Trezzano Rosa3.904 resident population (31.03.03)
MilanoMilano
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 33
Energy SavingsEnergy Savingswith TPFwith TPF
Third Party FinancingThird Party Financing
Energy Savings on Public Lighting
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 44
ProceduresProcedures
Public contract
Call for bids
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 55
Scheme TPFScheme TPF
TiescoTiesco
AUDIT
FEASIBILITY STUDY
CONTRACT DRAFTING
PLANNING
INSTALLATION
MONITORING
MAINTENANCE
SAVINGS
MunicipalitMunicipalityy
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 66
SAVINGSSAVINGS
before duringcontract
after theend of
contract
Municipality
Tiesco
Utility
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 77
FINANCIAL FLOWSFINANCIAL FLOWS
MunicipalitMunicipalityy
SuppliersSuppliersTiescoTiesco
Medium term Medium term loansloans
Performance service
Pay-back on savings
Payments
Repayments
Technology
Loans
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 88
AdvantagesAdvantages to Municipality to Municipality
• No investments• Guaranteed and shared savings• Guaranteed technologies• Joint management of energy and future
implementations
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 99
Baseline LightingBaseline Lighting
Luminaire 1 Luminaire 2 Luminaire 3 Luminaire 4 Luminaire 5 Luminaire 6
Type of lamps HP Mercury HP Mercury HP Sodium HP Sodium HP Sodium HP SodiumNb. of lamps 126 249 18 96 13 26
Power of single lamp 80 125 70 150 250 400
Type of ballast magnetic magnetic magnetic magnetic magnetic magneticLuminaire reflector aluminised aluminised aluminised aluminised aluminised aluminised
Baseline Lighting
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 1010
BeforeBefore
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 1111
Post-installation LightingPost-installation Lighting
Luminaire 1 Luminaire 2 Luminaire 3 Luminaire 4
Type of lamps HP Sodium HP Sodium HP Sodium HP SodiumNb. of lamps 334 164 4 26
Power of single lamp 70 100 150 400
Type of ballast magnetic magnetic magnetic magneticLuminaire reflector aluminised aluminised aluminised aluminised
Post-installation Lighting
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 1212
After - 1After - 1
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 1313
After - 2After - 2
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 1414
Lighting increaseLighting increaseBaseline Lighting
Power Lamps 80 125 70 100 150 250 400 Lumen per lamps 3.600 6.200 6.600 10.500 14.000 25.000 47.000 N. lamps 126 249 18 - 96 13 26
Total Lumen 453.600 1.543.800 118.800 - 1.344.000 325.000 1.222.000 5.007.200
Post Installation Ligthing
Power Lamps 80 125 70 100 150 250 400 Lumen per lamps 3.600 6.200 6.600 10.500 14.000 25.000 47.000 N. lamps - - 334 164 4 26
Total Lumen - - 2.204.400 1.722.000 56.000 - 1.222.000 5.204.400
+ 197.200 lumen+ 197.200 lumen
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 1515
Economic ResultsEconomic Results
Economic Savings:Economic Savings:– 112.944 kWh/yr of electric energy112.944 kWh/yr of electric energy
– 17 KW/yr of contractual power17 KW/yr of contractual power
– Elimination of penalties for low power factor (cosElimination of penalties for low power factor (cos<0.9)<0.9)– From “Management on call” to “Programmed Management”From “Management on call” to “Programmed Management”
16.657 €/year16.657 €/year
248.855 € in 15 years248.855 € in 15 years
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 1616
Environmental ResultsEnvironmental Results
Environmental Savings:Environmental Savings:
– Reduction of sky pollutionReduction of sky pollution
(LR 17/00 Regione Lombardia)(LR 17/00 Regione Lombardia)
– Reduction of atmospheric pollutionReduction of atmospheric pollution
82,3 t CO82,3 t CO22/yr, … NOx, … SOx, …/yr, … NOx, … SOx, …
(Kyoto Protocol, …)(Kyoto Protocol, …)
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 1717
IPMVPIPMVP
International Performance MeasurementInternational Performance Measurement
&&
Verification ProtocolVerification Protocol
to defineto define
Energy SavingsEnergy Savings
Polo Tecnologico
per l’Energia
Trento
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 1818
Fernando Savorana
ComuneComunedidi
Trezzano RosaTrezzano RosaI.P.O
.
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 1919
Environmental FundEnvironmental Fund
ENERGY SAVINGSENERGY SAVINGSTiescoTiesco
MunicipalitMunicipalityy
PrivatePrivate
BusinessBusiness
ENERGY SAVINGSENERGY SAVINGS
ENERGY SAVINGSENERGY SAVINGS
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 2020
Trezzano RosaTrezzano RosaGreenLight GreenLight Award 2003Award 2003
Luciano BurroLuciano Burro Municipality of Trezzano RosaMunicipality of Trezzano Rosa 2121
ContactsContacts
Comune di Trezzano RosaComune di Trezzano Rosa
Assessorato all’AmbienteAssessorato all’Ambiente