LATIN AMERICA AFRICA
EUROPE
A World of Inspiration
PORTUGAL
POLANDUl. Wadowicka 8 W30-415 KrakĂłw
SPAINCampus TribecaCarretera de Fuencarral a Alcobendas, nÂș 44, EdifĂcio 4 â B, nÂș 21Alcobendas â Madrid
IRELANDEnterprise & Technology Centre, Creagh RoadGalway, Ballinasloe
CZECH REPUBLICKavcĂ Hory Office Park, Building A, Silver tower, 5th floorNa Hrebenech II 1718/10Praha 4, 140 00
SLOVAKIAKaĆĄtielska 4, 821 05 Bratislava
HUNGARYKopaszi GĂĄt 5H â 1117 Budapest
ANGOLARua Joaquim Cordeiro da Mata, nÂș 61-63 Bairro da Maianga â Luanda
MALAWINasra House â City CentreP.O. Box 31379 â Lilongwe 3
MOZAMBIQUEEdifĂcio Milenium Park, 14Âș/15Âș andarAvenida Vladimir Lenine, nÂș 1792284 Maputo
SOUTH AFRICAOxford Corner 6th, 7th and 8th Floor 32A Jellicoe Avenue West Rosebank Joanesburgo 2196 Ăfrica do Sul
CAPE VERDERua S. Vicente, 63, 1Âș andar, Palmarejo 721 â Plateau â Praia
SĂO TOMĂ AND PRĂNCIPEAv. Marginal 12 de Julho, nÂș 1011 â 167
ZAMBIAIncito Office ParkReed Buck Road, 45/5BKabulonga â LusakaP.O. Box 320337Woodlands â Lusaka
ZIMBABWE7, Routledge Street,Milton Park,Harare
GHANAMovenpick Ambassador HotelSuit 709 â 7th floorIndependence Avenue
UGANDA 4, Upper Kololo TerraceP.O. Box 8453Kololo, Kampala
RUANDA Kigali City Tower Plot no. 641815th Floor, Avenue du Commerce, Office 1507Kigali
PERUAv. NicolĂĄs AyllĂłn, nÂș 2634 Ate, Lima 3
MEXICOHoracio 828 esq. TennysonCol. Polanco ReformaC.P. 11550Del. Miguel Hidalgo
BRAZILRua Gonçalves Dias, 2316Bairro Lourdes â Belo Horizonte/MGCEP.: 30140-092
COLOMBIACarrera 13A-87-81 38007 BogotĂĄ
AFRICA LATIN AMERICAEUROPE
www.facebook.com/motaengil
PORTUGAL
Porto Office
Rua do Rego Lameiro, n.Âș 384300-454 PortoPHONE: +351 225 190 300FAX: +351 225 191 261
Lisboa Office
Rua MĂĄrio DionĂsio, n.Âș 22799-557 Linda-a-VelhaPHONE: +351 214 158 200FAX: +351 214 158 700
47 SEPTEMBER 2015
47
SEP
TEM
BER
2015
GUADALAJARA LIGHT RAILWAYA MEGA PROJECT, A MEGA MISSION: TO ACCOMPLISH!
INTERVIEW WITH JOĂO PARREIRACEO OF MOTA-ENGIL AMĂRICA LATINA
"The commitment with excellency in this modern world is what sets us apart from others.â
MOTA-ENGIL CENTRAL EUROPEWins first railway contract in Polandwww.mota-engil.com
www.mota-engil.com
European Top 30
Leader in Portugal
22Countries
256Companies
3Continents
With almost 70 years of history, Mota-Engil has a business track record of excellence in Portugal and worldwide. Guided by a global and diversified success strategy, the Group operates in 22 countries, asserting itself with the competence and innovation which made it a national leader in the construction sector and a reference in service export, with 75% of its turnover from international markets.
Mota-Engil. A world of inspiration
A Leader with global vision.
3
SEPTEMBER 2015
UNITEDKINGDOM
SUMMARY06 INSTITUTIONALInterview with JoĂŁo Parreira
MotaâEngil in the Top 100 Worldwide
MotaâEngil successfully concludes issuing of bonds among retail investors
Ascendi Group and Ardian formalize partnership
14 MOTAâENGIL IN THE WORLDMotaâEngil Europe evaluates new markets
Motaâengil participating in the construction of some of the most iconic buildings in Lisbon
Motaâengil won tender to resurface Madeira's international airport
Expansion and remodelling works at Faro airport will be carried out by MotaâEngil
MotaâEngil Central Europe signs a contract to renovate Poland's A4 motorway
MotaâEngil signs first contract for railway line in Poland
AntĂłnio Mota visits road project in Zambia
MotaâEngil Africa has opened its doors in the Republic of Rwanda
MotaâEngil Angola secures new contract in Luanda
MotaâEngil constructs iconic building in the heart of Johannesburg
MotaâEngil constructing a five star hotel on the island of PrĂncipe
Guadalajara metro
Interview with Carlos RoldĂĄn Moya
ECB wins construction work in the State of MaranhĂŁo
Consita conquering Brazil
82 TECHNOLOGY AND INNOVATIONMotaâEngil invests in new tool for managing talent and performance
84 PEOPLEMEET â MotaâEngil Emerging Talent
86 FMAMManuel AntĂłnio da Mota Foundation Award launched In Peru
DIRECTOR Gonçalo Moura Martins
EDITOR Pedro Arrais
PUBLICATION MotaâEngil, SGPS, SA
HEAD OFFICE Rua do Rego Lameiro, 38, 4300â454 Porto
EDITING MotaâEngil, SGPS, SA
DESIGN White_Brand Services
PRINTER Ondagrafe, Artes GrĂĄficas, Lda
PRINT RUN 950 units LEGAL DEPOSIT 307551/10
MASTHEAD
Distribution free of charge
43 Rwanda: a new market in Africa
06 Interview with JoĂŁo Parreira CEO of MotaâEngil AmĂ©rica Latina
14 MotaâEngil Europe evaluates new markets
THE FOLLOWING CONTRIBUTED IN THIS EDITION ALCIDES PESSOA · ALEXANDRA PERICĂO · ANA PENEDA · ANA PIRES · ANA ROMĂO · ĂNGELA FERREIRA · CATARINA TEIXEIRA · DANIEL ZIÄCINA · EDUARDO PIMENTEL · FRANCISCO FRANCA · HUGO MAĂĂS · ISABEL CORREIA · JAKUB LEĆNIAK · JOANA BARRETO · JOANA VIEGAS · JOĂO PARREIRA · JORGE OLIVEIRA · JOYCE NGWIRA · KATARZYNA DOBRANSKA · LĂIDE ALMEIDA · LUĂS MONTEIRO · MAFALDA VAZ · MANUEL MOTA · MĂRCIA MEIRELES · MARIA BORDALO · MARTA VALE · ORIĂL JUVE DE YEBRA · PAULA COUTINHO · PEDRO BAGULHO · PEDRO SEIXAS · REGINA SEQUEIRA · RICARDO VASCONCELOS · RITA CABRAL · SANDRA REGUFE · SUSANA GUERREIRO · TERESA SILVA · VAZ PATO
62 Guadalajara light railway: a mega project
76 Consita conquering Brazil
28 MotaâEngil signs first contract for railway line in Poland
4
OPENING MESSAGE
SINERGIA 47
This ability to identify and materialise new opportunities translates into ambition, but also and in a pragmatic manner, it reveals the ability to strengthen the mitigation of the risk that resides in depending of any market or business, seeking to create synergies that enable new projects in which MotaâEngil can be competitive and simultaneously create value for its shareholders.
It was with this objective that MotaâEngil bid and won the process of privatisation of EGF, a company that will give us an added ability to act in the waste sector, enabling a stronger investment at the international level in this sector.
It is also with this objective in mind that MotaâEngil Europe is evaluating the possiâbility of entering the United Kingdom, that it is diversifying its activity in Poland, after having been awarded its first rail contract. Furthermore, and despite the stagnation in public investment, MotaâEngil will contiânue to work in Portugal each day, striving to conquer new projects such as those we have presented in this edition and which will be part of the MotaâEngil portfolio, as to continue to be a benchmark, not only as a market leader, but by developing new technical and innovative competences.
In this edition of SINERGIA, we seek to bring our readers the most significant achievements of the MotaâEngil Group in the last few months.
Among the various topics, I emphasize a recurrent factor in this edition: the demonstration of the effort and the permaânent ability to do more and better, regarâdless of the difficulties which evidently persist at the macroeconomic level.
Only thus can we continue to compete among the best in the world, in a restricted group of companies of which we are part, being in Top 100 worldwide, affirming the ability of execution and excellence in the the quality with which we develop each project.
However, and regardless of the size of the organisations, today we experienâce changes in context that require the companies to constantly adapt their positioning, and with such indicators as the slowing of the growth rhythm in the Chinese economy, the continued drop in the price of commodities, especially oil, and the constant reduction in public investment in European countries such as Portugal. Despite all these circumstances, MotaâEngil continues, nevertheless, to display, with our characteristic resilience, the ability to expand its horizon of activity.
CONQUERING NEW HORIZONS
The demonstration of the effort and the
permanent ability to do more and better,
regardless of the difficulties which evidently persist at the
macroeconomic level.
âș Chief Executive Officer
Gonçalo Moura Martins
5
SEPTEMBER 2015
The growth of activity in the area of infrastructures and waste, both in Mexico and Brazil, and a new concession in Aruba, are added to the portfolio of concessions held in the region, and strengthen our motivation to continue to invest in here in order to consolidate our position as a regional key player in the infrastructures area.
In Africa, we secured an especially important contract for Luanda and for its citizens, renovating the main streets of the capital of Angola, confirming MotaâEngil Angola as a company at the service of the country and capable of responding in a timely manner to the challenges presenâted to us. But we are also mindful of the new opportunities on this continent, and in this edition we present, among others, the first project we have been awarded in Rwanda, a new market in Africa where we will be present.
About Latin America, and by reading the interview that the CEO for the Latin American region gave to this edition, SINERGIA readers will learn in detail about the ongoing growth strategy that is being implemented, and which new geographical areas will soon be part of the footprint of the MotaâEngil Group.
We continue to diversify in Latin America and to ensure largeâscale projects such as the Guadalajara Metro, a project that is the cover story for this edition due to its signiâficance and level of demand, but which we shall be able to carry out in line with the qualities the Group has demonstrated throughout a 70âyear work history.
The growth of activity in the area of infrasâtructures and waste, both in Mexico and Brazil, and a new concession in Aruba, are added to the portfolio of concessions held in the region, and strengthen our motivaâtion to continue to invest in here in order to consolidate our position as a regional key player in the infrastructures area.
As JoĂŁo Parreira noted in his interview, our uncommon resilience allowed us to overcome the challenges that we have felt over the last few years. I am convinced that we shall continue in the future to meet our commitment to these markets.
I should also mention that winning new horizons was not achieved merely with new projects and the opening of compaânies in new markets. The Manuel AntĂłnio da Mota Foundation and those responsible for it have also managed to generate the activities we describe in this edition and which contribute to strengthening the values that are rooted in the culture of MotaâEngil and the spirit of solidarity with which we operate at the global level.
6
INSTITUTIONAL
SINERGIA 47
For the first time in the almost 70 years of MotaâEngil's history, this is the year in which Latin America represents the region with the largest order book of the Group. So we invited JoĂŁo Parreira, the CEO of MotaâEngil Latin America, for an interview with SINERGIA to better understand the activity of the Group in this strongly developing region.
NO. 1 EMPLOYEE IN MEXICOWe begin the journey with his arrival at the Group in 2007, a decision he says was based on the âthe attraction that MotaâEngil arises in any professional with international ambition, and the desire to
INTERVIEW WITH JOĂO PARREIRA,
CEO OF MOTAâENGIL LATIN AMERICA
âOur commitment to delivering, in this modern world, is what will
set us apart from the restâ
know and be present in various latitudes of the world, being able to reach the top of the organisationâ, declaring that âthis is what motivated me and this is what I am thankful for today: the trust of all of the shareholders to enable me to get this far.â
On this occasion, however, he remembers that âwhen I was invited to go to Mexico, we had won the concession bid for LivraâmentoâXalapa. I arrived on a Monday at six oÂŽclock in the morning at the airport in Mexico City, a city with 24 million inhabitants, without really knowing what I would find. When I reached the hotel I thought about turning back, but⊠I didn't.
"The strategic vision of internalisation,
implemented gradually, allowed us, through
a resilience that was absolutely out of the ordinary, to position
ourselves in the ranking of the 30 largest European
companies."
7
SEPTEMBER 2015
And eight years later here I am, still in Mexico City.
The determination that MotaâEngil has as a company gives us confidence that the sacrifices we make regarding our family life are counterbalanced by a perennial strategy, and as professionals, this is what makes take on the bet.â
A VISION OF THE STRATEGIC EVOLUTION IN RECENT YEARS Today, we asked him, as a member of the Executive Committee and the Board of Directors of the holding company, to share his vision of a Group that has greatly
changed due to its activity in different markets and businesses, given that JoĂŁo Parreira has the perspective of someone who is part of the strategic bodies and at the same time is close to the operations.
On this subject, he reminds us that âin 2008, when the Strategic Ambition Plan 2013 was started, we were present in 14 â 15 countries but 80% of our clients were handled directly from Portugal. Now, the opposite is true.
The decentralisation and the strategic vision of internalisation, implemented gradually, allowed us, through a resilience
that was absolutely out of the ordinary, to position ourselves in the ranking of the 30 largest European companies. All this in the midst of a crisis of the Portuguese financial sector.
If I could list everything bad that could happen between 2009 and 2012, I would lack sufficient imagination to fill in all of the requirements of what actually occurâred. However, the resilience, conviction and determination of our leaders, our shareholders and our employees to enable us to grow, led us to manage to overcoâme all of the challenges and to being considered today a leading company in SubâSaharan Africa, a midâsize regional player in Latin America and clearly the Portuguese leader in the infrastructures industry, and, I would say, one of the main Portuguese companies with an internaâtional position. It was possible to achieve this in the worst scenario.â
JoĂŁo Parreira noted that, âI was not part of the team responsible for defining this strategy in 2008, but I can take pride in being the driving force, in Mexico, for this strategy. Thus my identification, my empathy and my total symbiosis with the strategy defined at that time by Jorge Coelho, and which Gonçalo Moura Martins continued. This is the strategy that I continue to support on the Execuâtive Committee, and with which I identify with.â
Today, considering the size and diversity of the MotaâEngil Group, he recognises that âthe regions must strengthen their processes and procedures, because that is the only way we can continue to operate as a whole.â Citing as an example JosĂ© Mourinho, with whom he has been closely connected for about a decade, JoĂŁo Parreira reveals that one of the greatest lessons he learnt was âthe unprecedented management that the coach made of his teamâs players, individualising objectives whilst creating a whole that was much
8
INSTITUTIONAL
SINERGIA 47
stronger. If we manage to define indiviâdual objectives, of each of the regions, but at the same time maintain a shared global vision, we shall all save energy and work more efficiently; and the result of all this is far greater.â
THE CHALLENGES IN LATIN AMERICAAs for the work currently underway in Latin America and its main challenges, he summarizes them in a short sentence: âTo consolidate the regional dimension of MotaâEngil as an infrastructure company in Latin America, thus becoming able to gain more space in other countries.â
JoĂŁo Parreira emphasises that âin the last three years we changed our business profiâle, since the market of Peru had a relevanâce of over 80% in turnover. The strategy is to consolidate as a regional player, with Mexico having some preponderance, but where the three countries â Mexico, Brazil and Peru â are equivalent.â
THE IMPORTANCE OF DELIVERING THE GOALS FOR 2015For JoĂŁo Parreira âif 2014 was an imporâtant year for consolidating the acquisition of projects that allowed us to achieve a record order book for Latin America, which is also the largest among the regions of the MotaâEngil Group; 2015 is the year of showing the ability to deliver, which is being demonstrated very clearly
by a growth of 25% in the first six months of the year compared with the same period last year. This allows us to demonsâtrate that all of the expectations in Latin America are being confirmed.
Our success as a group results from our entrepreneurial ability, the ability to create new markets. But it is not enough
to create them, we must stabilise them as markets of local and regional dimension and relevance. Just like Portugal; even after so many years of a declining market, this market is essential for the MotaâEngil Group, because this is our cradle, this is where the origins of our knowledge reside.â
âOur success as a group results from
our entrepreneurial ability.â
9
SEPTEMBER 2015
PARTNERSHIPS AND THE CONCESSION REGIME IN LATIN AMERICAGiven the fact that the concession regime is a model widely used in Latin America, we asked JoĂŁo Parreira to comment on the market and on the application of this model. In his answer he confirmed that âthe entirety of the economic and compeâtitiveness development in the countries of Latin America is related to the capacity of its airport, port, and road infrastructures, since these are economies based on two phenomena: their industrialisation and the exportation of their natural resources, whether we are referring to crude, gas or precious metals. Infrastructures are essential.
The rationale that Europe had in the 1960s and 1970s to set up the philosophy of publicâprivate partnerships (PPPs) â which is an absolutely strategic economic solution â becomes efficient because it consists of sharing costs throughout the useful life of the infrastructure, just like in the industrial sector.
PPPs are a growth instrument of the infrastructures, and we are a company that operates in the infrastructure indusâtry. That is the reason why we cannot allow ourselves to be disconnected from the knowâhow we developed in Portugal over the last 20 years. That knowledge is what made us one of the most successful companies in the recent history of Latin America. Let us remember that we were awarded, have constructed, and today operate nine projects in this region, all of which under the regime of concessionâ.
PROJECT FINANCING Questioned about the financial strategy of MotaâEngil in Latin America, the CEO of the region states that âthe projects have the ability to generate cashâflow, and all of the local concession projects have local financing. All of them. This also arises from the maturity of the financial markets in this area of the world.
In Latin America, MotaâEngil has already established relationships with specific multilateral entities such as CAF, the InterâAmerican Development Bank (IBD) and the o Central American Bank. Our track record is very important for these entities, our 70âyear history of delivering. And in emerging countries, this is the most important criterion in a relationship of trust.
There is one thing I always say: 70 years of history with full name; we know who the directors are, and have a shareholder who is iconic in the sense that he is our first ambassador, our president. This is what gives us tranquillity and serenity when we engage in new markets.â
OPPORTUNITIES IN MEXICOProviding an analysis of the potential of each market in which MotaâEngil is present, JoĂŁo Parreira begins his evaluaâtion with Mexico, stating that âwith the strengthening of the commitment, with the growth in the level of investment, in 2016 Mexico will probably be the largest market in the Group, which presents a challenge, for Mexico and for the Group. This is a country that clearly has opportuânities in new business sectors.
In Mexico we have a stable path of growth. We started in the area of concessions, where we had a learning period and we established the strategic partnerships we felt were useful at a certain time; we were able to adjust this strategy at certain times and today, MotaâEngil is considered one of the three main building companies in the Mexican market.
At MotaâEngil we have the example of Capomo, our tourism project with a total of 7 km of beach and where we will promote urban design and the construction of hotel units that will operate in an area totalling 300 hectares. This project will position us in a distinctive segment in a country which is the largest tourist destination in Latin America and the 10th largest
worldwide. This will contribute to a great tourism development in Guadalajara and the country itself. This will be a project of great quality, to be developed in phases, which includes allâinclusive hotels, a golf course designed by Greg Norman and Lorena Ochoa, residential condominiuâms, and a Nature area â something very popular nowadays â with an Ecoâhotel. And even one mountain area, which will be very exclusive.
I can tell you first hand that we have signed the contract with Fairmont, a very prestigious Canadian hotel chain, and we are very honoured that they have selecâted us for their second hotel in Mexico. This was the first hotel to formalise the investment in the project. But we have various other wellâknown international chains interested in this project a little over two hours from Guadalajara, the 2nd city of Mexico, which has over ten million inhabitants, and whose nearest beach was four hours away.
This project is associated with FONATUR, which is a Mexican tourism fund. It is a largeâscale investment project, underâtaken by MotaâEngil for a period of 15 years and with estimated sales of over 2 billion dollars.â This investment ensures the continuity and growth of the MotaâEngil Group in Mexico for the next two decades.â
"We are a company who has delivered for 70 years. The symbolism of Guadalajara will allow us to extol this same message and set ourselves apart from the rest.â
10
INSTITUTIONAL
SINERGIA 47
ENTRY INTO THE ENERGY SECTORRecognising that the energy sector determining for the future of Mexicoâs development, JoĂŁo Parreira reveals, âWe are studying various possibilities and may, by the end of the year, acquire the first projects in the energy sector in Mexico; in production, distribution and also in specific competencies in engineeâring, procurement and construction in the area of energy.
In Peru we developed this a few years ago with two water projects. One of them we have already finished developing, having entered into a joint venture with an operaâtor to distribute and generate electrical energy."
To enter into the energy sector, JoĂŁo Parreira says âthe MotaâEngil Group has a tradition of knowing how to share its experience but also has the ability to receive the knowledge from those who know, live and have been in the market longer. This possibility and the availaâbility of the MotaâEngil Group and its employees to give and to receive, allows for partnershipâbuilding strategies to arise that are the differentiating factor of our growth in Latin America compared with our peers.â
THE GUADALAJARA METROBy developing one of the largest projects of the Group in Guadalajara, the CEO of MotaâEngil Latin America notes that âwe are a company who has delivered for 70 years. The symbolism of Guadalajara will allow us to extol this same message and set ourselves apart from the rest. We promoted mobility on this project and have placed Carlos RoldĂĄn, a professioânal with vast experience, in charge of a project which for us is both symbolic and strategic, to earn us the trust of the authorities. RoldĂĄn himself started his
journey in our group with the PeroteââXalapa construction project in Mexico, was recently in Peru, and has now returâned for this great challenge in Mexico. The relationship with the community, with the client and with our own employees on the project is essential for us to succeed."
THE STRATEGIC VISION IN PERUMoving on to Peru, where the Group started in 1998 in Latin America, JoĂŁo Parreira revealed that they intend for Peru to be âthe cluster in the mining area. This is where we started, this is where we have the best competencies. From Peru, we want to develop a relationship with the large mining clients in the world, and to know and handle the topics of safety and quality, which are strategic today, given that we want to be part of the great works, the great projects.
Peru is the cluster where we have all the resources, competencies, and experience to act in a market which is as important as the great private clients.
Peru is the market where we have the largest number of employees and our second largest equipment park. Thus, Peru must also become the development
"We shall develop a concession on the island of Aruba, in a new project we were awarded. This is a 100âmillion dollar project to expand and construct the waterfront running from the airport to the new hotel area."
11
SEPTEMBER 2015
cluster of the best operating practices of our equipment, not forgetting our central laboratory, which is essential for the qualiâty of the projects we are developing.â
THE BRAZILIAN EXPERIENCE UP TO NOWIn Brazil, and after a very inâdepth study of the local infrastructure market, the option to enter relied on the acquisition of a share in a company which, as JoĂŁo Parreira says, âhas the same DNA as us. And this has been the leverage for our ability to grow in Brazil, a country that already represents the second market in the region with regards to its order book.
We found a very important partner for us, who makes us feel at home, and this identification of values is the reason for the success of our presence in Brazil.
We have a team that is very consistent in all of its operating structure, among Brazilians and the Portuguese, and this transforms us into a company with a single voice. It's very pleasant. We are home, that's the best definition.
âOur commitment to delivering, in this modern world, is what will set us apart from the rest, and allow us, in a compeâtitive market such as Brazil, to maintain growth levels above 20% of the order book of the last years.â
Despite the recognised downturn in the Brazilian economy, JoĂŁo Parreira predicts âcontinued recurring growth in Brazil, so that, within 3 â 4 years, we will achieve annual billings of over 500 million euros per year.â
COLOMBIA AND THE NEW MARKETSOn Colombia, JoĂŁo Parreira says it will âbecome the platform for new markets, bearing in mind the experience of operation, development, construction and maintenanâce of the projects in PPPs. We want to be in Central America, in the Caribbean.
From this platform we shall develop a concession on the island of Aruba, in a new project we were awarded. This is a 100âmillion dollar project to expand and construct the waterfront running from the airport to the new hotel area. This is a road project with 10 km of rehabilitation and a new 7 km extension, for a construction period of 22 months and a concession for 22.5 years.
In the Dominican Republic, I hope this year we will be able to win the first project in a market in need of water and energy infrastructures.
In Paraguay, we are already qualified for some projects, and along with the Hospitals of Coimbra University (from Portugal), we shall try to define partnerâships for the hospital industry of Ecuador. We are also evaluating energy projects in Bolivia and have opened an office in Chile.
The objective is to constitute five platforâms of relatively the same size, i.e., a size greater than 200 million dollars of annual billing for each of the following: Peru, Mexico, Colombia, Brazil and Chile. Then, in cycles, with each opportunity, with each project, each of this operations can grow. I think that Mexico will stabilise at 500 million and Brazil will also achieve those numbers, since this integrated vision is part of the strategy for 2020 in the region of Latin America.â
INVESTING IN THE ENVIRONMENTIn the environment area, JoĂŁo Parreira considers that âwe have managed to achieve organic growth, both in Brazil with CONSITA, and in Mexico with GISA, and we are waiting for the upgrade represented by the incorporation of the EGF, since the size and technology of the EGF will clearly set us apart in growth in the environmental area of MotaâEngil in Latin America. Without the EGF it would be very difficult to grow in markets of this size because we would not have the technical requirements in terms of previous experience. However, currently, the largest waste collection contract in the entire Group is in Mexico, with 500,000 inhabitants.â
"The objective is to constitute five platforms of relatively the same size, i.e., a size greater than 200 million dollars of annual billing for each of the following: Peru, Mexico, Colombia, Brazil and Chile. Then, in cycles, with each opportunity, with each project, each of this operations can grow."
12
INSTITUTIONAL
SINERGIA 47
In the Public Offer for Subscription, 148,355 new shares were issued, corresponding to 74,177,500 euros, with a demand of 208,498 shares, an amount 1.41 times greater than the offer.
In the Public Exchange Offer provided in this operation, MotaâEngil exchanged 41,645 bonds corresponding to an amount of 20,822,500.00 euros, which earned the demand of over 1,100 investors exchanging shares that matured in March 2016 for bonds from the new emission, thus extending the investment period to 2020, and also receiving a an award of 14.64 euros in cash for each bond exchanged.
The operation had the participation of over 7,500 individual investors, of which around 6,400 are new investors, in a clear synonym of the strengthening of confidence in MotaâEngil Group.
RESULTS OF THE BOND ISSUANCE
MOTAâENGIL SUCCESSFULLY
CONCLUDES ISSUING OF BONDS
AMONG RETAIL INVESTORS
The search for new bonds largely surpassed the offering
in a global placement of 95 million euros
In line with the continuous process of refinancing foreseen in its financial strategy, MotaâEngil performed the issuing of bonds among retail investors, which enabled, besides the subscription of new bonds, an exchange for investors who held MotaâEngil 2013â2016 bonds, who could in this case extend the maturity of their investment at a fixed annual rate of 3.90%. At the end of the subscription period that ran between 17 and 30 June, on the 1st of July, at the head office of Euronext Lisbon, the results for the MotaâEngil FixedâRate Bonds, July 2015 â February 2020 operation were presented.
In an operation that had Caixa BI as global coordinator, Caixa Geral de DepĂłsitos and BPI banks in the placement syndicate and Vieira de Almeida as legal adviser, the operation's success was highlighted by all speakers at the session, including the president of Euronext Lisbon, LuĂs Laginha.
Representing MotaâEngil were the CEO, Gonçalo Moura Martins, and JosĂ© Pedro Freitas who, as CFO, was the speaker at
the ceremony, stating that âthis result shows the confidence of the investors in MotaâEngil, in its strategy and in its management team and, as it was in 2013, this is a significant gesture of recognition by the market and an additional factor that motivates us to do more and better.â At the end, he concluded thanking again all those involved in the operation.
Completing the issuance of the new bonds in the amount of 95 million euros, the operation thus fully complied with the objectives established, allowing MotaâEngil Group to refinance their activity and international expansion, as well as extending the maturity of the debt and optimising its financing costs.
13
SEPTEMBER 2015
ARDIANArdian, founded in 1996 and led by Dominique Senequier, is an independent private investment company with assets worth 50 billion dollars managed in Europe, North America, and Asia. It is today the world's seventh largest investâment fund in infrastructures, with a global network with over 350 employees divided by ten offices in Paris, London, New York, Beijing, Frankfurt, Jersey, Luxembourg, Milan, Singapore, and Zurich.
ASCENDIThe Ascendi Group manages a network of over 3,000 km in Europe, Latin America and Africa, and manages 16 assets and a direct operation of over 1,300 km in a toll system. As a global infrastructure operator, the Group has over 11 billion euros in investments, 10 billion euros in funds, and 1,600 employees.
ASCENDI GROUP AND ARDIAN FORMALIZE
PARTNERSHIP
French investment fund totals
300 million euros
Ardian will invest 300 million euros in acquiring a stake in these concessions. Mathias Burghardt, member of the Execuâtive Committee and head of infrastructure at Ardian, said: âThis joint deal is a great example of our strategy to partner with a range of specialist infrastructure operators throughout Europe over the longâterm, strengthening our network in the process. This transaction will pave the way for Ardian to explore further the Portuguese infrastructure landscape.â
Gonçalo Moura Martins, CEO of Ascendi Group, said: âThe announced partnership with Ardian is very relevant for the growing visibility of Ascendi's brand and emphasizâes the recognition of the high standard and specialized knowâhow in transport infraâstructure management by Ascendi. This opâeration also represents an important investâment of an international partner that will reâinforce the capacity to continue to develop its strategy to become a leading infrastrucâture player through sustainable growth.â
âArdian and Ascendi Group formalized a partnership which allows each party to share 50% ofthe Ascendi PT II Capital, a holding that will acquire the assets currently held by Ascendi Group in a network of five concessions located in Portugal, totalizing 500 km.
THE FOLLOWING CONCESSIONS ARE PART OF THE DEAL:âș Autoestradas da Grande Lisboa (Motorways of Greater Lisbon)
âș Autoestradas do Grande Porto (Motorways of Greater Porto)
âș Autoestradas do Norte (Motorways of the North)
âș Autoestradas da Costa de Prata (Motorways of the Silver Coast)
âș Autoestradas das Beiras Litoral e Alta (Motorways of the Beira Litoral and Beira Alta)
In 2015, MotaâEngil secured 86th place among the 100 largest builders in the world in the annual ranking of the Engineering NewsââRecord (ENR), an internationally recognised publication on the construction sector. Present in 22 countries, spread on three continents, MotaâEngil came in at 54th place among the world's most internationalised builders, criteria based on the turnover obtained in the domestic market, and for which a determining factor has been the signficant growth of the Group in the regions of Africa and Latin America. MotaâEngil has ranked among the 250 largest builders in the world since 2013, the year in which it was in 110th position. In 2014, the Group achieved a position among the 100 largest companies in the sector, at 98th place, which ensured the best position ever for a builder of Portuguese origin in this ranking. In obtaining a position of high prestige alongside the largest companies in the world in the sector of construction and manageâment of infrastructures, MotaâEngil sees yet another proof of the Companyâs growth.
MOTAâENGIL AMONG THE 100 LARGEST BUILDERS IN THE WORLD
14
MOTA-ENGIL IN THE WORLD
SINERGIA 47
UNITEDKINGDOM
MOTAâENGIL EUROPE EVALUATES NEW
MARKETS
Present in Ireland since 2006, the expansion to the United Kingdom is possible
The people who interact on a daily basis with those responsible for MotaâEngil recognise the Group's permanent will to study new business opportunities in construction and infrastructure management.
With a DNA for entrepreneurship at international level, the MotaâEngil Group began its activity in Ireland in 2006, pursuing opportunities identified at the time as a way to enter the new market at the time.
PRESENCE IN IRELANDThe activity in Ireland began with a branch of MotaâEngil Engenharia e Construção company in that country, wich later originated MotaâEngil Ireland Construction (MEIC), focused in the construction of buildings, road infraâstructures, and water treatment stations.
In the Environment and Services area, MotaâEngil Group also holds a stake
since January 2008 in Glan Agua Limitâed aiming to operate in the projection, development, implementation and management of infrastructures in the water sector, having won in the last few years some of the main contracts in the segment in this country.
EXPANSION TO THE UNITED KINGDOM With the Group about to celebrate ten years in Ireland, the executive responâsible for the engineering department in the European continent, Martinho Oliveira, is evaluating new opportuniâties wherever they may be, as long as they are in line with the strategic vision of the Group.
Seeking to deeply evaluate the United Kingdom market and its potential, MotaâEngil Europe developed a market study assessing its potential, and also attended some business events to locally ascertain its interest to begin to develop
EUROPE
PORTUGALPOLAND
SPAINIRELAND
CZECH REPUBLICSLOVAKIA HUNGARY
There is a high expectation of MotaâEngil
Europe entering the United Kingdom market
(...) âwe want to grow to about 100 million euros per year in the next four
to five yearsâ.
15
SEPTEMBER 2015
UNITEDKINGDOM
a deeper study of the market, especially Scotland and England markets.
With this objective, MotaâEngil took part in a recent initiative promoted by the Portuguese Chamber of Commerce in the United Kingdom, the Construction Seminar in London for the Portuguese construction sector, with the presence of Martinho Oliveira and LuĂs Moreira da Silva, the latter responsible for MotaâEngil in Ireland.
On this occasion, Martinho Oliveira confirmed that there is a high expectaâtion of MotaâEngil Europe entering the United Kingdom market, even quantiâfying the objective of invoicing for the combined market of Ireland and United Kingdom, where âwe want to grow to about 100 million euros per year in the next four to five yearsâ.
This perception is the result of an evaluâation of a global market whose industry
is worth approximately ÂŁ90,000 million annually, a broadened access to a larger number of potential clients, partners but also financiers such as banking and investment funds.
With this perspective of evolution, in June MotaâEngil Europe took the initiaâtive of opening an office at St. Albans, in North London. The designated team was assigned to evaluate in an integratâed manner the United Kingdom and Ireland markets, under the coordination of LuĂs Moreira da Silva and designating a financier, Francisco Paisana, under the leadership of Martinho Oliveira.
With this inâdepth study in the United Kingdom, MotaâEngil seeks to broaden its activity in the European continent, operating in a market with high potenâtial for companies with a large portfolio of competences in the area of Construcâtion and Infrastructure Management, as is the case of MotaâEngil.
In order to strengthen the presenâce of MotaâEngil in the United Kingdom, the company was present at the London Build 2015 through its Irish subsidiaries, MEIC and Glan Agua. They thus had the opportunity to present to United Kingdom's market its broad range of competences and operating areas.
The exhibition took place in the impressive O2Arena with an audience of potential clients and suppliers with great interest.
This participation represented a fist step of MotaâEngil Group in United Kingdom's market and was the ideal forum to establish commercial and business relationships, and for presenting and demonstrating the services offered by these two companies.
PRESENCE AT LONDON BUILD 2015
16
MOTA-ENGIL IN THE WORLD
SINERGIA 47
MOTAâENGIL PARTICIPATING IN THE
CONSTRUCTION OF SOME OF THE MOST ICONIC
BUILDINGS IN LISBON
With the recent inauguration of the new Museu dos Coches (National Coach Museum)
and the completion of the new EDP headquarters, MotaâEngil adds two
more projects to a curriculum of excellence
EUROPE
In the 1990s, some landmark projects were built in Lisbon which enhanced the country's heritage. These included the Centro Cultural de BelĂ©m (BelĂ©m Cultural Centre), and the requalification of what is today Parque das NaçÔes area, used initially for hosting the Expo 98. MotaâEngil took part in constructing some of these iconic buildings, which helped modernize the image of Portugal in the world. A clear example is the OceanĂĄrio de Lisboa (Lisbonâs oceanarium), distinguished recently as the best in the world.
Today, MotaâEngil Group, consisting of leading Portuguese shareholders but with a multiânational organizational
profile present in 22 countries, continues to be a leader in the industry in Portugal, constructing some of the most emblematic buildings.
Among the best known and most recent examples are Fundação Champalimaud (Champalimaud Foundation), the new Museu dos Coches (visited by over 24,000 in the first week after its opening at the end of May) and, more recently, the new EDP headquarters, a project that sets the company apart as a benchmark and leader in Portugal.
With a path of almost 70 years of successive achievements in the area
Today, MotaâEngil Group, continues to be
the sector's leader in Portugal, constructing
some of the most emblematic buildings.
Belém Cultural Centre
Lisbon Casino
Oceanarium
17
SEPTEMBER 2015
MotaâEngil is proud to continue producing some of the most representative engineering work in Portugal.
of construction and infrastructure management, MotaâEngil is proud to continue producing some of the most representative engineering work in Portugal, thus bringing together knowledge and innovation to achieve the excellence that is our hallmark.
New EDP headquarters
National Coach Museum
18
MOTA-ENGIL IN THE WORLD
SINERGIA 47
MOTAâENGIL WON TENDER TO
RESURFACE MADEIRA INTERNATIONAL
AIRPORT
Works will last 300 days and will be carried out exclusively at night
MotaâEngil was the entity selected in the tender launched by ANA â Aeroportos de Portugal, S.A. (ANA), for strengthening and reâprofiling the bituminous surfaces of Madeira Airport, in a contract worth 6.4 million euros.
The work to be developed is intended to improve the surface characteristics of the paved runway and taxiway but also to ensure a significant improvment in its structural capacity, to allow an increase in its period of service life.
EUROPE
Also integrated in the context of this contract was the improvement of the rainwater drainage system and upgrading the surface of the service road.
IN GENERAL, THE FOLLOWING WORK IS PROJECTED:âș Works of milling the existing runway â
170,000 m2;âș Works of application of bituminous
mixtures in the wear layer and other layers of the surface, including the roadside â 37,000 ton;
Madeira International Airport
19
SEPTEMBER 2015
The work to be developed is intended to improve the surface characteristics of the paved runway and taxiway but also to ensure a significant improvment in its structural capacity, to allow an increase in its period of service life.
âș Works of grooving the new runways â 102,000 m2;
âș Works of lightâsignalling;âș Works of painting daytime signalling;âș Works to improve drainage.
The contract will be carried out in 300 days on a night schedule between 00:30 AM and 5:30 AM, except from Sundays to Mondays, when the work personnel will rest. Except for emergency situations, Madeira Airport will be closed to regular traffic during that fiveâhour period.
In light of these conditions, the work will have very strict planning of all activities to ensure that in the short access period to the runway, all work will be developed as projected.
With a vast experience and curriculum in this type of surfacing work, MotaâEngil will thus have the opportunity to strengthen its extensive curriculum and continue to reaffirm its leadership in the engineering and construction industry in Portugal.
TAXIWAY
SERVICE ROAD
20
MOTA-ENGIL IN THE WORLD
SINERGIA 47
Air transportation is an industry that has seen a strong growth worldwide in the last few decades, driven by the growing need for transport and mobility of people and goods between different continents. Portugal is no exception, and the tourism industry has witnessed a high preponderâance of growth in air traffic to the country in the last few years.
In a highly competitive industry, the responâsiveness and the infrastructures quality are essential to the satisfaction of those travelâling, whether they travel for pleasure or on business. Certainly with the objective of continuing to provide even better service for those travelling to Portugal and continuing to be competitive on a global scale, ANA â Aeroportos de Portugal, S.A. launched a tender for the expansion and remodelling of the Faro Airport Terminal, which consists of works ranging from construction and techniâcal facilities, to customâmade furniture and
environmental and security systems, in the case of the latter the objective is to accomâmodate the most recent regulatory demands in the area of security control â XâRay machines and metalâdetector gates.
EXPANSION AND REMODELLING WORKS AT FARO AIRPORT WILL
BE CARRIED OUT BY MOTAâENGIL
Works will allow a significant increase in the Terminalâs capacity and improve the service quality for each passenger
EUROPE
CONTRACT WON IN FARO
âș Client: ANA â Aeroportos de Portugal
âș Location: Faro
âș Term of the contract: 22 months
âș Contracting amount: 32.8 million euros
Actual terminal â Outdoor
ANA â Aeroportos de Portugal, S.A. launched
a tender for the expansion and remodelling of the
Terminal at Faro's Airport, which consists of works
ranging from construction and technical facilities,
to customâmade furniture and environmental and
security systems.
SCOPE OF THE PROJECT:The project's main objective is to enable the Terminal to increase its flow of departures and arrivals, from 2,000 passengers during rush hour in one
21
SEPTEMBER 2015
Actual terminal â Indoor
direction to 3,000 passengers, maintaining the quality and efficiency of the service.
MAIN WORKS:âș Work regarding operational and architectural requalification: âș Expansion and remodelling of public Departures and Arrivals lounges, including a new commercial area, which involves the demolition of the entire existing front, façade and roof;
âș Construction of an outside plaza, in front and to the side of the Terminal property, between the Departures and Arrivals kerbsides;
âș Construction of a new interior commercial plaza on the Terminal's first floor, on the Air side, which involves the partial demolition of the existing construction of the central body (with reinforced concrete structure);
âș Construction of new facilities for the Portuguese Foreigners and Borders
MAIN WORKS: 01 Demolitions;
02 Special foundations: piles and microâpiles;
03 Concrete;
04 Metal structure;
05 Metal coverings;
06 Finishings;
07 Electrical installations;
08 Special installations: RVD, cable television, control tower management system, hourly information system, safety management system, automatic fire detection system, closedâcircuit television, SACA and security information service;
09 Heating, ventilation and air conditioning system installations;
10 Security;
11 Water, fires and sewage.
Service and overhaul of Customs and Lost and Found areas;
âș Construction of new facilities for rentâaâcar companies, welcome desks and airline companies;
âș Construction of a new duty free area in the Terminal;
âș Construction of a new Schengen commercial area, on the second floor;
âș Construction of new offices, East and West, on the second floor;
âș Construction of a new security control area on the second floor, and respective vertical accesses;
âș Relocation of the passport control area at Departures;
âș Remodelling of the Arrivals lounge and baggage collection area;
âș Relocation of the departures counters;âș Execution of all technical installations,
including: the installation of special electrical systems, of active and passive security, mechanical, water, sewage and fire systems;
âș Supply and assembly of customâmade furniture, including passport control counters at Departures and Arrivals, and the ANA Information Counter, on the Air side.
âș Works regarding requalification of the Environmental and Security Systems:
âș Execution of all work designed to meet the legal requirements of the environmental and security systems, including: smoke extraction, backâup generator, reserve power transformers, waterproofing and thermal insulation of the existing technical ceiling and overhaul of the system for collecting rainwater on the existing metal
roof, according to legislation in effect, and applicable to the existing areas of the Terminal which are not subject to expansion works.
Also included in the subject of the contract is the revision of the Health and Safety Plan (HSP) for the project phase, and the Plan for the Prevention and Management of Waste from Construction and Demolition (PPMWCD), as a result of the adaptation of the speciality projects, as well as the development of the HSP for the work phase, and the Technical Compilation, according to the respective applicable legal standards.
22
MOTA-ENGIL IN THE WORLD
SINERGIA 47
WORKS ON THE A3, PORTO â VALENĂA MOTORWAY Brisa â ConcessĂŁo RodoviĂĄria, the concesâsionaire company for key road infraâstructures in Portugal, has awarded to MotaâEngil the contract to improve the road surface on Santo Tirso â FamalicĂŁo subsection, South â North direction, of A3, Porto â Valença Motorway.
The objective of the contract, projecting works lasting eight weeks, is to improve the road surface on the section of motorâway between kilometres 20.9 and 25.7, in the South â North direction of Santo Tirso subsection, extending for approxiâmately 4.8 km.
The contract includes various technical works for the improvement and upgrading of the infrastructure conditions, including micro milling of the wear layer and its replacement with a new, 5 cm thick, final layer in a bituminous permeable mixture. Among other works, the levelling layer underlying the wear layer will also be improved, and the definitive horizontal signalling will be reâpainted.
WORKS ON THE A2, SOUTH MOTORWAYIn the south of Portugal, and also managed by BRISA, MotaâEngil is executing works to improve and reinforce the surface at
BRISA AWARDS MOTAâENGIL
CONTRACTS TO IMPROVE THE
SURFACE OF ITS MOTORWAY
INFRASTRUCTURE IN PORTUGAL
MotaâEngil develops works to improve road
surface within the country, from North to South
subsection junction A2 â A6 â A13 â AlcĂĄcer do Sal of the A2, South Motorway.
This contract includes the current section, seven viaducts and seven underpasses, in both directions, between km 56+293 and 81+300, operating since 1997 and has an approximate extension of 25.2 km (cross profile of 2 x 2 lanes), and the branches A, B, A+B, C, D, E, F, G, I, A2 â A6, A6 â A2, A13 â A6 of the junction of A2 â A6 â A13.
The works included in this contract are aimed to improve the functional characterâistics of the road surface on the roadway and branches of the junction of A2 â A6 â A13, by milling and repositioning the milled thickness with bituminous mixtures.
In certain sections with severe deformaâtions and cracking, sanitation is done on the right hard shoulder, with later compacting of granular material and filling up to the current elevation with bituminous mixtures.
It also includes repairing the transition edges in apparent expansion joints to be maintained, sawing pavement in hidden expansion joints to be maintained, performâing cross grooving in the wear layer, repaintâing of horizontal signalling, increasing the height of telecommunications manholes, placement of markers, repositioning of
EUROPE
A2 â South Motorway
23
SEPTEMBER 2015
directional stalls for guiding divergence points, flexible/folding position markers, shock absorbers and increasing the height of flexible guard rails.
Further to the South, MotaâEngil is preparâing to perform technical works, with a projected deadline of 60 days, consistâing on the replacement of the expansion joints on the bridge over Sado River and the access viaduct in the South â North direction, in AlcĂĄcer do Sal â GrĂąndola Norte subsection.
The work is expected to include milling the existing pavement and its repositionâing in the areas of the adjacent deck to the expansion joint. In addition, it is also anticipated that the drainage system of the joints in the lower area of the deck, will be reâestablished/adapted, including tests for drainage and water tightness.
A4 â PORTO â AMARANTE MOTORWAYStill in the north of Portugal, MotaâEngil has ongoing work for BRISA consisting in the rehabilitation of road surfaces, namely the Ermesinde Junction, which is part of the Ăguas Santas/Ermesinde Subsection, of the A4 â Porto/Amarante Motorway.
On this motorway, MotaâEngil will execute the bituminous road surfacing, a projectâed total of 6,450 tonnes and the milling of 23,650 m2, contributing to upgrading the pavement of the Junction branches and the fullâlane toll plaza, in addition to work to be developed in paving the road for slow traffic belonging to the Paredes/Penafiel Subsection.
The planned work, which includes milling, application of bituminous mixtures and interventions in horizontal and vertical
MotaâEngil signed a contract with a consortium led by Ferrovial for the construction of road surfaces (granular and bituminous bases) on the East section of the MarĂŁo Tunnel.
The work is being carried out on a 10 km extension linking MarĂŁo Tunnel with TrĂĄsâosâMontes motorway subconcession, and is expected to be completed in the coming month of November 2015.
It should be emphasized that the materials to be applied on the road surface layers (either the toutâvenant, or the bituminous aggregates) come from the Brivel quarry, located about 10 km from the construction site where, MotaâEngil has a plant for the manufacture of hot bituminous mixtures, which is able to produce 260 tonnes per hour, and will provide the 125,000 tonnes needed to construct the road surface for the work.
EUROPE
signalling, will be carried out in 14 weeks on a night time schedule (10:00 PM and 7:00 AM, from Monday to Friday), thus allowing the concessionaire to ensure quality service with the least possible impact on the infrastructure.
PROJECT INDICATORS
âș Contracting amount: 6,707,231.27 euros
âș Completion dates: eight monthsâș Description of the contract:
supply and application of layers of crushed aggregate of variable granulometry and layers of hot bituminous mixtures
âș Relevant quantities: road surfacing with crushed aggregate of variable granulometry â 278,000.00 tonnes; bituminous road surfacing â 125,000.00 tonnes.
MOTAâENGIL PERFORMS ROAD
SURFACING WORK ON MARĂO
TUNNEL
Work will be completed in November
A2 â South Motorway
24
MOTA-ENGIL IN THE WORLD
SINERGIA 47
On 13 June, Mercado do Bom Sucesso celebrated its second anniversary
In order to celebrate the date, DJ Maria Gambina was invited and there was a concert of Mikkel Solnado. Colour, music and visitors filled the Mercado on this special day. Two years after the completion of the renovation works and ensuring a new urban concept to this old traditional market, it can be said that the new Bom Sucesso is considered a winning project in Porto. Mercado do Bom Sucesso reopened to the public in June 2013 with an innovative concept, contemplating a fresh market, shops, restaurants, a hotel and an office building, a pioneer combination for Portugal.
In 2015, Mercado do Bom Sucesso made a solid way, with strong projects, having achieved an average of 50,000 visitors weekly. With a diverse public and a diversified cultural agenda, Mercado do Bom Sucesso is already one of the most visited places in the city and a reference in the promotion of urban renovation projects.
MERCADO DO BOM SUCESSO CELEBRATES TWO YEARS
EUROPE
MOTAâENGIL IN AN INTERNATIONAL
CONFERENCE WITH OVER 300
SPECIALISTS
Projects carried out in Portugal such as Ceira
Bridge and Pinhal Interior road concession presented
as case studies
EUROPE
MotaâEngil attended the MultiâSpan Large Bridges conference, organised by the School of Engineering of Porto Uniâversity, in partnership with Instituto Superior TĂ©cnico (Technical Superior Institute) of Lisbon University, Minho University and LaboratĂłrio Nacional de Engenharia Civil (Portuguese National Laboratory of Civil Engineering).
The event was held at Centro de Conâgressos da AlfĂąndega do Porto (the cityâs Conference Centre, formerly the
Customs House) and was attended by over 300 engineers from 42 countries.
The international bridge engineering community in attendance had the opâportunity to exchange knowledge and experiences on topics such as innovative construction methods, special foundaâtions and geotechnical research, new materials and special devices, safety and maintenance, structural analysis and reâhabilitation.
AntĂłnio HipĂłlito, of MotaâEngil's techânical department, reminds that âon these occasions MotaâEngil has the opâportunity to present a bit more of its work, since there was room for two presentations â one about Ceira Bridge, presented by Sara Gil, and the other about Pinhal Interior, by Nuno Amaro. Some of MotaâEngilâs projects were also referenced in other presentations, demonstrating the importance of the work developed.â
MotaâEngil Engenharia showed once again its availability to share its experiâence and knowledge within the technical and scientific community on topics relatâed to its activity. This demonstrated that MotaâEngil Group has, as part of its techânical structure, personnel with the highâest technical knowledge at the internaâtional level in civil engineering industry.
Rui Moreira, Mayor of Porto Municipality at the conference opening
25
SEPTEMBER 2015
EUROPE
MERCADO DO BOM SUCESSO AWARDED WITH 2015 CERTIFICATE OF EXCELLENCE FROM TRIPADVISOR
Excellence in the tourism and hotel sector
In order to receive the Certificate of Excellence, the establishment must maintain a minimum overall score of four bubbles (total of five). In addition, it needs to have a minimum number of evaluations and be registered on TripAdvisor for at least 12 months.
Mercado do Bom Sucesso received the Certificate of Excellence from TripAdvisorÂź, a distinction that has a global expression and which seeks to promote experiences of excellence to its customers. In its fifth year, the award given only to establishments that receive frequent high ratings on the TripAdvisorâs website, celebrates excellence in the tourism and hospitality industry.
TripAdvisor uses its own algorithm in order to determine the winners of the Certificate of Excellence. The criteria consist of quality, quantity and proximity of the ratings and reviews posted by the travellers on TripAdvisor within a period of 12 months. It is also considered how long the establishment are visible on the website and their ranking position in the popularity index.
MERCADO DO BOM SUCESSO WINS THE 2015
REAL ESTATE OSCARS
The great winner of the 2015 National Real Estate Award edition was Mercado do Bom Sucesso. The renewed market got the award for Best Development of the Year of 2015, and was considered considered the best work in the Trade category.
The Real Estate Oscars, as these awards are considered, are promoted by the real estate publication Magazine ImobiliĂĄrio, intending to award Portugalâs best in this area, based on the impartiality and quality of the projects.
Almeida Guerra, president of Rockbuilding, architect Regino Cruz, Paulo Dias, general director of Aguirre Newman, CĂ©sar Neto, managing director of RenascimĂłvel, and Eduardo Abreu, general director of Neoturis constituted the jury of the awards.
Paulo Dias accepted the awards to Mercado do Bom Sucesso on behalf of MotaâEngil
The criteria consist of quality, quantity and proximity of the ratings and reviews posted by the travellers on TripAdvisor within a period of 12 months.
EUROPE
Distinction by Magazine ImobiliĂĄrio
These awards to Mercado do Bom Sucesso, a requalification project in Porto with MotaâEngil as sole investor, in the beginning of 2015 join other awards given to this project. In 2014, the market's refurbishment project received the National Prize for Urban Renovation 2014 and the Global Awards for Excellence, and was also classified by IGESPAR (entity responsible for the Portuguese architectural and archaeological heritage) as Public Interest Monument.
26
MOTA-ENGIL IN THE WORLD
SINERGIA 47
One of the best known religious sites in the world, FĂĄtima Sanctuary is one of the most visited locations in Portugal, with thousands of tourists visiting and participating in the religious ceremonies.
In order to better receive visitors coming to FĂĄtima Sanctuary there are significant work underway. The project, with an estimated duration of 7 months, includes the construction of the new presbytery along with other works in the surrounding area. MotaâEngil has been trusted with this important project, contracted to carry out the work of engineering and construction.
âș Location: FĂĄtima Sanctuaryâș Scope of work: â Construction of a new presbytery in
the prayer area â new outdoor altar, entirely new construction which implies demolition of the existing outdoor altar, with adaptation of the outdoor staircase landings, around the new altar area.
â Colonnades â The lateral area over the new presbytery, with the main objective of reorganizing
MOTAâENGIL GUARANTES
CONSTRUCTION IN FĂTIMA
SANCTUARY
Works will allow more comfort for the thousands of people
coming to FĂĄtima every year from all over the world
EUROPE
all infrastructures needed to the functioning of the area and to grant comfort conditions and to improve the aesthetic qualities of this area.
â Surrounding intervention area â Making the construction of the new presbytery compatible with the new surrounding area, namely at the pavement level.
âș Term: seven monthsâș Main works:â Demolitionsâ Reinforced Concrete Structureâ Metal Structure (Tower)â Metal Structure (Covering)â Plastic reinforced with fibreglass
(Walkway)â Covering the Basilica in fibreglassâ Removing the existing Basilicaâ Finishingsâ Paintingsâ Hydraulic infrastructuresâ Electrical infrastructuresâ Security against fire and intrusionâ Visual and TV Communicationâ Electroâacousticsâ Scenic lightingâ Facilities and mechanical equipment
Existing presbytery
27
SEPTEMBER 2015
ELETROMECĂNICA COMPLETES
GUINCHO WASTE WATER TREATMENT
PLANT VENTILATION SYSTEM
Five air treatment units were installed
MotaâEngil Engenharia EletromecĂąnica, area of the company dedicated to electromechanics engineering, has completed the renovation of the ventilation system of Guincho Waste Water Treatment Plant (WWTP), an underground infrastructure projected to reduce chemical and biological environmental contaminants. Carried out in seven months, the project for SANEST involved a total of 23 companies, and 130 workers. Five air treatment units were installed, specifically suitable for extremely aggressive environments using coalescing filters, designed to
extract the high humidity and high salt concentrations present on the air from outside environment. The cooling of the nine electrical rooms was completed with direct expansion precision systems. The current insufflation potencial of new air in the WWTP is 216,000 m3/hr. and the electric rooms cooling capacity is 165 kW.
For a better architectural integration of the mechanical equipment into the surrounding landscape, construction and finishing works were also carried out after a careful selection of materials, equipment, and antiâcorrosive treatments. Taking into account the proximity of the plant to the coastline and the corrosive contaminants originating from the WWTP.
EUROPE
The project was under constant monitoring of Health, Safety and Environment technicians, who were involved to prevent accidents that could derive from possible hazardous mixtures. Extraordinary measures were also adopted, namely by using individual protection equipment, enforcing strict procedures, and permanent monitoring of air quality. Also due to the difficult access to work in several sites it were used special configuration scaffolding to carry out specific projects.
We should highlight the contribution by the Technical Office of Structures and Architecture in providing support by adopting new solutions and adapting them to situations which werenât initially part of the project.
MOTAâENGIL CENTRAL EUROPE
SIGNS A CONTRACT TO RENOVATE THE
A4 MOTORWAY IN POLAND
Recognised as one of the leading Polish companies in the construction industry, MotaâEngil was recently awarded a contract to carry out renovation works on two road sections of the A4.
The first contract includes renovation of over 7 km between the viaduct located on KÄ pielowa street in Krakow and a connection to Wielicka. The work consists of two phases: renovation of the road surface and horizontal signalling and repairing the structures and vertical signalling. The second part of the work will take place in a section of over
Work totals 34 km in a contract for more than 10 million euros
27 km, located between Wilkowice and KĆosĂłw the province of DolnoĆlÄ skie.
EUROPE
28
MOTA-ENGIL IN THE WORLD
SINERGIA 47
OFFICIAL OPENING OF THE 747 ROAD AT THE CHODEL BYPASS
MOTAâENGIL SIGNS FIRST
CONTRACT FOR RAILWAY LINE IN
POLAND
In a ceremony presided by minister WĆodzimierz KarpiĆski, the provincial governor Wojciech Wilk and representatives of local authorities, the regional road 747 was inaugurated in Poland.
With an extension of for 46 km, this infrastructure links Lublin to Lubelskie and Mazowieckie provinces. MotaâEngil Central Europe was the company
MotaâEngil Central Europe has signed a contract for the renovation of the railway line number 351 between Poznan and Szczecin, in the province of Wielkopolska. This is the first contract in Poland for works on railway lines, which was awarded by PKP Polskie Linie Kolejowe S.A., a project that includes the renovation of approximately 17 km of railway line to be used for the transport of cargo and passengers.
MotaâEngil Central Europe will be responsible for the project execution and construction, with an investment value of over 8 million euros. The renovation work includes, besides the railway surface, the railway traffic control devices, electrical and overhead lines, railway crossings and drainage system for the railway line.
Bridges and accesses by MotaâEngil Central Europe
MotaâEngil Central Europe will carry out the work of
renovation of the railway line along 17 km in the province
of Wielkopolska
responsible for the Chodel bypass, an investment of 15 million euros, as part of a global intervention in the project, with a total investment of 78 million euros.
The Chodel Bypass extends for 5 km, and MotaâEngil constructed a bridge, a viaduct, and a pedestrian bridge, as well as access roads to each of these constructions.
The investment's objective is to restore the full capacity of the railway line, increasing the current speed from 80 km/hour to 140 km/hour decreasing travel time, improving safety and reducing the costs of maintenance the infrastructure.
MotaâEngil thus takes another bold step to demonstrate its implementation capacity and quality level in a new sector of the Central European market.
EUROPE
EUROPE
Official opening ceremony
29
SEPTEMBER 2015
SECOND EDITION OF SAFETY WEEK WAS A SUCCESS
IN POLAND
Safety Week, a programme implemented in the construction sites of Poland's ten largest construction companies that signed the Agreement for Safety in Construction, ended on the 24th May 2015.
During this period, over 50 events took place in the construction sites of MotaâEngil Central Europe, including training and emergency simulation situations. Thanks to this investment, the promotion of a culture of safety in workplaces has reached hundreds of the company's employees. From the group of companies more than 30,000 people participated.
Health and life are invaluable, thus the promotion of safety in the workplace is always a priority for MotaâEngil Central Europe.
Second Edition of Start@ME Programme in Poland
MotaâEngil Central Europe began the second annual edition of its largest Internship Programme, known as Start@ME.
In an effort to select 30 candidates who will work at the company for 10 months in different areas of activity, and under the supervision of a highly experienced mentor, the aim of this programme is to provide a valuable professional experience for each of the selected candidates.
At the end, the candidates who show the most potential will be invited to remain with MotaâEngil Central Europe at the end of the programme, thus continuing their professional careers with the company.
After a rigorous selection process, the Start@ME programme began in August.
YOUR FUTURE BEGINS HERE
EUROPE
EUROPE
Over 50 events, including training and emergency
simulations
Thanks to this investment, the promotion of a culture of safety in the workplace has reached hundreds of the company's employees.
30
MOTA-ENGIL IN THE WORLD
SINERGIA 47
SUMA has just launched SUMAKids, an online interactive platform providing educational content and environmental awareness, to be housed both on the SUMA website and on the institutional sites of its local governmental clients.
Designed to be used whether by youngsters or teachers, educational supervisors, those living in the municipality as well as anyone interested in the topics presented, this platform will provide access to the contents developed by SUMA. This includes animations, the viewing of videos, stories and materials to download and develop activities, such as games of sequences and correspondence, as well as colouring arts and crafts sheets, among others.
The materials provided approach various topics related to the respect for the urban environment and the exercise of active citizenship, starting with the packaging and disposal of household waste, to reducing the production of waste materials and their valuation â such as packaging recycling, recycling of organic residues, and used cooking oils â, as well as promoting a focus on the products
SUMA LAUNCHES SUMAKIDS
INTERACTIVE PLATFORM
The constant technological evolution in environmental education is a concern that
SUMA has successfully brought to life with
this project
derived from recycling. At the same time, cross content is also used here, such as risk prevention in road areas, basic and food health, and safety in public and private spaces.
Designed to be another tool to bring SUMA closer to its direct and indirect clients, this platform was thought to promote the advantages of adopting behaviours of respect for the urban environment, exploring its financial dimensions (domestic and collective savings) and operational (saving time, efforts and routines), and it is set up as one more pillar in the commitment to social responsibility, a goal assumed by the company long ago.
This platform will provide access to the contents developed by SUMA, including animations, the viewing of videos, stories and materials to download and develop activities.
EUROPE
31
SEPTEMBER 2015
EUROPE
EUROPE
The one year contract of Manvia ensures the provision of technical assistance services and programmed preventive maintenance, systematic and corrective maintenance for Freeport Outlet Alcochete facilities.
The work includes inspections and interventions needed to perform the preventive maintenance of facilities and equipment, in order to maintain proper operation, conservation and total availability.
Santa Cruz Municipal Council in Madeira has awarded Manvia the contract to provide the management and maintenance servoces of wastewater treatment plants and of the pumping stations of Santa Cruz Municipality, which covers the facilities which are part of the public wastewater drainage and the drinking water supply networks, as well as the networks of the elementary school park buildings.
Manvia is responsible for the operation and maintenance of 18 facilities of the wastewater drainage networks, 4 of which are WWTPs and nine are facilities which are part of the drinking water supply network.
This new challenge, lasting 30 months, will increase Manviaâs experience in the exploitation of environmental systems,
The aim of this methodology is to ensure the total operability of the equipment and remaining infrastructures of the various business areas, eliminating the causes that result in breakdowns, wear and inoperability of the equipment/infrastructures, thus reducing the costs associated with corrective maintenance. Freeport Alcochete is the largest shopping outlet in Europe, with 75,000 metres, and over 140 shops, 17 restaurants, one bar and one exhibitions centre.
namely in the operation and maintenance of this systems, giving to the client effective guarantees of technical ability and knowâhow in operating them.
MANVIA ENSURES THE MAINTENANCE OF FREEPORT ALCOCHETE
ONE MORE WWTP MAINTENANCE AND OPERATIONS CONTRACT IN MADEIRA
The contract ensures the provision of technical assistance and programmed systematic and corrective maintenance services for the largest outlet in Europe
Manvia is in charge of 18 facilities part of the wastewater drainage networks
32
MOTA-ENGIL IN THE WORLD
SINERGIA 47
CLASSIFICATION SERVICES
IN CIMPOR SOUSELAS
PRODUCTION CENTRE
Manvia Cement and Steel Works performed a classification service of 180,997 tonnes of grinding media in the
Souselas Production Centre of CIMPOR/Intercement
The area of cement and steel works performed a classification service of 180,997 tonnes of grinding media from a raw mill and from a cement mill at the production centre of CIMPOR/Intercement, a leading national company in cement production.
As explained by JoĂŁo Rolim, Director of Manufacturing of Souselas production centre, the partnership that exists between CIMPOR/Intercement and Manvia for this type of operation is already a common practice, and results from the good performance by the maintenance company.
The availability and fast response in removing and placing cargo without interrupting production, the very quality of the service that Manvia provides with the classification according to the standards of the client, as well as compliance with all of the safety rules, are differentiating elements that have placed Manvia in a position of leadership in this industry.
This service, aimed at optimising the mills in any factory, has been carried out
throughout Europe, and at this time the possibility of going into other markets is being studied.
âThis work consists of physically separating by size every element that is grinding cargo, in order to optimise this cargo, removing the inert mass. On the other hand, the client can with some easiness identify all missing sizes, and replace this same quantity, also allowing optimisation of stockâ, explained JosĂ© Esteves, who is responsible for cement and steel works area.
Having started in 2001, this has been a growing business, and, today, Manvia has a fourth team getting ready for a market outside Europe. âThe advantage of our activity aims this winâwin method, which combines reducing energy costs and increasing the production of the mills, and this is what we successfully offer our clientsâ, says JosĂ© Esteves, adding that Manvia has been âbuilding new bridgesâ and âwe believe we are on the right track, and the proof is that up to now we have had enquiries from several factories in the United States and Canadaâ.
EUROPE
The availability and fast response in removing
and placing cargo without interrupting production, the
very quality of the service that Manvia provides with
the classification according to the standards of the client.
33
SEPTEMBER 2015
EUROPEIn April 2013, Manvia began the Experimental Regime for the Exploitation of the Works (EREW) of the irrigation blocks II and III of Ervidel hydroâagricultural development, in Beja, which lasted 24 months.
Over the past two years, Manvia prepared and put in place both systematic and conditioned preventive maintenance plans, which included the revision, replacement, lubrication, cleaning and inspection of the equipment, in order to reduce and prevent breakdowns and to increase its service life.
The infrastructure that are the target of the systemic preventive maintenance work of the EREW were Ervidel irrigation blocks II and III, the reservoir of command R2, and PenedrĂŁo pumping station.
According to AndrĂ© Barros, contract director of the Environment division at Manvia, this was a startâup of an infrastructure constructed by MotaâEngil Group, and whose maintenance was ensured by Manvia. âA contract like this
is important as it broadens our horizons and the coverage of the Environment division servicesâ, adding that due its involvement, âthere must be functional communication to the detail, because the smallest failure, originates a brutal loss.â
In terms of operations, maintenance and control of the provision of services, most noteworthy are the inclusion of duly accredited professional technicians, with specific professional experience, and the availability of resources that ensure total autonomy of the operating and maintenance teams.
Over the past two years, Manvia prepared and put into practice both systematic and conditioned preventive maintenance plans, which included the revision, replacement, lubrication, cleaning and inspection of the equipment.
MAINTENANCE OF ERVIDEL
HYDROâ âAGRICULTURAL DEVELOPMENT
Over the past two years, Manvia prepared
and put into practice preventive maintenance
plans, both systematic and conditioned
34
MOTA-ENGIL IN THE WORLD
SINERGIA 47
MANVIA PERSONNEL
MEETING
Invited to "Remembering the Past, to Plan the Future",
about 80 employees met for two days in SĂŁo Pedro
de Moel for another Manvia personnel meeting
The Board of Directors chairman, Pedro Vieira Neves, gave the initial speech, providing background information about the event and highlighting its importance, also noting the topics of past editions that have tested subjects like communication, proâactivity, teamwork, leadership, negotiation, strategy, creativity or innovation.
Under the topic Thinking of the Future this meeting aimed a reflection about the Present, but especially about the Future of Manvia, with the objective of jointly mapping out a strategy directed to internal issues.
The challenge was launched to the different work groups to identify the strengths, weaknesses, opportunities and threats of the company (SWOT Analysis), which verified an alignment of ideas among all those that could serve as a basis for the strategic topics of reflection for the next five years.
For those who paricipated, this event is at the same time a relaxing way to work, but also an opportunity to better understand the company, the activities, objectives and above all its competences and what can be offered to clients.
âIt was a meeting that brought together the company's main personnel but
it was also important to share what Manvia has to offer to its clients in the different areas, and also an opportunity for germinating new ideas for the future development of the company, development which will be sustained by an organic growth and supported in the opportunities arising where we already develop our activity as well as in new geographiesâ, stressed Pedro Vieira Neves, also taking time to set forth his expectations for the next five years.
âToday, Manvia has a financial structure and a group of competences, supported by a team of excellence and a knowâhow in the area of maintenance, that will allow the company to face the near future with confidence and with great ambitionâ, revealed Pedro Vieira Neves, adding that these characteristics, which are part of the company's DNA, will allow to consolidate the businesses in African markets and âcertainly, to approach new areas and geographies, namely Spain, Mexico and Brazil, successfullyâ. He ended by stating that âWe cannot fail to note that an important pillar for the ambitious growth we are seeking for Manvia lies in the continuous development and deepening of our competences in Portugal, always maintaining the objective of being leaders in the sectors in which we operateâ, he concluded.
EUROPE
âToday, Manvia has a financial structure and a group of
competences, supported by a team of excellence and
a knowâhow in the area of maintenance, that will allow
the company to face the near future with confidence
and great ambitionâ.PEDRO VIEIRA NEVES
35
SEPTEMBER 2015
ALDEIA DO TĂMEGA
A new nature tourism project in Amarante
EUROPE
Located in a prime location in Amarante, in the North of Portugal, stands Aldeia do TĂąmega (village of Tamega), a new tourist project by MotaâEngil Turismo, part of the RTA TĂąmegaclube resort, on the bank of TĂąmega River.
This village is ideal for holidays with family or friends, for nature lovers, for those wanting to have a good time without having to travel, and also for those who value a healthy lifestyle.
Here you can enjoy the water park â the largest in the North of the country; the Advanced Training gym; the tennis court and football field; and you may also discover our golf course, located about five minutes from the resort. In addition, you will have direct access to the cycling route that runs along the Tamega River, and may explore the enchanting landscapes of this region.
In the RTA TĂąmega Clube complex, you may also access the river to enjoy nonâmotor sports, such as canoeing.
DESCRIPTION OF THE ACCOMMODATIONSAldeia do TĂąmega was totally designed to provide you with days of great serenity in the midst of nature, and plenty of fun for
those who wish to explore the different activities available here.
Surrounded by nature, the village consists of four houses subdivided into 16 housing units with different types of accommodation, which can hold up to six people.
Every housing unit has all the conveniences, such as kitchenette, cooker, refrigerator, private WC, air conditioning, esplanade area, television, WiâFi Internet, and even a common guest lounge, with a pool table, pingâpong table, football table and other games.
TYPES OF ACCOMMODATIONS
Type T0
Type T1
Type T2
8
4
4
Parking is quite close to the housing, and is free. You may also enjoy the lovely gardens and the barbecue.
To complement your stay, you may book meals for groups of over 20 people.
For more information, please visitwww.aldeiadotamega.com
36
MOTA-ENGIL IN THE WORLD
SINERGIA 47
37
SEPTEMBER 2015
AFRICA
ANTĂNIO MOTA VISITS ROAD PROJECT IN ZAMBIA
Visit to the Great East Road project was an added motivational factor for the team
AntĂłnio Mota, Chairman of the board of directors of MotaâEngil Group, and Gilberto Rodrigues, MotaâEngil Africa CEO, visited MotaâEngil offices in Lusaka. The head of the Zambia branch, Fernando CardĂŁo, gave a presentation on the activity and the project underway.
The next day, AntĂłnio Mota and Gilberâto Rodrigues met with the president of the Republic of Zambia, His Excellency the Honourable Edgar Changwa Lungu. The presence of the Board of Direcâtors chairman was an opportunity to reaffirm the commitment of the Group in investing and supporting the developâment of Zambia. After this meeting, the team proceeded with visit to the Great East Road project. This is the flagship
project of MotaâEngil Africa in Zambia. The team visited all project's facilities including the quarry, the industrial unit for manufacturing asphalt, the base camp, prefabrication equipment and the mechanical facilities.
At lunch, AntĂłnio Mota encouraged the team to keep up the hard work, knowing that they should always act with the quality level for which the MotaâEngil Brand is renowed throughâout the world.
The team recognised the visit as of vital importance for the cohesion and unity of the team and had reinforced their motivation to continuously improve their work performance.
38
MOTA-ENGIL IN THE WORLD
SINERGIA 47
VISIT TO CABINDA
Representatives of Mota family and administrators of MotaâEngil Angola
were in Cabinda for a symbolic visit to where the company started
its activity in 1946
AFRICA
With a distinguished committee of members of Mota family such as Manuela Mota, Teresa Mota, Teresa Mota Neves and SĂlvia Mota, in addition to members of the Board of MotaâEngil Angola namely the chairman, Paulo Pinheiro, and AntĂłnio Graça, accomâpanied by other representatives of the company, the visit felt like a return to the origins, that is to say, where the accredited entrepreneurial activity of MotaâEngil Angola began, in 1946.
The main objective of the visit was to present a house to one of the oldest employees of MotaâEngil universe, currently retired, Mr. AdĂŁo Bachi, who
was hired by the company in 1957. The delivery of the property was an act of gratitude for his zeal and loyalty, since Mr. AdĂŁo Bachi has remained, since the beginning of his collaboration, in his old home, which has served as head office, dwelling and company's guestâhouse, by then named Mota & Companâhia, located in Landana, municipality of Cacongo, province of Cabinda.
Mr. AdĂŁo Bachi started as a house employee, providing general support to logistical tasks. He later moved on to caring for the children of the employees who cohabited the guestâhouse. Over time, he assumed various
Maria Teresa Mota was present at the visit to Cabinda
39
SEPTEMBER 2015
positions, from logger to shopkeeper, in charge of selling merchandise. After the departure from Cabinda of Mr. Manuel Mota, his boss, Mr. AdĂŁo Bachi became responsible for and in charge of the villas.
In recognition of the fact that this esteemed employee did not abandon the company during the troubled years of war in Angola, and also protected Mota & Companhia assets, Mr. AntĂłnio Mota decided that he should be given a new home.
The intervening parties in the construcâtion of the house were the employees of the current MotaâEngil Angola, Carlos Lima, Carlos Pires, JoĂŁo MagalhĂŁes, JĂșlio Silva (responsible for the work), Nuno Pimenta, Manuel Alves (foreman) and MĂĄrio Castro.
On their visit to the Cabinda province, Mota family and the remaining members of the committee had the opportunity to learn more about the culture and customs of the province inhabitants, having visited the city and later traveling to the local companyâs facilities. The trip also included a visit to Maria Manuela farm, located in the
village of Mongo Macongo, municipality of Necute. The purpose of this stop was to pay homage to Maria Manuela Mota, the eldest daughter of Manuel Mota. In fact, all the members of the committee were welcomed by the local commuânity and the administrator. Here, the entire committee had the opportuânity to learn the process of the artisanal manufacture of palm oil. This farm, now inactive, will be rehabilitated to manufacture this same product, for later marketing. It was also possible to know the Tchiela farm, in the municipality of Cacongo, which will be reactivated for the manufacture and later marketing of livestock and vegetables.
With this visit, they were able to know the roots, that is to say the history, of this great company of which we are a part, the MotaâEngil.
The main objective of this visit was to present a house to one of the oldest employees of the MotaâEngil universe, currently retired, Mr. AdĂŁo Bachi, who was hired by the company in 1957.
Maria Teresa Mota was present at the visit to Cabinda
40
MOTA-ENGIL IN THE WORLD
SINERGIA 47
CALUEQUE SCHOOL OFFICIAL
OPENING
The project is part of the social responsibility
policy of MotaâEngil Angola
The official opening of Calueque's school, in Cunene province, was attended by disâtinguished representatives of MotaâEngil namely the directors of the holding comâpany, Manuela Mota and Teresa Mota, as well as Teresa Mota Neves, Board of Directors of MotaâEngil Angola chairâman, Paulo Pinheiro, and others repâresenting the company that built the school, with no counterpart and for the benefit of the population. Also present at the ceremony was the municipal adminâistrator of Naulila, Colmincil Eliseu dos Santos, along with other guests.
The participation of MotaâEngil Angola in this offer presented to Caluequ'se resiâdents was aimed at contributing to the education and training of children and young people, transforming them into aware and compassionate citizens, reâsponsible for their own sustainable deâvelopment.
This activity falls in the context of the social responsibility and cohesion of MotaâEngil Angola. Besides building the
school, the company offered each stuâdent a kit with school supplies. Thus, the company sought to motivate the students attendance, thereby reducing the absenâtee rates seen in the region.
Because the education sector is vital for the growth of a developed society, MotaâEngil Angola is very proud of its participation.
AFRICA
The participation of MotaâEngil Angola in this offer presented
to Calueque's residents was aimed at contributing to the
education and training of children and young people,
transforming them into aware and compassionate citizens,
responsible for their own sustainable development.
Maria Teresa and Maria Manuela Mota at the inauguration of the school
41
SEPTEMBER 2015
RWANDA
AFRICA
MOTAâENGIL AFRICA HAS OPENED A DOOR TO THE REPUBLIC OF RWANDA
Kigali Airport itâs the first project
MotaâEngil Africa has opened a door to The Republic of Rwanda, a new country offering new horizons for the company. Rwanda is a landlocked East African country whose green, mountainous landscape has earned the nickname âLand of a Thousand Hills.â Its renowned Volcanoes National Park is home to mountain gorillas and golden monkeys. Rwanda is bordered by Uganda, Tanzania, Burundi and the Democratic Republic of the Congo.
It's a country that is in a trajectory of growth. Between 2001 and 2014 the country registered an annual average growth of 9%, driven by coffee and tea exports and the growing tourism. This provides numerous opportunities for MotaâEngil. The work as began with the flagship project âKigali Infrastructure Taxiway and Apron Improvementsâ. The project is being managed by Denis Martindale while JoĂŁo Neto is the Country Director.
JoĂŁo Neto has just recently completed the management of Nacala Railway Project.
JoĂŁo Neto, country director
A challenge that he accepted and overcame with great results. Now he becomes part of the solution for this new emergent market in Africa.
The Kigali Airport Project includes the civil engineering construction of the new taxiway, a new hangar and electriâcal installation of AGL and Floodlights. The contract is worth 23 million dollars with a 10 month contract duration. The date of completion is estimated in the spring of 2016.
MotaâEngil Africa Rwanda Branch has 100% of the contract that will involve 187,438 m3 of excavations, 24,243 m3 of Stone, 15,167 m3 of bituminous works and 231 aircraft ground lights. This project is the first of its kind in this new market, and is just the beginning for MotaâEngilâs presence in Rwanda. With the excellence and quality of our work that we exhibit in all other markets being brought to the country, and with a cohesive team in place, the trajecâtory of growth for MotaâEngil Africa continues.
ANGOLAMALAWI
MOZAMBIQUESOUTH AFRICA
CAPE VERDESĂO TOMĂ AND PRĂNCIPE
ZAMBIAZIMBABWE
GHANA UGANDARWANDA
42
MOTA-ENGIL IN THE WORLD
SINERGIA 47
Gilberto Rodrigues was the speaker
at the event in London
FINANCIAL TIMES AFRICAN
INFRASTRUCTURE
Gilberto Rodrigues was guest speaker at the Financial Times African Infrastrucâture Financing and Development 2015 Summit that took place in London.
The purpose of the event, sponsored by the Financial Times, was to present the investment potential African continent represents, more specifically, to raise awareness on the needs for investment in infrastructures, especially on the energy sector. This would allow the economic development of the region and improve the quality of life for its citizens, while attracting the interest of companies, multilaterals, pension funds and private equity companies.
In his speech, Gilberto Rodrigues spoke of the challenges and opportuânities for construction companies in Africa, sharing the consolidated experiâence of MotaâEngil, working in Africa for 69 years.
In addition, MotaâEngil Africa had a booth at the event, to make the brand known and noticed by the financial instiâtutions present.
MotaâEngil Africa was represented by Gonçalo Moura Martins, Bruno Machado, Carlos Pascoal, Pedro Antelo, Antonio Pimenta and the marketing team.
AFRICA
Gilberto Rodrigues spoke of the challenges
and opportunities for construction companies
in Africa, sharing the consolidated experience
of MotaâEngil, working in Africa for 69 years.
43
SEPTEMBER 2015
AFRICA
As administrator and the main responsible for operations in Africa, Gilberto Rodrigues will thus be at the forefront of creating programmes at CCA designed specifically to attract potential investment partners in Africa.
The Corporate Council on Africa (CCA) was formed in 1993 for the purposes of contributing to the strengthening of comâmercial relations between the United States of America (USA) and the African continent. MotaâEngil Africa has been part of this body since 2013.
The CCA works closely with governâments and multilateral entities to imâprove the investment and business climate in Africa, and to renew the perception of African markets within the U.S. business community.
For this organisation, the future sucâcess of Africa depends on the ability of managers and entrepreneurs to creâate wealth through the private sector. American companies and even its citiâzens can contribute more efficiently if partnerships are created, and areas in the private sector are identified in which the US and its companies can bring added value by setting up companies, investing capital, and transferring techânology and management.
Following up on their activities, at the beginning of 2015, the management
of CCA proposed the nomination of Gilberto Rodrigues, CEO of MotaâEngil Africa, to the Board of Directors of CCA.
On this occasion it was possible to know other members such as Paul Hinks (chairman of CCA and also the CEO of Symbion Power), Antony Cook (Microsoft), Aliko Dangote (Dangote Group), Jay Johnson (representing the Chevron Group), Jay Ireland (General Electric), and David Picard (Caterpilâlar), among others.
As administrator and the main responâsible for operations in Africa, Gilberto Rodrigues will thus be at the forefront of creating programmes at CCA designed specifically to attract potential investâment partners in Africa, and at the same time raising the profile of the African continent in the USA, a process to be developed through contacts and the creâation of business relationships, as well as the promotion of a forum to share ideas and information.
For more information on the CCA, please consult: www.africacncl.org/
CORPORATE COUNCIL ON AFRICA (CCA)
The CCA was formed for the purposes of contributing to the commercial relations between the United States of America and the African continent
Gilberto Rodrigues participates in the CAA work group
44
MOTA-ENGIL IN THE WORLD
SINERGIA 47
GILBERTO RODRIGUES WAS GUEST SPEAKER IN WASHINGTON
Event organised by the EXIM Bank
Every year, the EXIM Bank promotes a conference that gathers over 1,200 exporters, responsible for purchases at international level, politicians and government representatives to analâyse global trends in commerce and how American companies can take advantage to increase exports and create jobs.
In the event held in Washington, the CEO of MotaâEngil Africa, Gilberto Rodrigues, participated in two work sessions as speaker, accompanied by Rattan DâSouza, a consultant who colâlaborated with MotaâEngil Africa in promoting commercial relationships with American companies.
The EXIM Bank is an independent fedâeral agency that supports the U.S. exâports sector, providing financial mechâanisms such as guarantees, loans and export credit insurance, in order to contribute to strengthening the sales of American goods and services proâvided by American companies abroad. In 2014, it approved operations worth 20.5 billion dollars, which helped with 27.5 billion exported, and the
creation of 164,000 jobs in the comâmunities it supported.
Having as central theme of the sesâsions the airports of the future and the changes anticipated in the sector, Gilberto Rodrigues shared with those present his vision of the future for the airport sector and its economic agents, using as an example the new Kigali inâternational airport, in Ruanda, which MotaâEngil Africa is building for the loâcal government.
The second session in which Gilberto Rodrigues participated was attended by American exporters responsible for purchases and developing business in Africa. The objective was to share inâformation about the action model to the African continent and to identify opporâtunities for American exporters, namely in identifying the countries and sectors with the greatest potential.
In this session, the CEO of MotaâEngil Africa presented the strategic vision of his company for expansion in Africa, strengthening new opportunities with potential partners present at the event.
AFRICA
Gilberto Rodrigues, CEO of MotaâEngil Africa
45
SEPTEMBER 2015
AFRICA
MOTAâENGIL AFRICA MEETING AND WORKSHOP
ON STRATEGIC PLANNING
Event attended by top executives from
every country where the company is present
MotaâEngil Africa management team promoted a meeting different from cusâtomary, by inviting to Johannesburg all of the executives with management responsibilities in each African marâket for an annual strategic planning workshop. This was an opportunity to gather, for the first time and around the same table, those responsible for the different markets.
CEO Gilberto Rodrigues started the event by speaking of the history, viâsion and strategy for the future of MotaâEngil Africa. He also shared the perspectives and the economic conâtext the company currently faces.
Throughout the day, those responsible presented their ideas, ensuring a sharâing of positions for the work to be deâveloped this year. This was followed by the expansion criteria for the new markets and identifying opportuniâties by sector of activity and for each
country. After that, was discussed the strategic planning process, along with the future envisioned for MotaâEngil Africa.
During the session there was also an opâportunity to organise small work groups, which allowed colleagues from different countries to share ideas and experiences, and to propose alternative solutions for the challenges expected this year. The benefits of this exercise were evident during the work session.
Once the conclusions of the work sesâsion and the ideas to achieve the vision for the future of MotaâEngil Africa had been presented, Gilberto Rodrigues closed the work, encouraging those presâent to be part of the solution needed for growth and continuing innovation. He stressed that everyone should work toâgether for the single objective of making MotaâEngil Africa greater, more diversiâfied and united.
CEO Gilberto Rodrigues started the event by
speaking of the history, vision and strategy for
the future of MotaâEngil Africa. He also shared
the perspectives and the economic context the
company currently faces.
46
MOTA-ENGIL IN THE WORLD
SINERGIA 47
Promoted by those in charge of the BiĂłpio quarry, in partnership with the department of marketing, communicaâtion, image and social responsibility of MotaâEngil Angola, a social responsibility event took place at an elementary school in the Commune of BiĂłpio.
This action included the donation of school material to elementary school students by MotaâEngil Angola, which was represented by the senior managers: SĂ©rgio Bento, Alexandre Monteiro, Paulo Vaz, NĂ©lia SebastiĂŁo, Nuno Moreira and Joana Viegas. The School Board of BiĂłpio
BIĂPIO QUARRY SOCIAL RESPONSIBILITY
ACTIVITY
Promoting education was the main objective
Commune was represented by Frederico Calumbo, sent by the BiĂłpio Administraâtion, AntĂłnio Vasconcelos, accompanied by local representatives, traditional regional leaders (sobas) and the coordinaâtor of the neighbourhood.
The event took place in the primary school of the village of Cabrais, commune of BiĂłpio, municipality of Catumbela, province of Benguela. It was developed as part of the social support for the BiĂłpio quarry, in the context of obtainâing the environmental license issued by the Ministry of the Environment. The
AFRICA
47
SEPTEMBER 2015
school has 45 students, ranging from six to eight years old.
This action, which is part of the policy of responsibility and social cohesion of MotaâEngil Angola, also gave to each student a kit consisting of notebooks, pencils, pens, erasers, pencil sharpener, ruler, markers, a backpack and a gown.
With these new materials, the company seeks to promote education in the region, to ensure that even those in need have the tools to allow them to build a productive future, with higher indexes of happiness and wellâbeing.
Once again, MotaâEngil Angola has strengthened its presence in a sector such as education, vital for the growth of a developed society. The company is very proud to be part of this process, and thus contribute to the growth and affirmation of Angola in the world.
MotaâEngil Angola has strengthened its presence in a sector such as education, vital for the growth of a developed society. The company is very proud to be part of this process.
48
MOTA-ENGIL IN THE WORLD
SINERGIA 47
AFRICA
The municipality of Luanda has decided to promote projects to repair the infraâstructures of the municipality, such as roads, walkways, kerbstones and road signs. Present at the signing of the conâtract awarded to MotaâEngil Angola were the Governor of the province of Luanda, Graciano Domingos, and the chairman of the Board of Directors of MotaâEngil Angola, Paulo Pinheiro.
Also present for this act were distinâguished representatives of the Govâernment of Angola, who, with their presence, wanted to demonstrate the importance of this contract for the conâtinuing improvement and requalificaâtion underway in Luanda, making this
city a benchmark at the international level. Representing MotaâEngil Angola were AntĂłnio Graça, Calheiros Cruz and Tavares Rodrigues.
Integrated in the framework of the comâmemorations of the 40th anniversary of National Independence, this project has a budget of 78.9 million dollars (about 860 billion kwanzas) and an execution period of six months, with completion projected for 9 November of this year.
Sixteen streets were selected as priorâity, among which are the Comandante Arguelles, Josina Machel, 17 de Setemâbro, Coqueiros, Frederico Engels, Maâjor Kanhangulo, Largo do Ambiente,
MOTAâENGIL ANGOLA SECURES NEW
CONTRACT IN LUANDA
Works aimed at repairing the streets of Luanda
49
SEPTEMBER 2015
Paulo Pinheiro and the Governor of the province of Luanda, Graciano Domingos, celebrate the agreement
and the axis known as Eixo ViĂĄrio consisting of the avenues Ngola Kiluâanje, Lenine, Joaquim Kapango, Braâsil, ValĂłdia and Portugal.
By allowing the optimisation of muânicipal road traffic, this work will enâable an increase in the quality of life for the inhabitants of Luanda and also leading to the improvement of one of the most outstanding features of this prestigious country.
For MotaâEngil, after completion of the emblematic work of Luanda Bay, this is a new opportunity to continue contributing to the development of the Angolan capital.
By allowing the optimisation of municipal road traffic, this work will enable an increase in the quality of life for the inhabitants of Luanda.
50
MOTA-ENGIL IN THE WORLD
SINERGIA 47
The first stone of the works of enlargeâment of the Northern Bypass road between Kampala and Namboole was laid in a ceremony attended by the President of Uganda, Yoweri Museveni, who thus honoured the event with his prestigious presence.
Representing MotaâEngil at the ceremoâny were Gilberto Rodrigues, Carlos Pascoal and Francisco Franca.
The inaugural celebration was also attended by the Ambassador Head of Delegation European Union to Uganda, Kristan Schmidt, the former Minister of Public Works, Abraham Byadala, and representatives of the Uganda National Roads Authority (UNRA).
The project, financed by the European Union, the European Investment Bank and the Government of Uganda, is estimated at 67.4 million euros and is expected to be completed in July 2017. The work will have an extension of 21 km between Busega and KampalaâJinja, and includes drainage and earthmoving
MOTAâENGIL BEGINS WORKS
ON KAMPALA NORTHERN
BYPASS ROAD
The ceremony was attended by the
President of Uganda, Yoweri Museveni
works, two 3.5 km carriageways, and their respective kerbs, safety equipâment, walkways, road separators, fences and lighting, as well as the construction of pedestrian bridges and bus stops. The new motorway is adjacent to an existing 17.5 km road.
There is a strong need to develop a sustainable transport network in Uganda and this new enlargement work is fundamental to increase vehicular traffic and to make the roads more efficient. This will make the country more appealing to investment, and thus contribute to a higher level of developâment and competitiveness.
The project, financed by the European Union, the European Investment Bank and the Government of Uganda, is estimated at 67.4 million euros and is expected to be completed in July 2017.
AFRICA
Gilberto Rodrigues accompanies Yoweri Museveni, President of Uganda, and Kristan Schmidt, Ambassador of the European Commission at the ceremony
51
SEPTEMBER 2015
MotaâEngil Africa Moçambique will provide mining work, including drillâing, excavation, loading and transport of sterile material resulting from the expanâsion of the Moatize coal mine managed by Vale company.
The material handling will total 50 million tonnes throughout the 18 months of the contract, with a total value of 111 million dollars.
With the equipment mobilised and duly prepared for the operation, MotaâEngil Africa Moçambique will have an equipâment fleet dedicated to the project consisting on a total of four 250âtonne
MOTAâENGIL SIGNS MINING CONTRACT WITH VALE IN MOZAMBIQUE
AFRICA
AFRICA
bulldozers and twentyâfour 100âtonne dumpers to the project's execution, with the support of six 50âtonne bulldozers, two 25âtonne motor graders, and three 75âtonne drilling cars.
The project will have a total of 300 fullâtime workers at the peak of production, consisting of 50 expatriate employees and 250 Mozambique national employees.
MotaâEngil Africa thus continues a partnership relationship with VALE, strengthened with the success of the work performed by the builder in sections 3 and 5 of Nacala Corridor, between Mozambique and Malawi.
MOTAâENGIL AFRICA MOZAMBIQUE HONOURED WITH THE TEKTĂNICA MOĂAMBIQUE 2015 AWARD
As in previous editions, the Mozambique branch of MotaâEngil Africa received the TektĂłnica Mozambique 2015 award in the category of Grandes Projectos â Large Projects. In this edition the award in the Large projects category was attributed to MotaâEngil and to the Mozambique company Administração Nacional de Estradas (ANE). After being recognised as the largest builder in the Mozambique market (see the last edition of SINERGIA), MotaâEngil was again recognised for its technical ability and for mobilising its resources to achieve some of the most notable infrastructure projects executed in this country.
Project expected to last 18 months
52
MOTA-ENGIL IN THE WORLD
SINERGIA 47
The contract, developed for the Mozambiâcan company Portos e Caminhos de Ferro de Moçambique, E.P. â CFM, involves the construction of a new railway bridge over Umbeluzi River and the respective access tracks. This will allow the existing bridge, to be placed out of service once is showing signs of advanced material deterioration.
The new railway bridge over UmbelĂșzi River has a total length of 363 m and it consists on a composite deck of 2.70âmetresâhigh metal beams and a prefabricated reinforced concrete slab with free expansion at the right abutment
Having as client the Ministry of Justice, MotaâEngil is developing the construcâtion of the headquarters of Instituto do PatrocĂnio e AssistĂȘncia JurĂdica (Instiâtute for Legal Assistance and Representaâtion â ILAR), in Mozambique.
The project includes an office building designed for services to be provided at the central level by the ILAR, as well as this instituteâs branch for the city of Maputo, with the capacity to house approximately 170 workers. The construction area will be 4,949 m2, within an area of land of 912.80 m2. The building has eight floors, one of which is the basement with an approximate area of 870 m2. The other
MOTAâENGIL AFRICA MOZAMBIQUE
BUILDS THE HEADQUARTERS
OF INSTITUTE FOR LEGAL
REPRESENTATION AND ASSISTANCE
NEW RAILWAY BRIDGE OVER
UMBELĂZI RIVER
MotaâEngil Africa Mozambique begins
the works
AFRICA
AFRICA
and a blocker in the left abutment. The five pillars and one of the abutments are founded in heading masses set in 26 piles. The roadwork to be developed consists of laying 1,550 metres of ballast tracks, of which 678 are to the north of the bridge (Maputo side), 340 metres on the deck of the new bridge, and 532 to the south of the bridge.
The existing Goba line between km 37+138 and 38+600 will be deactivated immediâately after the connection to the new alternative, and will then be torn down and removed.
seven floors have an approximate area of 580 m2 for offices and support areas.
53
SEPTEMBER 2015
With an extensive and notorious background due to the construction some of the most emblematic buildings in the city of Maputo, MotaâEngil is currently building a hotel in Nampula â a project awarded last March which is currently the largest ongoing work in this region of Mozambique.
The project consists of adapting an existing structure, including all finishing works and facilities for construction of a 5âstar hotel in Nampula with 117 rooms. The aim is to achieve a level of excellence that sets it apart from the hotel offerings
MOTAâENGIL AFRICA MOZAMBIQUE CONSTRUCTS THE LARGEST ONGOING WORK IN NAMPULA
MOTAâENGIL AFRICA MOZAMBIQUE
BEGINS REHABILITATION
WORKS FOR MOZAL
Grand Plaza Hotel Nampula
AFRICA
AFRICAIn Mozambique, MotaâEngil recently started the work of rehabilitation and improvement of the streets located inside the factory and in the port of Mozal â an area for parking and stocking aluminium.
The rehabilitations to be developed for this important Mozambican company will be achieved by treating all patholoâgies in the road surface with the respecâtive repairs, and later providing a layer of modified bitumen.
in similar buildings in the region. The architectural project is by the architect Steve Reynolds, from Durban, Republic of South Africa.
Besides this work, the contract includes the laying of concrete paving in the port area and all horizontal signalling in the surfaced areas.
The project, awarded last March, is currently the largest ongoing work in this region of Mozambique.
54
MOTA-ENGIL IN THE WORLD
SINERGIA 47
AFRICA
MotaâEngil Africa Mozambique is currently working on the expansion and modernisation of a group of hospitals for the Ministry of Health of the Repubâlic of Mozambique (MHRM).
MotaâEngil thus continues to ensure the strengthening of its leadership position in the construction industry in this market, developing projects that contribute to better health services to the population, and making a signifiâcant investment to the development of Mozambique.
1. MAVALANE HOSPITALClient: MHRM â Ministry of HealthStatus: Blocks F, H, Ebola ward, and rehabilitation of Polana Caniço Hospital completed and delivered. Block NO completed and awaiting provisional acceptance. Block PQ in finishing works phase.Brief description: The expansion of the Hospital consists of four separate blocks, being build from the ground up (blocks N, O, P and Q) and the rehabilitation of two existing blocks (blocks F and H).
MOTAâENGIL AFRICA
MOZAMBIQUE BUILDS
HOSPITALS FOR THE MINISTRY
OF HEALTH
Works of expansion and modernisation
of five hospital units, in a significant investment
for the development of the country
MotaâEngil thus continues to ensure the strengthening of
its leadership position in the construction
industry in this market.
The contract includes demolitions, earth moving, building a surrounding wall, structure, finishing works, specialities, and works on the exterior. It should be noted that the general contract also included the Ebola Ward and rehabilitaâtion of a fourâstorey building at Polana Caniço Hospital.
2. MATERNITY BUILDING OF MAPUTO CENTRAL HOSPITALClient: MHRM â Ministry of HealthStatus: CompletedBrief description: This project includes the full rehabilitation of the maternity ward, part of Maputo Central Hospital, consisting of three floors of infirâmary wards and one floor of operating theatres.
3. DERMATOLOGY BUILDING OF MAPUTO CENTRAL HOSPITALClient: MHRM â Ministry of HealthStatus: Structure in reinforced concrete being built. Brief description: This project consists of the construction of the dermatology ward, in Maputo Central Hospital. This is a building to be constructed from the
Maternity building of the Maputo Central Hospital
55
SEPTEMBER 2015
The Platinum Building, which incorporates a merger of residences, offices and shops in the timeless Avenida Julius Nyerere, in the upscale area of Maputo, has finished the construction of the residential building structure of the with 25 floors and the office building with 21 floors.
The construction phase of the structure in reinforced concrete is concluded, and the work is now in the phase of finishing works and execution of technical instalâlations. The roof slab, corresponding to a leisure area with a panoramic pool and a remarkable view overlooking the city and Maputo bay, is completed. Also completed is the model apartment of the building. Characterised by its minimalâist features, where the signature of the architect Frederico Valssassina is evident in the concern with the harmony in the combination of materials.
PLATINUM BUILDING COMPLETES MODEL APARTMENT AND REACHES THE LAST FLOOR
MotaâEngil Africa Mozambique works carried out by Promovalor
AFRICAThis project is promoted by Promovalor, and thus MotaâEngil, as the responsible construction company, is associated with an outstanding quality project in the city of Maputo.
Mavalane Hospital
Macia Hospital
ground up, with two floors and reusing the roof on a metal structure. It has a covered area of about 925 m2 and a total construction area of 2,603 m2.The dermatology ward block is projected to 56 beds, with the following specialty services: chemotherapy, phototherapy, therapeutic baths, and heliotherapy treatments. These services are available on the two floors and roof that make up the building. Communication between the different rooms of the floor is done through a corridor located after the reception area for patient triage in the building. The treatment rooms are at the entrance to the floor, and the inpatient rooms and bathrooms are in an internal area, ensuring some privacy for hospitalised patients and service personnel.
4. RADIOTHERAPY BUILDING OF MAPUTO CENTRAL HOSPITALClient: NEOPHARMA, LDAStatus: Structure completed
Brief description: The work consists in building the structure of the radioâtherapy unit of the Maputo Central Hospital.This project is divided into two parts: the bunker to install the radiotherapy treatâment equipments and the support area.The structure in reinforced concrete was executed in exposed concrete with stereotomy executed using wooden boards.
5. MACIA HOSPITALClient: MHRM â Ministry of HealthStatus: Finalisation of earthmoving and start of marking and excavation of the foundations.Brief description: Construction of Macia District Hospital consisting of eight distinct buildings (administration, infirmary, maternity, operating theatres, among others) and six residences for workers in a gross construction area of approximately 5,500 m2, to be done within 18 months.
56
MOTA-ENGIL IN THE WORLD
SINERGIA 47
It has become a tradition for MotaâEngil Africa Mozambique to celebrate the 1st of May by taking part in the traditional ceremony in the Workers Plaza in Maputo, and this year was no exception. In the event participated workers from all of the existing areas in Mozambique market, especially the city of Maputo and its province.
MOTAâENGIL AFRICA
MOZAMBIQUE CELEBRATES
LABOUR DAY WITH ITS EMPLOYEES
AFRICA
AFRICA
After the parade, the commemoraâtions continued in the Machava central construction yard, with a speech congraâtulating all of the workers involved in the company, followed by a luncheon. These commemorations were also held in all of the provinces where MotaâEngil Africa Mozambique conducts activities.
The event, held in Maputo at Centro Cultural PortuguĂȘs (Portuguese cultural centre), was addressed to Portuguese entrepreneurs wishing to open businesses in Mozambique.
MOTAâENGIL GIVES PRESENTATION ON THE PROGRAMME
INTERNATIONALISING IN PARTNERSHIP IN MOZAMBIQUE
Invited by the Embassy of Portugal, Paulo Pereira, CFO of the Mozambique market, gave a presentation about âinternationâalising in partnershipâ at the economic seminar More and Better Credit for Microâcompanies and SMEs in Mozambique.
The event, held in Maputo at Centro Cultural PortuguĂȘs (Portuguese cultural centre), was addressed to Portuguese entrepreneurs wishing to open businesses in Mozambique. Topics related to financâing instruments were discussed, such as the Portuguese business cooperation
fund, Fundo Empresarial da Cooperação Portuguesa â FECOP, and the funding instruments of the financial development society, Sociedade Financeira de Desenâvolvimento â SOFID, and the Internationâalising in Partnership programme.
The presentation given by MotaâEngil was based on the Internationalising in Partnerâship programme, a partnership between MotaâEngil, Caixa Capital, and Portugal Ventures, which looks to providing operating and financial support for interânationalisation projects of Portuguese industrialâbased companies.
57
SEPTEMBER 2015
MOTAâENGIL INAUGURATES WORKS IN CAPE VERDE
Construction projects of Banca Furada dam and management of the Ribeira da Prata river basin, both in S. Nicolau island, were completed
MotaâEngil inaugurated Banca Furada dam in a ceremony presided by the Prime Minister, JosĂ© Maria Neves.
Situated in FajĂŁ, near Ribeira Brava, the new infrastructure with a 300 thousand mÂł of water capacity, will irrigate a total area of 35 hectares, benefiting about 175 local farmers.
The work, in the amount of 6.35 million euros, was financed under a 200 million euro line of credit, which has already allowed the construction of five identiâcal infrastructures, four on the island of Santiago and one on the island of Santo AntĂŁo.
Recently, MotaâEngil also inaugurated the work of Ribeira da Prata river basin planning, the largest in Cape Verde. This work lasted two years and had a total investment of 700 million Cape Verde escudos (6.3 million euros).
The work included the construction of an underground dam, with a pumping
device fed by solar energy, 30 torrenâtial control dykes, 16 deposits, six collection dykes and about 7 km of water distribution pipes in HDPE. This management should benefit approxiâmately 350 farmers directly and create 400 indirect jobs.
âWe are making large investments in agribusiness because we want it to be a competitive sector, able to generate more revenue and more jobs so that we can accelerate the rhythm of growth and developmentâ, pointed Prime Minister JosĂ© Maria Neves at the inauguration.
Ribeira da Prata river basin Banca Furada dam
Ribeira Prata
AFRICA
58
MOTA-ENGIL IN THE WORLD
SINERGIA 47
AFRICA
MALAWI SHIPPING COMPANY WAS
THE LOGISTICAL BASE FOR
SCIENTIFIC EXPEDITION
The ship MVâKatundu hosted a vast scientific
community and received cuttingâedge
equipment to carry out an important geological and geophysical study on the movement of the earthâs
crust, earthquakes and volcanoes
The Malawi Shipping Company (MSC) made part of a team to carry out a study on the earthâs crust at the bottom of Lake Niassa, located in the Great Rift Valley, between Malawi and Tanzania. In this expedition, the Malawi Shipping Company collaborated significantly providing the largest ship in the fleet, the MVâKatundu, with 61.5 metres in length, 12.5 metres in width and 720 tonnes of cargo capacity.
The MVâKatundu served as the logistiâcal base for the expedition, since all equipment used for the research operaâtion was installed on the ship, namely the container for monitoring, control, recording and collecting seismic data, a 20âtonne telescopic crane, the hydraulic winch for the research equipment, high pressure air compressors, the office and the dormitories.
The objective of SEGMeNT (Study of Extension and MaGmatism in Malawi aNd Tanzania), the study and scienâtific research project name, is to study the complex of tectonic faults created around 35 million years ago with the separation of the African and Arab tectonic plates.
This scientific research is a partnership of the Government of Malawi with the Government of Tanzania, Columbia University, Syracuse University and other education institutions and will also provide new information about earthquakes and volcanoes in the region.
The work was developed between the North of Malawi and the South of Tanzaânia, and gathered a vast team of geosciâentists, technicians, scientific equipâment operators and naval crew, who were also supported by a vast team from the Malawi Shipping Company which, from land, provided all operational support in setting up and supporting the operation.
Taking into account the transformaâtion held in the shipâs environment and the added number of people of the research team, additional equipment had to be installed on board to provide extra rescue, safety, and firefighting means. This was done also to comply with all the requirements of the maritime and work safety authorities, who performed the proper inspections on the ship.
This work was being conducted between the
North of Malawi and the South of Tanzania, and gathered a vast team of
geoscientists, technicians, scientific equipment
operators and naval crew, who were also supported
by a vast team from Malawi Shipping Company.
59
SEPTEMBER 2015
MOTAâENGIL CONSTRUCTS
ICONIC BUILDING IN THE HEART OF JOHANNESBURG
MotaâEngil will leave its mark with the construction
of an important office and residential building
in Johannesburg
MotaâEngil signed a contract with Lushaka Investments to construct a residential and office building in Sandton, the business and financial centre of Johanânesburg, in South Africa.
The iconic Central Square Building is a 483.7 million rand (about 34.7 million euros) project, and the work is expected to last 24 months.
MotaâEngil Construction South Africa will fully assume the construction, which will involve 18,250 mÂł of concrete, 530 pillars, 2,000 mÂČ of aluminium and glass for the windows and 1,495 tonnes of steel, in a total new construction area of 65,000 mÂČ.
This will be the project that allows the emergence of MotaâEngil brand in the construction market in South Africa and provides an opportunity to show the experience of almost 70 years in the sector at the international level.
MotaâEngil Construction South Africa started out by working through a South
African construction company it conquer, but is now gradually starting to acquire its own work, integrating the group of 11 countries in which MotaâEngil is working in the production of important projects on the African continent.
AFRICA
AFRICA DO SUL
60
MOTA-ENGIL IN THE WORLD
SINERGIA 47
MotaâEngil took part in the Small Builders Development Course business development project in South Africa, sponsoring the course designed for 24 owners and workers of small and medium companies. The course was specifically aimed at sustainability and the growth of the SME, and allowed the trainees to acquire important informaâtion on how to effectively administer a construction company.
During the training, participants prepared a business plan, and had
their questions regarding how to find and obtain work, and how to carry out an efficient construction project answered. They also received other important tools on how to be successâful in the industry. This initiative has proven to be important to MotaâEngil, since it is a way to transmit the experience of almost 70 years in the construction sector, contributing to the quality of the work of the subconâtractors who will be participating. The course will be divided in 14 sessions, during of six months.
MOTAâENGIL INVOLVED IN TRAINING PROJECT IN SOUTH AFRICA
MotaâEngil South Africa sponsored a sixâmonth course designed for workers and owners of small construction businesses
AFRICA
MOTAâENGIL TAKES PART IN AFRICAN
CONSTRUCTION EXPO
MotaâEngil Africa was one of the main sponsors of the African Construction Expo, Building Africa Together event, which took place along with the Totally Concrete week. This is one of the greatâest events for the construction indusâtry in South Africa, and it was held in the Sandton Convention Centre in Johannesburg.
The initiative is organised in order to present among the participants the latest innovations, construction technologies, and investment opportuânities in South Africa.
The sponsorship of MotaâEngil Africa aimed to contribute to the promotion of excellence in this sector in South Africa by sharing knowledge and experiâences. During the event there was an opportunity to highlight Nacala Rail Corridor, constructed by MotaâEngil in Mozambique and Malawi, since JoĂŁo
The event was an important opportunity to show
the work and experience of the MotaâEngil Group
in South Africa
Neto, who is responsible for the work, was invited to make a presentation to the participants.
This event also gave MotaâEngil Africa a chance to strengthen the visibility of MotaâEngil in Sandton, the business and financial centre of Johannesburg, in South Africa, thus affirming to the construction indusâtry that the company officially in the South African market, where it recently started its activity working under the MotaâEngil brand.
AFRICA
61
SEPTEMBER 2015
MotaâEngil was awarded the contract to build a five star hotel on the island of PrĂncipe, an investment by the South African HBD Group worthing over 12 million dollars. The luxury hotel complex will be built on Sundy beach, considered as the tourist area of the autonomous region of PrĂncipe, 150 km from SĂŁo TomĂ©. The project is to be completed in 2016. SĂŁo TomĂ© e PrĂncipe Minister of the Economy, Agostinho Fernandes, attended the contract signaâture between HBD, represented by Nuno Rodrigues, and MotaâEngil, represented by David Santos.
The Minister recalled that the construction of this hotel is within the context of the framework agreement of investment, signed four years ago between the HBD Group, owned by the South African Mark Shuttleworth, and the regional government of PrĂncipe led by JosĂ© Cassandra. Besides the investment in hotel and tourism infraâstructures on the island, MotaâEngil has also developed works of rehabiliâtation and modernisation of the sole airport of Principe.
MOTAâENGIL CONSTRUCTING A FIVE STAR HOTEL ON THE ISLAND OF PRĂNCIPE
MotaâEngil is now investing in the construction of a luxury hotel unit, 150 km from SĂŁo TomĂ©
AFRICA
VIBEIRAS COMPLETES WORK
IN MOROCCO
Project consisted of works in the outside areas
of a housing urbanization in the coastal area of Salé
Morocco's branch of Vibeiras is finishing the project of reconstructing the outside areas accessing the new sales centre of Bab Al Bahr project, in a 1.5 millionâeuro contract.
Bab Al Bahr means âdoor to the beachâ and is located in the city of SalĂ©, next to the banks of Bouregreg River, on the Northwest coast of the country. This is a deluxe real estate project, which is being built. The challenge presented to Vibeiâras was to complete the project in only 30 days (after the resolution of all special issues), which required the mobilisation of the entire company.
Both the owner of the project, who is originally from Dubai, and the team of designers and consultants were keen on
AFRICAdemonstrating their satisfaction with the results of the work. We expect to be able to present new proposals and new projects to be completed in this market where Vibeiâras has been consolidating its position.
62
MOTA-ENGIL IN THE WORLD
SINERGIA 47
The extension of the light urban rail system (line 3) in the metropolitan area of Guadalajara, capital of the Mexican State of Jalisco, is one of the most amâbitious and valuable projects being developed by MotaâEngil in Mexico. It includes what is currently, among many other challenges, the most imâportant underground engineering project ever developed by MotaâEngil in the world. SINERGIA went to Mexico to get to know the city, the project and its protagonists.
GUADALAJARA: THE SECOND LARGEST URBAN AREA IN MEXICOThe Metropolitan Area of Guadalajara is the second largest urban area in a country of over 120 million inhabitâants. It is the 10th largest urban area in all Latin America, in which every day 4.5 million inhabitants commute. This is a region with a GDP ranking among the top 10 in Latin America, driven
by an economy sustained by industry, services and cultural, religious and gastronomical tourism. The municipalâity of Tequila, birthplace of the national Mexican drink, is a neighbour of Guaâdalajara in the State of Jalisco, and is also famous for such culinary delights as pozole, tamales and especially tortas ahogadas, which canât be found in any other part of the world. In October, the city is the stage for the second most imâportant religious event in all Mexico: La Romeria (âThe Pilgrimageâ), in honour of the Virgin of Zapopan, with a two million people procession. Other mustâvisit points in the historic centre of Guadalajara are the Cathedral, the Paâlacio de Gobierno (government palace), the Monumento Ă la IndependĂȘncia (monument to independence), and the churches of San JosĂ© and San Franâcisco. What does this have to do with our work? Everything, as we shall see in the following pages.
LATIN AMERICA
LATIN AMERICA
GUADALAJARA METRO
A Mega Project, a Mega Mission: to Accomplish!
Within two years around 250,000 persons will be
transported on this route every day.
63
SEPTEMBER 2015
A PUBLIC SERVICE PROJECTThe Guadalajara Light Train project that has been eagerly awaited by the popuâlace for a long time, and its main client is the SecretarĂa de Comunicaciones y Transportes del Gobierno Federal â State Secretariat of Communications and Transport of the Federal Government. Its objective is to unite the areas of Zaâpopan, Guadalajara and Tlaquepaque.
The mission of the consortium, led by MotaâEngil, is the construction of 12 metro stations (seven elevated and five underground) distributed along 14 km of tracks, subdivided within two parts â one part in viaduct and another in tunnel â, and uniting those stations.
Within two years, upon completion of construction of line 3, around 250,000 persons will be transported on this route every day. They will then be able to connect to lines 1 and 2 of the
light rail network, as well as the metroâbus and the bus station.
The section of elevated rail viaduct for which MotaâEngil is responsible will exâtend for almost 9 km, with a deck width of 10.7 m. The platform is of static type, with a maximum distance between supâports of 45 m. Each of the seven elevated stations will be 95 m in length, and anâother 75 m if we consider the accesses.
As for the underground section, it will travel a total of 5.36 km, starting at the La Normal station and ending at the Plaza de la Bandera station, two of the busiest areas of the city. With the help of an earth pressure balanced tunnel boring machine (EPB) with a mixed front requested and customâdesigned to perforate rock â like a tunnel boring machine (TBM) â or soil with the same efficiency and without havâing to use more than one machine.
ELEVATED VIADUCT
âș Section 1: 8.35 kmâș Deck width: 10.7 mâș Lower gauge: 6 mâș Type of viaduct: Isostatic.
Maximum distance between supports: 45 m
âș Approach viaduct: Statically indeterminate of three or four spans
âș Maximum distance between supports: 33 m
MAIN QUANTITIES:âș Concrete: 157,496 m3
âș Structural steel for the viaduct: 17,750 tonnes
âș Structural steel for the stations: 12,250 tonnes
âș Reinforcement steel: 29,131 tonnesâș Pillars: 61,000 m
DIMENSIONS:âș Length of the pier: 75 mâș Length of elevated stations: 95 mâș Length of underground stations:
110 mâș Maximum slope: 5%
UNDERGROUND SECTION
âș Type of tunnel boring machine: EPB (Earth Pressure Balanced) mixed front (soil/rock)
âș Inside diameter: 10.40 mâș Outside diameter: 11.55 m
MAIN QUANTITIES:âș Concrete: 323,000 m3
âș Reinforcement steel: 42,000 tonnesâș Excavation: 1,285,000 m3
âș Jet grouting: 20,000 m3
DIMENSIONS:âș Length of the perforated tunnel:
3.9 kmâș Total length of the tunnel: 5.35 kmâș Thickness of the staves: 38 cm
64
MOTA-ENGIL IN THE WORLD
SINERGIA 47
The tunnel will have a section with 11.55 m in diameter, linking five underâground stations with a length of 110 m each (plus accesses), at an average depth of 30 m of surface.
The final area of the route, located in Tlaquepaque, will be the vehicle collecâtion centre and maintenance workshop.
As for the value of the contract, the viaâduct section is worth about 150 million euros, and the tunnel 226 million euros. The construction period is three years, and the work should be completed by the middle of 2017.
A STIMULATING TECHNICAL CHALLENGE. A TREMENDOUS HISTORIC RESPONSIBILITY. A work of this size and complexity, developed in an urban context, is in itself a great challenge. The work is being carried out along 14 km and crosses a large part of the subsoil of the historic centre of the city, passing a scant 20 metres from the foundations of the 300 years old Cathedral. It also makes goes right under the Templo de San Francisco de Assis (temple of St. Francis of Assisi), dating from 1580. This represents a tremendous historic
In the specific context of risk manageâment, the global synergies provided by the Group have proven to be especially significant, namely through the contriâbution of the team led by Ismael Gaspar (engineering unit) and the methods deâveloped and perfected over the years to support this management at different levels. From his visit and monitoring of the project have resulted, for inâstance, recommendations for drillings and more specific tests to better unâderstand the areas of fault lines, and tools and methods were implemented for an even more rigorous planning and control than the ones already apâplied. The work becomes more robust, the community gains confidence and the technicians involved attain comâpetences which, the Company and the communities, will continue to benefit from in the near future.
ENGINEERING AS AN IMMINENTLY SOCIAL SCIENCEBesides its technical complexity, one of the other great challenges involved is the social and political management of the work. Technical solutions are not
and social responsibility, to which was given the utmost attention.
In the Cathedral case, at its own iniâtiative and responsibility, MotaâEngil requested the support of Prof. Julio Appleton (Doctorate in Civil Engiâneering in the area of structures and full professor of Reinforced and PreâStressed Concrete at Instituto Superior TĂ©cnico â Technical Superior Institute), who travelled to the site to evaluate possible abnormalities in the Catheâdral foundations and recommend a set of measures for their rehabilitation and reinforcement, which are currently being analysed by the client. Also, in the case of the Cathedral and the openâings made to analyse its foundations, the discovery of some bones led to the involvement of Instituto Nacional de ArqueologĂa e HistĂłria â INAH (Nationâal Institute of Archaeology and History) which has, since then, closely moniâtored the progress of the works. Nothing should be left to chance in a project of this size and exposure, neither at the level of the quality of execution and the safety of persons and buildings, or, naturally and consequently, at the level of contractual management and of all risks involved.
65
SEPTEMBER 2015
designed in a social vacuum. Coming together in this same project and in an urban scenario, are, among others, the federal client (the Secretaria de Comunicaciones y Transportes â Comâmunications and Transports Office), state entities (the SITEUR, Sistema de Transporte ElĂ©ctrico Urbano â Electriâcal Urban Transport System, and the SecretarĂa de Movilidad del Estado de Jalisco â Office of Mobility of the State of Jalisco), supervising entities, MotaâEngil, as builder, and hundreds of thousands of people, locals and tourâists, whose life, mobility and wellâbeing will inevitably be disrupted during the project. This means one has to see enâgineering as an art of finding solutions that work, and working is, above all, constructing, at each moment and unâder each unforeseen circumstance, the optimal social conditions to be able to accomplish our mission in the frameâwork of existing conditions.
The execution of the viaduct and the elevated stations, for instance, impliâcates moving large metal structures at night using special transportation, as well as more than 200 concrete decks about 40 m each. Any problem in transport or in the delicate process of assembly planned for each night will result next morning in chaos for milâlions of people, in significant loss for the local economy, it would demand a very delicate management of the relationship with the client and with different stakeholders, and erode the Company's image with impact not only regionally, but also nationally. To illustrate the importance and public exposure of the project, it should be mentioned that the recent arrival of the tunnel boring machine at Port of Manzanillo and the complex process of its transport by land to Guadalajara was on national news, echoed in the newspaper and TV channels.
The liaison with SITEUR and with Office of Mobility regarding the work planning, reorganising mobility in the city, the good and timely manageâment of expectations, and providing information to the community, have a determining role for the effective posâsibility of accomplishment. In the same way, in an approach more indirect but just as relevant, the actions of social responsibility and approaching the community that MotaâEngil is preparâing are also essential. An example of this is the programme of distributing school supplies to local employees chilâdren. We fulfil the social mission that is part of our DNA and, with the proper management of internal and external communication, we are creating social conditions to continue to move ahead smoothly.
Since the work is still in an initial phase, the SINERGIA team wishes MotaâEngil in Mexico good luck with this challenge.
Terminal norte (elevada) Belenes (elevada)
Mercado del mar (elevada)
Basilica (elevada)
Plaza patria (elevada)
CircunvalaciĂłn (elevada)
Federalismo (elevada)
Normal (subterrĂĄnea) Alcalde santuario (subterrĂĄnea) Catedral (subterrĂĄnea) Analco (subterrĂĄnea) Plaza de la bandera (subterrĂĄnea)
ESTACIONES ELEVADAS
ESTACIONES SUBTERRĂNEAS
66
MOTA-ENGIL IN THE WORLD
SINERGIA 47
âș What is your assessment of these first months since you became responsible for special projects in the Latin Ameri-can region?I believe the current moment is less for making evaluations and more for rolling our sleeves up and keep going. If experiâence taught me anything, it is that time is money, so we must constantly make careful choices about the most producâtive activities in which to invest. The time for assessments will come, it is part of our dayâtoâday and a valuable work tool. But I personally prefer to do it at a time when I can look back and can identify me with the work done and the result obtained.
âș Do you mean that you still do not see yourself in the ongoing projects?Yes and no. I see myself in the ambition, in the technical capability and desire people have to do things well. I see myself in the solidarity I found in work groups and in their sense of mission. However, and this is why I say it is time to roll our sleeves up, my concern is to channel in a productive, organised and controlled way all these positive elements I found here, so that we can achieve the sole result that matters
INTERVIEW WITH CARLOS ROLDĂN MOYAA globetrotter at MotaâEngil Latin America
Carlos RoldĂĄn Moya has spent almost half of his 57 years accumulating a rich and varied experience. Since 2009, when he joined MotaâEngil in the Autopista PeroteâXalapa construction project in Mexico, he has spent his time, directly or indirectly, at the service of the Group.
In the professional career he has built since his education in Mining Engineering, completed in Argenâtina, his homeland, he passed through a handful of benchmark companies in the construction industry and almost a dozen countries, including Spain, Chile, Ecuador, Colombia, Portugal, Italy, Peru, and Mexico.
Returning to Mexico in 2015 as director for special projects of the Latin Ameriâcan subâholding company, he speaks about his new duties, especially about the works on the tunnel of line 3 of the Guadalajara light metro, one of the projects that has absorbed a great deal of his attention and expertise.
in this company: to comply with the client, the company and the commuânity which we serve! And here, yes, I believe the margin for evolution is still great. But I also believe that, in this company, that is a path that will never be concluded no matter how much we continue to evolve.
âș Why did you decide to estab-lish your work base in Guadala-jara when the head office of the sub-holding company is in Mexico City?Precisely, as I was saying, because time is money. Today we have in Guadalaâjara a fantastic project, in which we have invested for about a year and which we must (and will) complete in another two. Despite having, fortunately, other imporâtant projects in the region and even here in Mexico [editorâs note: in Acapulco], related to tunnels, which is one of my specialities, management believed â and I agree â that the size of this metro project deserved my full attention. This doesn't mean I will not go to Mexico City, Acapulco, or anywhere else. Travelling has never been a problem for me. But these days, this is where I can best serve the Company.
"It is time to roll our sleeves up to achieve the
sole result that matters in this company:
to comply with the client, the company and the community
which we serve!"CARLOS ROLDĂN MOYA
Carlos RoldĂĄn Moya
67
SEPTEMBER 2015
The event was an opportunity for the company to make its experience in the segment known in Mexico.
The 3rd International Tunnels Course was held in Guadalajara, Mexico, jointly organised by the ITACET â Foundation for the Education and Training on Tunnelling and Unâderground Space Use, the AMITOS â AsociaciĂłn Mexicana de IngenierĂa de TĂșneles y Obras SubterrĂĄneas (Mexâican Association for Engineering of Tunnels and Underground Works), the SCT â SecretarĂa de Comunicaciones y Transportes del Gobierno de MĂ©xico (Communications and Transports Ofâfice of the Government of Mexico), and the AsociaciĂłn Mexicana de IngenierĂa de VĂas Terrestres (Mexican Associaâtion of Roadway Engineering).
Given the significance of the underâground work currently underway in the region, MotaâEngil was represented by an important delegation, includâing AndrĂ©s Conesa, the MotaâEngil MĂ©xico (MEM) chairman of the board, Pedro Pereira (director of production of MEM) and Carlos RoldĂĄn (director of special projects of MotaâEngil AmĂ©rica Latina), among other members of the technical contingent that MotaâEngil currently has mobilised in Guadalajaâra. The aim was to provide specialised information, both to qualified profesâsionals in the sector and to young and curious engineers, on topics of mechaânised tunnel excavation.
Over the two days of the event, whether in the presentations by the international speakers, or in parallel
sessions promoted by the companies and associations represented, everyâthing was discussed, from the most strategic issues on the option for underground mobility, to geotechniâcal and hydrological issues and the selection of mechanical excavation equipment, including logistical isâsues, safety, or the environmental questions to be considered in difâferent types of projects concerning working in tunnels.
At MotaâEngil booth, one of the most soughtâafter of the event, the interest of attendees and lecturers centred mainly on the specific characteristics of the tunnel boring machine orâdered specifically by MotaâEngil for the ongoing project in Guadalajara, the strategy to deal with the subsoil of the cityâs historic centre, and the methods implemented to analyse and control risks.
âș In your words, what makes this project so âfantasticâ?You see, in a word, I would say itâs the challenge. The immediate challenge of finding a technical solution for excavatâing a tunnel that crosses soil but also rock, which makes the option of a TBM tunnel boring machine or a traditional EPB machine inadvisable.
It would be impossible to bring two different âmonstersâ so that each would do part of the underground work, so we ordered from the supplier a mixed frontâloading (soil/rock) EPB solution which allowed us to minimise the additional pressures on the terrain in the very delicate area where we will pass, while ensuring the efficiency of progress in both types of terrain.
On the other hand, we have the challenge of programming and managâing unforeseen events, mainly due the insufficient information we have about the buried services and the synchroniâsation required between the advance of the tunnel and the underground stations, which should be almost finished structurally when the tunnel boring machine passes. If we crossâreference this with the complexity of contractual management, the particuâlarities of relationships with clients, suppliers, partners, which are as much technicalâeconomic as socioâcultural (or I would even say ethnographic), we have one of the most fantastic cocktails I have ever tried.
I could keep talking about the historic monuments we have crossed, the management of urban mobility during the work, the night work and in depth, the management of costs and risks in general, and so on; I believe you underâstand the enthusiasm and the investment of the Company in this project.
MOTAâENGIL FEATURED AT THE 3RD INTERNATIONAL TUNNELS COURSE IN GUADALAJARA
68
MOTA-ENGIL IN THE WORLD
SINERGIA 47
CONSTRUCTION OF THE MINE
LEACH PAD AT THE NORTH LAGUNAS
MINE IN PERU
MotaâEngil Peru continues a commercial
connection begun in 2009
MotaâEngil Peru currently has underâway the Construction of the Mine Leach Pad â Phase 6 for the Barrick Misquichilca, S. A., mining company, a client for whom the company has been working since 2009.
The mine is located in the mountain range of La Libertad region, district of Quiruvilca, province of Santiago de Chuco, at 4,200 metres above sea level in Peru.
The Construction Pad â Phase 6 consists of extending a watertight mine leach pad of approximately 30 hectares with geosynthetic materials.
The general process for the project inâvolves activities such as massive excaâvations, exploration of the quarries with low permeability materials, landfills, placement of low permeability flooring,
installation of geosynthetics, plus pipes, and placement of overcoat.
The contracted amount for this project is 30.5 million dollars and the time for exeâcution corresponds to 330 days, with comâpletion expected by 26 December 2015.
Regarding to labour and equipment, the project uses a total of 680 workers, 360 of whom members of nearby communities. The amount of yellowâline heavy equipâment, transports, and passenger vehiâcles corresponds to 133 units.
In this project, and in the remaining ones, MotaâEngil Peru shows once again its social commitment, by hiring local suppliers and creating direct work for people living in nearby communities, which, in this case, represent more than 50% of the personnel working on the project.
LATIN AMERICA
In this project MotaâEngil Peru shows, once again, its social commitment,
by hiring local suppliers and creating direct work
for people living in nearâby communities.
69
SEPTEMBER 2015
The Rehabilitation and Improvement of the Huancavelica-Lircay Motorway work has begun on provided by the Vial Jaylli Consortium, formed by MotaâEngil Peru, JJC and Construtora Upaca companies.
The work opening ceremony was attended by the President of the Republic of Peru, Ollanta Humala, as well as the Minister of Transports and Communications, JosĂ© Gallardo Ku, the Regional Governor of Huancavelica, Clodoaldo Ălvarez and the Chief Executive Officer of MotaâEngil Peru, Jorge BalsemĂŁo, representing the Vial Jaylli Consortium.
This work, covering 71.95 kilometres, will be connected to others currently under construction, thus contributing
WORK OF REHABILITATION
AND IMPROVEMENT OF THE
HUANCAVELICAâLIRCAY MOTORWAY
This work, in Peru, covers 71.95 kilometres
LATIN AMERICA
LATIN AMERICA
MOTAâENGIL PERU ENSURES
THE WORK OF ELEVATING THE TAILINGS DAM
The work will be done for the mining company Antamina
In a private bidding process, MotaâEngil Peru was awarded the construction work of the project Elevating the Tailings Dam. The work will have a term of approximately four months, with an investment of 5.7 million dollars by the mining company Antamina, a company with which MotaâEngil has been working since 1996.
The mine is located in Peru, in San Marcos district, region of Ancash, and is 4,300 metres above sea level. Given the constant growth in the waâter mirror of the tailings deposit levâel, the operating plan provides that it will not be necessary to raise the crown of the tailings dam over the next few years, since its volumetric capacity meets the storage conditions
of the probable maximum precipitation (PMP), always maintaining a minimum free border of 2.0 m.
The project Elevating the Tailings Dam â Phase V, includes various works namely filling the filters for the regrowth of the dam, constructing a concrete curb and making it watertight by installing a geomembrane.
to linking Huancavelica with other regions such as Ayacucho, ApurĂmac and Ica. The investment corresponds to over 400 million nuevos soles (over 100 million euros) and will use 50,000 cubic metres of asphalt road surface. The project also includes the construction of three bridges, the excavation of 2.7 million cubic metres, and moving of 900,000 cubic metres of earth in operations of earth moving, improvements and landfills.
Due to the rugged terrain and the zone's intense climate (rains and thunderstorms), the Vial Jaylli Consortium companies have programmed the use of a set of high engineering techniques, to allow completion of the work in the time period established, according to the highest quality standards of the industry.
To this end, starting February 2017, the inhabitants of this zone in Peru will be able to enjoy the benefits of a safer, high quality motorway, which will give a boost to the local economy.
70
MOTA-ENGIL IN THE WORLD
SINERGIA 47
The first corresponds to the project Civil Works and Structures Piers MU1 and MU2 and was awarded to MotaâEngil Peru for the total amount of 24.5 million dollars. The second, which was awarded in a private tender, corresponds to the manufacturing of piles and is 22.9 milâlion dollars.
The aboveâreferenced work is part of a vast ongoing investment plan by PetroperĂș, valued at 2,730 million dollars. This project, extremely important to the development of the country, is located on the northern coast of Peru, in the province of Talara, region of Piura.
MOTAâENGIL PERU WILL CONTRIBUTE TO THE MODERNISATION OF TALARA REFINERY
In the context of the great project of Modernisation of the Talara Refinery
(PMTR) undertaken by TĂ©cnicas Reunidas, S. A., MotaâEngil Peru
will ensure two works
CIVIL WORKS ON THE STRUCTURES OF PIERS MU1 AND MU2The project includes the execution of maritime and port works such as the new hybrid pier (MU2), which will be used during the construction phase of the project Modernisation of the Talara Refinery to unload equipment and material, and later in the operating phase to load/unload liquid products from the refinery. Other works correspond to actions of lesser complexity on the existing liquid cargo pier (MU1), namely removing the boat moorings and replacing them with fast escape hooks.
LATIN AMERICA
71
SEPTEMBER 2015
The activity by MotaâEngil Peru on these two projects will include dredging work, with a volume to be dredged in the pier zone: 116,900 m3 and a volume to be dredged in the canal zone of 55,000 m3, performing dynamic pile driving tests, the placement of 246 vertical and inclined metal piles.
PIER PLATFORM After completion of the pile emplacement using maritime means, a work surface will be installed with preâfabricated reinforced concrete elements, which, in this case, correspond to beams and slabs. Previously, the piles will be welded to
steel corbels to give temporary support to the group of preâfabricated beams and slabs and, as a result, to the concrete in situ, until it hardens.
PREâFABRICATED ELEMENTS
Preâfabricated beams
Preâfabricated slabs
Capping beams
142 units
361 units
20 units
The work also involves the placement of 13 moorings for a 75âton load, construction of a berthing dolphin and mooring dolphin, installation of two independent drainage systems, for clean water and polluted water, and intervention in the electrical installation.
MANUFACTURE OF PILES
In the second contract awarded to MotaâEngil Peru, the work consists of driving preâfabricated 40 x 40 cm section piles for the foundation of various tanks and structures of Talara Refinery.
The total length of the preâfabricated piles is 72,780 metres.
This project, which is extremely important to the development of the country, is located on the northern coast of Peru, in the province of Talara, region of Piura.
72
MOTA-ENGIL IN THE WORLD
SINERGIA 47
ECB WINS THE BID FOR WORK IN THE STATE
OF MARANHĂO
Contract involves the implementation of 150 km
of rail line for VALE mining company, for 243 million euros
MotaâEngil signed, through ECB, two new contracts with VALE totalling 777 million reais (about 243 million euros) to duplicate part of the CarajĂĄs rail line, in State of MaranhĂŁo, corresponding to implementing Blocks A2, A3 and A4.
This rail line is owned by VALE â Empresa de Mineração, and is used to transport ore from CarajĂĄs (the exploration site, located in the State of ParĂĄ) to Port of SĂŁo Luis, in MaranhĂŁo, where 350,000 passengers and about 120,000,000 tonnes of ore f low every year.
The contract covers nine segments with a total rail line extension of approximately 150 km and includes the execution of the infrastructure, earth
moving, subâballast, drainage, and current and special civil engineering works, with the construction of 12 bridges and ten viaducts.
In this work special attention is given to earth moving (3.8 million mÂł, to be done in two shifts), since the heavy rain between January and June make the works more difficult to execute.
The work on Block A2 started in May and must be completed in December 2016. As for Blocks A3 and A4, they are expected to be completed in June 2017.
LATIN AMERICA
73
SEPTEMBER 2015
MAIN QUANTITIES INVOLVED:
Excavation and load for landfill
Concrete
Deck areas
Hydraulic passages
Metal piles Root piles (inclined, in reinforced concrete)
3,800,000 m3
47,000 m3
13,100 m3
3,420 m
24,560 m
1,000 m
The contract covers nine segments with a total rail line extension of approximately 150 km.
74
MOTA-ENGIL IN THE WORLD
SINERGIA 47
ECB will carry out work for VALE mining company in three mines in Minas Gerais State.
One of the contracts is for the FĂĄbrica mine, in the amount of over 40.3 million reais, and is designed to gather and channel the deep waters outside the VALE area, ensuring its unaltered quality.
The contract is designed to implement roads to allow the safe traffic of equipâment and vehicles operating during the drains constructing phase performed at the bottom of the valley.
The work also includes the implemenâtation of drains at the bottom of the canyon, with a cross section correspondâing to the shaping of the land, followed by placement of a geotextile blanket and execution of the rockfill (drainage layer) in the specific dimensions of the filters, and finally the recoating of drains with protective coarse sterile.
Also for VALE, ECB was awarded the contract for the construction and extenâsion of shallow drain channels for water runâoff from Jangada mine and CĂłrrego do FeijĂŁo mine, which includes the construction of a sump in the JacĂł mine and environmental protection
ECB CARRIES OUT WORK FOR VALE
IN MINAS GERAIS
Drainage work surpasses 15.3 million euros
LATIN AMERICA
75
SEPTEMBER 2015
work. The drain channels have an extension of 90 metres in Mangaba channel ( Jangada mine), 340 metres in Jaco III channel ( Jangada mine) and 230 metres in Menezes III (CĂłrrego FeijĂŁo mine). The works also include the execution of various deep drainage services in CĂłrrego do FeijĂŁo mine and the 8,000 mÂČ sump at Jangada mine, on top of JacĂł III drain.
The sum of these support contracts to the activity in the three VALE mines in Brazil totals over 56 million reais (about 15.3 million euros).
The contract is designed to implement roads to allow the safe traffic of equipment and vehicles operating during the drains constructing phase performed at the bottom of the valley.
76
MOTA-ENGIL IN THE WORLD
SINERGIA 47
CONSITA CONQUERING
BRAZIL
Affiliate company of MotaâEngil Group is awarded four new contracts
for waste management and urban cleaning in several States of Brazil
At the end of 2014, SUMA invested in reâentering the Brazilian market, by acquiring the CONSITA company, in partnership with Empresa Construtora Brasil (ECB), a Brazilian company in the construction sector and affiliate of the MotaâEngil Group.
CONSITA, in its 43 years of activity, has dedicated 25 years to developing solutions for managing waste. At the start of the 1990s, it pioneered the process of privatising urban cleaning services in Belo Horizonte, the capital of Minas Gerais state.
With awards in the states of Minas Gerais, SĂŁo Paulo and Rio de Janeiro, the current provisions of Consita
include the annual collection of about 100 thousand tonnes of miscellaneous, selective and hospital waste, urban cleaning activities, and the implemenâtation and management of municipal landfills.
CONSITA AWARDED CONTRACT IN BELO HORIZONTETotalling over 20 years of activity in the area of urban cleaning and collecâtion of waste in the state of Minas Gerais, in 2015 CONSITA started a new service in Belo Horizonte, the capital city of the state.
The contract consists on the proviâsion of maintenance services on roads and other public places in Venda Nova
LATIN AMERICA
77
SEPTEMBER 2015
RIO GRANDE DO SUL
RIO DE JANEIRO
MINAS GERAIS
SĂO PAULO
STATES WHERE CONSITA IS PRESENT
BRAZILand Pampulha areas of Belo Horizonte Municipality as well as in its northern region. It includes manual and mechanâical sweeping, grass cutting, manual and mechanical cleaning of gutters, as well as ancillary services such as paintâing and cleaning poles and walkways, removing waste from critical points on walkways, and collecting and transâporting waste arising from these activiâties to the sanitary landfill.
It is projected that 500 workers employed by this contract will complete, annually, 170,000 km of manual and mechanical sweeping, 12,000 km of grass cutting, and 90,000 gutter units intervention, in an area comprising approximately 600,000 inhabitants.
CONSITA, in its 43 years of activity, has dedicated 25 years to developing solutions for managing waste.
2 MILLION RESIDENTS
served by CONSITA
78
MOTA-ENGIL IN THE WORLD
SINERGIA 47
COLLECTING RECYCLABLES Also in Belo Horizonte, CONSITA obtained a contract to provide the services of solid waste collecting in the east, northeast and northwest regions of the municipality, sorting and selectâing different household recyclable materials â paper, metal, plastic and glass â in the modalities pointâtoâpoint for paper/metal/plastic and doorâtoâdoor for paper/metal/plastic/glass, as well as transporting it to the waste treatment centre.
Lasting five years and with a turnover of over 21 million reais, this provision of services will reach a population estimated at 700,000 inhabitants, thus extending the universe of activity of this company to close to two million inhabitants served, and strengthening the presence of this affiliate in Minas Gerais state.
Since March, CONSITA has also begun providing urban cleaning and grass
With the new contracts CONSITA shall provide
service to nearly two million people.
79
SEPTEMBER 2015
cutting services in the municipality of Varginha, state of Minas Gerais.
BEGINNING OF ACTIVITY IN RIO GRANDE DO SULCONSITA has just been awarded its first contract in Rio Grande do Sul state. It was chosen to collect houseâhold waste and transport it to the sorting station, which is projected to move 4,000 tonnes of waste per month, serving a population of approximately 215,000 persons in the municipality of SĂŁo Leopoldo.
With this new award, CONSITA expands to the southernmost state of Brazil and continues to strengthen its
position as a benchmark operator in the area of waste management in Brasil.
An experienced and solid production force, the commitment to customer satisfaction and the existence of an integrated management system â resulting in the Quality certification, since 2003, by ISO 9001 â are in line with SUMAâs vision and management policy. This bodes well for a successful enterprise, and for one more investâment in the geographical expansion of the organisation, made possible by the sharing of specific technical knowledge and experience, innovative power and flexibility of SUMA in its activities in international markets.
80
MOTA-ENGIL IN THE WORLD
SINERGIA 47
MARTIFER GROUP
WEST SEA: ONE YEAR AT
VIANA SHIPYARD
In one year the company has created about 200 jobs
West Sea is a company created by Martiâfer Group to manage the subconcession of lands and infrastructures of the former ENVC â Estaleiros Navais de Viana do Castelo, E.P., in May the company celebrated its one year presence inside the shipyards.
After taking possession of the infrastrucâture in May 2014, in one year the company has created about 200 jobs, 80% of which are held by former ENVC employees.
During the last year, and after a process of the shipyard requalification and equipâment repairing, the shipyard has been fully operational, and has already repaired or reconverted over 45 ships from all over the world.
As for naval construction, the company has in its order book two hotel ships, currently under construction, which should be completed at the begining of 2016. In July, the Company has also
signed the contract for the construcâtion of two Ocean Patrol Vessels for the Portuguese Navy, whose construction is scheduled to start still in 2015.
The first year of activity was marked with a ceremony attended by the Portuguese prime minister, Pedro Passos Coelho, and the national defence minister, José Pedro Aguiar Branco.
During the last year, and after a process of the shipyard requalification and equipment repairing, the shipyard has been fully operational, and has already repaired or reconverted over 45 ships from all over the world.
81
SEPTEMBER 2015
Martifer Solar will be responsible for the construction of four solar plants with a total capacity of 57 Mwp of solar photovoltaic projects in Jordan, which are part of the National Renewable Energy Plan for this country, currently importing 95% of its energy needs â costing about oneâfifth of the GDP of the country.
In the order book of 57 Mwp, there are three projects with an individual capacity of 11 Mwp located near the city of Maâan, in SouthâCentral Jordan, and one with a capacity of 24 Mwp
which will be constructed near the city of Mafraq.
These projects are four of the seven to be developed under a 207 million dollar financing concluded in May and that gathered the a IFC, Bahrainâs Arab Bank, the European Arab Bank, the MWO, the FinnFund and OPECâs International Development Fund, as well as the World Bank, which will provide investment guarantees through the Multilateral Investment Guarantee Agency (MIGA).
MARTIFER SOLAR IN JORDAN
MARTIFER GROUP
The company makes its debut in the Middle East, where it will provide engineering, construction, operation and maintenance services for four solar photovoltaic plants
TECHNOLOGY AND INNOVATION
82
SINERGIA 47
This is a unique platform, whose main purpose is to manage processes of perforâmance and talent management, developâment, training and knowledge.
Success Factors is the world leader in cloud solutions for talent management, and was considered by Gartner as the best technological human resources applicaâtion in the world, thus strengthening the vanguard position of the Group in this matter.
Since it is cloud technology, it has the additional advantage of allowing employâees to access it, through a smart phone, tablet or PC, from any location in the world, as long as there is Internet access (inside or outside the Groupâs premises).
According to Eduardo Pimentel, CEO of MotaâEngil Ambiente e Serviços, âwe invest in Success Factors as a way to sustainably support the methodology of performance management of our staff, which will allow us to evaluate employees in a more transparent, transversal and fair way, with uniform criteria throughout the multiple companies that compose the universe of MotaâEngil Ambiente e Serviçosâ.
LuĂs Monteiro, director of human resources for MotaâEngil Ambiente e Serviços, notes that this is one way for MotaâEngil to ensure that it is âon the front line when it comes to human capital management tools, which is essential for a group that is the leader in its operating areasâ, stressing his conviction that âwe can only maintain a leadership position if the management of human resources is at the highest levelâ.
Among the many features of Success Factors, the most relevant are:
âș Managing and monitoring the key indicaâtors of performance for the business and the teams;
MOTAâENGIL INVESTS IN A NEW TOOL FOR MANAGING TALENT
AND PERFORMANCE
Pursuing a strategy of modernisation and consolidation of human capital management practices, MotaâEngil Ambiente e Serviços is implementâing the SAP Success Factors platform which, starting in 2015, will be directed at all 1,000 employees from the holding company, and the areas of water, waste, logistics and multiâservice.
This is a unique platform, whose main purpose
is to manage processes of performance
and talent management, development, training
and knowledge.
Success Factors is a pioneer project in the Group and at the national level. It was
developed by MotaâEngil Ambiente e Serviços (Environment and Services), and will allow
the integration of all employees on a single platform, managing with more efficiency
the processes related to human capital
83
SEPTEMBER 2015
In order to enable the full training and use of the Success Factors by MotaâEngil Ambiente e Serviços employees, the project is designed to include a training effort of approximately 3,000 hours, which has been developed internally and is estimated to last until September 2015.
VĂtor Martins, director of corporate IT for MotaâEngil, also insists that this solution is âinnovative and will bring benefits to MotaâEngil Groupâ.
Acting in sectors in which competitiveâness, innovation, sustainability and human qualification are essential factors for success, the universe of MotaâEngil companies is taking an important step forward in its strategy and ability to differentiate.
âș Reporting and controlling in a cascade system the execution of goals and results;
âș Developing and evaluating the perforâmance and potential of the employees;
âș Mapping and developing competencies which are crucial to the company;
âș Monitoring and developing individual development plans;
âș Intensifying the dissemination of knowledge in the different companies involved;
âș Promoting team spirit, maximising synergies and the interchange between the different employees of MotaâEngil companies.
All features listed are available in an environment that is easy to navigate, intuitive and designed for use by all employees, regardless their functions.
All the platform features are available in an environment that is easy to navigate, intuitive and designed for use by all employees.
KEY PROJECT INDICATORS:
âș 1,000 â universe of users in 2015
âș 15 companies of MotaâEngil Ambiente e Serviços involved
âș 4 months â total time for project execution
âș 100% compliance with initial budget
âș + 2,500 hours of internal training for employees
84
PEOPLE
SINERGIA 47
MEET MOTAâENGIL EMERGING
TALENTThe Programme aims to identify,
develop and retain talent in the Group
In line with current trends regarding the management of human resources, and in an effort to respond to the challenges of Talent Management, MotaâEngil Group will start the MotaâEngil Emerging Talent Programme (MEET), to identify, develop and retain talent in the Group, in order to ensure response to future challenges.
The MEET Programme addresses this concern, presenting itself as a programme directed towards the highâpotential youth in the Group, and aiming to encourage and act as an accelerator for the development of employees with talent, and favouring their preparation to assume positions with greater responsiâbility and seniority.
WITH THIS PROGRAMME, WE HOPE TO ACHIEVE THE FOLLOWING OBJECTIVES:âș To identify young talent in the different
geographical areas, based on a set of preâdefined criteria;
âș To develop the competences considâered critical for this segment;
âș To spread the culture of MotaâEngil Group among future leaders;
âș To promote the sharing of best practices;
âș To promote a culture of meritocracy;âș To retain talent and prepare for succesâ
sion in the various operating levels.
In line with these objectives and assumpâtions, the MEET â MotaâEngil Emerging Talent Programme will last three years, and will be cyclical. It is expected that it
85
SEPTEMBER 2015
contact with other MEET participants and keyâpersons in the Organisation.
With these activities, the aim is to expose the participants to various contexts, which contribute to accelerating their
development and individual growth in the Group. On the other hand, the Program shall also have activities that are more individual, allowing a greater overseeing of highâpotential employees.
will be renewed at the end of each cycle, when the Group identifies a new group of MEET participants.
THIS FORMAT ALLOWS COMPLIANCE WITH THE BASIC ASSUMPTIONS UNDERLYING THE PROGRAMME:âș Management dedicated to highâpotenâ
tial youth, encouraging and acceleratâing their evolution;
âș The renewal of the pool of emerging talent, ensuring a continuous rejuveânation of the pyramid's base for the Group's future leadership.
Each cycle of the Programme, will hold a set of crossâcutting activities, promoting the Group's culture, developing crossâsectional and business competences,
The programme is directed towards thehighâpotential youth in the Group, and aiming to encourage and act as an accelerator for the development of employees with talent.
86
SINERGIA 47
MANUEL ANTONIO DA MOTA FOUNDATION
MANUEL ANTĂNIO DA MOTA FOUNDATION
AWARD LAUNCHED IN PERU
A partnership with MotaâEngil Peru with the support of Piura University and the
Regional Office of Education of Piura
The Foundation, in partnership with MotaâEngil Peru and with the support of Piura University and the Regional Office of Education of Piura, launched in Peru the first edition of Manuel AntĂłnio da Mota Foundation Award, seeking to build on the experience and example represented by Manuel AntĂłnio da Mota Award, which is already in its sixth edition in Portugal.
Manuel AntĂłnio da Mota Foundation Award seeks to promote creativity, innovation and best educational practicâes in the schools of the Peruvian region of Piura. It is the result of a protocol signed on 14 October 2014 between the entities promoting the Award and the Peruvian educational institutions that support it.
The region of Piura, home to the port of Paita, managed by MotaâEngil, is located
Manuel AntĂłnio da Mota Foundation Award seeks
to promote creativity, innovation and best
educational practices in the schools of the Peruvian
region of Piura.
in the northern region of the country, extends across an area of 35,892.5 km2, and has a population of over 1.7 million inhabitants. Its more than 2,400 learnâing centres provide elementary and secondary education for approximately 191,000 students.
The Award, governed by its own regulaâtion, is divided into two categories: the School category, which seeks to recognise the trajectory and successes achieved in innovative projects designed to improve educational success; and the Teacher category, which seeks to honour teachers who have gained a reputation for training students in the schools in the region.
In the School category, the award presented is intended to finance the project submitted by the institution, while the award in the Teacher category is to fund a scholarship for the winning teacher to enrol in a postâgraduate programme at a Portuguese university.
The application period ended in August, and the selection of the winning candiâdates was made by a jury consisting of members of MotaâEngil Peru Foundation and Peruvian personalities with recogânised experience and knowledge in the educational field.
The Award will be presented at a ceremony on 12 November at the Lima Municipal Theatre, an iconic building in the Peruvian capital, which was inauguârated in 1920 and has been recently remodelled, having all is beauty and splendour restored.
MotaâEngil celebrated the first edition of the Manuel AntĂłnio da Mota Foundation award in the Piura region, in the North of Peru.
This award seeks to recognise innovaâtion in educational institutions, in
87
SEPTEMBER 2015
This award seeks to recognise innovation in educational institutions, in addition to exceptional performance by teachers.
addition to exceptional performance by teachers. This activity, supported by the DREP â Direção Regional de Educaâção de Piura (Piura Regional Education Office), is directed to all public schools in the region and aims to recognise the academic institution whose educational project is the most innovative and, through the Educational Institution Committee, the best teachers.
âPiura is an important region for MotaâEngil Peru and the Foundation, not only because it's home to the companyâs most iconic work (the Port of Paita), but also for its valuable academic and human potential. Therefore, Piura has been selected for the first edition of the award which, in future, will be reproâduced in all regions where we operateâ, noted Paula BalsemĂŁo, representing Manuel AntĂłnio da Mota Foundation, during the competition's presentation.
88
SINERGIA 47
MANUEL ANTONIO DA MOTA FOUNDATION
MANUEL ANTĂNIO DA MOTA
FOUNDATION AND SANTILLANA
LAUNCH CULTURAL AND PEDAGOGICAL
PROJECT
This project aims to promote education, promotion
and valuation of the Portuguese cultural heritage
in school communities
for exploration, proposed activities and school trips, so that teachers can develop and work the theme of heritage with their students; pedagogical Itineraries contemplating suggestions for visits to institutions or locations representative of different types of heritage; and Didactic units integrating digital didactic material with proposals for pedagogical explora-tion of various topics related to heritage.
The project started in May 2015 with the pedagogical itineraries, and the begin-ning of the other phases is scheduled to start with the academic year 2015 â 2016.
Manuel AntĂłnio da Mota Foundation, which includes in its collection of activities a wide range of projects in the educational area, through support and partnerships for education that have been developing, undertakes this new investment along with a publishing group of recognised competence, experience and prestige in its area of activity. This has certainly contributed greatly to the predictable and desirable success of this effort in promot-ing, fostering and preserving the heritage of Portugal, a greater asset and a funda-mental legacy for the construction of its secular identity.
Portuguese market for over 25 years, publishing textbooks and other didactic and pedagogical resources.
Manuel AntĂłnio da Mota Foundation and Santillana, as part of their commitment to invest in the training of young citizens, also assume their responsibility in educa-tion for an informed and aware citizenry. To this end, both institutions joined forces to develop a project to promote cultural education, to ensure the preservation of an asset, recognised as essential for society: its heritage, and transmit a vision that is modern, dynamic and entrepreneurial, as well as an element for economic and social enrichment.
This project aims to promote the educa-tion, promotion and valuation of the Portuguese cultural heritage in school communities, and is designed for students, teachers and educational supervisors.
Elements of the project to be promoted in all schools of the country include an itinerant exhibition consisting on a set of panels that present graphically and appealingly the different types of heritage; a Guide to pedagogical research for teachers, consisting of suggestions
"O PatrimĂłnio: Dar um Futuro ao Passa-do" (Heritage: Giving a Future to the Past) is the name of a cultural and pedagogi-cal project resulting from a protocol signed between Manuel AntĂłnio da Mota Foundation and Santillana, which has been carrying out its activity in the
89
SEPTEMBER 2015
The project, in its third edition, is the result
of a partnership between the Foundation, Amarante
Entrepreneurial Association (AEA) and the secondary
schools of Amarante municipality
CLOSING CEREMONY OF THE
THIRD EDITION OF "YOUNG
ENTREPRENEURS â BUILDING THE
FUTURE" PROJECT
of the municipality (Escola SecundĂĄria de Amarante, Externato de Vila MeĂŁ, ColĂ©gio de SĂŁo Gonçalo, Escola Profisâsional AntĂłnio do Lago Cerqueira) and the training centre of the IndĂșstria MetalĂșrâgica e MetalomecĂąnica (Metallurgy and Metalworking Industry â CENFIM). This was followed by a visit to an exhibition of some of the projects submitted to the competition held in the areas of the TĂąmega Entrepreneurial Institute (IET).
The quality of the projects submitted was unanimously praised thus showing an evident improvement compared with the two previous editions, thus patenting the efforts of the entire educational commuânity and the effort to make the best of this initiative, which will continue in the next academic year.
the Foundation, the Associação Empreâsarial de Amarante (Amarante Entreâpreneurial Association â AEA) and the secondary schools of Amarante municiâpality, aims to encourage entrepreneurâial potential in students, teachers and the community of the municipality of Amarante, leading to a change in attitude and to a direct contact with entrepreâneurial concepts and to the development of new social and personal competenâcies. The project's main iniciative is the competition of business ideas.
In the ceremony, with speeches by the chairman of the Executive Committee of the Foundation, the President of the AEA and the management of IET, were also presented the winning business/project ideas in each of the four schools
The quality of the projects submitted was unanimously
praised thus showing an evident improvement
compared with the two previous editions.
The closing ceremony for the 3rd edition of Young Entrepreneurs â Building the Future project took place in the auditoârium of the Instituto Empresarial do TĂąmega (TĂąmega Entrepreneurial Instiâtute â IET) at the closing of the academic year 2014 â 2015.
This project, which is in its third edition and results from a partnership between
90
SINERGIA 47
MANUEL ANTONIO DA MOTA FOUNDATION
importance of the support of Mota family since the genesis of the project and the policies of cooperation of the Social Security Ministry to allow its sustainability.
In the same sense, Rui Barreira, director of Braga District Centre at the Instituto da Segurança Social. I.P. (Social Security Institute), stressed the need of this work, which arose from a complete symbioâsis among the local government, civil society and Social Security.
In the ceremony attended by hundreds of guests, Maria Manuela Mota, Rui Pedroto and InĂȘs Mota represented Manuel AntĂłnio da Mota Foundation.
MANUEL ANTĂNIO DA MOTA
FOUNDATION AT THE INAUGURATION OF THE EXPANSION
WORKS OF MANUEL ANTĂNIO DA MOTA
SOCIAL CENTRE
Few months after its opening, Associaâção de Solidariedade de Santo AndrĂ© de Codessoso, a private welfare instituâtion operating in the parish of Codesâsoso, municipality of Celorico de Basto, inaugurated the works of expanding its retirement home to accommodate 46 people, nearly doubling its capacity. The association also monitors 25 people in a regime of home support.
The parish of Codessoso is the birthâplace of Manuel AntĂłnio da Mota, and the construction of the retirement home on 8 June 2014, his birthday, was largely supported by Mota family, MotaâEngil and the Foundation, the latter with connected with the expansion work.
The mayor of Celorico de Basto, Joaquim Mota e Silva, said the expansion was necessary and positive to respond to an enormous demand from the community, adding that this was a significant step in the history of this institution that honours the work of Manuel AntĂłnio da Mota. The mayor also stressed the
The retirement home will accommodate 46 people, nearly
doubling its capacity
Joaquim Mota e Silva and Rui Barreiras at the inaugural moment with Maria Manuela Mota, InĂȘs Mota and Rui Pedroto, from the Manuel AntĂłnio da Mota Foundation
www.mota-engil.com
Top 30Europeu
LĂder emPortugal
22PaĂses
256Empresas
3Continentes
Com quase 70 anos de histĂłria, a Mota-Engil conta com um percurso empresarial de excelĂȘncia em Portugal e no Mundo. Orientado por uma estratĂ©gia global e diversificada de sucesso, o Grupo exerce atividade em 22 paĂses afirmando-se com a competĂȘncia e inovação que o fizeram lĂder nacional no setor da construção e uma referĂȘncia na exportação de serviços, com 75% do seu volume de negĂłcios proveniente de mercados internacionais.
Mota-Engil. Um Mundo de Inspiração
Um lĂdercom visĂŁo global.
LATIN AMERICA AFRICA
EUROPE
A World of Inspiration
PORTUGAL
POLANDUl. Wadowicka 8 W30-415 KrakĂłw
SPAINCampus TribecaCarretera de Fuencarral a Alcobendas, nÂș 44, EdifĂcio 4 â B, nÂș 21Alcobendas â Madrid
IRELANDEnterprise & Technology Centre, Creagh RoadGalway, Ballinasloe
CZECH REPUBLICKavcĂ Hory Office Park, Building A, Silver tower, 5th floorNa Hrebenech II 1718/10Praha 4, 140 00
SLOVAKIAKaĆĄtielska 4, 821 05 Bratislava
HUNGARYKopaszi GĂĄt 5H â 1117 Budapest
ANGOLARua Joaquim Cordeiro da Mata, nÂș 61-63 Bairro da Maianga â Luanda
MALAWINasra House â City CentreP.O. Box 31379 â Lilongwe 3
MOZAMBIQUEEdifĂcio Milenium Park, 14Âș/15Âș andarAvenida Vladimir Lenine, nÂș 1792284 Maputo
SOUTH AFRICAOxford Corner 6th, 7th and 8th Floor 32A Jellicoe Avenue West Rosebank Joanesburgo 2196 Ăfrica do Sul
CAPE VERDERua S. Vicente, 63, 1Âș andar, Palmarejo 721 â Plateau â Praia
SĂO TOMĂ AND PRĂNCIPEAv. Marginal 12 de Julho, nÂș 1011 â 167
ZAMBIAIncito Office ParkReed Buck Road, 45/5BKabulonga â LusakaP.O. Box 320337Woodlands â Lusaka
ZIMBABWE7, Routledge Street,Milton Park,Harare
GHANAMovenpick Ambassador HotelSuit 709 â 7th floorIndependence Avenue
UGANDA 4, Upper Kololo TerraceP.O. Box 8453Kololo, Kampala
RUANDA Kigali City Tower Plot no. 641815th Floor, Avenue du Commerce, Office 1507Kigali
PERUAv. NicolĂĄs AyllĂłn, nÂș 2634 Ate, Lima 3
MEXICOHoracio 828 esq. TennysonCol. Polanco ReformaC.P. 11550Del. Miguel Hidalgo
BRAZILRua Gonçalves Dias, 2316Bairro Lourdes â Belo Horizonte/MGCEP.: 30140-092
COLOMBIACarrera 13A-87-81 38007 BogotĂĄ
AFRICA LATIN AMERICAEUROPE
www.facebook.com/motaengil
PORTUGAL
Porto Office
Rua do Rego Lameiro, n.Âș 384300-454 PortoPHONE: +351 225 190 300FAX: +351 225 191 261
Lisboa Office
Rua MĂĄrio DionĂsio, n.Âș 22799-557 Linda-a-VelhaPHONE: +351 214 158 200FAX: +351 214 158 700
47 SEPTEMBER 2015
47
SEP
TEM
BER
2015
GUADALAJARA LIGHT RAILWAYA MEGA PROJECT, A MEGA MISSION: TO ACCOMPLISH!
INTERVIEW WITH JOĂO PARREIRACEO OF MOTA-ENGIL AMĂRICA LATINA
"The commitment with excellency in this modern world is what sets us apart from others.â
MOTA-ENGIL CENTRAL EUROPEWins first railway contract in Polandwww.mota-engil.com