurr ee
ss
II SSVV
-- 11
Thi
s do
cum
ent
was
pre
pare
d fo
r th
e de
sign
cer
tific
atio
n ap
plic
atio
n to
th
e U
.S.
Nuc
lear
Reg
ulat
ory
Com
mis
sion
and
con
tain
s te
chno
logi
cal
info
rmat
ion
that
con
stitu
tes
inte
llect
ual p
rope
rty.
Cop
ying
, us
ing,
or
dist
ribut
ing
the
info
rmat
ion
in t
his
docu
men
t in
who
le o
r in
par
t is
per
mitt
ed o
nly
by t
he U
.S. N
ucle
ar R
egul
atory
C
omm
issi
on a
nd i
ts c
ontr
acto
rs f
or t
he p
urpo
se o
f re
view
ing
desi
gn
cert
ifica
tion
appl
icat
ion
mat
eria
ls.
Oth
er u
ses
are
stric
tly p
rohi
bite
d w
ithou
t th
e w
ritte
n pe
rmis
sion
of
Kor
ea E
lect
ric P
ower
Cor
pora
tion
and
Kor
ea H
ydro
& N
ucle
ar P
ower
Co.
, Ltd
.
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
2
CCOO
NNTT
EENN
TTSS
11.. N
o/T
ITL
E
22.. O
BJ
EC
TIV
ES
3.
OV
ER
VIE
W o
f S
CE
NA
RIO
4. A
NT
ICIP
AT
ED
PR
OC
ED
UR
E F
LO
WP
AT
H
5.
PR
EP
AR
AT
ION
of
EV
AL
UA
TIO
N
6.
MA
JOR
ST
EP
S o
f S
CE
NA
RIO
7.
PR
IMA
RY
TA
SK
PE
RF
OR
MA
NC
E M
EA
SU
RE
S
8. O
TH
ER
PE
RF
OR
MA
NC
E M
EA
SU
RE
S A
PP
LIC
AB
LE
TH
RO
UG
HO
UT
SC
EN
AR
IO
9.
SIM
UL
AT
OR
EX
ER
CIS
E E
VA
LU
AT
ION
PL
AN
10.
INS
TR
UC
TO
R A
IDS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
3
1. N
o/T
ITL
E:
ISV
-1,
Sm
all
Bre
ak L
oss
of
Co
ola
nt
Acc
iden
t (S
BL
OC
A)
and
CB
P/D
isp
lay
Fai
lure
2. O
BJE
CT
IVE
S:
Val
idat
e th
at t
he i
nteg
rate
d sy
stem
ade
quat
ely
supp
orts
pla
nt p
erso
nnel
in
safe
ly o
pera
ting
the
plan
t du
ring
vario
us e
quip
men
t m
alfu
nctio
ns in
clu
ding
a S
BLO
CA
, as
fol
low
s:
a.
Val
idat
e th
e sh
ift s
taffi
ng l
evel
is
adeq
uate
to
supp
ort
perf
orm
ance
of
crew
mem
ber
task
s an
d al
low
for
adeq
uate
cre
w in
tera
ctio
n.
b.
Val
idat
e th
at t
he d
esig
n ha
s ad
equ
ate
capa
bilit
y fo
r al
ertin
g, in
form
ing,
con
trol
ling,
and
fee
dbac
k su
ch t
hat
pers
onne
l tas
ks a
re s
ucce
ssfu
lly c
ompl
eted
dur
ing
the
acci
dent
res
pons
e.
c.
Val
idat
e sp
ecifi
c pe
rson
nel t
asks
can
be
acco
mpl
ishe
d w
ithin
spe
cific
tim
e an
d pe
rfor
man
ce c
riter
ia.
d.
Val
idat
e th
at t
he H
SIs
min
imiz
e pe
rson
nel
erro
r an
d as
sure
err
or d
etec
tion
and
reco
very
cap
abili
ty w
hen
erro
rs o
ccur
.
e.
Val
idat
e th
at t
he p
erso
nnel
can
effe
ctiv
ely
tran
sitio
n be
twee
n th
e H
SIs
and
pro
cedu
res
in a
ccom
plis
hing
thei
r ta
sks.
3. O
VE
RV
IEW
of
SC
EN
AR
IO
Dur
ing
stea
dy s
tate
ful
l po
wer
ope
ratio
n a
SG
1 D
ownc
omer
Hig
h R
adia
tion
mon
itor
alar
m i
s re
ceiv
ed.
The
crew
res
pond
s an
d de
term
ines
the
ala
rm i
s du
e to
a f
aile
d in
stru
men
t. S
ubse
quen
tly a
SB
LOC
A o
ccur
s; t
he
reac
tor
auto
mat
ical
ly t
rips,
and
the
saf
ety
inje
ctio
n se
tpoi
nt i
s ex
ceed
ed b
ut t
he S
I do
es n
ot a
utom
atic
ally
initi
ate.
The
cre
w m
anua
lly i
nitia
tes
SI
in r
espo
nse.
Ope
rato
rs s
tart
em
erge
ncy
oper
atio
n by
ent
erin
g E
OP
-
1001
“S
tand
ard
Pos
t T
rip A
ctio
n”.
Afte
r ta
king
the
pos
t tr
ip a
ctio
ns,
oper
ator
s di
agno
se t
he L
OC
A f
ollo
win
g
entr
y in
to E
OP
-100
2 “D
iagn
ostic
Act
ion”
. A
ccor
ding
to
the
resu
lts o
f ac
cide
nt
diag
nosi
s, o
pera
tors
ent
er a
nd
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
4
perf
orm
the
ste
ps o
f E
OP
-200
2 ”L
oss
of C
oola
nt A
ccid
ent”
. T
he C
ompu
ter
Bas
ed P
roce
dure
Sys
tem
(C
BP
)
fails
dur
ing
the
perf
orm
ance
of
EO
P-2
002.
Ope
rato
rs t
rans
ition
to
the
hard
cop
y of
EO
P-2
002
and
cont
inue
the
emer
genc
y op
erat
ion.
All
HS
I di
spla
ys,
incl
udin
g th
e op
erat
or c
onso
le d
ispl
ays
and
LDP
, fa
il, f
orci
ng t
he
oper
ator
to
the
safe
ty c
onso
le.
The
sce
nario
con
clud
es w
hen
the
RC
S i
s co
oled
and
dep
ress
uriz
ed t
o th
e
poin
t th
at t
he S
hutd
own
Coo
ling
Sys
tem
(S
CS
) ca
n be
pla
ced
in s
ervi
ced.
4. A
NT
ICIP
AT
ED
PR
OC
ED
UR
E F
LO
WP
AT
H
5. P
RE
PA
RA
TIO
N o
f E
VA
LU
AT
ION
TS TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
5
T
S
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
6
6. M
AJO
R S
TE
PS
of
SC
EN
AR
IO
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
7
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
8
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
9
7.
PR
IMA
RY
TA
SK
PE
RF
OR
MA
NC
E M
EA
SU
RE
S
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
10
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
11
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
12
8.
OT
HE
R P
ER
FO
RM
AN
CE
ME
AS
UR
ES
AP
PL
ICA
BL
E T
HR
OU
GH
OU
T S
CE
NA
RIO
.
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
13
9.
SIM
UL
AT
OR
EX
ER
CIS
E E
VA
LU
AT
ION
PL
AN
9.1
INIT
IAL
CO
ND
ITIO
NS
/SIM
UL
AT
OR
SE
TU
P
9.2
EV
EN
T-1
R
OT
AT
E O
PE
RA
TIO
N O
F E
SW
P
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
14
9.3
EV
EN
T-2
S
G1
DO
WN
CO
ME
R R
AD
IAT
ION
FA
IL H
I
TS
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
15
9.4
EV
EN
T-3
S
BL
OC
A +
Au
tom
atic
Act
uat
ion
Fai
lure
of
SIA
S
[P
OP
-01:
Sta
nd
ard
Po
st T
rip
Act
ion
s]
TS
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
16
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
17
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
18
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
19
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
20
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
21
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
22
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
23
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
24
TS
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
25
[PO
P-0
2: D
iag
no
stic
Act
ion
s]
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
26
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
27
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
28
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
29
[E
OP
-02:
Lo
ss o
f C
oo
lan
t A
ccid
ent]
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
30
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
31
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
32
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
33
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
34
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
35
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
36
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
37
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
38
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
39
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
40
9.5
EV
EN
T-4
C
om
pu
ter
Bas
ed P
roce
du
re S
yste
m (
CB
P)
Fai
l
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
41
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
42
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
43
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
44
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
45
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
46
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
47
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
48
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
49
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
50
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
51
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
52
9.6
EV
EN
T-5
A
ll D
isp
lay
of
Op
erat
or
Co
nso
les
and
LD
P F
ail
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
53
9.7
EV
EN
T-6
RC
S C
oo
ldo
wn
at
Saf
ety
Co
nso
le
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
54
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
55
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
56
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
57
9.8
PO
ST
EX
ER
CIS
E E
VA
LU
AT
ION
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
58
9.9
DA
TA
AC
QU
ISIT
ION
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
59
10.
INS
TR
UC
TO
R A
IDs
a.
TR
EN
DIN
G P
AR
AM
ET
ER
s fo
r S
BL
OC
A (
Tre
nd
file
: m
f_IS
V-1
)
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
60
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
61
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
62
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
63
b.
Mal
fun
ctio
ns/
Rem
ote
/Ove
rrid
e L
ist
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
64
c.
AN
TIC
IPA
TE
D D
IAL
OG
SC
RIP
Ts
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
65
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
66
d.
SH
IFT
TU
RN
OV
ER
SH
EE
T
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
67
T
S
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
1
AAPP
PPEE
NNDD
II XX 22
AA
nntt ii
ccii pp
aatt ee
dd TT
rr aann
ssii ee
nntt
WWii tt
hhoo
uutt
TTrr ii
pp ((
AATT
WWTT
))
wwii tt
hh OO
vvaatt ii
oonn
DDii ss
tt rrii bb
uutt ee
dd CC
oonn
tt rroo
ll SS
yyss
tt eemm
((DD
CCSS
)) FF
aaii ll
uurr ee
ss
II SSVV
-- 22
Thi
s do
cum
ent
was
pre
pare
d fo
r th
e de
sign
cer
tific
atio
n ap
plic
atio
n to
th
e U
.S.
Nuc
lear
Reg
ulat
ory
Com
mis
sion
and
con
tain
s te
chno
logi
cal
info
rmat
ion
that
con
stitu
tes
inte
llect
ual p
rope
rty.
Cop
ying
, us
ing,
or
dist
ribut
ing
the
info
rmat
ion
in t
his
docu
men
t in
who
le o
r in
par
t is
per
mitt
ed o
nly
by t
he U
.S. N
ucle
ar R
egul
atory
C
omm
issi
on a
nd i
ts c
ontr
acto
rs f
or t
he p
urpo
se o
f re
view
ing
desi
gn
cert
ifica
tion
appl
icat
ion
mat
eria
ls.
Oth
er u
ses
are
stric
tly p
rohi
bite
d w
ithou
t th
e w
ritte
n pe
rmis
sion
of
Kor
ea E
lect
ric P
ower
Cor
pora
tion
and
Kor
ea H
ydro
& N
ucle
ar P
ower
Co.
, Ltd
.
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
2
CCOO
NNTT
EENN
TTSS
11.. N
o/T
ITL
E
22.. O
BJE
CT
IVE
S
3. O
VE
RV
IEW
of
SC
EN
AR
IO
4. A
NT
ICIP
AT
ED
PR
OC
ED
UR
E F
LO
WP
AT
H
5. P
RE
PA
RA
TIO
N o
f E
VA
LU
AT
ION
6. M
AJO
R S
TE
PS
of
SC
EN
AR
IO
7. P
RIM
AR
Y T
AS
K P
ER
FO
RM
AN
CE
ME
AS
UR
ES
8. O
TH
ER
PE
RF
OR
MA
NC
E M
EA
SU
RE
S A
PP
LIC
AB
LE
TH
RO
UG
HO
UT
SC
EN
AR
IO
9. S
IMU
LA
TO
R E
XE
RC
ISE
EV
AL
UA
TIO
N P
LA
N
10.
INS
TR
UC
TO
R A
IDS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
3
1.
No
/TIT
LE
: IS
V-2
, AA
nntt ii
ccii pp
aatt ee
dd TT
rr aann
ssii ee
nntt
WWii tt
hhoo
uutt
TTrr ii
pp ((
AATT
WWTT
)) ww
ii tthh
OOvvaatt ii
oonn
DDii ss
tt rrii bb
uutt ee
dd CC
oonn
tt rroo
ll SS
yysstt ee
mm
(( DDCC
SS))
FFaaii ll
uurr ee
ss
2.
OB
JEC
TIV
ES
:
Val
idat
e th
at t
he i
nteg
rate
d sy
stem
ade
quat
ely
supp
orts
pla
nt p
erso
nnel
in
safe
ly o
pera
ting
the
plan
t du
ring
vario
us e
quip
men
t m
alfu
nctio
ns in
clud
ing
an A
TW
T w
ith O
vatio
n D
CS
failu
res,
as
follo
ws:
a.
Val
idat
e th
e sh
ift s
taffi
ng l
evel
is
adeq
uate
to
supp
ort
perf
orm
ance
of
crew
mem
ber
task
s an
d al
low
for
adeq
uate
cre
w in
tera
ctio
n.
b.
Val
idat
e th
at t
he d
esig
n ha
s ad
equa
te c
apab
ility
for
ale
rtin
g, in
form
ing,
con
trol
ling,
and
fee
dbac
k su
ch t
hat
pers
onne
l tas
ks a
re s
ucce
ssfu
lly c
ompl
eted
dur
ing
the
acci
dent
res
pons
e.
c.
Val
idat
e sp
ecifi
c pe
rson
nel t
asks
can
be
acco
mpl
ishe
d w
ithin
spe
cific
tim
e an
d pe
rfor
man
ce c
riter
ia.
d.
Val
idat
e th
at t
he H
SIs
min
imiz
e pe
rson
nel
erro
r an
d as
sure
err
or d
etec
tion
and
reco
very
cap
abili
ty w
hen
erro
rs o
ccur
.
e.
Val
idat
e th
at t
he p
erso
nnel
can
effe
ctiv
ely
tran
sitio
n be
twee
n th
e H
SIs
and
pro
cedu
res
in a
ccom
plis
hing
thei
r ta
sks.
3.
OV
ER
VIE
W o
f S
CE
NA
RIO
Uni
t is
in
Hot
Sta
ndby
(H
SB
) co
nditi
on a
fter
the
com
plet
ion
of c
ore
phys
ics
test
. T
he c
rew
att
ains
cor
e cr
itica
lity
by
with
draw
al o
f re
gula
ting
grou
p ro
ds a
nd i
ncre
ases
pow
er u
p to
2%
. A
t 2%
pow
er,
the
crew
rol
ls u
p a
turb
ine
driv
en M
ain
Fee
dwat
er P
ump
(MF
WP
) an
d st
op S
tart
-up
Fee
dwat
er P
ump
(SU
FW
P).
Dur
ing
the
pow
er i
ncre
ase
to 8
% f
or t
urbi
ne
rolli
ng,
a ch
argi
ng c
ontr
ol v
alve
(C
V-2
12P
) fa
ils c
lose
d. A
fter
reco
very
fro
m t
he e
vent
PZ
R s
pray
val
ve (
RC
-100
E)
fails
open
cau
sing
an
unco
ntro
lled
RC
S d
epre
ssur
izat
ion.
The
RO
trie
s to
clo
se t
he is
olat
ion
valv
e of
the
spr
ay v
alve
but
it f
ails
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
4
due
to s
ticki
ng o
f th
e is
olat
ion
valv
e. T
he S
RO
ord
ers
a re
acto
r tr
ip in
res
pons
e. T
he R
O a
ttem
pts
to t
rip t
he r
eact
or b
ut it
will
not
trip
. Aft
er r
ecog
nitio
n of
the
AT
WT
con
ditio
n th
e R
O tr
ips
the
reac
tor
by in
terr
upt
ing
the
pow
er to
MG
set
s. F
ollo
win
g
the
succ
essf
ul r
eact
or t
rip t
he O
vatio
n D
CS
fai
ls.
All
HS
I al
arm
s, d
ispl
ays,
con
trol
s, a
nd C
BP
s on
the
LD
P a
nd O
pera
tor
Con
sole
s ar
e fa
iled
off.
The
cre
w c
an n
o lo
nger
mon
itor
nor
cont
rol t
he p
lant
fro
m t
he O
pera
tor
Con
sole
. T
he S
RO
ord
ers
the
crew
to
tran
sit
to t
he S
afet
y C
onso
le.
At
the
Saf
ety
Con
sole
, th
e cr
ew m
aint
ains
cor
e co
olin
g w
ith m
inim
um
inve
ntor
y of
HS
I ala
rms,
dis
play
s an
d co
ntro
ls. W
hen
the
stab
ilize
d R
CS
coo
ldow
n ra
te is
att
aine
d, th
e sc
enar
io w
ill b
e cl
osed
out
.
4.
AN
TIC
IPA
TE
D P
RO
CE
DU
RE
FL
OW
PA
TH
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
5
5. P
RE
PA
RA
TIO
N o
f E
VA
LU
AT
ION
T
S
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
6
6. M
AJO
R S
TE
PS
of
SC
EN
AR
IO
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
7
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
8
7.
PR
IMA
RY
TA
SK
PE
RF
OR
MA
NC
E M
EA
SU
RE
S
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
9
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
10
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
11
8.
OT
HE
R P
ER
FO
RM
AN
CE
ME
AS
UR
ES
AP
PL
ICA
BL
E T
HR
OU
GH
OU
T S
CE
NA
RIO
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
12
9.
SIM
UL
AT
OR
EX
ER
CIS
E E
VA
LU
AT
ION
PL
AN
9.1
INIT
IAL
CO
ND
ITIO
NS
/SIM
UL
AT
OR
SE
TU
P
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
13
9.2
EV
EN
T-1
HS
B t
o 2
5%
PO
WE
R O
PE
RA
TIO
N
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
14
9.3
EV
EN
T-2
CH
AR
GIN
G C
ON
TR
OL
VA
LVE
(C
V-2
12P
) F
AIL
CLO
SE
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
15
9.4
EV
EN
T-3
PZ
R S
PR
AY
VA
LV
E F
AIL
S O
PE
N w
ith
AN
TIC
IPA
TE
D T
RA
NS
IEN
T W
ITH
OU
T T
RIP
(A
TW
T)
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
16
[PO
P-0
1: S
tan
dar
d P
ost
Tri
p A
ctio
ns]
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
17
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
18
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
19
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
20
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
21
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
22
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
23
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
24
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
25
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
26
[PO
P-0
2: D
iag
no
stic
Act
ion
s]
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
27
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
28
[E
OP
-01:
Rea
cto
r T
rip
Rec
ove
ry]
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
29
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
30
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
31
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
32
9.5
EV
EN
T-4
OV
AT
ION
DC
S F
AIL
UR
ES
(C
om
mo
n M
od
e F
ailu
res)
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
33
9.6
EV
EN
T-4
CO
OL
DO
WN
RC
S a
t S
AF
ET
Y C
ON
SO
LE
wit
h O
vati
on
DC
S F
ailu
res
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
34
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
35
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
36
9.7
PO
ST
EX
ER
CIS
E E
VA
LU
AT
ION
9.8
DA
TA
AC
QU
ISIT
ION
TS
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
37
10.
INS
TR
UC
TO
R A
IDs
a.
TR
EN
DIN
G P
AR
AM
ET
ER
s fo
r A
TW
T w
ith
Ova
tio
n D
CS
Fai
lure
s (T
ren
d f
ile:
mf_
ISV
-2)
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
38
T
S
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
39
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
40
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
41
b.
Mal
fun
ctio
ns/
Rem
ote
Fu
nc
tio
ns/
Ove
rrid
e L
ist
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
42
c.
AN
TIC
IPA
TE
D D
IAL
OG
SC
RIP
Ts
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
43
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
44
d.
SH
IFT
TU
RN
OV
ER
SH
EE
T
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
45
T
S
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
1
AAPP
PPEE
NNDD
II XX 33
EE
xxccee
ssssii vv
ee SS
tt eeaamm
DDeemm
aann
dd EE
vveenn
tt (( EE
SSDD
EE))
wwii tt
hh AA
ll aarr mm
SSeerr vv
eerr
FFaaii ll
uurr ee
ss
II SSVV
-- 33
Thi
s do
cum
ent w
as p
repa
red
for
the
desi
gn c
ertif
icat
ion
appl
icat
ion
to
the
U.S
. Nuc
lear
Reg
ulat
ory
Com
mis
sion
and
con
tain
s te
chno
logi
cal
info
rmat
ion
that
con
stitu
tes
inte
llect
ual p
rope
rty.
Cop
ying
, usi
ng, o
r di
strib
utin
g th
e in
form
atio
n in
this
doc
umen
t in
who
le o
r in
par
t is
perm
itted
onl
y by
the
U.S
. N
ucle
ar R
egul
atory
C
omm
issi
on a
nd it
s co
ntra
ctor
s fo
r th
e pu
rpos
e of
rev
iew
ing
desi
gn
cert
ifica
tion
appl
icat
ion
mat
eria
ls. O
ther
use
s ar
e st
rictly
pro
hibi
ted
with
out t
he w
ritte
n pe
rmis
sion
of K
orea
Ele
ctric
Pow
er C
orpo
ratio
n an
d K
orea
Hyd
ro &
Nuc
lear
Pow
er C
o., L
td.
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
2
CCOO
NNTTEE NN
TTSS
11.. N
o/T
ITL
E
22.. O
BJE
CT
IVE
S
3. O
VE
RV
IEW
of
SC
EN
AR
IO
4. A
NT
ICIP
AT
ED
PR
OC
ED
UR
E F
LO
WP
AT
H
5. P
RE
PA
RA
TIO
N o
f E
VA
LU
AT
ION
6. M
AJO
R S
TE
PS
of
SC
EN
AR
IO
7. P
RIM
AR
Y T
AS
K P
ER
FO
RM
AN
CE
ME
AS
UR
ES
8. O
TH
ER
PE
RF
OR
MA
NC
E M
EA
SU
RE
S A
PP
LIC
AB
LE
TH
RO
UG
HO
UT
SC
EN
AR
IO
9. S
IMU
LA
TO
R E
XE
RC
ISE
EV
AL
UA
TIO
N P
LA
N
10.
INS
TR
UC
TO
R A
IDS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
3
1. N
o/T
ITL
E:
ISV
-3, E
xces
sive
Ste
am D
eman
d E
ven
t (E
SD
E)
wwii tt
hh AA
ll aarr mm
SSeerr vv
eerr
FFaaii ll
uurr ee
ss
2. O
BJE
CT
IVE
S:
Val
idat
e th
at th
e in
tegr
ated
sys
tem
ade
quat
ely
supp
orts
pla
nt p
erso
nnel
in s
afel
y op
erat
ing
the
plan
t du
ring
vario
us e
quip
men
t m
alfu
nctio
ns in
clud
ing
an E
xces
sive
Ste
am D
eman
d E
vent
with
Ala
rm S
erve
r fa
ilure
s, a
s
follo
ws:
a.
Val
idat
e th
e sh
ift s
taffi
ng le
vel i
s ad
equa
te t
o su
ppor
t pe
rfor
man
ce o
f cr
ewm
embe
r ta
sks
and
allo
w f
or
adeq
uate
cre
w in
tera
ctio
n.
b.
Val
idat
e th
at th
e de
sign
has
ade
quat
e ca
pabi
lity
for
aler
ting,
info
rmin
g, c
ontr
ollin
g, a
nd f
eedb
ack
such
tha
t
pers
onne
l tas
ks a
re s
ucce
ssfu
lly c
ompl
eted
dur
ing
the
acci
dent
res
pons
e.
c.
Val
idat
e sp
ecifi
c pe
rson
nel t
asks
can
be
acco
mpl
ishe
d w
ithin
spe
cific
tim
e an
d pe
rfor
man
ce c
riter
ia.
d.
Val
idat
e th
at th
e H
SIs
min
imiz
e pe
rson
nel e
rror
and
ass
ure
erro
r de
tect
ion
and
reco
very
cap
abili
ty w
hen
erro
rs o
ccur
.
e.
Val
idat
e th
at th
e pe
rson
nel c
an e
ffect
ivel
y tr
ansi
tion
betw
een
the
HS
Is a
nd p
roce
dure
s in
acc
ompl
ishi
ng
thei
r ta
sks.
3. O
VER
VIE
W o
f SC
ENA
RIO
Dur
ing
stea
dy s
tate
full
pow
er o
pera
tion
the
oper
ator
s ar
e sc
hedu
led
to p
erfo
rm a
mo
nthl
y co
ntro
l rod
par
tial m
ove
men
t
mon
thly
sur
veill
ance
test
. Dur
ing
the
test
, the
Loo
se P
art
Mon
itorin
g S
yste
m (
LPM
S)
dete
cts
an a
bnor
mal
sig
nal a
nd th
e
oper
ator
s in
itiat
e an
ana
lysi
s as
dire
cted
by
proc
edur
e. S
ubse
quen
tly, a
L/D
Hx
tube
leak
occ
urs
as in
dica
ted
by C
CW
hi
radi
atio
n al
arm
s an
d a
CC
ST
hi l
evel
ala
rm. T
he c
rew
dia
gnos
es th
e ev
ent a
nd is
olat
es C
VC
S c
harg
ing
and
letd
own
to
repa
ir th
e fa
iled
tube
. The
LP
MS
ana
lysi
s in
dica
tes
ther
e is
like
ly d
ebris
in th
e re
acto
r co
re. T
he S
ite M
ange
r di
rect
s th
e
oper
atin
g cr
ew to
com
men
ce a
pla
nt s
hutd
own
to M
ode
4 in
pre
para
tion
for
a m
aint
enan
ce o
utag
e to
insp
ect t
he c
ore.
He
requ
ests
the
crew
be
in m
ode
3 w
ithin
two
hour
s. T
he c
rew
brie
fs a
nd b
egin
s a
pow
er d
ecre
ase.
Dur
ing
the
pow
er
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
4
decr
ease
, tw
o M
FW
Ps
trip
, but
the
RP
CS
doe
s no
t fun
ctio
n au
tom
atic
ally
as
expe
cted
. T
he R
O d
rops
a s
elec
ted
cont
rol
rod
and
unlo
ads
the
turb
ine
rapi
dly
in o
rder
to s
tabi
lize
the
plan
t. A
t 25%
pow
er a
larm
ser
ver
A a
nd B
fails
. The
SR
O
decl
ares
a s
ite e
mer
genc
y pe
r th
e em
erge
ncy
plan
. The
cre
w c
ontin
ues
the
pow
er d
ecre
ase
to 5
0MW
s an
d tr
ips
the
turb
ine.
Fol
low
ing
the
reac
tor
shut
dow
n, a
ste
am li
ne b
reak
insi
de C
NM
T o
ccur
s. T
he c
rew
sta
rts
emer
genc
y op
erat
ion
by e
nter
ing
PO
P-0
1 “S
tand
ard
Pos
t Trip
Act
ion”
. Afte
r ta
king
the
post
trip
act
ions
, the
cre
w p
erfo
rms
PO
P-0
2 “D
iagn
ostic
Act
ion”
. A
ccor
ding
to
the
resu
lts o
f ac
cide
nt d
iagn
osis
, th
e cr
ew e
nter
s an
d pe
rfor
ms
the
step
s of
EO
P-0
4 ”E
xces
sive
Ste
am D
em
and
Eve
nt”
with
out a
larm
s. W
hen
the
RC
S is
coo
ldow
n be
low
230
℃,
the
scen
ario
will
be
clos
ed o
ut.
4. A
NT
ICIP
AT
ED
PR
OC
ED
UR
E F
LO
WP
AT
H
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
5
5. P
RE
PA
RA
TIO
N o
f E
VA
LU
AT
ION
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
6
6. M
AJO
R S
TE
PS
of
SC
EN
AR
IO
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
7
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
8
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
9
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
10
7.
PRIM
ARY T
ASK
PER
FORM
AN
CE
MEA
SURES
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
11
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
12
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
13
8. O
TH
ER
PE
RF
OR
MA
NC
E M
EA
SU
RE
S A
PP
LIC
AB
LE
TH
RO
UG
HO
UT
SC
EN
AR
IO
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
14
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
15
9.
SIM
UL
AT
OR
EX
ER
CIS
E E
VA
LU
AT
ION
PL
AN
9.1
INIT
IAL
CO
ND
ITIO
NS
/SIM
UL
AT
OR
SE
TU
P
9.2
EV
EN
T-1
C
ON
TR
OL
RO
D P
AR
TIA
L M
OV
EM
EN
T S
UR
VE
ILL
AN
CE
TE
ST
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
16
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
17
9.3
EV
EN
T-2
C
VC
S L
ET
DO
WN
Hx
TU
BE
LE
AK
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
18
9.4
EV
EN
T-3
10
0%
to
HO
TS
TA
ND
BY
SH
UT
DO
WN
OP
ER
AT
ION
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
19
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
20
9.5
EV
EN
T-4
T
WO
MF
WP
s T
RIP
wit
h A
UT
OM
AT
IC IN
ITIA
TIO
N F
AIL
UR
E o
f R
PC
S
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
21
9.6
EV
EN
T-5
AL
RA
M S
ER
VE
R A
an
d B
FA
ILU
RE
S
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
22
9.7
EV
EN
T-6
M
AIN
ST
EA
M L
INE
2B
BR
EA
K in
sid
e C
ON
TA
INM
EN
T
[PO
P-0
2 :
Dia
gn
ost
ic A
ctio
ns]
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
23
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
24
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
25
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
26
[EO
P-0
4 : Ex
cess
ive
Stea
m D
eman
d E
vent]
T
S
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
27
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
28
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
29
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
30
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
31
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
32
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
33
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
34
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
35
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
36
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
37
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
38
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
39
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
40
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
41
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
42
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
43
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
44
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
45
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
46
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
47
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
48
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
49
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
50
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
51
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
52
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
53
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
54
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
55
9.8
PO
ST
EX
ER
CIS
E E
VA
LU
AT
ION
9.9
DA
TA
AC
QU
ISIT
ION
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
56
10.
INS
TR
UC
TO
R A
IDs
a.
TR
EN
DIN
G P
AR
AM
ET
ER
s fo
r E
SD
E (
Tre
nd
par
amet
ers
file
: m
f_IS
V-3
)
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
57
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
58
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
59
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
60
b.
Mal
fun
ctio
ns/
Rem
ote
/Ove
rrid
e L
ist
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
61
c.
AN
TIC
IPA
TE
D D
IAL
OG
SC
RIP
Ts
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
62
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
63
d.
SH
IFT
TU
RN
OV
ER
SH
EE
T
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
64
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
1
AP
PE
ND
IX 4
L
oss
of
All
Fee
dw
ater
(L
OA
F)
ISV
-4
Thi
s do
cum
ent
was
pre
pare
d fo
r th
e de
sign
cer
tific
atio
n ap
plic
atio
n to
th
e U
.S.
Nuc
lear
Reg
ulat
ory
Com
mis
sion
and
con
tain
s te
chno
logi
cal
info
rmat
ion
that
con
stitu
tes
inte
llect
ual p
rope
rty.
Cop
ying
, us
ing,
or
dist
ribut
ing
the
info
rmat
ion
in t
his
docu
men
t in
who
le o
r in
par
t is
per
mitt
ed o
nly
by t
he U
.S. N
ucle
ar R
egul
atory
C
omm
issi
on a
nd i
ts c
ontr
acto
rs f
or t
he p
urpo
se o
f re
view
ing
desi
gn
cert
ifica
tion
appl
icat
ion
mat
eria
ls.
Oth
er u
ses
are
stric
tly p
rohi
bite
d w
ithou
t th
e w
ritte
n pe
rmis
sion
of
Kor
ea E
lect
ric P
ower
Cor
pora
tion
and
Kor
ea H
ydro
& N
ucle
ar P
ower
Co.
, Ltd
.
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
2
CO
NT
EN
TS
1. N
o/T
ITL
E
2. O
BJE
CT
IVE
S
3. O
VE
RV
IEW
of
SC
EN
AR
IO
4. A
NT
ICIP
AT
ED
PR
OC
ED
UR
E F
LO
WP
AT
H
5. P
RE
PA
RA
TIO
N o
f E
VA
LU
AT
ION
6. M
AJO
R S
TE
PS
of
SC
EN
AR
IO
7. P
RIM
AR
Y T
AS
K P
ER
FO
RM
AN
CE
ME
AS
UR
ES
8. O
TH
ER
PE
RF
OR
MA
NC
E M
EA
SU
RE
S A
PP
LIC
AB
LE
TH
RO
UG
HO
UT
SC
EN
AR
IO
9. S
IMU
LA
TO
R E
XE
RC
ISE
EV
AL
UA
TIO
N P
LA
N
10.
INS
TR
UC
TO
R A
IDS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
3
1. N
o/T
ITL
E:
ISV
-4, L
oss
of
All
Fee
dw
ater
(L
OA
F)
2. O
BJE
CT
IVE
S:
Val
idat
e th
at t
he i
nteg
rate
d sy
stem
ade
quat
ely
supp
orts
pla
nt p
erso
nnel
in
safe
ly o
pera
ting
the
plan
t du
ring
vario
us e
quip
men
t m
alfu
nctio
ns in
clud
ing
an L
oss
of A
ll F
eedw
ater
, as
follo
ws:
a.
Val
idat
e th
e sh
ift s
taffi
ng l
evel
is
adeq
uate
to
supp
ort
perf
orm
ance
of
crew
mem
ber
task
s an
d al
low
for
adeq
uate
cre
w in
tera
ctio
n.
b.
Val
idat
e th
at t
he d
esig
n ha
s ad
equa
te c
apab
ility
for
ale
rtin
g, in
form
ing,
con
trol
ling,
and
fee
dbac
k su
ch t
hat
pers
onne
l tas
ks a
re s
ucce
ssfu
lly c
ompl
eted
dur
ing
the
acci
dent
res
pons
e.
c.
Val
idat
e sp
ecifi
c pe
rson
nel t
asks
can
be
acco
mpl
ishe
d w
ithin
spe
cific
tim
e an
d pe
rfor
man
ce c
riter
ia.
d.
Val
idat
e th
at t
he H
SIs
min
imiz
e pe
rson
nel
erro
r an
d as
sure
err
or d
etec
tion
and
reco
very
cap
abili
ty w
hen
erro
rs o
ccur
.
e.
Val
idat
e th
at t
he p
erso
nnel
can
effe
ctiv
ely
tran
sitio
n be
twee
n th
e H
SIs
and
pro
cedu
res
in a
ccom
plis
hing
thei
r ta
sks.
3. O
VE
RV
IEW
of
SC
EN
AR
IO
Fol
low
ing
shift
tur
nove
r, t
he T
O s
tart
s th
e T
D A
FW
P 1
B m
on
thly
sur
veill
ance
tes
t pe
r th
e sc
hedu
le.
Afte
r re
achi
ng r
ated
spee
d, t
he t
urbi
ne t
rips
due
to f
ailu
re o
f th
e ov
ersp
eed
trip
mec
hani
sm.
The
1B
TD
AF
WP
Lim
iting
Con
ditio
ns o
f
Ope
ratio
n (L
CO
) is
ap
plie
d pe
r te
chni
cal
spec
ifica
tions
. S
ubse
quen
tly a
CV
CS
let
dow
n lin
e le
ak f
orm
s up
stre
am o
f
letd
own
cont
rol
valv
e C
V-2
01P
/Q b
ut m
alfu
nctio
ning
loc
al r
adia
tion
mon
itors
do
not
alar
m.
The
RO
loc
ates
the
lea
k
usin
g m
ultip
le c
ontr
ol r
oom
ind
icat
ions
alo
ng w
ith a
fie
ld i
nspe
ctio
n by
the
loc
al o
pera
tor.
The
cre
w s
tops
the
lea
k by
isol
atin
g th
e C
VC
S le
tdo
wn
line.
Soo
n af
terw
ard,
a b
us f
ault
occu
rs a
t th
e tw
o 13
.8kV
Non
-1E
bus
es c
ausi
ng a
ll 13
.8kV
mot
ors
to s
top,
inc
ludi
ng:
MF
WP
boo
ster
pum
ps,
SU
FW
P,
CO
Ps,
and
CW
Ps.
The
uni
t tr
ips
due
to t
he l
oss
of
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
4
cond
ense
r va
cuum
and
los
s of
SG
fee
dwat
er.
MD
AF
WP
s ar
e st
arte
d by
the
Aux
iliar
y F
eedw
ater
Act
uatio
n S
igna
l
(AF
AS
) bu
t th
e T
D A
FW
P 1
A f
ails
to
star
t be
caus
e th
e st
eam
sup
ply
valv
e to
th
e tu
rbin
e is
stu
ck c
lose
d. T
he c
rew
ente
rs P
OP
-01
“Sta
ndar
d P
ost
Trip
Act
ion”
and
PO
P-0
2 ”D
iagn
ostic
Act
ions
”. D
urin
g di
agno
stic
s, t
wo
MD
AF
WP
s ar
e
trip
ped
in s
eque
nce
by o
verlo
ad r
esu
lting
in
a lo
ss o
f al
l S
G f
eedw
ater
. T
he c
rew
re-
diag
nose
s th
e ev
ent
per
PO
P-0
2
“Dia
gnos
tic A
ctio
ns”
and
ente
rs t
o E
OP
-05,
“L
oss
of A
ll F
eedw
ater
”. T
he s
cena
rio w
ill b
e cl
osed
out
whe
n st
able
RC
S
cool
ing
cond
ition
s ar
e es
tabl
ishe
d us
ing
FR
G-0
6 “C
ore
and
RC
S h
eat r
em
oval
”.
4. A
NT
ICIP
AT
ED
PR
OC
ED
UR
E F
LO
WP
AT
H
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
5
5. P
RE
PA
RA
TIO
N o
f E
VA
LU
AT
ION
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
6
6. M
AJO
R S
TE
PS
of
SC
EN
AR
IO
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
7
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
8
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
9
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
10
7.
PR
IMA
RY
TA
SK
PE
RF
OR
MA
NC
E M
EA
SU
RE
S
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
11
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
12
8. O
TH
ER
PE
RF
OR
MA
NC
E M
EA
SU
RE
S A
PP
LIC
AB
LE
TH
RO
UG
HO
UT
SC
EN
AR
IO
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
13
9. S
IMU
LA
TO
R E
XE
RC
ISE
EV
AL
UA
TIO
N P
LA
N
9.1
INIT
IAL
CO
ND
ITIO
NS
/SIM
UL
AT
OR
SE
TU
P
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
14
9.2
EV
EN
T-1
T
D A
FW
P 1
B S
UV
EIL
LA
NC
E T
ES
T
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
15
9.3
EV
EN
T-2
C
VC
S L
ET
DO
WN
LIN
E L
EA
K u
pst
ream
CO
NT
RO
L V
AL
VE
CV
-201
P/Q
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
16
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
17
9.4
EV
EN
T-3
13
.8kV
SW
-02M
, SW
-02N
BU
S F
AU
LT
[P
OP
-01:
Sta
nd
ard
Po
st T
rip
Act
ion
s]
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
18
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
19
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
20
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
21
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
22
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
23
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
24
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
25
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
26
[PO
P-0
2: D
iag
no
stic
Act
ion
s]
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
27
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
28
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
29
9.5
EV
EN
T-4
: L
OS
S o
f A
LL
FE
ED
WA
TE
R (
LO
AF
)
[EO
P-0
1: R
eact
or
Tri
p R
eco
very
]
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
30
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
31
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
32
[PO
P-0
2: D
iag
no
stic
Act
ion
s]
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
33
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
34
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
35
[E
OP
-05:
Lo
ss o
f A
ll F
eed
wat
er]
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
36
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
37
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
38
[FR
P-0
6: C
ore
an
d R
CS
Hea
t re
mo
val,
Su
cces
s P
ath
HR
-3 o
nce
th
rou
gh
co
olin
g]
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
39
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
40
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
41
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
42
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
43
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
44
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
45
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
46
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
47
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
48
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
49
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
50
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
51
9.6
PO
ST
EX
ER
CIS
E E
VA
LU
AT
ION
9.7
DA
TA
AC
QU
ISIT
ION
TS
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
52
10.
INS
TR
UC
TO
R A
IDs
a.
TR
EN
DIN
G P
AR
AM
ET
ER
s fo
r L
OA
F (
Tre
nd
file
: m
f_IS
V-4
)
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
53
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
54
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
55
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
56
b.
Mal
fun
ctio
ns/
Rem
ote
/Ove
rrid
e L
ist
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
57
c.
AN
TIC
IPA
TE
D D
IAL
OG
SC
RIP
Ts
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
58
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
59
d.
SH
IFT
TU
RN
OV
ER
SH
EE
T
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
60
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
1
AP
PE
ND
IX 5
S
tati
on
Bla
ck O
ut
(SB
O)
ISV
-5
Thi
s do
cum
ent
was
pre
pare
d fo
r th
e de
sign
cer
tific
atio
n ap
plic
atio
n to
th
e U
.S.
Nuc
lear
Reg
ulat
ory
Com
mis
sion
and
con
tain
s te
chno
logi
cal
info
rmat
ion
that
con
stitu
tes
inte
llect
ual p
rope
rty.
Cop
ying
, us
ing,
or
dist
ribut
ing
the
info
rmat
ion
in t
his
docu
men
t in
who
le o
r in
par
t is
per
mitt
ed o
nly
by t
he U
.S. N
ucle
ar R
egul
atory
C
omm
issi
on a
nd i
ts c
ontr
acto
rs f
or t
he p
urpo
se o
f re
view
ing
desi
gn
cert
ifica
tion
appl
icat
ion
mat
eria
ls.
Oth
er u
ses
are
stric
tly p
rohi
bite
d w
ithou
t th
e w
ritte
n pe
rmis
sion
of
Kor
ea E
lect
ric P
ower
Cor
pora
tion
and
Kor
ea H
ydro
& N
ucle
ar P
ower
Co.
, Ltd
.
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
2
CO
NT
EN
TS
1. N
o/T
ITL
E
2. O
BJE
CT
IVE
S
3. O
VE
RV
IEW
of
SC
EN
AR
IO
4. A
NT
ICIP
AT
ED
PR
OC
ED
UR
E F
LO
WP
AT
H
5. P
RE
PA
RA
TIO
N o
f E
VA
LU
AT
ION
6. M
AJO
R S
TE
PS
of
SC
EN
AR
IO
7. P
RIM
AR
Y T
AS
K P
ER
FO
RM
AN
CE
ME
AS
UR
ES
8. O
TH
ER
PE
RF
OR
MA
NC
E M
EA
SU
RE
S A
PP
LIC
AB
LE
TH
RO
UG
HO
UT
SC
EN
AR
IO
9. S
IMU
LA
TO
R E
XE
RC
ISE
EV
AL
UA
TIO
N P
LA
N
10.
INS
TR
UC
TO
R A
IDS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
3
1. N
o/T
ITL
E:
ISV
-5,
Sta
tio
n B
lack
Ou
t (S
BO
)
2. O
BJE
CT
IVE
Ss:
Val
idat
e th
at t
he i
nteg
rate
d sy
stem
ade
quat
ely
supp
orts
pla
nt p
erso
nnel
in
safe
ly o
pera
ting
the
plan
t du
ring
vario
us e
quip
men
t m
alfu
nctio
ns in
clud
ing
a S
tatio
n B
lack
Out
, as
follo
ws:
a.
Val
idat
e th
e sh
ift s
taffi
ng l
evel
is
adeq
uate
to
supp
ort
perf
orm
ance
of
crew
mem
ber
task
s an
d al
low
for
adeq
uate
cre
w in
tera
ctio
n.
b.
Val
idat
e th
at t
he d
esig
n ha
s ad
equa
te c
apab
ility
for
ale
rtin
g, in
form
ing,
con
trol
ling,
and
fee
dbac
k su
ch t
hat
pers
onne
l tas
ks a
re s
ucce
ssfu
lly c
ompl
eted
dur
ing
the
acci
dent
res
pons
e.
c.
Val
idat
e sp
ecifi
c pe
rson
nel t
asks
can
be
acco
mpl
ishe
d w
ithin
spe
cific
tim
e an
d pe
rfor
man
ce c
riter
ia.
d.
Val
idat
e th
at t
he H
SIs
min
imiz
e pe
rson
nel
erro
r an
d as
sure
err
or d
etec
tion
and
reco
very
cap
abili
ty w
hen
erro
rs o
ccur
.
e.
Val
idat
e th
at t
he p
erso
nnel
can
effe
ctiv
ely
tran
sitio
n be
twee
n th
e H
SIs
and
pro
cedu
res
in a
ccom
plis
hing
thei
r ta
sks.
3. O
VE
RV
IEW
of
SC
EN
AR
IO
Dur
ing
stea
dy s
tate
ful
l pow
er o
pera
tion
and
as d
iscu
ssed
at t
urn
over
, th
e R
eact
or O
pera
tor
swap
s th
e ch
argi
ng p
umps
per
the
mon
thly
equ
ipm
ent
rota
tion
sche
dule
. A
s so
on a
s C
HG
Pu
mp
01A
is
shut
dow
n, V
CT
lev
el t
rans
mitt
er L
T-2
27 f
ails
to
low
. C
harg
ing
pum
p su
ctio
n va
lve
is t
rans
ferr
ed t
o th
e B
AS
T a
nd b
egin
s in
ject
ion
of h
igh
bora
ted
wat
er t
o R
CS
. R
eact
or
Ope
rato
r m
inim
izes
cha
rgin
g flo
w a
nd m
akes
a r
eque
st t
o th
e I&
C t
eam
to
insp
ect
the
tran
smitt
er.
The
cre
w s
tabi
lizes
the
plan
t fo
llow
ing
the
unpl
anne
d bo
ratio
n. U
pon
rest
orin
g th
e ch
argi
ng p
ump
suct
ion
to t
he V
CT
, th
e de
aera
tor
leve
l con
trol
ler
LIK
-318
NO
1 f
ails
low
and
the
val
ve t
o th
e de
aera
tor
clos
es.
The
Tur
bine
Ope
rato
r sw
aps
to t
he s
tand
by c
hann
el a
nd
rest
ores
the
val
ve t
o th
e op
en p
ositi
on.
The
Loa
d D
ispa
tch
Cen
ter
calls
with
a r
epor
t th
at a
tor
nado
is a
ppro
achi
ng t
he s
ite
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
4
and
orde
rs t
he S
RO
to
dec
reas
e un
it po
wer
to
75%
due
to
asso
ciat
ed t
rans
mis
sion
line
load
and
grid
inst
abili
ty.
Dur
ing
the
pow
er d
ecre
ase,
off
site
pow
er i
s lo
st a
nd t
he u
nit
trip
s. E
DG
B s
tart
s au
tom
atic
ally
but
ED
G A
fai
ls t
o st
art
for
unkn
own
reas
ons.
The
cre
w e
nter
s P
OP
-01
“Sta
ndar
d P
ost
Trip
Act
ions
”, P
OP
-02
“Dia
gnos
tic A
ctio
ns”,
and
the
n tr
ansi
tions
to
EO
P-
06 “
Loss
of
Offs
ite P
ower
/Los
s of
For
ced
Circ
ulat
ion”
. E
DG
B t
rips
durin
g E
OP
-06
exe
cutio
n. B
ecau
se t
he A
AC
DG
is O
ut
of S
ervi
ce (
OO
S)
for
mai
nten
ance
, th
e cr
ew e
nter
s E
OP
-07
“Sta
tion
Bla
ck O
ut”
usin
g re
-dia
gnos
is o
f th
e ev
ent
per
PO
P-0
2
“Dia
gnos
tic A
ctio
ns”.
The
cre
w m
ain
tain
s R
CS
coo
ling
usin
g th
e S
Gs,
whi
ch a
re b
eing
fed
by
the
TD
AF
WP
s pe
r E
OP
-07.
Whe
n on
e 4.
16kV
cla
ss-1
E b
us i
s re
ener
gize
d by
ED
G A
, an
d th
e m
inim
um
req
uire
d vi
tal
equi
pmen
t is
res
tore
d, t
he
scen
ario
will
be
clos
ed o
ut.
4. A
NT
ICIP
AT
ED
PR
OC
ED
UR
E F
LO
WP
AT
H
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
5
5. P
RE
PA
RA
TIO
N o
f E
VA
LU
AT
ION
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
6
6. M
AJO
R S
TE
PS
of
SC
EN
AR
IO
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
7
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
8
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
9
7. P
RIM
AR
Y T
AS
K P
ER
FO
RM
AN
CE
ME
AS
UR
ES
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
10
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
11
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
12
8. O
TH
ER
PE
RF
OR
MA
NC
E M
EA
SU
RE
S A
PP
LIC
AB
LE
TH
RO
UG
HO
UT
SC
EN
AR
IO
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
13
9.
SIM
UL
AT
OR
EX
ER
CIS
E E
VA
LU
AT
ION
PL
AN
9.1
INIT
IAL
CO
ND
ITIO
NS
/SIM
UL
AT
OR
SE
TU
P
9.2
EV
EN
T-1
R
OT
AT
E C
HA
RG
ING
PU
MP
fro
m 1
A t
o 1
B
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
14
9.3
EV
EN
T-2
C
VC
S V
CT
LT
-227
FA
IL L
OW
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
15
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
16
9.4
EV
EN
T-3
D
EA
ER
AT
OR
LE
VE
L C
ON
TR
OL
LE
R L
IK-0
318N
O1
FA
IL L
OW
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
17
9.5
EV
EN
T-4
10
0%
to
75
% P
OW
ER
OP
ER
AIT
ON
9.6
EV
EN
T-5
L
OS
S o
f O
FF
SIT
E P
OW
ER
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
18
[PO
P-0
1: S
tan
dar
d P
ost
Tri
p A
ctio
ns]
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
19
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
20
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
21
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
22
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
23
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
24
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
25
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
26
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
27
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
28
[PO
P-0
2: D
iag
no
stic
Act
ion
s]
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
29
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
30
[EO
P-0
6: L
oss
of
Off
site
Po
wer
/Lo
ss o
f F
orc
ed C
ircu
lati
on
]
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
31
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
32
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
33
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
34
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
35
9.7
EV
EN
T-6
ST
AT
ION
BL
AC
K O
UT
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
36
[PO
P-0
2: D
iag
no
stic
Act
ion
s]
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
37
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
38
[EO
P-0
7: S
tati
on
Bla
ck O
ut]
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
39
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
40
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
41
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
42
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
43
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
44
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
45
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
46
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
47
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
48
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
49
9.8
PO
ST
EX
ER
CIS
E E
VA
LU
AT
ION
9.9
DA
TA
AC
QU
ISIT
ION
TS
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
50
10.
INS
TR
UC
TO
R A
IDs
a.
TR
EN
DIN
G P
AR
AM
ET
ER
s fo
r S
BO
(T
ren
d f
ile:
mf_
ISV
-5)
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
51
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
52
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
53
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
54
b.
Mal
fun
ctio
ns/
Rem
ote
/Ove
rrid
e L
ist
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
55
c.
AN
TIC
IPA
TE
D D
IAL
OG
SC
RIP
Ts
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
56
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
57
d.
SH
IFT
TU
RN
OV
ER
SH
EE
T
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
58
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
1
AP
PE
ND
IX 6
S
team
Gen
erat
or
Tu
be
Ru
ptu
re (
SG
TR
)
ISV
-6
Thi
s do
cum
ent
was
pre
pare
d fo
r th
e de
sign
cer
tific
atio
n ap
plic
atio
n to
th
e U
.S.
Nuc
lear
Reg
ulat
ory
Com
mis
sion
and
con
tain
s te
chno
logi
cal
info
rmat
ion
that
con
stitu
tes
inte
llect
ual p
rope
rty.
Cop
ying
, us
ing,
or
dist
ribut
ing
the
info
rmat
ion
in t
his
docu
men
t in
who
le o
r in
par
t is
per
mitt
ed o
nly
by t
he U
.S. N
ucle
ar R
egul
atory
C
omm
issi
on a
nd i
ts c
ontr
acto
rs f
or t
he p
urpo
se o
f re
view
ing
desi
gn
cert
ifica
tion
appl
icat
ion
mat
eria
ls.
Oth
er u
ses
are
stric
tly p
rohi
bite
d w
ithou
t th
e w
ritte
n pe
rmis
sion
of
Kor
ea E
lect
ric P
ower
Cor
pora
tion
and
Kor
ea H
ydro
& N
ucle
ar P
ower
Co.
, Ltd
.
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
2
CO
NTE
NTS
1. N
o/T
ITL
E
2. O
BJE
CT
IVE
S
3. O
VE
RV
IEW
of
SC
EN
AR
IO
4. A
NT
ICIP
AT
ED
PR
OC
ED
UR
E F
LO
WP
AT
H
5. P
RE
PA
RA
TIO
N o
f E
VA
LU
AT
ION
6. M
AJO
R S
TE
PS
of
SC
EN
AR
IO
7. P
RIM
AR
Y T
AS
K P
ER
FO
RM
AN
CE
ME
AS
UR
ES
8. O
TH
ER
PE
RF
OR
MA
NC
E M
EA
SU
RE
S A
PP
LIC
AB
LE
TH
RO
UG
HO
UT
SC
EN
AR
IO
9. S
IMU
LA
TO
R E
XE
RC
ISE
EV
AL
UA
TIO
N P
LA
N
10.
INS
TR
UC
TO
R A
IDS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
3
1. N
o/T
ITL
E:
ISV
-6,
Ste
am G
ener
ato
r T
ub
e R
up
ture
(SG
TR
)
2. O
BJE
CT
IVE
S:
Val
idat
e th
at t
he i
nteg
rate
d sy
stem
ade
quat
ely
supp
orts
pla
nt p
erso
nnel
in
safe
ly o
pera
ting
the
plan
t du
ring
vario
us e
quip
men
t m
alfu
nctio
ns in
clud
ing
a S
team
Gen
erat
or T
ube
Rup
ture
, as
follo
ws:
a.
Val
idat
e th
e sh
ift s
taffi
ng l
evel
is
adeq
uate
to
supp
ort
perf
orm
ance
of
crew
mem
ber
task
s an
d al
low
for
adeq
uate
cre
w in
tera
ctio
n.
b.
Val
idat
e th
at t
he d
esig
n ha
s ad
equa
te c
apab
ility
for
ale
rtin
g, in
form
ing,
con
trol
ling,
and
fee
dbac
k su
ch t
hat
pers
onne
l tas
ks a
re s
ucce
ssfu
lly c
ompl
eted
dur
ing
the
acci
dent
res
pons
e.
c.
Val
idat
e sp
ecifi
c pe
rson
nel t
asks
can
be
acco
mpl
ishe
d w
ithin
spe
cific
tim
e an
d pe
rfor
man
ce c
riter
ia.
d.
Val
idat
e th
at t
he H
SIs
min
imiz
e pe
rson
nel
erro
r an
d as
sure
err
or d
etec
tion
and
reco
very
cap
abili
ty w
hen
erro
rs o
ccur
.
e.
Val
idat
e th
at t
he p
erso
nnel
can
effe
ctiv
ely
tran
sitio
n be
twee
n th
e H
SIs
and
pro
cedu
res
in a
ccom
plis
hing
thei
r ta
sks.
3. O
VE
RV
IEW
of
SC
EN
AR
IO
Dur
ing
stea
dy s
tate
ful
l po
wer
ope
ratio
n , t
he
Rea
ctor
Ope
rato
r st
arts
the
CC
W p
ump
rota
te o
pera
tion
per
mon
thly
sche
dule
. D
urin
g th
e B
tra
in r
otat
e op
erat
ion,
the
Rea
ctor
Ope
rato
r fin
ds n
o in
dica
tion
of d
isch
arge
flo
w f
or 2
B p
ump
star
ted.
Ins
pect
ion
reve
als
the
root
val
ves
clos
ed.
Sub
sequ
ently
, co
nden
ser
hotw
ell s
odiu
m h
igh
alar
m in
itiat
ed.
As
the
alar
m i
s id
entif
ied
as t
rue,
The
Tur
bine
Ope
rato
r st
arts
iso
latio
n of
sus
pect
ed c
onde
nser
per
AO
P-3
530.
Afte
r is
olat
ing
the
cond
ense
r, t
he c
rew
sta
rts
decr
easi
ng p
ower
to
75%
by
requ
est
of L
oad
Dis
patc
h C
ente
r. A
fter
a w
hile
, th
e R
eact
or
Ope
rato
r fin
ds c
ontr
ol r
ods
fully
with
draw
n an
d T
avg
chan
nel
faile
d to
low
. A
fter
clea
r th
em,
the
Rea
ctor
Ope
rato
r
reco
gniz
es t
he V
CT
leve
l dec
reas
ed s
light
ly a
nd t
ries
to f
ind
the
caus
e w
ith f
aile
d se
cond
ary
side
rad
iatio
n m
onito
ring.
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
4
Aft
er a
ll, t
he c
rew
con
clud
es t
hat
a S
G 1
tub
e le
ak h
as o
ccur
red
and
the
radi
oact
ivity
exc
eede
d op
erat
ing
limit
by
sam
plin
g th
e bl
owdo
wn.
D
urin
g th
e ra
pid
pow
er
decr
ease
, S
GT
R
occu
rs
and
the
reac
tor
trip
s.
The
cr
ew
star
ts
emer
genc
y op
erat
ion
per
PO
P-0
1 “S
tand
ard
Pos
t T
rip A
ctio
ns”
and
PO
P-0
2 “D
iagn
ostic
Act
ions
”. A
ccor
ding
to
the
resu
lts o
f ac
cide
nt d
iagn
osis
, th
e cr
ew p
erfo
rms
the
step
s of
EO
P-0
3, ”
SG
TR
”. W
hen
the
SD
C e
ntry
con
ditio
ns a
re
esta
blis
hed,
the
sce
nario
will
be
clos
ed o
ut.
4. A
NT
ICIP
AT
ED
PR
OC
ED
UR
E F
LO
WP
AT
H
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
5
5. P
RE
PA
RA
TIO
N o
f E
VA
LU
AT
ION
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
6
6. M
AJO
R S
TE
PS
of
SC
EN
AR
IO
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
7
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
8
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
9
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
10
7.
PR
IMA
RY
TA
SK
PE
RF
OR
MA
NC
E M
EA
SU
RE
S
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
11
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
12
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
13
8. O
TH
ER
PE
RF
OR
MA
NC
E M
EA
SU
RE
S A
PP
LIC
AB
LE
TH
RO
UG
HO
UT
SC
EN
AR
IO
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
14
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
15
9.
SIM
UL
AT
OR
EX
ER
CIS
E E
VA
LU
AT
ION
PL
AN
9.1
INIT
IAL
CO
ND
ITIO
NS
/SIM
UL
AT
OR
SE
TU
P
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
16
9.2
EV
EN
T-1
R
OT
AT
E o
f C
HA
RG
ING
PU
MP
fro
m 1
A, 1
B t
o 2
A,2
B
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
17
9.3
EV
EN
T-2
C
ON
DE
NS
ER
A T
UB
E L
EA
K(H
otw
ell L
eft)
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
18
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
19
9.4
EV
EN
T-3
10
0%
to
75
% P
OW
ER
OP
ER
AT
ION
9.5
EV
EN
T-4
R
RS
Tav
g F
AIL
LO
W
TS
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
20
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
21
9.6
EV
EN
T-5
S
TE
AM
GE
NE
RA
TO
R T
UB
E L
EA
K w
ith
2ry
RA
DIA
TIO
N M
ON
ITO
RIN
G F
AIL
UR
ES
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
22
9.7
EV
EN
T-6
S
TE
AM
GE
NE
RA
TO
R T
UB
E R
UP
TU
RE
(SG
TR
)
[PO
P-0
1: S
tan
dar
d P
ost
Tri
p A
ctio
ns]
TS
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
23
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
24
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
25
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
26
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
27
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
28
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
29
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
30
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
31
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
32
[PO
P-0
2: D
iag
no
stic
Act
ion
s]
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
33
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
34
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
35
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
36
[EO
P-0
3: S
team
Gen
erat
or
Tu
be
Ru
ptu
re]
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
37
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
38
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
39
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
40
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
41
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
42
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
43
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
44
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
45
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
46
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
47
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
48
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
49
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
50
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
51
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
52
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
53
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
54
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
55
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
56
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
57
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
58
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
59
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
60
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
61
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
62
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
63
9.8
PO
ST
EX
ER
CIS
E E
VA
LU
AT
ION
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
64
9.9
DA
TA
AC
QU
ISIT
ION
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
65
10.
INS
TR
UC
TO
R A
IDs
a.
TR
EN
DIN
G P
AR
AM
ET
ER
s fo
r S
GT
R (
Tre
nd
file
: m
f_IS
V-6
)
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
66
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
67
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
68
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
69
b.
Mal
fun
ctio
ns/
Rem
ote
/Ove
rrid
e L
ist
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
70
c.
AN
TIC
IPA
TE
D D
IAL
OG
SC
RIP
Ts
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
71
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
72
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
73
d.
SH
IFT
TU
RN
OV
ER
SH
EE
T
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
74
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
1
AP
PE
ND
IX 7
M
ain
Co
ntr
ol
Ro
om
Fir
e
ISV
-7
Thi
s do
cum
ent
was
pre
pare
d fo
r th
e de
sign
cer
tific
atio
n ap
plic
atio
n to
th
e U
.S.
Nuc
lear
Reg
ulat
ory
Com
mis
sion
and
con
tain
s te
chno
logi
cal
info
rmat
ion
that
con
stitu
tes
inte
llect
ual p
rope
rty.
Cop
ying
, us
ing,
or
dist
ribut
ing
the
info
rmat
ion
in t
his
docu
men
t in
who
le o
r in
par
t is
per
mitt
ed o
nly
by t
he U
.S. N
ucle
ar R
egul
atory
C
omm
issi
on a
nd i
ts c
ontr
acto
rs f
or t
he p
urpo
se o
f re
view
ing
desi
gn
cert
ifica
tion
appl
icat
ion
mat
eria
ls.
Oth
er u
ses
are
stric
tly p
rohi
bite
d w
ithou
t th
e w
ritte
n pe
rmis
sion
of
Kor
ea E
lect
ric P
ower
Cor
pora
tion
and
Kor
ea H
ydro
& N
ucle
ar P
ower
Co.
, Ltd
.
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
2
CO
NT
EN
TS
1. N
o/T
ITL
E
2. O
BJE
CT
IVE
S
3. O
VE
RV
IEW
of
SC
EN
AR
IO
4. A
NT
ICIP
AT
ED
PR
OC
ED
UR
E F
LO
WP
AT
H
5. P
RE
PA
RA
TIO
N o
f E
VA
LU
AT
ION
6. M
AJO
R S
TE
PS
of
SC
EN
AR
IO
7. P
RIM
AR
Y T
AS
K P
ER
FO
RM
AN
CE
ME
AS
UR
ES
8. O
TH
ER
PE
RF
OR
MA
NC
E M
EA
SU
RE
S A
PP
LIC
AB
LE
TH
RO
UG
HO
UT
SC
EN
AR
IO
9. S
IMU
LA
TO
R E
XE
RC
ISE
EV
AL
UA
TIO
N P
LA
N
10.
INS
TR
UC
TO
R A
IDS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
3
1. N
o/T
ITL
E:
ISV
-7, M
ain
Co
ntr
ol R
oo
m F
ire
2. O
BJE
CT
IVE
Ss:
Val
idat
e th
at th
e in
tegr
ated
sys
tem
ade
quat
ely
supp
orts
pla
nt p
erso
nnel
in s
afel
y op
erat
ing
the
plan
t du
ring
vario
us e
quip
men
t m
alfu
nctio
ns in
clud
ing
a M
ain
Con
trol
Roo
m F
ire, a
s fo
llow
s:
a.
Val
idat
e th
e sh
ift s
taffi
ng le
vel i
s ad
equa
te t
o su
ppor
t pe
rfor
man
ce o
f cr
ewm
embe
r ta
sks
and
allo
w f
or
adeq
uate
cre
w in
tera
ctio
n.
b.
Val
idat
e th
at th
e de
sign
has
ade
quat
e ca
pabi
lity
for
aler
ting,
info
rmin
g, c
ontr
ollin
g, a
nd f
eedb
ack
such
tha
t
pers
onne
l tas
ks a
re s
ucce
ssfu
lly c
ompl
eted
dur
ing
the
acci
dent
res
pons
e.
c.
Val
idat
e sp
ecifi
c pe
rson
nel t
asks
can
be
acco
mpl
ishe
d w
ithin
spe
cific
tim
e an
d pe
rfor
man
ce c
riter
ia.
d.
Val
idat
e th
at th
e H
SIs
min
imiz
e pe
rson
nel e
rror
and
ass
ure
erro
r de
tect
ion
and
reco
very
cap
abili
ty w
hen
erro
rs o
ccur
.
e.
Val
idat
e th
at th
e pe
rson
nel c
an e
ffect
ivel
y tr
ansi
tion
betw
een
the
HS
Is a
nd p
roce
dure
s in
acc
ompl
ishi
ng
thei
r ta
sks.
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
4
3. O
VE
RV
IEW
of
SC
EN
AR
IO
Dur
ing
stea
dy s
tate
full
pow
er o
pera
tion,
MF
WP
B v
ibra
tion
high
ala
rm is
rec
eive
d. T
O r
eque
sts
Pre
vent
ive
Mai
nten
ance
(PM
) te
am
to d
iagn
ose
the
vibr
atio
n of
MF
WP
B. P
M r
epor
ts th
at th
e vi
brat
ion
grap
h in
dica
tes
a da
mag
e of
the
pum
p be
arin
gs. S
ite m
anag
er d
ecid
es to
dis
asse
mbl
e th
e be
arin
g. T
he c
rew
dec
reas
es th
e re
acto
r po
wer
to 7
5%
and
shut
dow
n M
FW
P B
per
SO
P-3
541
-01.
Sub
sequ
ently
, a
leak
in t
he C
VC
S c
harg
ing
line
occu
rs,
but
no r
adia
tion
alar
m
initi
ated
. R
O d
iagn
oses
the
even
t an
d co
nclu
des
that
the
leak
occ
urs
insi
de c
onta
inm
ent
char
ging
line
s. A
fter
isol
atio
n of
CH
G/L
D li
nes,
the
crew
sta
rts
pow
er d
ecre
ase
by m
axi
mu
m r
ate
to 5
0MW
and
sto
ps tu
rbin
e/re
acto
r m
anua
lly p
er G
OP
-
3004
. Dur
ing
pow
er d
ecre
ase
SG
2 F
W m
aste
r co
ntro
ller
fails
to lo
w a
nd r
ecov
ered
by
the
oper
ator
act
ions
. As
soon
as
RC
S r
each
ed
HS
B c
ondi
tion,
a M
CR
fire
ala
rm is
initi
ated
and
a s
mok
e is
out
from
the
cabl
e ar
ea o
f the
MC
R r
oof.
The
crew
trie
s to
sup
pres
s th
e fir
e by
fire
ext
ingu
ishe
rs,
but f
ails
. SR
O d
ecid
es to
eva
cuat
e M
CR
and
mov
e to
Re
mot
e
Shu
tdow
n R
oom
(R
SR
). A
t the
RS
R,
the
crew
sta
rts
the
RC
S c
oold
own
to C
SD
con
ditio
ns p
er A
OP
-375
4-01
. Whe
n th
e
RC
S te
mpe
ratu
re is
rea
ched
bel
ow 2
50℃
, th
e sc
enar
io w
ill b
e cl
osed
out
.
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
5
4. A
NT
ICIP
AT
ED
PR
OC
ED
UR
E F
LO
WP
AT
H
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
6
5. P
RE
PA
RA
TIO
N o
f E
VA
LU
AT
ION
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
7
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
8
6. M
AJO
R S
TE
PS
of
SC
EN
AR
IO
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
9
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
10
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
11
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
12
7.
PR
IMA
RY
TA
SK
PE
RF
OR
MA
NC
E M
EA
SU
RE
S
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
13
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
14
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
15
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
16
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
17
8. O
TH
ER
PE
RF
OR
MA
NC
E M
EA
SU
RE
S A
PP
LIC
AB
LE
TH
RO
UG
HO
UT
SC
EN
AR
IO
TS T
S
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
18
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
19
9.
SIM
UL
AT
OR
EX
ER
CIS
E E
VA
LU
AT
ION
PL
AN
9.1
INIT
IAL
CO
ND
ITIO
NS
/SIM
UL
AT
OR
SE
TU
P
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
20
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
21
9.2
EV
EN
T-1
M
FW
P B
VIB
RA
TIO
N H
IGH
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
22
9.3
EV
EN
T-
100
% t
o 7
5%
PO
WE
R O
PE
RA
TIO
N
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
23
9.4
EVEN
T-3
CH
ARG
ING
LIN
E LE
AK insi
de
CO
NTA
INM
ENT
with N
O R
AD
IATI
ON
ALA
RM
S
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
24
9.5
EV
EN
T-4
75
% t
o H
SB
PO
WE
R D
EC
RE
AS
E a
t a
MA
XIM
UM
RA
TE
TS TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
25
9.6
EV
EN
T-5
S
G 2
FW
MA
ST
ER
CO
NT
RO
LL
ER
FA
IL L
OW
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
26
9.7
EV
EN
T-6
M
AIN
CO
NT
RO
RO
OM
FIR
E
TS
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
27
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
28
9.8
EV
EN
T-7
R
CS
CO
OL
DO
WN
at
RE
MO
TE
SH
UT
DO
WN
RO
OM
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
29
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
30
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
31
9.9
PO
ST
EX
ER
CIS
E E
VA
LU
AT
ION
9.10
DA
TA
AC
QU
ISIT
ION
TS
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
32
10.
INS
TR
UC
TO
R A
IDs
a.
TR
EN
DIN
G P
AR
AM
ET
ER
s fo
r M
CR
FIR
E (
Tre
nd
file
: m
f_IS
V-7
)
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
33
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
34
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
35
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
36
b.
Mal
fun
ctio
ns/
Rem
ote
/Ove
rrid
e L
ist
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
37
c.
AN
TIC
IPA
TE
D D
IAL
OG
SC
RIP
Ts
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
38
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
39
d.
SH
IFT
TU
RN
OV
ER
SH
EE
T
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
40
TS
KE
PC
O &
KH
NP
HF
V&
V S
cena
rios
A
PR
1400
-E-J
-NR
-130
02-N
P R
ev.
0
KE
PC
O &
KH
NP
41
TS